Loading...
HomeMy WebLinkAboutExportedReport-2-1-2018 4.10.30 PMPERMIT TIME TRACKING REPORT (MFP17004721) Log Date Time Type User Start Time End Time Total Time Billed Billable Amount Comments 10/25/2017 Construction Inspector Patrick Miller 8:00 am 9:00 am 1.00 $60.00 No Construction Inspector Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No $120.00 2.00TOTALS FOR 2017-10-25: 10/26/2017 Construction Inspector Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No $60.00 1.00TOTALS FOR 2017-10-26: 10/27/2017 Construction Inspector Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 10-27 Contractor continues work with good TCP and Progress $60.00 1.00TOTALS FOR 2017-10-27: 10/28/2017 Construction Inspector Patrick Miller 9:00 am 4:00 pm 7.00 $420.00 No 10-28 work on Saturday with a crossing into the plat. Good TCP and good clearance $420.00 7.00TOTALS FOR 2017-10-28: 10/30/2017 Construction Inspector Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 10-30 contractor continues his work with Good TCP and progress $60.00 1.00TOTALS FOR 2017-10-30: 10/31/2017 Construction Inspector Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 10-31 Contactor continues with work Construction Inspector Patrick Miller 12:00 pm 1:00 pm 1.00 $60.00 No 10-31 Contactor continues with work. $120.00 2.00TOTALS FOR 2017-10-31: 11/02/2017 Construction Inspector Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 11-2 Work is going well with pig pushed and contractor making connections. $60.00 1.00TOTALS FOR 2017-11-02: 11/06/2017 Construction Inspector Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 11-6 contractor work to tye in next to private road HOA didn 't like them parking on there road so they called Alex. TCP OK and I let Alex know that if HOA got nasty to let me know and that I wanted them to have work completed on the hill this week so we could get it patched. TCP is good. $60.00 1.00TOTALS FOR 2017-11-06: 11/07/2017 Construction Inspector Patrick Miller 10:00 am 11:00 am 1.00 $60.00 No 11-7 contractor continues to prep with cut over from old main to new main with cut over to happen next week. TCP is good and effective. $60.00 1.00TOTALS FOR 2017-11-07: 11/08/2017 Construction Inspector Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 11-8 Joe the foreman needed to start a little earilier on the 9th to complete bottom out on mainline I said it was OK based on no sheets are allowed on the upper road. TCP today was good. $60.00 1.00TOTALS FOR 2017-11-08: 11/09/2017 February 01, 2018 Page 1 of 3 Log Date Time Type User Start Time End Time Total Time Billed Billable Amount Comments Construction Inspector Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 11-9 Contractor was given a early start on 55th to be able to complete a bottom out on the steel main and was given aditional time in the pm to 4:30 to complete test. This was granted because no steel sheets are allowed the sloop of the road and curve and it's necessary to backfill and cold mix the hole every day. $60.00 1.00TOTALS FOR 2017-11-09: 11/10/2017 Construction Inspector Patrick Miller 8:00 am 12:00 pm 4.00 $240.00 No 11-10 Contractor was making new connections and preparing for tye over on the 14. Let me know that Paving could start on the 15. I called Aaron from AA and will meet with Dino on the 11th to go over paving. I will have him start on the top of the hill on 55th and work down. TCP was good and crew was happy not to be wo9rking this SAT. $240.00 4.00TOTALS FOR 2017-11-10: 11/11/2017 Construction Inspector Patrick Miller 4.50 $337.50 No Overtime Inspection $337.50 4.50TOTALS FOR 2017-11-11: 11/14/2017 Construction Inspector Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 11-14 Contractor has completed work on the "Hill" portion of 55th and we are prepare to get AA up there to patch. They will be up on the 16th starting with the patches furthest up the hill and working there way down. 1 ft. tee cuts with return in the spring with 2 inch grind over patches. they will provide there own TCP. $60.00 1.00TOTALS FOR 2017-11-14: 11/16/2017 Construction Inspector Patrick Miller 12:00 pm 1:00 pm 1.00 $60.00 No 11-16 AA asplhalt working on 55th and patching With Joe's crew boring on Talbot Both crews have good TCP and are proceeding as planned . $60.00 1.00TOTALS FOR 2017-11-16: 11/20/2017 Construction Inspector Patrick Miller 9:00 am 10:00 am 1.00 $75.00 No 11-20 check site and work all is good $75.00 1.00TOTALS FOR 2017-11-20: 11/21/2017 Construction Inspector Patrick Miller 10:00 am 11:00 am 1.00 $75.00 No 11-21 Check site all is good TCP very nice. $75.00 1.00TOTALS FOR 2017-11-21: 11/27/2017 Construction Inspector Patrick Miller 9:00 am 10:00 am 1.00 $75.00 No 11-27 work continues with good progress and TCP $75.00 1.00TOTALS FOR 2017-11-27: 11/29/2017 Construction Inspector Patrick Miller 8:00 am 9:00 am 1.00 $60.00 No Work is going well With good TCP $60.00 1.00TOTALS FOR 2017-11-29: 12/01/2017 Construction Inspector Patrick Miller 10:00 am 11:00 am 1.00 $75.00 No 12-1 Work is going well with crossing and TCP $75.00 1.00TOTALS FOR 2017-12-01: 12/04/2017 Construction Inspector Patrick Miller 0.00 $0.00 No work is ok TCP good. February 01, 2018 Page 2 of 3 Log Date Time Type User Start Time End Time Total Time Billed Billable Amount Comments $0.00 0.00TOTALS FOR 2017-12-04: 12/06/2017 Construction Inspector Patrick Miller 0.00 $0.00 No 12-6 Work continues. $0.00 0.00TOTALS FOR 2017-12-06: 12/08/2017 Construction Inspector Patrick Miller 0.00 $0.00 No 12-8 Crew is glad it Friday work is good with button up for the weekend. $0.00 0.00TOTALS FOR 2017-12-08: 12/12/2017 Construction Inspector Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 12-12 Work is getting close to end of job. TCP is good. $60.00 1.00TOTALS FOR 2017-12-12: 12/14/2017 Construction Inspector Patrick Miller 10:00 am 11:00 am 1.00 $60.00 No 12-14 Request for OT on the 16th because of day Care. TCP good today. $60.00 1.00TOTALS FOR 2017-12-14: 12/16/2017 Construction Inspector Patrick Miller 7:00 am 11:00 am 4.00 $300.00 No 12-16 Doing the crossing for the Day Care TCP is good PSE to show up for relight today. Construction Inspector Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 12-15 confirm time for Sat work and end of today work TCP is Good . $360.00 5.00TOTALS FOR 2017-12-16: 12/19/2017 Construction Inspector Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 12-19 Work completed meet with contractor about hauling off sheets and he agreed. Awaiting restoration . $60.00 1.00TOTALS FOR 2017-12-19: February 01, 2018 Page 3 of 3