HomeMy WebLinkAboutMFP17002992DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP17002992
IVR Number: 17002992
Permit InformaƟon
Permit Name:Puget Sound Energy Gas Permits
Address/LocaƟon:06/23/2017ApplicaƟon Date:9117000110Parcel Number:11242 SE 186TH ST
Permit Type:06/26/2017Issue Date:Franchise
Permit Work Class:06/26/2018ExpiraƟon Date:Minor UƟlity
Job Number:109104814Franchise Type:Natural Gas
DescripƟon:REPLACE EXISTING LONG SIDE GAS SERVICE. RestoraƟon per City of Renton Standards.
Contacts
Name Address PhoneTypeBilling
Aurelie Johannson
PSE/Infrasource ‐ Billing
1660 Park Ln
Burlington, WA 98233
B: (425) 466‐4771Applicant
Aurelie Johannson
PSE/Infrasource ‐ Billing
1660 Park Ln
Burlington, WA 98233
B: (425) 466‐4771ContactX
Stuart BenneƩ
Infrasource Services LLC
14103 Stewart Rd
Sumner, WA 98490
B: (303) 419‐8755
H: (425) 677‐5197
C: (713) 985‐6489
Contractor
Business License Number: BL.036742ConstrucƟon Contractor: INFRASL871C2
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057‐3232
Owner
General CondiƟons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for
ANY work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010
) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES