HomeMy WebLinkAboutP_Design_109103106_V2_171002N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
N/A
N/A
N/A
N/A N/A
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500
Reviewed and complied with all construction notes.
Recorded all required information on the as-built per GOS 2500.1700.
Completed post installation inspection per GOS 2525.1200 and 2525.2700.
Left the work area in a clean and safe condition.
FITTER'S CHECKLIST
Foreman's Name (printed) ___________________________________
Foreman's Signature________________________________________
Company: InfraSource Construction Date ______________
(CHECK BOX TO CONFIRM COMPLETION)
4680 06/11
11287956 109103106
109106117
108599298
108599297
GAS
PROJECT PHASE Notification #Order #
Retirement
Relocate
SAP Superior
Service/Meter
Dis. Reg. / FT
Ind. MSA
Service/Meter
HOLE HOG TABLE
CALLOUT LOCATION DEPTH LENGTH
BP1 START
BP2 END
BP3 START
BP4 END
BP5 START
BP6 END
BP7 START
BP8 END
BP9 START
BP10 END
BP11 START
BP12 END
BP13 START
BP14 END
BP15 START
BP16 END
BP17 START
BP18 END
BP19 START
BP20 END
CP APPROVED
PLOT PLAN
SCALE: NONE 109103106DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC OP MAP
Emer Sect GAS WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
CP APPROVAL
MAPPING
SCALE PAGE
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY CONTACT PHONE NO DATE
Drawing Number
SAP Sup Order Nbr
PC APPROVAL
J.ANDERSON 425-398-6006
J.ANDERSON 425-398-6006
J.MALM 425-424-6421 7/28/17
E VOLIANSKYI 425-424-6426 7/31/17
J.ANDERSON 425-398-6006 .
JOHNSON 206-571-8519 3/3/17
EXISTING RENTON
DUPONT PIPE REPLACEMENT
5301 TALBOT RD S
RENTON, WA 98055
109103106
1" = 30' 1/5
KING 32 SYSSKGPM
NE06-22-05 212.080 215.081
Cell Phone:
"Locates Required"
"Flagging Required"
Yes No
Yes No
E-Mail:
Manager:
Project Manager Contact Information:
JEFF ANDERSON
425-417-1764
jeff.anderson2@pse.com
STOP TIME
START TIME
GAS MAIN PRESSURE & TESTING
TESTED BY
GAS MAIN INSTALLATION/RETIREMENT
SOAP AIR NITROGEN WATER
SOAP AIR NITROGEN WATER
STOP TIME
START TIME TESTED BY
TEST RESULTS P F
TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928
P F
Type/Work ManufacturerPipe Size Type Est Length Act Lgth
TYPE TEST
/ /
DATE OFF
PRESSURE
DATE ON
DATE OFF
TYPE TEST
PRESSURE
SYS MAOPDESIGN PRESS
DATE ON
2023 03/10
TEST RESULTS
/ /
/ /
/ /
SAP BATCH YEAR & FOOTAGE
ACTUAL
LENGTH OF
RETIREMENT
MATERIAL
RETIRED
ORIGINAL
JOB
ORIGINAL
YEAR
PROPOSED
LENGTH OF
RETIREMENT
SIZE OF
RETIRED
MAINTALBOT RD SS 192ND ST
(PVT RD)
(S 55TH ST)S 192ND
ST
SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG
BOX (TEST LEAD) INSTALLATION.
THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS
TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS
SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION.
MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400.
PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200.
ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY
COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE
INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY
THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED
PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE.
DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT
PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND
NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS
EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY
ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES.
TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811
FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO
STANDARD GAS CONSTRUCTION NOTES:
14.
13.
15.
10.
11.
THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE.
9.
6.
7.
5.
4.
3.
1.
60
16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH.
BILL JOHNSON 206-571-8519
NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2.
8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS
OPERATING STANDARD 2525.2500.
NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX.
GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12.
___________________________, PHONE______________.
NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17.
FOOTAGE BETWEEN FITTINGS.
18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL
INFORMATION ON D-4 CARD)
PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING
INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER
PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION.
MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400
REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS.
INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES
INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND
PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS.
MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED
BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300.
INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE
NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED
REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985.
REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300.
REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED.
INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR
STANDARDS 2525.2100 AND 2525.3600.
PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700.
11.
12.
14.
13.
AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500.
PER PSE GAS OPERATING STANDARD 2550.1600.
ABANDONMENT OR DEACTIVATION.
10.
9.
5.
6.
7.
8.
GAS OPERATING STANDARD 2525.2300.
4.
1.
2.
3.
OUTAGE.
