Loading...
HomeMy WebLinkAboutP_Design_109103106_V2_171002N Vicinity Map N/A Owner / Developer Contact Info officeATTN: N/A N/A N/A N/A N/A THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: InfraSource Construction Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 11287956 109103106 109106117 108599298 108599297 GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service/Meter Dis. Reg. / FT Ind. MSA Service/Meter HOLE HOG TABLE CALLOUT LOCATION DEPTH LENGTH BP1 START BP2 END BP3 START BP4 END BP5 START BP6 END BP7 START BP8 END BP9 START BP10 END BP11 START BP12 END BP13 START BP14 END BP15 START BP16 END BP17 START BP18 END BP19 START BP20 END CP APPROVED PLOT PLAN SCALE: NONE 109103106DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL J.ANDERSON 425-398-6006 J.ANDERSON 425-398-6006 J.MALM 425-424-6421 7/28/17 E VOLIANSKYI 425-424-6426 7/31/17 J.ANDERSON 425-398-6006 . JOHNSON 206-571-8519 3/3/17 EXISTING RENTON DUPONT PIPE REPLACEMENT 5301 TALBOT RD S RENTON, WA 98055 109103106 1" = 30' 1/5 KING 32 SYSSKGPM NE06-22-05 212.080 215.081 Cell Phone: "Locates Required" "Flagging Required" Yes No Yes No E-Mail: Manager: Project Manager Contact Information: JEFF ANDERSON 425-417-1764 jeff.anderson2@pse.com STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / SAP BATCH YEAR & FOOTAGE ACTUAL LENGTH OF RETIREMENT MATERIAL RETIRED ORIGINAL JOB ORIGINAL YEAR PROPOSED LENGTH OF RETIREMENT SIZE OF RETIRED MAINTALBOT RD SS 192ND ST (PVT RD) (S 55TH ST)S 192ND ST SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG BOX (TEST LEAD) INSTALLATION. THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO STANDARD GAS CONSTRUCTION NOTES: 14. 13. 15. 10. 11. THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 9. 6. 7. 5. 4. 3. 1. 60 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. BILL JOHNSON 206-571-8519 NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2. 8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12. ___________________________, PHONE______________. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17. FOOTAGE BETWEEN FITTINGS. 18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD) PLUG ENDS OF DEACTIVATED OR INSERTED MAINS AND SERVICES IN ACCORDANCE WITH PSE GAS OPERATING INSIDE METER SETS SHALL BE MOVED OUTSIDE WHENEVER POSSIBLE OR SET REGULATORS AND VENTS OUTSIDE PER PROJECT MANAGER TO MAKE EGOR RUN IMMEDIATELY PRIOR TO STARTING CONSTRUCTION. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300, 2525.3400 REFER TO PSE GAS OPERATING STANDARD 2525.1700 FOR MAIN AND SERVICE COVER REQUIREMENTS. INSTALL CURB VALVE AT PROPERTY LINE OR 5/8" PE WHIP AT MAIN (AS REQUIRED) ON NEW AND EXISTING SERVICES INSTALL ANODES AND TEST LEAD WIRES AS REQUIRED PER PSE GAS FIELD PROCEDURES 4515.1000 AND 4515.1020 AND PSE GAS OPERATING STANDARD 2600.1200. TEST LEAD WIRES ARE REQUIRED ON ALL TRANSITION FITTINGS. MAINTAIN CATHODIC PROTECTION FOR STEEL MAINS