Permit Name:Puget Sound Energy Gas Permits
Address/Loca!on:11/27/2017Applica!on Date:2460700780Parcel Number:12903 SE 160TH ST
Permit Type :02/01/2018Issue Date:Franchise
Permit Work Class:02/01/2019Expira!on Date :Major U&lity
Job Number:109105582Franchise Type :Natural Gas
Descrip!on:PRE CONSTRUCTION MEETING AT AT CITY HALL IS REQUIRED FOR THIS PERMIT .
THIS IS A MAJOR FRANCHISE PERMIT AND INSPECTIONS SHALL BE CHARGED AT $60/HOUR.
PERMIT WILL BE GIVEN FOLLOWING THE PRE CONSTRUCTION MEETING.
EQUIPMENT SHALL NOT BE STORED WITHIN THE CITY ROW.
Replace exis&ng 1 1/4" PE gas main with 2" PE main. Test & Tie or replace 46 gas services on main replacement.
Pothole for other u&li&es in the area. 3'X5' asphalt cuts at all service replacement/test & &e loca&ons . Restora&on
per City of Renton standards .
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - GAS - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Stuart BenneG
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419-8755
H: (425) 677-5197
C: (713) 985-6489
Contractor
Business License Number: BL.036742Construc!on Contractor : INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - GAS - BILLING
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condi!ons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy
109105582
Anish Kumar
253-208-2183
anish.kumar@pse.com
12903 SE 160th St 98058 Dupont Pipe Replacement
See description below in 'Sketch' space. Restoration per City of Renton standards.
PSE/Infrasource 253-208-2183
INFRASL871C2 BL.036742
11/27/2017
MFP17005628
see comments below
Justin Johnson 1-25-2018
Scott Warlick 2/1/2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
109105582 - Dupont Pipe Replacement
PSE/Infrasource
Lisa Griffith 425-406-0121
6905 S 228th St, Kent 98032
lisa.griffith@pse.com
12903 SE 160th St
TBD
5/24/2018
Anish Kumar 11/27/2017
MFP17005628
7:00 am to 3:00 pm
Monday through Friday
Justin Johnson
12-14-2017
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
Replace existing 1-1/4" PE gas main with 2” PE main in SE 160 ST from 195' E of SE 128 PL SE to 4 ’ N
of SE 159th ST. Replace existing 1-1/4" PE main with 2” PE main in 131 PL SE from 10' S to 130' N of
SE 159th ST. Replace existing 1-1/4” PE main with 2” PE main in SE 158th PL from 3’ N to 186’ W of
129th PL SE. Replace existing 1-1/4" PE main with 2” PE main in SE 157th PL from 10' N to 395' E of
129th PL SE. Replace existing 1-1/4" PE main with 2” PE main in 129th CT SE from 7' S to 395' S of
129th PL SE. Test & Tie or replace 46 gas services on main replacement. Long side services proposed
to be hole hogged under asphalt with 2'X2' potholes in asphalt over water mains/other utilities where
required. Method of installation is hole hog/open trench. Hole hog approx. every 100'-150' with 3'X5'
windows and 3'X5' open cuts at all service replacement/test & tie in locations. Restoration per City of
Renton standards.
pre-construction meeting at City Hall is required for this permit.
This is a major franchise permit and inspections shall be charged at $60/hour.
permit will be given following the pre-construction meeting.
equipment shall not be stored within the City ROW.
SE
158TH
PL129TH PL SESE 159TH STSE
1
6
0
T
H
S
T SE 158TH ST130TH PL SE
SE 159TH ST1
2
9
0
3
16161212 16161111161613131313
TIE-IN 4' NCLSTOPFLAGGER
STOPFLAGGER
STOPFLAGGE
RBEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1 W20-7A BEPREPAREDTOSTOPW3-4100'100'100'ROADWORKAHEADW20-1W20-7AON
E
L
A
N
E
RO
A
D
AH
E
A
D
W20-4100'100'100'RO
A
D
WO
R
K
AH
E
A
D
W20-1W20-7AONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AX'W20-7AFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR
KFROM TO
TOW A
W
AY A
R
E
A
PHO
N
E 888-99
99
INFR
A
S
O
U
R
C
E L
L
C 00
0
0000000
NO PAR
KI
N
G
NO-PARK
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
RKFROMTOTOW A
WAY AREAPHONE 888-9999INFRAS
O
U
RC
E LLC 000 0000000NO PARKING
NO-PARKFROM TOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKR9-9SIDEWALKCLOSEDR9-9SIDEW
A
L
K
CLOS
E
DPATH OF INSTALLATIONJob#109105582 12903 SE 160th St, Renton, WANovember 1, 2017Sheet 1 of 5 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425PRINT ON11X17" SHEETS ONLYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be from 195' E of SE 128 PL SE to 4' Nof SE 159th ST.BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAY0'8040MFP17005628
130TH PL SE
13
1
S
T
P
L
S
E
131ST PL SE SE 159TH STSE 159TH PLTIE-IN 10' SCLSTOPFLAGGER
STOPFLAGGE
R
ONE LANEROADAHEADW20-4
100'100'100'ROADWORKAHEADW20-1 W20-7A ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7A100'W20-7AFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
F
ROM
TO
TOW
AW
A
Y
AR
E
A
PH
ON
E
8
8
8
-
9
9
9
9
I
N
F
R
A
SOU
R
C
E
L
LC
0
0
0
0
0
0
0
0
0
0NO
P
AR
K
ING
NO-
P
A
R
KRESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREPATH OF INSTALLATIONJob#109105582 12903 SE 160th St, Renton, WANovember 1, 2017Sheet 2 of 5 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425PRINT ON11X17" SHEETS ONLYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be in 131ST PL SE from 10' Sto 130' N of SE 159th ST.BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAY0'6030MFP17005628
129TH CT SE
SE 157TH PL SE
158TH
PL129TH PL SE129TH PL SESE 159TH STSE
1
6
0
T
H
S
T
130TH PL SE
SE 159TH ST16161212 161611111
2
1
2 1616TIE-IN 10' SCLSTOPFLAGG
ER X'STOPFLAGG
E
RPATH OF INSTALLATIONFROMTOTOW AWAY
AREAPHONE 888
-9999
INFRASOURCE
LLC
000
0000000NO
PARK
INGNO-PA
RKRESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
ONE LAN
E
ROAD
AHEAD W20-4100'100'100'RO
A
D
WO
R
K
AH
E
A
D
W20-1W20-7ABEPREPAREDTOSTOPW
3
-
4
10
0
'
10
0
'
10
0
'ROADWORKAHEADW
2
0
-
1
W2
0
-
7
A FROMTOTOW AWAY
AREAPHONE 888
-9999
INFRASOURCE
L
LC
000
0
000000 NO
PARK
ING
NO-P
A
R
K ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7ABE
PREPARED
TO
STOP W3-4100'100'ROAD
WORK
AHEAD W20-1Job#109105582 12903 SE 160th St, Renton, WANovember 1, 2017Sheet 3 of 5 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425PRINT ON11X17" SHEETS ONLYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be in SE 158 PL from 3' N to 186' W of129th PL SE.BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAY0'7035MFP17005628
129TH CT SE
SE 157TH PL SE
158TH
PL129TH PL SE129TH PL SESE 159TH ST16161212 161611111
2
1
2 12121616X'RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURETIE-IN 10' NCLPATH OF INSTALLATIONSTOPFLAGGE
R
STOPFLAG
G
ER
ONE LANEROADAHEADW20-4
100'100'
100'ROADWORKAHEADW20-1
W20-7A ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7AX'X'PLACE W20-1 SIGNS ON ALLADJACENT STREETS WITHIN FEET OF WORK AREAROADWORKAHEADW20-1 ROADWORKAHEADW20-1300FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKF
R
OM
T
O
T
OW
AW
A
Y
A
R
E
A
P
H
O
N
E
8
8
8
-
9
9
9
9
IN
F
R
A
S
O
U
R
C
E
L
L
C
0
0
0
0
0
0
0
0
0
0
N
O
P
A
R
K
I
N
G
NO-P
A
R
K
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK
F
R
O
M
T
O
T
OW
A
W
A
Y
A
R