STANDARD IP & LP GAS
REPLACEMENT CONSTRUCTION NOTES
15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:####
S 53RD PL
(PVT RD)98TH AVE
S
(PVT RD)
S 51ST CT
S 50TH PL
(PVT RD)
S 50TH ST
(PVT RD)
TALBOT S RD
PRESSURE CONTROL
REVIEW REQUIRED
RETIRE 2" MPE 77'
RETIRE 1-1/4" MPE 4'
RETIRE 2" STW 10'
4" PE-A 1072'
2" PE-A 2070'
2" PE 9'
PROJECT ENGINEER:
CELL:
EMAIL:
CONSTRUCTION QUESTIONS:
PROJECT CONTACT INFORMATION:
CONST MANAGER:
CELL:
EMAIL:
PROJ MANAGER:
CELL:
EMAIL:
FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNER
SHALL BE CONTACTED:
BILLING QUESTIONS:
425-417-1764
JEFF ANDERSON
jeff.anderson2@pse.com
206-255-4824
STEVE MELLINGER
steve.mellinger@pse.com
425-417-1764
JEFF ANDERSON
jeff.anderson2@pse.com
FIELD NOTES:
ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.1.
2.NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND
DURING CONSTRUCTION, INCLUDING AT OR BEYOND THE CONNECTION POINTS.
BYPASS INSTRUCTIONS:
NOTIFY PSE PLANNING 2 WEEKS
BEFORE START OF CONSTRUCTION
DATE.
JOAN BATES
GAS SYSTEM PLANNING
425-462-3858
REQUEST FOR BYPASS SIZING:
PLEASE INCLUDE THE JOB NUMBER,
ADDRESS, PLAT & OP NUMBERS.
CALL JOAN BATES
BEFORE CONSTRUCTION TO
CONFIRM. 425-462-3858
INSTALL 2 T/L WIRES AT EACH PE
TO STW TRANSITION,
PER B. JOHNSON, CP TECH 8/3/17
PC APPROVAL ...
BOM for WO: 109103106
ITEM QTY DESCRIPTION PART NO.
47 20'PIPE 2" STRAIGHT MED DENSITY 7000263
46 1 PIPE 1-1/4" MED DENSITY COIL 7000169
45 1 TAP TEE 2" X 1-1/4" HDPE 9999563
44 1 TAP TEE 6" X 1-1/4" MDPE 9999554
43 1 VALVE 6" PE MED DENSITY 9998791
42 2 VALVE 4" PE MED DENSITY 9998790
41 3 BOX VALVE COMPLETE PLASTIC FOR 4" TO 8"9996262
40 5 BOX VALVE COMPLETE PLASTIC 1-1/8" TO 2"9996260
39 5 BOX SUPPORT 2" POLYVALVE 9996257
38 12 BRICK 4" X 8" X 2" THICK CONCRETE 9996191
37 5 VALVE 2" PE MED DENSITY 5600259
36 3377'WIRE #14 COPPER TRACER 8500940
35 1039'PIPE 6" STRAIGHT MED DENSITY 7000586
34 2142' PIPE 4" STRAIGHT MED DENSITY 7000466
33 196'PIPE 2" COIL MED DENSITY 7000261
32 50'PIPE 1-1/8" COIL MED DENSITY 7000121
31 10'CP WIRE #10 COPPER 8500930
30 1 WELD METAL CATHODIC MOLD 8500080
29 1 TRANSITION, 6" X 0.280" X SDR-13.5, GR B, WELD X FUSE 7800812
28 1 CP COPPER ADAPTER SLEEVE 7600540
27 4 CP BOX TEST STATION COMPLETE PLASTIC 5000307
26 3 TEE 2" X 5/8" HDPE TAP TEE 9999565
25 1 TEE 1-1/4" X 5/8" HDPE TAP TEE 9999562
24 1 TEE 1-1/4" X 1-1/8" HDPE TAP TEE 9999561
23 1 TEE 4" X 5/8" MDPE TAP-TEE 9999553
22 1 TEE 4" X 1-1/8" MDPE TAP-TEE 9999552
21 5 TEE 2" X 5/8" MDPE TAP-TEE 9999550
20 1 TEE-PUNCH, SERV 1/2" X 5/8" X 125 PSIG, PE OUTLET, 1/4" CUTTER 7800575
19 1 TEE 6" X 6" MDPE INLINE TEE 7800424
18 2 TEE 4" X 4" MDPE INLINE TEE 7800413
17 2 TEE 6" X 2" MDPE HV 9996713
16 6 TEE 4" X 2" MDPE HV 9996712
15 8 TEE 2" X 2" MDPE HV 9996711
14 1 ELL 6" X 4" 90 DEGREE WELD STD Y52 9996771
13 1 STOP-B/O 4" X 150 PSIG, MUELLER H-17160 7600766
12 1 REDUCER 6" X 4" MDPE 7200518
11 1 REDUCER 4" X 2" MDPE 7200504
10 1 REDUCER 2" X 1-1/4" MDPE 7200399
9 1 ELBOW 6" X 90 HDPE 6000741
8 1 ELBOW 6" X 45 MDPE 6000739
7 4 ELBOW 4" X 90 MDPE 6000674
6 9 ELBOW 2" X 90 MDPE 6000484
5 2 COUPLING 4" ELECTROFUSION FITTING 5800510
4 1 CAP, 4" X 0.237", Y-52, WELD 9996797
3 1 CAP 6" MDPE 5200732
2 2 CAP 4" MDPE 5200689
1 10 CAP 2" MDPE 5200649
PHASE 2
PHASE 1
INSTALL 4" MPE 2142'
INSTALL 6" MPE 1039'
INSTALL 2" MPE 196'
RETIRE
RETIRE
RETIRE
60 60 PSIG
NO NAME(PVT RD)
IP GAS FLOWIP GAS FLOWIP GAS FLOW
IP GAS FLOW
#301-304, 202,201,101, 102440 BLDG #A#301-304, 202,201,101, 102440 BLDG #AIP GAS FLOWIP GAS FLOWIP GAS FLOW IP GAS FLOWIP GAS FLOW 521252124907 4827
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALJ.ANDERSON 425-398-6006J.ANDERSON 425-398-6006J.MALM 425-424-6421 7/28/17E VOLIANSKYI 425-424-6426 7/31/17J.ANDERSON 425-398-6006 .JOHNSON 206-571-8519 3/3/17EXISTINGRENTONDUPONT PIPE REPLACEMENT5301 TALBOT RD SRENTON, WA 980551091031061" = 30' 2/5KING32SYSSKGPMNE06-22-05212.080215.081Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11MATCHLINE A-ATHIS SHEETMATCHLINE B-BSEE SHEET 3MATCHLINE A-ATHIS SHEETTALBOT RD S
S 51ST CT (PVT)1Scale: NONE DETAIL1Scale: NONE DETAIL223Scale: NONE DETAIL3Scale: NONE DETAIL44S 48TH STS 50TH PL (PVT)S 50TH ST (PVT)PLOT PLANSCALE: 1" = 30'-0" (PVT RD)TALBOT S RDTALBOT RD S
IP GAS FLOWIP GAS FLOW
IP GAS FLOWT&T
5301
401IP GAS FLOWIP GAS FLOWT&T5212THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALJ.ANDERSON 425-398-6006J.ANDERSON 425-398-6006J.MALM 425-424-6421 7/28/17E VOLIANSKYI 425-424-6426 7/31/17J.ANDERSON 425-398-6006 .JOHNSON 206-571-8519 3/3/17EXISTINGRENTONDUPONT PIPE REPLACEMENT5301 TALBOT RD SRENTON, WA 980551091031061" = 30' 3/5KING32SYSSKGPMNE06-22-05212.080215.081Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11MATCHLINE C-CTHIS SHEETMATCHLINE B-BSEE SHEET 2MATCHLINE D-DSEE SHEET 4MATCHLINE C-CTHIS SHEETTALBOT RD S
TALBOT RD S
S 53RD PL (PVT)Scale: NONE DETAIL5Scale: NONE DETAIL656PLOT PLANSCALE: 1" = 30'-0" STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYSOAP AIR NITROGEN WATERSOAP AIR NITROGEN WATERSTOP TIMESTART TIMETESTED BYTEST RESULTS P FTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928P FTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /STOP TIMESTART TIMETESTED BYSOAPAIRNITROGENWATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /GASSED UP PIPELINEPIPESEGMENTFOREMAN'SDATENAME60N/A
IP GAS FLOWIP GAS FLOWIP GAS FLOW
IP GAS FLOW
19207
1920019206THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALJ.ANDERSON 425-398-6006J.ANDERSON 425-398-6006J.MALM 425-424-6421 7/28/17E VOLIANSKYI 425-424-6426 7/31/17J.ANDERSON 425-398-6006 .JOHNSON 206-571-8519 3/3/17EXISTINGRENTONDUPONT PIPE REPLACEMENT5301 TALBOT RD SRENTON, WA 980551091031061" = 30' 4/5KING32SYSSKGPMNE06-22-05212.080215.081Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11MATCHLINE D-DSEE SHEET 3MATCHLINE E-E
SEE SHEET 5
TALBOT RD S
(S 55TH ST)S 192ND STS 192ND STNO NAME (PVT RD)PLOT PLANSCALE: 1" = 30'-0" Scale: NONE DETAIL - PHASE 17A7Scale: NONE DETAIL - PHASE 27BPHASE 2PHASE 1PHASE 2PHASE 1
IP GAS FLOWIP GAS FLOWIP
GAS
F
LOW IP GAS FLOWT&T19203THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALJ.ANDERSON 425-398-6006J.ANDERSON 425-398-6006J.MALM 425-424-6421 7/28/17E VOLIANSKYI 425-424-6426 7/31/17J.ANDERSON 425-398-6006 .JOHNSON 206-571-8519 3/3/17EXISTINGRENTONDUPONT PIPE REPLACEMENT5301 TALBOT RD SRENTON, WA 980551091031061" = 30' 5/5KING32SYSSKGPMNE06-22-05212.080215.081Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11MATCHLINE E-ESEE SHEET 4 (S 55TH ST)98TH AVE SS 192ND STS 192ND STPLOT PLANSCALE: 1" = 30'-0" Scale: NONE DETAIL88STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYSOAP AIR NITROGEN WATERSOAP AIR NITROGEN WATERSTOP TIMESTART TIMETESTED BYTEST RESULTS P FTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928P FTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /GASSED UP PIPELINEPIPESEGMENTFOREMAN'SDATENAME60N/A