BY THE USE OF CONTINUITY BONDS OR OTHER MEANS DETERMINED BY THE PSE CORROSION ENGINEER PER PSE GAS OPERATING STANDARD 2600.1300. INSTALL ONE POUND ANODE FOR EVERY 1000' OF LOCATING WIRE. INSTALL ANODE AND TEST LEAD WIRES PER PSE NOTIFY GAS CUSTOMERS, OR DISTRIBUTE FLYER #1443 A MINIMUM OF TWO WORKING DAYS PRIOR TO A PLANNED REPLACE ALL "NO RECORD" SERVICES AND 1-1/8" PE SERVICES INSTALLED PRIOR TO 1985. REPLACE EXISTING ACTIVE SERVICES PER PSE GAS OPERATING STANDARDS 2525.2100 AND 2575.2300. REMOVE OR RENDER INOPERABLE DEACTIVATED VALVES ON CASING WHERE MPE PIPE IS INSERTED. INSTALL REPLACEMENT MAINS PER PSE GAS OPERATING STANDARDS 2525.2100 FOR INSERTIONS AND 2525.3600 FOR STANDARDS 2525.2100 AND 2525.3600. PSE GAS OPERATING STANDARDS 2575.2300 AND 2550.1700. 11. 12. 14. 13. AND 2525.1200, AND PSE GAS FIELD PROCEDURE 4700.1500. PER PSE GAS OPERATING STANDARD 2550.1600. ABANDONMENT OR DEACTIVATION. 10. 9. 5. 6. 7. 8. GAS OPERATING STANDARD 2525.2300. 4. 1. 2. 3. OUTAGE. STANDARD IP & LP GAS REPLACEMENT CONSTRUCTION NOTES 15.ACTIVE SERVICES TO BE REPLACED DENOTED BY:#### S 53RD PL (PVT RD)98TH AVE S (PVT RD) S 51ST CT S 50TH PL (PVT RD) S 50TH ST (PVT RD) TALBOT S RD PRESSURE CONTROL REVIEW REQUIRED RETIRE 2" MPE 77' RETIRE 1-1/4" MPE 4' RETIRE 2" STW 10' 4" PE-A 1072' 2" PE-A 2070' 2" PE 9' PROJECT ENGINEER: CELL: EMAIL: CONSTRUCTION QUESTIONS: PROJECT CONTACT INFORMATION: CONST MANAGER: CELL: EMAIL: PROJ MANAGER: CELL: EMAIL: FOR MAIN DESIGNS REALIGNMENTS - FIELD DESIGNER SHALL BE CONTACTED: BILLING QUESTIONS: 425-417-1764 JEFF ANDERSON jeff.anderson2@pse.com 206-255-4824 STEVE MELLINGER steve.mellinger@pse.com 425-417-1764 JEFF ANDERSON jeff.anderson2@pse.com FIELD NOTES: ALL DUPONT AND STW PIPES SHALL BE RETIRED PER SCOPE OF WORK.1. 2.NOTIFY PROJECT MANAGER IF ADDITIONAL DUPONT AND/OR STW MATERIALS ARE FOUND DURING CONSTRUCTION, INCLUDING AT OR BEYOND THE CONNECTION POINTS. BYPASS INSTRUCTIONS: NOTIFY PSE PLANNING 2 WEEKS BEFORE START OF CONSTRUCTION DATE. JOAN BATES GAS SYSTEM PLANNING 425-462-3858 REQUEST FOR BYPASS SIZING: PLEASE INCLUDE THE JOB NUMBER, ADDRESS, PLAT & OP NUMBERS. CALL JOAN BATES BEFORE CONSTRUCTION TO CONFIRM. 425-462-3858 INSTALL 2 T/L WIRES AT EACH PE TO STW TRANSITION, PER B. JOHNSON, CP TECH 8/3/17 PC APPROVAL ... BOM for WO: 109103106 ITEM QTY DESCRIPTION PART NO. 47 20'PIPE 2" STRAIGHT MED DENSITY 7000263 46 1 PIPE 1-1/4" MED DENSITY COIL 7000169 45 1 TAP TEE 2" X 1-1/4" HDPE 9999563 44 1 TAP TEE 6" X 1-1/4" MDPE 9999554 43 1 VALVE 6" PE MED DENSITY 9998791 42 2 VALVE 4" PE MED DENSITY 9998790 41 3 BOX VALVE COMPLETE PLASTIC FOR 4" TO 8"9996262 40 5 BOX VALVE COMPLETE PLASTIC 1-1/8" TO 2"9996260 39 5 BOX SUPPORT 2" POLYVALVE 9996257 38 12 BRICK 4" X 8" X 2" THICK CONCRETE 9996191 37 5 VALVE 2" PE MED DENSITY 5600259 36 3377'WIRE #14 COPPER TRACER 8500940 35 1039'PIPE 6" STRAIGHT MED DENSITY 7000586 34 2142' PIPE 4" STRAIGHT MED DENSITY 7000466 