E
A
P
H
O
N
E
8
8
8
-
9
9
9
9
IN
F
R
A
S
O
U
R
C
E
L
L
C
0
0
0
0
0
0
0
0
0
0
N
O
P
A
R
K
I
N
GNO-PARK
FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSE 159TH STJob#109105582 12903 SE 160th St, Renton, WANovember 1, 2017Sheet 4 of 5 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425PRINT ON11X17" SHEETS ONLYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be in SE 158 PL from 3' N to 186' W of129th PL SE.BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAY0'7035MFP17005628
PIERCE AVE SESE 19TH CT
129TH CT SE
SE 157TH PL1
2
1
2 121216161616STOPFLAGG
ERFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK129TH PL SEFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKTIE-IN 7' SCLPATH OF INSTALLATIONFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PA
RK PLACE SIGNS ONBOTH SIDES OFWORK AREARESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURE129TH PL SESTOPFLAG
G
ER
X
'100'ROADWORKAHEADW20-
1
W20-7AONE LANEROADAHEADW20-4ROADWORKAHEADW20-1FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKSTOPFLAGGE
R
O
N
E
L
A
N
E
R
O
A
D
A
H
E
A
D
W20-4100'100'100'R
O
A
DWO
R
K
A
H
E
A
D
W20-1
W20-7AONE LANEROADAHEADW20-4 X'X'X'ROADWORKAHEADW20-1 W20-7A
USEMAXIMUMAVAILABLESPACE FORSIGNSFR
O
M
TO
TO
W
A
W
A
Y
A
R
E
A
PH
O
N
E
8
8
8
-
9
9
9
9
INF
R
A
S
O
U
R
C
E
L
L
C
0
0
0
0
0
0
0
0
0
0
N
O
P
A
R
K
I
N
G
NO-PARK
Job#109105582 12903 SE 160th St, Renton, WANovember 1, 2017Sheet 5 of 5 yuriy.bashtovoy@pse.com(425)398-6193CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425PRINT ON11X17" SHEETS ONLYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.8. Work area will be in 129 CT SE from 7' S to 395' S of129th PL SE.BORE PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAY0'7035MFP17005628
NVicinity MapN/AOwner / Developer Contact InfoofficeATTN:N/AN/AN/AN/AN/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/1111310552GASPROJECT PHASENotification #Order #RetirementSVC RetireSAP SuperiorService/MeterService/MeterHP Svc/MSADis. Reg. / FTInd. MSAInd. ServiceService/MeterService/MeterSYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIGBOX (TEST LEAD) INSTALLATION.THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION ISTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT ASSHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BYCOMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIREINSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BYTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACEDPER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUTPRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HANDNOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSEROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARYALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOSTANDARD GAS CONSTRUCTION NOTES:14.13.15.10.11.THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.9.6.7.5.4.3.1.6016. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.BOBBY BRYAN253-722-8796NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2.8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GASOPERATING STANDARD 2525.2500.NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12. ___________________________, PHONE______________.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17.FOOTAGE BETWEEN FITTINGS.18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALLINFORMATION ON D-4 CARD)PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATINGINSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICESINSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 ANDPSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINEDBY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSENOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FORSTANDARDS 2525.2100 AND 2525.3600.PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.11.12.14.13.AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.PER PSE GAS OPERATING STANDARD 2550.1600.ABANDONMENT OR DEACTIVATION.10.9.5.6.7.8.GAS OPERATING STANDARD 2525.2300.4.1.2.3.OUTAGE.STANDARD IP & LP GASREPLACEMENT CONSTRUCTION NOTES15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:AREA PLANSCALE: NTS STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYGAS MAIN INSTALLATION/RETIREMENTSOAP AIR NITROGEN WATERSOAP AIR NITROGEN WATERSTOP TIMESTART TIMETESTED BYTEST RESULTS P FTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928P FType/WorkManufacturerPipe SizeType Est Length Act LgthTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /109105582Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.comSAP BATCH YEAR & FOOTAGEACTUALLENGTH OFRETIREMENTMATERIALRETIREDORIGINALJOBORIGINALYEARPROPOSEDLENGTH OFRETIREMENTSIZE OFRETIREDMAIN###T&T###T&TKEY TO SERVICE ACTIONLEGENDFIELD NOTES:2. NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION,1. ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.INCLUDING AT OR BEYOND THE CONNECTION POINTS.FIELD DESIGNER: CELL: EMAIL: CONSTRUCTION QUESTIONS:PROJECT CONTACT INFORMATION:CONST MANAGER: CELL: EMAIL: PROJ MANAGER: CELL: EMAIL: FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNERSHALL BE CONTACTED:BILLING QUESTIONS:425-214-3020DAVE MATULICHdavid.matulich@pse.com206-255-4824STEVE MELLINGERsteve.mellinger@pse.com425-406-0121LISA GRIFFITHlisa.griffith@pse.comSHEET 2SHEET 3SHEET 4
109105583108598783108598782HOLE HOG TABLECALLOUT LOCATION DEPTH LENGTHBP1 STARTBP2 ENDBP3 STARTBP4 ENDBP5 STARTBP6 ENDBP7 STARTBP8 ENDBP9 STARTBP10 ENDBP11 STARTBP12 ENDBP13 STARTBP14 ENDBP15 STARTBP16 ENDBP17 STARTBP18 ENDBP19 STARTBYPASS INSTRUCTIONS:NOTIFY PSE PLANNING 2 WEEKSBEFORE START OF CONSTRUCTIONDATE.JOAN BATESGAS SYSTEM PLANNING425-462-3858REQUEST FOR BYPASS SIZING:PLEASE INCLUDE THE JOB NUMBER,ADDRESS, PLAT & OP NUMBERS.CALL JOAN BATESBEFORE CONSTRUCTION TOCONFIRM.#####DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH 425-424-6472E.VOLIANSKYI 425-424-6428 11/7/2017T.LY 425-424-6414 11/7/2017D.MATULICH 425-424-6442 .B.BRYAN 253-722-8796 11/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30' 1/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A109105582WORKSITEINSTALL 4" MPE 155'INSTALL 2" MPE 1481'RETIRE 2" STW 6'RETIRE 2" PE-B 362'RETIRE 2" PE-A 14'RETIRE 4" PE-A 5'6060 PSIGRETIRE 4" PE-B 109'RETIRE 1 1/4" PE-A 115'RETIRE 2" MPE 7'129TH PL SE SE 160TH ST SE 159TH ST13
1
S
T
P
L
S
E
131ST PL SE SE 157TH PL129TH CT SESE 158TH PLSHEET 6
SHEET
5
MFP17005628
S S S S S S S S SDDDDDD DD SSSDDCCC C C C C C
CC C C CC C CPPTTTTTPPPPPPPPPPPPTTTT
TTTPP
PPBFM129TH COURT SE 129TH PLACE SE///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////1562415618156251562915635156411564215632
15648156451565715649
156521565315647 1562715701
15707 IP GAS FLOWIP GAS FLOWIP GAS FLOWIP GAS FLOW
///////////////////////////////////THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11PLOT PLANSCALE: 1" = 30'-0" Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'2/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A129TH PL SE129TH CT SE
1Scale: NTSDETAIL VIEW1ALL MEASUREMENTS AREFROM MONUMENT LINEMFP17005628
S S SSSSSS
SSSSSDDDDDDD D DD
DDDS
DSS SSSDD DCCC
CCC CCCCCCCC C
CCCC CCCCTTPPPPP P P ][][TPPPP PPPPPPPPPPPPPPP
PPPPPPPPPPPT TTTTT
TTTTTTTT PBSE 157TH PLACESE 158TH PLACE129TH PLACE SE129TH PLACE SE/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////156471570115707 1293215706129261293712938129
4
3
12952129441294
9
