Loading...
HomeMy WebLinkAboutP_Plan Drawings_170516_V1D W ® W ti<r0o �ZN 0 �0Q� M wry�N Q w Q LU Z 0)� w¢a) •9 :% Q Fu 2 U) 0 � r O 4) a) r c:: W21-7 o 06 Coo U E En a) (10 CL > _ a� a) c 00 a) W o� o ovi aQ(m ami x E U) m = U_ c �— O ..0 CO U) Ec E QR CO E co 0 � ,��, '� (n O E o x 0 N E m -a c U to m 0 C: > L m E > w o O 0 0 E a) °) o Fmm w L) Z a) V .0 O 'D O Q0 >N� a) o--0 CO .a) zW Y C70 SO N i a) O J N�. N U� C O O OU •U) O U) o co Lu 0 0 LL oQaa@aO Zr c6N cn(Y) qqr U) L6 cor�oo(f) noys ,OOZ � ,OOZ W21-5 �ap�noUs �S 3nd H196 L w O w z (9 U O U LL ~ U_ > O Z Wd LL Ne J Z ~ Q O C7 >Q J N m /^Fj 3: F) > ® M I I ® Am4l ianinniic nnrl _ a o � L-6ZM �OOZ z coomV OZ Q QQ H a � J W W 0 0 0 ZU Q ~ V M N QJ = W Up=ono at:�7-Q0 UM) LO �LO U)MN SE 17fiTH _ ST 'i',�:.';. JOINT 2"MPE-7 JOINT 2"MPE-7 64' � 10'NCL --- � � " 0 I' 2' (� �( 1'NCL -__- - ...__. . _.... .._.I I_ _ ..._ 0 50' 100" 2" CAP EOfAIWIREBOX ;1o'rlcL, 89'WCL 14 15 � � 16 � 7 INSTALL 4" = 2 FT ( )NCL',;{ )'WCL INSTALL 2" = 12 FT JOINT 2"=961 FT ' `I r I / SEE CONS' I .DETAIL ''2"INLINE TEE 28'SCL, 26'WC ( ')'SCL,( �, )WCL 'NCL,(i )'WCL PI91Pli'YiAfl�'i37Y[•i'T:JI� Cao T' POLYVALVE/OPEN 28'NCL, 53'WCL ( )'NCL, ( )'WCL BEGIN JOINT lAAIN 28'NCL, 30'WCL ( )'NCL, ( )'WCL INSTALL 2" MPE•710' 2" CAP E0IAIWIREBOX 10'NGL, 58'ECL ( �.)'NCL, ( )'EC'. 2" T.L. 8 T.F. 2 ( )'NCL, ( )'WCL � -� i ;, 4 ,t I < �I 3 m i .a N t ._ _ m _) �, PO' !E RON ' _ �. S LY - I s. t' 2 , JOINT 2" fAPE-7 180' @ 28'NCL _' I ' Lam' @ ( i'NCL MPE-7 196 @28WCL I @l 1'WCL if ( )'SCL, ( )WCL ( )'NCL, 4" ST W T I )'WCL I 4" B.O. TIE-IN 28'NCL, 16'WCL I ( )'NCL, ( )WCL 4"STW T01 CONSTRUCTION DETAIL N.T.S. � Kt� STW-U 1973 CROSSING CONDUIT TABLE X-ING # LOCATION GAS POWER XING LENGTH TYPE OF CROSSING (Feeder, Primary, Secondary, etc.) FROM TO SIZE OM NPE OTY LOCATION SIZE PM TYPE OTY X01 A LOT3 POWER ONLY 2 D8120 1 100 PRIMARY X02 LOT4 LOT9 4 40 1 S 2 D8120 1 80 GAS MAIN, PRIMARY - - - - 3 D8120 1 SECONDARY X03 LOT 10 LOT 11 4 40 1 E 2 D8120 1 95 GAS MAIN, PRIMARY X04 LOT 11 L0T2 2 40 1 S 3 D8120 1 60 GAS SVC, SECONDARY X05 LOT 13 LOT 15 4 40 1 E 3 DB720 2 60 GAS MAIN, SECONDARY X06 LOT 14 LUT 13 2 40 1 E 2 DB120 1 60 GAS SVC, SECONDARY X07 LOT 17 LOT1 2 40 1 W 2 DB720 1 60 GAS SVC, SECONDARY 2'PVC GAS M19AIN INSTALLATIONARETIREh1ENT PLUG/CAPS=6 2'YELLOW SCH 40 PVC=180 Act Lgth FT 2'D8120 GREY PVC=395 P.9PE-7 FT 2'PVC PLUG/CAPS=10 INSTALL 4' PVC PLUG /CAPS = 6 4' YELLOW SCH 40 PVC = 235 FT 3" DB120 GREY PVC = 180 FT 3' PVC PLUG /CAPS = 6 1 1/4" x 2" FUSED TIE-IN 24'SCL, 127 WCL ( )'SCL, ( )WCL 1 t/4'PEr-- -� PmPedy L"are N ,rbv of UtZ.Yez E � \ Curb Sda.ak wwm may aryl F`sr �{f�- Orl Pea - .. ., -�{ 12'Typ'val � aM COMu2s's I Final G,amda� %��/l\\\\. � 1r Mm 1 �� � �° Fat eaafis'�e >� sepaarnn �. h6n Calder Loelun orrodd n� � 12'M'm _ 12'hlm° %.' Over Po'ner 4a e�tercePt (dzPlh varies). 6a12'Rem 3eM Shaff.,g �, -' 6w12'I.Gn BeM ahadeg Wp1h Over Gas after Ca�Patlian' -- -- �`. OrerPa�xraflerCarPaction� I • 4� sand aeeu„a' , G NdTEL P £ry pewMary NOTES: 1. If the final tackfilt contains rocks greater Phan 8 inches in diameter, install 12 inches rompacfed sand shading across the full v,idN of the trench.' If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full vidth of the trench. ' 2. Rocks realer than 10 inches diameter are not rmrtted In the final backfill 9 Pe 3. Sand beddng is required under PSE gas ppe eeddng Is not regwred for the full vndU of the trench rt shall extend from the side of the Vench nearest to vfiere the gas matNservice is installed to a rtnn mum of 6'nches on the opposde side of the gas Ilne. 4. Util ties shat not be stacked overthe as lme mthe Vench 9 S. Iflret utrhOes vAl be lnciudedmthe Vench ease contact PSE orlacal n drectl for Gearance re utrements ,d po,�er mmpa Y Y Q 6. Red d clearance of 4lnches betvreen paspr and communication, must have appra/al d the commumcanons tympanies. ' AJternatrves[o full undU trench sha6�regNre PSE approval. JOINT TRENCH DETAIL Primary &Secondary -Mainline Gas 8 Communications (NTS) CP NOTES: INSTALL PER PSE STANDARDS (4510.1020 - FIG. 4) IF LOW FSP READ. INSTALL 9LB ANODE AND BRING WIRE UP IN BOX 1MTH TEST LEAD OFF MAIN. NOTIFY TBD CORROSION TECH. @TBD CP Test Tape wrap vreld joint ovedapping existing coating 3". PE Main) PES Steel) Wrapped Steel Gas Mail TYPICAL TEST LEAD CONNECTION FOR PE MAIN CONNECTED TO WRAPPED STEEL MAIN SCALE: NONE 2"POLYVALVE/OPEN 28'SCL, IITWCL T02 CONSTRUCTION DETAIL N.T.S. FITTER'S CHECKLIST fceEac aoxTo corutRra covPLEnorq ❑ Inspected Steel a,M PE pye per GOG 2450.1500 aM 2450.7500 ❑ RarisnedaM compfxad wdh aft construc5on roles. ❑ Rewrded ata required Warmatron on the azt aper G05250017W. ❑ c«aa ted post maramoon mspeer n Per Gas zsz57zeo and zs25.noo. ❑ LeR llK vrodc ateanackan aiM safe wndAm. Foreman's Sg�uNre Foreman's Name (printed) Campa,y. PMeko lnc Date GENERAL NOTES -GAS (JOINT TRENCH): 1. Excavator to contact Utilities Underground Location Center (One -Cala 48 hours prior to consbuction, to hvo working days prior to construc0on. 1-800-424-5555 2. Notify appropriate permitting agency prior to job start (see perrrtit requirements). 