33 196'PIPE 2" COIL MED DENSITY 7000261 32 50'PIPE 1-1/8" COIL MED DENSITY 7000121 31 10'CP WIRE #10 COPPER 8500930 30 1 WELD METAL CATHODIC MOLD 8500080 29 1 TRANSITION, 6" X 0.280" X SDR-13.5, GR B, WELD X FUSE 7800812 28 1 CP COPPER ADAPTER SLEEVE 7600540 27 4 CP BOX TEST STATION COMPLETE PLASTIC 5000307 26 3 TEE 2" X 5/8" HDPE TAP TEE 9999565 25 1 TEE 1-1/4" X 5/8" HDPE TAP TEE 9999562 24 1 TEE 1-1/4" X 1-1/8" HDPE TAP TEE 9999561 23 1 TEE 4" X 5/8" MDPE TAP-TEE 9999553 22 1 TEE 4" X 1-1/8" MDPE TAP-TEE 9999552 21 5 TEE 2" X 5/8" MDPE TAP-TEE 9999550 20 1 TEE-PUNCH, SERV 1/2" X 5/8" X 125 PSIG, PE OUTLET, 1/4" CUTTER 7800575 19 1 TEE 6" X 6" MDPE INLINE TEE 7800424 18 2 TEE 4" X 4" MDPE INLINE TEE 7800413 17 2 TEE 6" X 2" MDPE HV 9996713 16 6 TEE 4" X 2" MDPE HV 9996712 15 8 TEE 2" X 2" MDPE HV 9996711 14 1 ELL 6" X 4" 90 DEGREE WELD STD Y52 9996771 13 1 STOP-B/O 4" X 150 PSIG, MUELLER H-17160 7600766 12 1 REDUCER 6" X 4" MDPE 7200518 11 1 REDUCER 4" X 2" MDPE 7200504 10 1 REDUCER 2" X 1-1/4" MDPE 7200399 9 1 ELBOW 6" X 90 HDPE 6000741 8 1 ELBOW 6" X 45 MDPE 6000739 7 4 ELBOW 4" X 90 MDPE 6000674 6 9 ELBOW 2" X 90 MDPE 6000484 5 2 COUPLING 4" ELECTROFUSION FITTING 5800510 4 1 CAP, 4" X 0.237", Y-52, WELD 9996797 3 1 CAP 6" MDPE 5200732 2 2 CAP 4" MDPE 5200689 1 10 CAP 2" MDPE 5200649 PHASE 2 PHASE 1 INSTALL 4" MPE 2142' INSTALL 6" MPE 1039' INSTALL 2" MPE 196' RETIRE RETIRE RETIRE 60 60 PSIG NO NAME(PVT RD) IP GAS FLOWIP GAS FLOWIP GAS FLOW IP GAS FLOW #301-304, 202,201,101, 102440 BLDG #A#301-304, 202,201,101, 102440 BLDG #AIP GAS FLOWIP GAS FLOWIP GAS FLOW IP GAS FLOWIP GAS FLOW 521252124907 4827 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALJ.ANDERSON 425-398-6006J.ANDERSON 425-398-6006J.MALM 425-424-6421 7/28/17E VOLIANSKYI 425-424-6426 7/31/17J.ANDERSON 425-398-6006 .JOHNSON 206-571-8519 3/3/17EXISTINGRENTONDUPONT PIPE REPLACEMENT5301 TALBOT RD SRENTON, WA 980551091031061" = 30' 2/5KING32SYSSKGPMNE06-22-05212.080215.081Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11MATCHLINE A-ATHIS SHEETMATCHLINE B-BSEE SHEET 3MATCHLINE A-ATHIS SHEETTALBOT RD S S 51ST CT (PVT)1Scale: NONE DETAIL1Scale: NONE DETAIL223Scale: NONE DETAIL3Scale: NONE DETAIL44S 48TH STS 50TH PL (PVT)S 50TH ST (PVT)PLOT PLANSCALE: 1" = 30'-0" (PVT RD)TALBOT S RDTALBOT RD S IP GAS FLOWIP GAS FLOW IP GAS FLOWT&T 5301 401IP GAS FLOWIP GAS FLOWT&T5212THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALJ.ANDERSON 425-398-6006J.ANDERSON 425-398-6006J.MALM 425-424-6421 7/28/17E VOLIANSKYI 425-424-6426 7/31/17J.ANDERSON 425-398-6006 .JOHNSON 206-571-8519 3/3/17EXISTINGRENTONDUPONT PIPE REPLACEMENT5301 TALBOT RD SRENTON, WA 980551091031061" = 30' 3/5KING32SYSSKGPMNE06-22-05212.080215.081Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11MATCHLINE C-CTHIS SHEETMATCHLINE B-BSEE SHEET 2MATCHLINE D-DSEE SHEET 4MATCHLINE C-CTHIS SHEETTALBOT RD S TALBOT RD S S 53RD PL (PVT)Scale: NONE DETAIL5Scale: NONE DETAIL656PLOT PLANSCALE: 1" = 30'-0" STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYSOAP AIR NITROGEN WATERSOAP AIR NITROGEN WATERSTOP TIMESTART TIMETESTED BYTEST RESULTS P FTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928P FTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /STOP TIMESTART TIMETESTED BYSOAPAIRNITROGENWATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /GASSED UP PIPELINEPIPESEGMENTFOREMAN'SDATENAME60N/A IP GAS FLOWIP GAS FLOWIP GAS FLOW IP GAS FLOW 19207 1920019206THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALJ.ANDERSON 425-398-6006J.ANDERSON 425-398-6006J.MALM 425-424-6421 7/28/17E VOLIANSKYI 425-424-6426 7/31/17J.ANDERSON 425-398-6006 .JOHNSON 206-571-8519 3/3/17EXISTINGRENTONDUPONT PIPE REPLACEMENT5301 TALBOT RD SRENTON, WA 980551091031061" = 30' 4/5KING32SYSSKGPMNE06-22-05212.080215.081Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11MATCHLINE D-DSEE SHEET 3MATCHLINE E-E SEE SHEET 5 TALBOT RD S (S 55TH ST)S 192ND STS 192ND STNO NAME (PVT RD)PLOT PLANSCALE: 1" = 30'-0" Scale: NONE DETAIL - PHASE 17A7Scale: NONE DETAIL - PHASE 27BPHASE 2PHASE 1PHASE 2PHASE 1 IP GAS FLOWIP GAS FLOWIP GAS F LOW IP GAS FLOWT&T19203THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECOP MAPEmer SectGAS WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYCP APPROVALMAPPINGSCALEPAGEENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACT PHONE NO DATEDrawing NumberSAP Sup Order NbrPC APPROVALJ.ANDERSON 425-398-6006J.ANDERSON 425-398-6006J.MALM 425-424-6421 7/28/17E VOLIANSKYI 425-424-6426 7/31/17J.ANDERSON 425-398-6006 .JOHNSON 206-571-8519 3/3/17EXISTINGRENTONDUPONT PIPE REPLACEMENT5301 TALBOT RD SRENTON, WA 980551091031061" = 30' 5/5KING32SYSSKGPMNE06-22-05212.080215.081Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500Reviewed and complied with all construction notes.Recorded all required information on the as-built per GOS 2500.1700.Completed post installation inspection per GOS 2525.1200 and 2525.2700.Left the work area in a clean and safe condition.FITTER'S CHECKLISTForeman's Name (printed) ___________________________________ Foreman's Signature________________________________________Company: InfraSource Construction Date ______________(CHECK BOX TO CONFIRM COMPLETION)4680 06/11MATCHLINE E-ESEE SHEET 4 (S 55TH ST)98TH AVE SS 192ND STS 192ND STPLOT PLANSCALE: 1" = 30'-0" Scale: NONE DETAIL88STOP TIMESTART TIMEGAS MAIN PRESSURE & TESTINGTESTED BYSOAP AIR NITROGEN WATERSOAP AIR NITROGEN WATERSTOP TIMESTART TIMETESTED BYTEST RESULTS P FTESTED BY PSE PRESSURE CONTROL, SEE FORM 1928P FTYPE TEST / /DATE OFFPRESSUREDATE ONDATE OFFTYPE TESTPRESSURESYS MAOPDESIGN PRESSDATE ON2023 03/10TEST RESULTS / / / / / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /STOP TIMESTART TIMETESTED BYSOAP AIR NITROGEN WATERP FTYPE TEST / /DATE OFFPRESSUREDATE ONTEST RESULTS / /GASSED UP PIPELINEPIPESEGMENTFOREMAN'SDATENAME60N/A