HomeMy WebLinkAboutInspection Log V.111 ♦ PermitRansil,
•.d Submittal Routing v.l
Route Franchise Submittal v.l
•.d vre-construction se.1
id PreConMeeting v.l
• Inspections v.l
%d Inspection Log v.l
%,,I r_,.... t I A, �
id Job Start V
Q.1 R
•d Restoration v.l
ro Restoration v.2
id Restoration v.3
p2 Restoration v.4
Service Installation v.l
• $ Foal Inspections v.l
pJ Final Closeout Inspection v.l
• Overtime Inspection v.l
Overtime Inspection Requested v.l
EdRlnspetaion
Inspection
Inspection Number
IENG1715779
in
IN
Request
Date
10/25/2017
creature Type
EN G -In sped on Log
Actual Start Time 10:15 AM
Schedule Start
Data
12/23/2017
Status
Pass
•
"
Smedme End
Data
12/23/2017
Data Entered
10/25/2017
•
e
Actual Start
Date
12/23/2017
cnmmrn
[;+
Actual End
wIr
1z/23/2017
V chemiss &Address JNnte Aemspectn ,Carel:EnerGov
oasquarea caun maderand amp 11 here to soup D that real
I Eager
> K 1110-24 Foreman Joe 425 516 4936 showed up and
I Rotes are being keep in time tracker so we can bill
1u2-22 work eomolaed a imitinn restoration.
10-24 Foreman Joe 425 516 4936 showed up and we went over requirements and
reminded him that sheets on the upper road of Snake Hill weren't allowed. HuntCo showed
up to start drilling from top of straightaway towards Talbot. Holes were backfilled and
topped with cold mix. Two visit today with one late in the day to make sure they were
getting off the road on time. This resulted in .5 hour of OT.
10-25 Work continues with potholing and directional drilling Two visits today also but no
OT TCP was in placed and functioning properly. Same crew but was a concern about
work on the curve coming up. two visits today.
10-26 Work is at the intersection on Talbot and 55th. Potholing and boring uphill toward
preestablish pit app 150 up on the road. Steel sheet here was allowed to remain thru Sat
the 28th for a -in of pipe on Sat. One visit today.
OK p Cancel
momm ,,,h s6A,bnn _New USam 9) Formal gD(am 10111
•
Request Time 6:46 AM
in
IN
Schedule Start Time 12: 00 AM
•
Schram, End Time 12: 00 AM
IN
Actual Start Time 10:15 AM
in
•
Actual End nm, 10:15 AM
In
lilmlill
q patrc,imagal
"
21
10/27/2017 8:32:02 AM
LQ
11/9/2017 7:32:27 AM
k
q
lz/2281710:15:14 AM
3/
QAdd Net,
y