3. Erosion and sediment control shall be per PSE Standard Practice 0150.3200 Techniques for Temporary Erosion and Sedment ContrGl and any addifional local jurisdiction requirements. 4. Any change in route, pipe size type, Oe -in method or additional main footage must be approved by the appropriate Engineer/Projed Manager. 5. Complete'Exposed Pipe Condition Report° on all exposed existing Steel PSE Facilities. Check box on report for wire box (Test Lead) installation. 6. Pipeline Markers and Warning Signs shall be installed and recorded by the Contractor per PSE Gas Operating Standard 2525.2500. 7. To prevent accidental overpressure of adjoining systems, no two mains shall be connected, except as shown on this design, unless approved by the appropdate EngineerlProjed Manager. 8. System MAOP denoted by System MAOP = 60 PSIG 9. Install Main Valves out of Uaffic where possihle. 10. Gauge (use Manometer for LP Systems) and monitor use of all stoppers and squeezes to insure adequate feed. 11. Install one pound Anode for every 1000' of beating vbre. Install Anode and Test Lead NAres per PSE Gas Operating Standards 2525.1200 and 2525.2300. 12. If STW pipe involved, coordinate installa8on vrilh CP Tech. TBD Cell #TBD . 13. Purge Points and Pressure Taps shall be installed per PSE Gas Operating Standards 2525.3400 and PSE Gas Field Procedures Manua10812 and 0813. 14. Mains and services shall be tested and purged per PSE Gas Operating Standards 2525.3300 and 2525.3400. 15. Unless otherwise noted: All pipes Installed in plat to be 2°MPE-7. All crossings to be Yellow 4' PVC. All Services to be 1-1/8' PE. / denotes service stub location. (__� denotes footage between fillings. 16. Customerto dig and backfill on private property or easement onty. Trenches must conform to PSE Gas Operafing Standards 2525.1500, 2525.1600 and 2525.1700. 17. Nate all recordahle footages, locations and material changes on the as -built in red. 18. Upon completion of the project send the print copy, along with the completed work order, listing crew 8 actual materials used to the appropriate design group. 19. On site precon required before start ofjob. 20. At symbol: install natural gas main piping and fixtures. Size as indicated on tables and work sketch (gas main is to parallel power system unless otherwise shown on work sketch). 21. Inclement weather conddions may cause delays in construction times and dates. PROJECT PNASE GAS M19AIN INSTALLATIONARETIREh1ENT Order# TypeMbrk Pipe S¢e Type Est Leyth Act Lgth 1.9anvlacNrer INSTALL 4' P.9PE-7 2FT N/A WA INSTALL 2' MPE-7 12 FT WA WA JOINT 7 h9PE-7 901 FT WA 8.29.16 1 DRAWN BY C. SNYDER 8.29.16 cHECKEDBv COUNTY KING Emer Sect 32 GAS Wi(CTR CSPSKPTN APPROVED BY 253.606.4580 GAS h1AlN PRESSURE 8 TESTING CP APPROVAL TYPE TEST TBD ❑SOAP ❑AIR ❑NITROGEN � WATER DATE ON / / START TIh9E A9APPING TESTED BV DATE OFF / / STOP TIP.9E UTILITIES CABLE TELEPNONE PRESSURE CONTACT CBL TBO TEST RESULTS � P ❑ F TYPE TEST COh4M TEL TBD ❑SOAP ❑ AIR ❑NITROGEN ❑ WATER DATE ON SCALE AS NOTED / / START T11.9E TESTED BY DATE OFF / / STOP TIl.1E PRESSURE TEBT RESULTS ❑P ❑F ❑TESTED BY PSE PRESSURE CONTROL, SEE FORh11928 DESIGN PRESS 6 SVS hV OP 3 -6 2023 03170 PROJECT PNASE Notification# Order# GAS SAP Superior Service Stabs Service/PAe�r Service/P.leter ServicertAeter Ind. Service Ind. IASA Dis. Reg. / FT HP Svc/P.15A Relocate Retirement 503213303 107052077 WA 100309933 NIA WA WA WA WA N/A WA WA WA WA N/A WA WA WA WA WA WA WA Cr+zarer. catsrPucnar cast mces Project 1,lanager Contact Information Aranager. BRIAtl tiAR/AON Ce9 Phone: 425.^ 95mm28 vicinity Map N.T.S. EMAIL CONTACT: ROBERT�ITAYLORDEV.COt.7 Owner/Developer Contact Info NORDIC RIDGE, LLC 75 LAKE BELLEW E OR BELLEWE, WA 98005 ATTPP: ROBERT FITZO,IAURICE 425.894.4533 office For mntads beton dal t-806CALL PSE (2255773) CALL (900) 4245555 2 BUSINESS DAYS BEFORE YOU DIG "Locates Required° Yes ® No � °Flagging Required' Yes® Nc❑ REAL ESTATEIEASEl.9ENT REDTffi( RW -0'%i579 ) PERIAIT RENTON REV# DATE BY DESCRIPTION FUNCTION CONTACT PNONE NO DATE 3 PROJECT h1GR B.HARh90N 425.495.5528 6.7.16 2 ENGR-GAS C.SNYDER 8.29.16 1 DRAWN BY C. SNYDER 8.29.16 cHECKEDBv COUNTY KING Emer Sect 32 GAS Wi(CTR CSPSKPTN APPROVED BY 253.606.4580 CP APPROVAL TBD TBD TBD 1/4 SEC 32NE-T23N4205E OP /.9AP 212.080 PLAT R9AP 214.083 A9APPING JOINT FACILITIES ARRANGEh9ENTS UTILITIES CABLE TELEPNONE RIGHT OF WAY CONTACT CBL TBO COM9A TBO ROWTBO PHONE® CBL TEL TBD COh4M TEL TBD ROW TEL TBD PUGS KINKADE CROSSING SOUND 2' MPE-7 GAS MAIN EXTENSION - 17 S/F LOTS ENERGY 77709116TH AVE SE, RENTON, WA 96058 DESIGNED BY PUGET SOUND ENERGY SAP Sup Order NM t0705p77 ELEC ONer Number tosoet177 SCALE AS NOTED PAGE 1 OF 2 / ROW VARIES 39.5' VARIES E 8' 8' 22 VARIES s1oLY7ALK rw/rtx a E% ASPHALT_ _ a ASPHALT G EX 4• STW IF 16W 1089-1959 CROSS SECTION - 116TH AVE SE SCALE: NONE LOOKING NORTH rF7�3i11 CROSS SECTION -ROAD B SCALE: NONE LOOKING EAST GAS SERVICE PIPE TABLE 53' ROW W 26, ASPHALT I ASPHAV 26' CROSS SECTION - ROAD A, SOUTH OF SE 177TH PL SCALE: NONE LOOKING NORTH 47' ROW E CROSS SECTION -ROAD A, NORTH OF SE 177TH PL SCALE: NONE LOOKING NORTH DESCRIPTION JJ JlrvliLtJ = 14 - LJJ Y 1 l 1/0- Ft LOCATION PIPE DESIGN AS•BUILT OF ACTIVITIES FROM TO LOT SIZE (IN) TYPE LENGTH lFT) LOCATION LENGTH IFTI EFV SIZE LOCATION REMARKS LS SINGLE 2"MAIN 1 11/8 MPE-7 30 ( )EGL 2600 LS SINGLE 2"MAIN 2 11/8 MPE-7 60 ( )NGL 1 2600 SS SINGLE 2"MAIN 3 11/8 MPE-7 10 ( )WCL 2600 SS SINGLE 2"MAIN 4 11/8 MPE-7 10 ( )WCL 2600 SS SINGLE 2'MAIN 5 11/8 MPE-7 10 ( )SCL PLAT MAP 214.083 2600 SS SINGLE 2"MAIN 6 11/8 MPE-7 10 ( )SCL 2600 SS SINGLE 2"MAIN 7 11/8 MPE-7 10 ( )SCL TELEPHONE 2600 SS SINGLE 2"MAIN 8 11/8 MPE-7 10 ( )SCL PHONE#I 2600 COMM TEL TBO SS SINGLE 2" MAIN 9 11/8 MPE-7 10 ( )SCL 2600 SS SINGLE 2"MAIN 10 11/8 MPE-7 10 ( )NGL 2600 SS SINGLE 2"MAIN 11 11/8 MPE-7 10 ( )NGL 2600 SS SINGLE 2"MAIN 12 11/8 MPE-7 10 ( )NCL 2600 LS SINGLE 2"MAIN 13 11/8 MPE-7 25 ( )WCL 2600 SS SINGLE 2"MAIN 14 11/8 MPE-7 10 ( )WCL 2600 SS SINGLE 2"MAIN 15 11/8 MPE-7 10 ( )WCL 2600 SS SINGLE 2"MAIN 16 11/8 MPE-7 10 ( )ECL 2600 SS SINGLE 2"MAIN 17 11/8 MPE-7 10( )ECL 2600 YIYt thV = 1 / LS SINGLES= 3 - 2' bINN 53' ROW 941{939 CROSS SECTION - SE 177TH PL SCALE: NONE LOOKING WEST S 76'ACCESS N g 3 � 3 O ASPHALT ASPHALT PROP. 2"MPE-7 10'NCGL CROSS SECTION - ALLEY A SCALE: NONE LOOKING WEST SI EX PLAT MAP 214.083 SCALE: 1" = 100' For mntaas belay dal 1-W&CALL PSE (2255773) CALL (800) 4245555 2 BUSINESS DAYS BEFORE YOU DIG REAL ESTATE/EASEMENTPERMIT REDTS( RW -096579 ) RENTON REVp DATE BY DESCRIPTION FUNCTION CONTACT PHONE NO DATE 3 PROJECT MGR HHARPRON 425.495.5528 67.16 2 ENGR-GAS C.SNYDER 8.29.16 1 DRAWN BY C.SNYDER 829.16 CHECKEDBY COUNTY KING Emer Sect 32 GAS WK CTR CSPSKPTN APPROVED BY 253606.4580 CP APPROVAL TBD TBD TBD 1/4 SEC 32NE-T23N-ROSE OP M1tAP 212080 PLAT MAP 214.083 61APPING JOINT FACILITIES ARRANGEMENTS UTILITIESCABLE TELEPHONE RIGHT OF WAY CONTACT C8L TBO COAI.I TBD ROWTBD PHONE#I CBL TEL TBD COMM TEL TBO ROWTELTBD PUGET KINKADE CROSSING SOUND E 2 MPE-7 GAS MAIN EXTENSION -17 S/F LOTS NERGY 17709116TH AVE SE, RENTON, WA 98058 DESIGNED BY PUGET SOUND ENERGY SAP Sup Order Nbr 107052077 ELEC Order Number 1D5081177 SCALE PAGE ASNOTED 20F2