Loading...
HomeMy WebLinkAboutP_Design_109105582_V1_171127NVicinity MapN/AOwner / Developer Contact InfoofficeATTN:N/AN/AN/AN/AN/ATHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/1111310552GASPROJECT PHASENotification #Order #RetirementSVC RetireSAP SuperiorService/MeterService/MeterHP Svc/MSADis. Reg. / FTInd. MSAInd. ServiceService/MeterService/MeterSYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIGBOX (TEST LEAD) INSTALLATION.THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION ISTO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT ASSHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BYCOMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIREINSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BYTHE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACEDPER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUTPRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HANDNOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYSEROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARYALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TOSTANDARD GAS CONSTRUCTION NOTES:14.13.15.10.11.THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.9.6.7.5.4.3.1.6016. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.BOBBY BRYAN253-722-8796NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2.8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GASOPERATING STANDARD 2525.2500.NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12. ___________________________, PHONE______________.NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17.FOOTAGE BETWEEN FITTINGS.18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALLINFORMATION ON D-4 CARD)PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATINGINSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICESINSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 ANDPSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINEDBY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSENOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FORSTANDARDS 2525.2100 AND 2525.3600.PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.11.12.14.13.AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.PER PSE GAS OPERATING STANDARD 2550.1600.ABANDONMENT OR DEACTIVATION.10.9.5.6.7.8.GAS OPERATING STANDARD 2525.2300.4.1.2.3.OUTAGE.STANDARD IP & LP GASREPLACEMENT CONSTRUCTION NOTES15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:AREA PLANSCALE: NTS STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYGAS MAIN INSTALLATION/RETIREMENTSOAP AIR NITROGEN WATERSOAP AIR NITROGEN WATERSTOP TIMESTART TIMETESTED BYTEST RESULTS P FTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928P FType/WorkManufacturerPipe SizeType Est Length Act LgthTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /109105582Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.comSAP BATCH YEAR & FOOTAGEACTUALLENGTH OFRETIREMENTMATERIALRETIREDORIGINALJOBORIGINALYEARPROPOSEDLENGTH OFRETIREMENTSIZE OFRETIREDMAIN###T&T###T&TKEY TO SERVICE ACTIONLEGENDFIELD NOTES:2. NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION,1. ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.INCLUDING AT OR BEYOND THE CONNECTION POINTS.FIELD DESIGNER: CELL: EMAIL: CONSTRUCTION QUESTIONS:PROJECT CONTACT INFORMATION:CONST MANAGER: CELL: EMAIL: PROJ MANAGER: CELL: EMAIL: FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNERSHALL BE CONTACTED:BILLING QUESTIONS:425-214-3020DAVE MATULICHdavid.matulich@pse.com206-255-4824STEVE MELLINGERsteve.mellinger@pse.com425-406-0121LISA GRIFFITHlisa.griffith@pse.comSHEET 2SHEET 3SHEET 4 109105583108598783108598782HOLE HOG TABLECALLOUT LOCATION DEPTH LENGTHBP1 STARTBP2 ENDBP3 STARTBP4 ENDBP5 STARTBP6 ENDBP7 STARTBP8 ENDBP9 STARTBP10 ENDBP11 STARTBP12 ENDBP13 STARTBP14 ENDBP15 STARTBP16 ENDBP17 STARTBP18 ENDBP19 STARTBYPASS INSTRUCTIONS:NOTIFY PSE PLANNING 2 WEEKSBEFORE START OF CONSTRUCTIONDATE.JOAN BATESGAS SYSTEM PLANNING425-462-3858REQUEST FOR BYPASS SIZING:PLEASE INCLUDE THE JOB NUMBER,ADDRESS, PLAT & OP NUMBERS.CALL JOAN BATESBEFORE CONSTRUCTION TOCONFIRM.#####DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH 425-424-6472E.VOLIANSKYI 425-424-6428 11/7/2017T.LY 425-424-6414 11/7/2017D.MATULICH 425-424-6442 .B.BRYAN 253-722-8796 11/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30' 1/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A109105582WORKSITEINSTALL 4" MPE 155'INSTALL 2" MPE 1481'RETIRE 2" STW 6'RETIRE 2" PE-B 362'RETIRE 2" PE-A 14'RETIRE 4" PE-A 5'6060 PSIGRETIRE 4" PE-B 109'RETIRE 1 1/4" PE-A 115'RETIRE 2" MPE 7'129TH PL SE SE 160TH ST SE 159TH ST13 1 S T P L S E 131ST PL SE SE 157TH PL129TH CT SESE 158TH PLSHEET 6 SHEET 5 S S S S S S S S SDDDDDD DD SSSDDCCC C C C C C CC C C CC C CPPTTTTTPPPPPPPPPPPPTTTT TTTPP PPBFM129TH COURT SE 129TH PLACE SE///////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////1562415618156251562915635156411564215632 15648156451565715649 156521565315647 1562715701 15707 IP GAS FLOWIP GAS FLOWIP GAS FLOWIP GAS FLOW ///////////////////////////////////THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11PLOT PLANSCALE: 1" = 30'-0" Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'2/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A129TH PL SE129TH CT SE 1Scale: NTSDETAIL VIEW1ALL MEASUREMENTS AREFROM MONUMENT LINE S S SSSSSS SSSSSDDDDDDD D DD DDDS DSS SSSDD DCCC CCC CCCCCCCC C CCCC CCCCTTPPPPP P P ][][TPPPP PPPPPPPPPPPPPPP PPPPPPPPPPPT TTTTT TTTTTTTT PBSE 157TH PLACESE 158TH PLACE129TH PLACE SE129TH PLACE SE/////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////156471570115707 1293215706129261293712938129 4 3 12952129441294 9 12953129571295615712129161580215808IP GAS FLOWIP GAS FLOWIP GAS FLOWIP GAS FLOWIP GAS FLOW12920//////////////////////////////////////////THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11PLOT PLANSCALE: 1" = 30'-0" Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'3/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A129TH PL SESE 157TH PLScale: NTSDETAIL VIEW22ALL MEASUREMENTS AREFROM MONUMENT LINE DSS SSSSSSSDD D D D D CCCCCCCC CCTTTTTPPPPPPPP PP P TP P 129TH PLACE SESE 158TH PLACE129TH PLACE SE// / / / / //// / / / / /// / / / /// / / / / //// / / / ///////////////////////////////////////////////////////// ///////////1565715712129161290612910129011290212909129051580515802158081 2 9 1 8 /////// IP GAS FLOWIP GAS FLOWIP GAS FLOWIP GAS FLOW////////////////////////////PLOT PLANSCALE: 1" = 30'-0" THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'4/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A129TH PL SESE 158TH PLScale: NTSDETAIL VIEW33ALL MEASUREMENTS AREFROM MONUMENT LINE SS SD D DC CCCTPPPPP P P TTTTTTP P][SE 159TH STREET131ST PLACE SE//////////////////////////////////////////////////////////////////////19805/8" MPE 140'N19805/8" MPE 140'N1590015820158141580915815 159061301713023IP GAS FLOWIP GAS FLOWIP GAS FLOW///////////////////////////////////PLOT PLANSCALE: 1" = 30'-0" SE 159TH ST131ST PL SE13 1 S T P L S E THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'5/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AScale: NTSDETAIL VIEW44ALL MEASUREMENTS AREFROM MONUMENT LINE SSSSDSSSSSSS S SCCCCC CCCCCCIRPPPPTTTTTT TTTTP P T T TT TPPPPPP PPPPP PP P PP B IRPBP129TH PLACE SES E 1 6 0 T H S T R E E T SE 159TH STREET//////////////////////////////////////////////////// / //// / / / / / / / / / / / / / / / / / / / ///////////////////////////////////////////////////////////////////////////////////////////////////11115/8" MPE 594'W19795/8" MPE 563'W11115/8" MPE 594'W1290112902129091290512928129341 2 9 1 8 12909129151291012904 1290312835///////IP GAS FLOWIP GAS FLOWIP G A S F L O W IP GAS FLOW IP GAS FLOWIP GAS FLOW////////////////////////////////////////// / / / / / / / / / / / / / /PLOT PLANSCALE: 1" = 30'-0" 129TH PL SESE 1 6 0 TH S T SE 159TH STTHIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11Cell Phone:"Locates Required""Flagging Required"Yes NoYes NoE-Mail:Manager:Project Manager Contact Information:LISA GRIFFITH425-406-0121lisa.griffith@pse.com###T&T###T&TKEY TO SERVICE ACTIONLEGEND DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEDrawing NumberSAP Sup Order NbrPC APPROVALL.GRIFFITH425-424-6472E.VOLIANSKYI425-424-642811/7/2017T.LY425-424-641411/7/2017D.MATULICH425-424-6442.B.BRYAN253-722-879611/1/2017...N/ARENTONDUPONT PIPE REPLACEMENT12903 SE 160TH STRENTON, WA 98058PSE1091055821"=30'6/6KING32SYSSKGPMSE 21-23-05208.080211.085N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/AScale: NTSDETAIL VIEW55Scale: NTSDETAIL VIEW66SE 161ST PLALL MEASUREMENTS AREFROM MONUMENT LINE BOM for WO: 109105582 ITEM QTY DESCRIPTION PART NO. 33 4 BRICK 4" X 8" X 2" THICK CONCRETE 9996191 32 1 BOX VALVE COMPLETE PLASTIC FOR 4" TO 8"9996262 31 1 VALVE 4" PE MED DENSITY 9998790 30 5 BOX VALVE COMPLETE PLASTIC 1-1/8" TO 2"9996260 29 5 BOX SUPPORT 2" POLYVALVE 9996257 28 5 VALVE 2" PE MED DENSITY 5600259 27 6 CORROSION PROTECTION BOX FOR TEST STATIONS 5000307 26 1636 WIRE #14 COPPER TRACER 8500940 25 155 PIPE 4" STRAIGHT MED DENSITY 7000466 24 1481 PIPE 2" COIL MED DENSITY 7000261 23 63 PIPE 1-1/4" COIL MED DENSITY 7000169 22 10 CAP 1-1/4" PE MED DENSITY 5200629 21 10 CP WIRE #10 COPPER 8500930 20 1 WELD METAL CATHODIC MOLD 8500080 19 1 TRANSITION, 2" X 0.154" X SDR-11, GR B, WELD X FUSE 7800809 18 1 CP COPPER ADAPTER SLEEVE 7600540 16 10 TEE 4" X 5/8" HDPE TAP TEE 9999570 15 5 TEE 4" X 1-1/4" HDPE TAP TEE 9999568 13 1 TEE 2" X 1-1/4" HDPE TAP TEE 9999563 12 4 TEE 1-1/4" X 1-1/4" HDPE TAP TEE 9999560 11 1 TEE-PUNCH, SERV 1/2" X 5/8" X 125 PSIG, PE OUTLET, 1/4" CUTTER 7800575 10 5 TEE 4" X 4" MDPE INLINE TEE 7800413 9 1 TEE 2" X 2" MDPE INLINE TEE 7800362 8 1 STOP-B/O 2" X 150 PSIG, MUELLER H-17160 7600741 7 1 ELL 2" 90 DEGREE WELD STD 6000500 6 5 REDUCER 4" X 2" MDPE 7200504 5 15 ELBOW 4" X 90 MDPE 6000674 4 2 ELBOW 2" X 90 MDPE 6000484 3 10 COUPLING 4" ELECTROFUSION FITTING 5800510 2 1 CAP, 2" X 0.154", WPB, WELD 5200675 1 5 CAP 2" MDPE 5200649