Loading...
HomeMy WebLinkAboutMFP17004933DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17004933 IVR Number: 17004933 Permit Informa!on Permit Name:Puget Sound Energy Gas Permits Address/Loca!on:10/18/2017Applica!on Date:0423059080Parcel Number:3152 NE SUNSET BLVD Permit Type :10/30/2017Issue Date:Franchise Permit Work Class:10/30/2018Expira!on Date :Minor U(lity Job Number:109096620Franchise Type :Natural Gas Descrip!on:Re(re exis(ng 3/4" STW and 2" PE Gas Main from NE 12th onto Private Property . Install new 2" PE service at new loca(on from NE 12th to 3152 NE Sunset Blvd. About 7 Asphalt Cuts. Permit Replaces previous permit MFP16002852. Restora(on per City of Renton Standards . Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - GAS - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Stuart BenneA Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: BL.036742Construc!on Contractor : INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - GAS - BILLING 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date MFP17004933 Holly Powers 10/20/2017 3152 Justin Johnson 10-30-2017 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form MFP17004933 3152 NE Sunset Blvd. Justin Johnson 10-30-2017 9:00 am to 3:00 pm SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 101010101010101010 11 11 11 11 10 11 11 11 11 10 11 11 11 11 NE SUNSET BLVDNE SUNSET BLVDNE SUNSET BLVDNE 12th ST NE 12th ST R0 0 7 - L 350'*350'R O A D W O R K AH E A D W20-1350' ARRW- B R D ROADWORKAHEADW20-1350'ROADWORKAHEADW20-1 RIG H T L A N E CL O S E D AH E A D W20-5RW4-2L* USE MAXIMUM SPACE AVAILABLE FOR SIGN ONLYR3-5RONLYR3-5RCENTER LANECLOSEDAHEADW9-3ROADWORKAHEADW20-1350'350'M6-2Job#109096620 (Revised) 3124 NE Sunset Blvd, Renton, WA March 22, 2017 Sheet 1 of 3 stephen.gadke@pse.com (425) 424-6431 N PSE PUGET SOUND ENERGY PRINT ON 11X17" SHEETS ONLY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Alert affected residents and businesses if existing on WSDOT roadway. 4. Work area will be 403' NCL of NE 12th St & 38' E to C/L of NE Sunset Blvd. 5. See sheet 3 for WSDOT Notes and Tables. BORE PIT 28" TRAFFIC CONE TRAFFIC FLOW WORK VEHICLEWORK VEHICLE SIGN LOCATION WARNING FLAG ARROW BOARD LEGEND MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 007599 Card Exp.5/31/2017 stephen.gadke@pse.com (425) 424-6431 MFP17004933 101010101010101010 11 11 11 11 10 11 11 11 11 10 11 11 11 11 NE SUNSET BLVDNE SUNSET BLVDNE 12th ST 8_X_10 -P L A T E 8_X_10-P L AT E CREW WILL USE ADA COMPLIANT RAMPS FOR PEDESTRIAN DIVERSION (SEE ATTACHED DIAGRAM FOR DETAILS)ROADWORKAHEADW20-1R O A D W O R K AH E A D W20-1Crew will create pedestrian/ wheelchair compliant ramps and assist pedestrians around work area. Add additional cones for safety 4' minSIDEWALKCLOSEDR9-9SIDEWALK CLOSEDR9-9curb face Level Landing from Sidewalk to curb edge non-skid material Level Landing from Ramp onto street surface non-skid material Ramp Surface ADA compliant (12:1 slope) non-skid material (crew will assist) Stabilized material for full ramp support Cold Mix 5' x 8' steel plate 3/4"-1" thick, non-skid material cold mixcold mix non-skid plate 12 : 1 s l o p e STREET WHERE WORK IS DONEADJACENT STREET ADJACENT STREETSIDEWALKCLOSEDR9-9SIDEWALK CLOSEDR9-9R9-11SIDEWALK CLOSED AHEADR9-11SIDEWALKCLOSEDAHEADM6-2ARRW-BRD W4-2LRIGHT LANECLOSEDAHEADW20-5R350'350'*350'350'ROADWORKAHEADW20-1350'ROADWORKAHEADW20-1 350'ONLYR3-5RONLYR3-5RJob#109096620 (Revised) 3124 NE Sunset Blvd, Renton, WA March 22, 2017 Sheet 2 of 3 stephen.gadke@pse.com (425) 424-6431 N PSE PUGET SOUND ENERGY PRINT ON 11X17" SHEETS ONLY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Alert affected residents and businesses if existing on WSDOT roadway. 4. Work area will be 403' NCL of NE 12th St & from C/L to 43' WCL of NE Sunset Blvd. 5. See sheet 3 for WSDOT Notes and Tables. BORE PIT 28" TRAFFIC CONE TRAFFIC FLOW WORK VEHICLEWORK VEHICLE SIGN LOCATION WARNING FLAG ARROW BOARD LEGEND MINIMUM TAPER LENGTH=L (FT.) LANE WIDTH 10 11 12 20 70 75 80 25 105 115 125 30 150 165 180 35 205 225 245 40 270 295 320 45 475 495 540 POSTED SPEED (MPH) 50 500 550 600 55 550 605 660 60 - 660 720 Puget Sound Energy Traffic Control Supervisor: Stephen R Gadke Card No. 007599 Card Exp.5/31/2017 stephen.gadke@pse.com (425) 424-6431 MFP17004933 Job#109096620 (Revised) 3124 NE Sunset Blvd, Renton, WA March 22, 2017 Sheet 3 of 3 stephen.gadke@pse.com (425) 424-6431 PSE PUGET SOUND ENERGY PRINT ON 11X17" SHEETS ONLY ”” – MFP17004933 NE SUNSET BLVD (ARTERIAL)31233155IP GAS FLOWIP GAS FLOWIP GAS FLOW IP G A S F L O WIP GAS FLOWNE 12TH STMAI'S PLACERESTAURANTTOSHI'STERIYAKI3152 SUNSET PLAZAPROP. ESM'TIP G A S F L O W 35'60'T&T3154 CLEANERS NATURAL NAILST&T3164 T&T3172 T&T3192 NVicinity MapN/AOwner / Developer Contact InfoofficeATTN:N/AN/AN/AN/AN/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/1111222419109096620109096621108590633108590632GASPROJECT