Loading...
HomeMy WebLinkAboutMFP17002172DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP17002172 IVR Number: 17002172 Permit Informa!on Permit Name:Puget Sound Energy Gas Permits Address/Loca!on:05/16/2017Applica!on Date:3342100630Parcel Number:923 N 28TH PL Permit Type :05/16/2017Issue Date:Franchise Permit Work Class:05/16/2018Expira!on Date :Minor U’lity Job Number:#106323403Franchise Type :Natural Gas Descrip!on:INSTALL NEW SHORT SIDE 1 1/8" PE GAS SERVICE. 1 HARD SURFACE CUT ANTICIPATED . All restora’on per City of Renton Standards. Contacts Name Address PhoneTypeBilling Aurelie Johannson PSE/Infrasource - Billing 1660 Park Ln Burlington, WA 98233 B: (425) 466-4771Applicant Aurelie Johannson PSE/Infrasource - Billing 1660 Park Ln Burlington, WA 98233 B: (425) 466-4771ContactX STUART BENNETT INFRASOURCE SERVICES LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: BL.036742Construc!on Contractor : INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner General Condi!ons & Signature Permission is hereby given for the work described on this permit according to the condi’ons hereon and according to the approved plans and specifica’ons pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all ’mes . I hereby cer’fy that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restora’on and Street Overlay Requirements . Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspec’ons and for ANY work in the Right of Way. Call 8 1 1 to locate underground u’li’es at least two full business days prior to any excava’on . In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consulta’on with the transmission pipeline company prior to performing any construc’on or excava’on ac’vi’es . This requirement to consult with the transmission pipeline company is in addi’on to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES