HomeMy WebLinkAboutExportedReport-2-1-2018 4.10.30 PMPERMIT TIME TRACKING REPORT (MFP17004721)
Log Date Time Type User Start
Time
End
Time
Total
Time
Billed Billable
Amount
Comments
10/25/2017 Construction
Inspector
Patrick Miller 8:00 am 9:00 am 1.00 $60.00 No
Construction
Inspector
Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No
$120.00 2.00TOTALS FOR 2017-10-25:
10/26/2017 Construction
Inspector
Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No
$60.00 1.00TOTALS FOR 2017-10-26:
10/27/2017 Construction
Inspector
Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 10-27 Contractor continues work
with good TCP and Progress
$60.00 1.00TOTALS FOR 2017-10-27:
10/28/2017 Construction
Inspector
Patrick Miller 9:00 am 4:00 pm 7.00 $420.00 No 10-28 work on Saturday with a
crossing into the plat. Good TCP and
good clearance
$420.00 7.00TOTALS FOR 2017-10-28:
10/30/2017 Construction
Inspector
Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 10-30 contractor continues his work
with Good TCP and progress
$60.00 1.00TOTALS FOR 2017-10-30:
10/31/2017 Construction
Inspector
Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 10-31 Contactor continues with
work
Construction
Inspector
Patrick Miller 12:00 pm 1:00 pm 1.00 $60.00 No 10-31 Contactor continues with
work.
$120.00 2.00TOTALS FOR 2017-10-31:
11/02/2017 Construction
Inspector
Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 11-2 Work is going well with pig
pushed and contractor making
connections.
$60.00 1.00TOTALS FOR 2017-11-02:
11/06/2017 Construction
Inspector
Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 11-6 contractor work to tye in next
to private road HOA didn 't like them
parking on there road so they called
Alex. TCP OK and I let Alex know
that if HOA got nasty to let me know
and that I wanted them to have work
completed on the hill this week so we
could get it patched. TCP is good.
$60.00 1.00TOTALS FOR 2017-11-06:
11/07/2017 Construction
Inspector
Patrick Miller 10:00 am 11:00 am 1.00 $60.00 No 11-7 contractor continues to prep
with cut over from old main to new
main with cut over to happen next
week. TCP is good and effective.
$60.00 1.00TOTALS FOR 2017-11-07:
11/08/2017 Construction
Inspector
Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 11-8 Joe the foreman needed to start
a little earilier on the 9th to complete
bottom out on mainline I said it was
OK based on no sheets are allowed
on the upper road. TCP today was
good.
$60.00 1.00TOTALS FOR 2017-11-08:
11/09/2017
February 01, 2018 Page 1 of 3
Log Date Time Type User Start
Time
End
Time
Total
Time
Billed Billable
Amount
Comments
Construction
Inspector
Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 11-9 Contractor was given a early
start on 55th to be able to complete a
bottom out on the steel main and was
given aditional time in the pm to 4:30
to complete test. This was granted
because no steel sheets are allowed
the sloop of the road and curve and
it's necessary to backfill and cold mix
the hole every day.
$60.00 1.00TOTALS FOR 2017-11-09:
11/10/2017 Construction
Inspector
Patrick Miller 8:00 am 12:00 pm 4.00 $240.00 No 11-10 Contractor was making new
connections and preparing for tye
over on the 14. Let me know that
Paving could start on the 15. I called
Aaron from AA and will meet with
Dino on the 11th to go over paving. I
will have him start on the top of the
hill on 55th and work down. TCP
was good and crew was happy not
to be wo9rking this SAT.
$240.00 4.00TOTALS FOR 2017-11-10:
11/11/2017 Construction
Inspector
Patrick Miller 4.50 $337.50 No Overtime Inspection
$337.50 4.50TOTALS FOR 2017-11-11:
11/14/2017 Construction
Inspector
Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 11-14 Contractor has completed
work on the "Hill" portion of 55th and
we are prepare to get AA up there to
patch. They will be up on the 16th
starting with the patches furthest up
the hill and working there way down.
1 ft. tee cuts with return in the spring
with 2 inch grind over patches. they
will provide there own TCP.
$60.00 1.00TOTALS FOR 2017-11-14:
11/16/2017 Construction
Inspector
Patrick Miller 12:00 pm 1:00 pm 1.00 $60.00 No 11-16 AA asplhalt working on 55th
and patching With Joe's crew boring
on Talbot Both crews have good
TCP and are proceeding as planned .
$60.00 1.00TOTALS FOR 2017-11-16:
11/20/2017 Construction
Inspector
Patrick Miller 9:00 am 10:00 am 1.00 $75.00 No 11-20 check site and work all is
good
$75.00 1.00TOTALS FOR 2017-11-20:
11/21/2017 Construction
Inspector
Patrick Miller 10:00 am 11:00 am 1.00 $75.00 No 11-21 Check site all is good TCP very
nice.
$75.00 1.00TOTALS FOR 2017-11-21:
11/27/2017 Construction
Inspector
Patrick Miller 9:00 am 10:00 am 1.00 $75.00 No 11-27 work continues with good
progress and TCP
$75.00 1.00TOTALS FOR 2017-11-27:
11/29/2017 Construction
Inspector
Patrick Miller 8:00 am 9:00 am 1.00 $60.00 No Work is going well With good TCP
$60.00 1.00TOTALS FOR 2017-11-29:
12/01/2017 Construction
Inspector
Patrick Miller 10:00 am 11:00 am 1.00 $75.00 No 12-1 Work is going well with
crossing and TCP
$75.00 1.00TOTALS FOR 2017-12-01:
12/04/2017 Construction
Inspector
Patrick Miller 0.00 $0.00 No work is ok TCP good.
February 01, 2018 Page 2 of 3
Log Date Time Type User Start
Time
End
Time
Total
Time
Billed Billable
Amount
Comments
$0.00 0.00TOTALS FOR 2017-12-04:
12/06/2017 Construction
Inspector
Patrick Miller 0.00 $0.00 No 12-6 Work continues.
$0.00 0.00TOTALS FOR 2017-12-06:
12/08/2017 Construction
Inspector
Patrick Miller 0.00 $0.00 No 12-8 Crew is glad it Friday work is
good with button up for the
weekend.
$0.00 0.00TOTALS FOR 2017-12-08:
12/12/2017 Construction
Inspector
Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 12-12 Work is getting close to end of
job. TCP is good.
$60.00 1.00TOTALS FOR 2017-12-12:
12/14/2017 Construction
Inspector
Patrick Miller 10:00 am 11:00 am 1.00 $60.00 No 12-14 Request for OT on the 16th
because of day Care. TCP good
today.
$60.00 1.00TOTALS FOR 2017-12-14:
12/16/2017 Construction
Inspector
Patrick Miller 7:00 am 11:00 am 4.00 $300.00 No 12-16 Doing the crossing for the Day
Care TCP is good PSE to show up
for relight today.
Construction
Inspector
Patrick Miller 1:00 pm 2:00 pm 1.00 $60.00 No 12-15 confirm time for Sat work and
end of today work TCP is Good .
$360.00 5.00TOTALS FOR 2017-12-16:
12/19/2017 Construction
Inspector
Patrick Miller 9:00 am 10:00 am 1.00 $60.00 No 12-19 Work completed meet with
contractor about hauling off sheets
and he agreed. Awaiting restoration .
$60.00 1.00TOTALS FOR 2017-12-19:
February 01, 2018 Page 3 of 3