PHASENotification #Order #Main RetireSVC RetireSAP SuperiorService/MeterService/MeterHP Svc/MSADis. Reg. / FTInd. MSAInd. ServiceService/MeterService/MeterSYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG BOX (TEST LEAD) INSTALLATION.THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION ISTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT ASSHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BYCOMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIREINSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BYTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACEDPER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HANDNOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSEROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARYALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOSTANDARD GAS CONSTRUCTION NOTES:14.13.15.10.11.THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.9.6.7.5.4.3.1.6016. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.BILL JOHNSON206-571-8519NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2.8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GASOPERATING STANDARD 2525.2500.NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12. ___________________________, PHONE______________. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17.FOOTAGE BETWEEN FITTINGS.18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALLINFORMATION ON D-4 CARD)PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATINGINSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICESINSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 ANDPSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINEDBY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSENOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FORSTANDARDS 2525.2100 AND 2525.3600.PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.11.12.14.13.AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.PER PSE GAS OPERATING STANDARD 2550.1600.ABANDONMENT OR DEACTIVATION.10.9.5.6.7.8.GAS OPERATING STANDARD 2525.2300.4.1.2.3.OUTAGE.STANDARD IP & LP GASREPLACEMENT CONSTRUCTION NOTES15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:#####HOLE HOG TABLECALLOUTLOCATIONDEPTHLENGTHBP1STARTBP2ENDBP3STARTBP4ENDBP5STARTBP6ENDBP7STARTBP8ENDBP9STARTBP10ENDBP11STARTBP12ENDBP13STARTBP14ENDBP15STARTBP16ENDBP17STARTBP18ENDBP19STARTBP20ENDSAP BATCH YEAR & FOOTAGERETIREDMAINMATERIALRETIREDRETIREMENTLENGTH OFACTUAL RETIREMENTORIGINAL YEARPROPOSEDLENGTH OFSIZE OFPLOT PLANSCALE: 1" = 30'-0" STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYGAS MAIN INSTALLATION/RETIREMENTSOAPAIRNITROGENWATERSOAPAIRNITROGENWATERSTOP TIMESTART TIMETESTED BYTEST RESULTSPFTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928PFType/WorkManufacturerPipe SizeTypeEst LengthAct LgthTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /INSTALL2"MPE288'INSTALL4"MPE66'RETIRE2"PE-A81'RETIRE4"STW4'RETIRE1-1/4"STW55'RETIRE3/4"STW23'6060 PSIG109096620DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrJ.GUAY425-424-6411N/AM.LOCK425-424-64133/17/17J.MALM425-424-64213/17/17M.JASSON425-466-9047.JOHNSON206-571-85193/17/17REQUIREDRENTON3124 NE SUNSET BLVDREPLACE DUPONT 2" PE-A IP MAINRENTON, WA 98056PSE1090966201"=30'1/1KING30SYSSKGPMSW 4-23-05204.080205.084N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/ACell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:JOHN GUAY425-505-3768john.guay@pse.comFIELD NOTES:NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION,ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.INCLUDING AT OR BEYOND THE CONNECTION POINTS.1.2.SITEScale: N.T.S.DETAIL TIE-IN11FIELD DESIGNER: CELL: EMAIL: CONSTRUCTION QUESTIONS:PROJECT CONTACT INFORMATION:CONST MANAGER: CELL: EMAIL: PROJ MANAGER: CELL: EMAIL: FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNERSHALL BE CONTACTED:BILLING QUESTIONS:425-466-9047MARK JANSSONmark.jansson@pse.com206-255-4824STEVE MELLINGERsteve.mellinger@pse.com425-505-3768JOHN GUAYjohn.guay@pse.comMFP17004933 BILL OF MATERIAL ITEM QTY DESCRIPTION PART NO. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 288' SAP# 109096620 40 41 42 43 44 45 BYPASS MATERIALS 19 20 21 22 23 18 PIPE 2" MPE COIL 7000261 WIRE #14 TRACING 8500940354' CP TEST LEAD BOX COMPLETE 5000307 CP WIRE #10 TEST LEAD 850093010' VALVE 2" MPE 5600259 BOX SUPPORT 2" POLYVALVE 9996257 BOX COMPLETE 1" THRU 2" POLYVALVES 9996260 1 1 1 CAP 2" MPE 52006491 PIPE 2" MPE STRAIGHT 700026320' PIPE 4" MPE STRAIGHT 700046666' COUPLING 4" ELECTROFUSION 58005101 1 TEE 4" X 4" MPE INLINE 7800413 STOPPER 4" X 150 STD H-17260 B/O 7600766 ELL 4" X 90° WELD 9996779 1 1 1 1 TRANSITION FITTING 4"7800811 CAP 4" WELD 9996797 TEE SERVICE PUNCH 1/2" X 5/8" PE OUTLET 78005751 1 3 1 1 CAP 4" MPE 5200689 HDPE FUSION TAPPING TEE 4" X 5/8" (GAUGE TEE)7800782 TEE 4" X 2" MPE HV TAPPING 9996712 MFP17004933