12953129571295615712129161580215808IP GAS FLOWIP GAS FLOWIP GAS FLOWIP GAS FLOWIP GAS FLOW12920//////////////////////////////////////////THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11PLOT PLANSCALE: 1" = 30'-0" Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'3/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A129TH PL SESE 157TH PLScale: NTSDETAIL VIEW22ALL MEASUREMENTS AREFROM MONUMENT LINEMFP17005628
DSS SSSSSSSDD
D
D
D
D CCCCCCCC
CCTTTTTPPPPPPPP
PP
P
TP P 129TH PLACE SESE 158TH
PLACE129TH PLACE SE//
/
/
/
/
////
/
/
/
/
///
/
/
/
///
/
/
/
/
////
/
/
/
/////////////////////////////////////////////////////////
///////////1565715712129161290612910129011290212909129051580515802158081
2
9
1
8
///////
IP
GAS
FLOWIP GAS FLOWIP GAS FLOWIP GAS FLOW////////////////////////////PLOT PLANSCALE: 1" = 30'-0" THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'4/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A129TH PL SESE 158TH PLScale: NTSDETAIL VIEW33ALL MEASUREMENTS AREFROM MONUMENT LINEMFP17005628
SS SD D DC
CCCTPPPPP P
P TTTTTTP P][SE 159TH STREET131ST PLACE SE//////////////////////////////////////////////////////////////////////19805/8" MPE 140'N19805/8" MPE 140'N1590015820158141580915815
159061301713023IP GAS FLOWIP GAS FLOWIP GAS FLOW///////////////////////////////////PLOT PLANSCALE: 1" = 30'-0" SE 159TH ST131ST PL SE13
1
S
T
P
L
S
E
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'5/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AScale: NTSDETAIL VIEW44ALL MEASUREMENTS AREFROM MONUMENT LINEMFP17005628
SSSSDSSSSSSS
S
SCCCCC CCCCCCIRPPPPTTTTTT
TTTTP P
T
T
TT
TPPPPPP PPPPP
PP
P
PP
B
IRPBP129TH PLACE SES
E
1
6
0
T
H
S
T
R
E
E
T
SE 159TH STREET////////////////////////////////////////////////////
/
////
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
///////////////////////////////////////////////////////////////////////////////////////////////////11115/8" MPE 594'W19795/8" MPE 563'W11115/8" MPE 594'W1290112902129091290512928129341
2
9
1
8
12909129151291012904
1290312835///////IP GAS FLOWIP GAS FLOWIP
G
A
S
F
L
O
W
IP GAS FLOW IP GAS FLOWIP GAS FLOW//////////////////////////////////////////
/
/
/
/
/
/
/
/
/
/
/
/
/
/PLOT PLANSCALE: 1" = 30'-0" 129TH PL SESE 1
6
0
TH
S
T
SE 159TH STTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'6/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AScale: NTSDETAIL VIEW55Scale: NTSDETAIL VIEW66SE 161ST PLALL MEASUREMENTS AREFROM MONUMENT LINEMFP17005628
BOM for WO: 109105582
ITEM QTY DESCRIPTION PART NO.
33 4 BRICK 4" X 8" X 2" THICK CONCRETE 9996191
32 1 BOX VALVE COMPLETE PLASTIC FOR 4" TO 8"9996262
31 1 VALVE 4" PE MED DENSITY 9998790
30 5 BOX VALVE COMPLETE PLASTIC 1-1/8" TO 2"9996260
29 5 BOX SUPPORT 2" POLYVALVE 9996257
28 5 VALVE 2" PE MED DENSITY 5600259
27 6 CORROSION PROTECTION BOX FOR TEST STATIONS 5000307
26 1636 WIRE #14 COPPER TRACER 8500940
25 155 PIPE 4" STRAIGHT MED DENSITY 7000466
24 1481 PIPE 2" COIL MED DENSITY 7000261
23 63 PIPE 1-1/4" COIL MED DENSITY 7000169
22 10 CAP 1-1/4" PE MED DENSITY 5200629
21 10 CP WIRE #10 COPPER 8500930
20 1 WELD METAL CATHODIC MOLD 8500080
19 1 TRANSITION, 2" X 0.154" X SDR-11, GR B, WELD X FUSE 7800809
18 1 CP COPPER ADAPTER SLEEVE 7600540
16 10 TEE 4" X 5/8" HDPE TAP TEE 9999570
15 5 TEE 4" X 1-1/4" HDPE TAP TEE 9999568
13 1 TEE 2" X 1-1/4" HDPE TAP TEE 9999563
12 4 TEE 1-1/4" X 1-1/4" HDPE TAP TEE 9999560
11 1 TEE-PUNCH, SERV 1/2" X 5/8" X 125 PSIG, PE OUTLET, 1/4" CUTTER 7800575
10 5 TEE 4" X 4" MDPE INLINE TEE 7800413
9 1 TEE 2" X 2" MDPE INLINE TEE 7800362
8 1 STOP-B/O 2" X 150 PSIG, MUELLER H-17160 7600741
7 1 ELL 2" 90 DEGREE WELD STD 6000500
6 5 REDUCER 4" X 2" MDPE 7200504
5 15 ELBOW 4" X 90 MDPE 6000674
4 2 ELBOW 2" X 90 MDPE 6000484
3 10 COUPLING 4" ELECTROFUSION FITTING 5800510
2 1 CAP, 2" X 0.154", WPB, WELD 5200675
1 5 CAP 2" MDPE 5200649
MFP17005628