Loading...
HomeMy WebLinkAboutP_Design_107055282_V1_171227LOT 4(6,954 SQ. FT)LOT 3(7,252 SQ. FT)LOT 2(7,252 SQ. FT)LOT 1(8,265 SQ. FT)SSSSSSWWW20' BSBL20' BSBL5' BSBL5' BSBL20' BSBL20' BSBL5' BSBL5' BSBL15' BSBL15' BSBL5' BSBL5' BSBL5' BSBL20' BSBL20' BSBL15' BSBL8324332" PE-A IP 14'W 70E158 2" STW IP 14'S 9121462" PE IP 14'W 9020122" PE IP 14'W 19935/8" MPE 294'E 14'W TAPPING TEE 2" UNKNOWN 15'W TAPPING TEE 2" UNKNOWN 13'S TRANSITION 2" UNKNOWN 18'W CAP 2" MPE 249'S SADDLE 2" PE 15'S TRANSITION 2" UNKNOWN 15'S 13'S 14'W15'W16044 201'S 306'SIP GAS FLOWIP GAS FLOWIP GAS FLOW IP GAS FLOW 114TH AVE SESE 162ND ST N Vicinity Map N/A Owner / Developer Contact Info officeATTN: 206.484.4321 16834 SE 43RD ST BELLEVUE, WA 98006 N/A TRAVIS KASSEBAUM THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 AT LEAST 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Inspected Steel and PE pipe per GOS 2450.1400 and 2450.1500 Reviewed and complied with all construction notes. Recorded all required information on the as-built per GOS 2500.1700. Completed post installation inspection per GOS 2525.1200 and 2525.2700. Left the work area in a clean and safe condition. FITTER'S CHECKLIST Foreman's Name (printed) ___________________________________ Foreman's Signature________________________________________ Company: InfraSource Construction Date ______________ (CHECK BOX TO CONFIRM COMPLETION) 4680 06/11 505052285 107055282 N/A 106332357 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A GAS PROJECT PHASE Notification #Order # Retirement Relocate SAP Superior Service/Meter Service/Meter HP Svc/MSA Dis. Reg. / FT Ind. MSA Ind. Service Service/Meter Service/Meter SYSTEM MAOP DENOTED BY: SYSTEM MAOP = ___ PSIG BOX (TEST LEAD) INSTALLATION. THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2600 FOR ALL HP VALVES IF THE LOCATION IS TO PREVENT ACCIDENTAL OVERPRESSURE OF ADJOINING SYSTEMS, NO TWO MAINS SHALL BE CONNECTED EXCEPT AS SHOWN ON THIS DESIGN UNLESS APPROVED BY APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. RESTORE ALL DRIVEWAYS SUBJECT TO OPEN CUT TO ORIGINAL OR BETTER CONDITION. MAINS AND SERVICES SHALL BE TESTED AND PURGED PER PSE GAS OPERATING STANDARDS 2525.3300 AND 2525.3400. PURGE POINTS AND PRESSURE TAPS TO BE INSTALLED PER PSE GAS OPERATING STANDARDS 2525.3300, AND 2525.1200. ANY CHANGE IN ROUTE, PIPE SIZE/TYPE, TIE-IN METHOD OR ADDITIONAL MAIN FOOTAGE MUST BE APPROVED BY COMPLETE "PIPE CONDITION REPORT" ON ALL METALLIC PSE FACILITIES. CHECK BOX ON REPORT FOR WIRE INSTALL MAIN VALVES OUT OF TRAFFIC WHERE POSSIBLE. VALVE MARKERS SHALL BE INSTALLED AND RECORDED BY THE OPPORTUNITY TO PURCHASE AN EXCESS FLOW VALVE WHEN THEIR SERVICE IS INSTALLED OR REPLACED PER GAS OPERATING STANDARD 2550.1600. ALLOW ADEQUATE TIME FOR CUSTOMER DECISION AND RESPONSE. DELIVER FLYERS BE SURE TO INCLUDE THE LIST OF FREQUENTLY ASKED QUESTIONS AND INFORMATION ABOUT PRIOR TO BEGINNING CONSTRUCTION. USE iSi TO DISTRIBUTE FLYERS IF JOB IS LARGE, OTHERWISE HAND NOTIFY PROPERTY OWNERS ADJACENT TO PROPOSED CONSTRUCTION ACTIVITIES A MINIMUM OF TWO WORKING DAYS EROSION AND SEDIMENT CONTROL AND ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. EROSION AND SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY ALL CONSTRUCTION IS TO CONFORM TO PSE GAS OPERATING STANDARDS AND GAS FIELD PROCEDURES. TO CONSTRUCTION, IN WESTERN WASHINGTON CALL: 1-800-424-5555. OR CALL NATIONWIDE: 811 FIELD LOCATE ALL UNDERGROUND UTILITIES. EXCAVATOR TO CALL "ONE-CALL" TWO WORKING DAYS PRIOR TO STANDARD GAS CONSTRUCTION NOTES: 14. 13. 15. 10. 11. THE APPROPRIATE PSE ENGINEER OR PSE REPRESENTATIVE. 9. 6. 7. 5. 4. 3. 1. 45 16. IF METALLIC PIPE IS INVOLVED, COORDINATE INSTALLATION WITH CP TECH. NOTIFY APPROPRIATE PERMITTING AGENCY PRIOR TO JOB START (SEE PERMIT REQUIREMENTS).2. 8.PIPELINE MARKERS AND WARNING SIGNS SHALL BE INSTALLED AND RECORDED BY THE CONTRACTOR PER PSE GAS OPERATING STANDARD 2525.2500. NOT READILY ACCESSIBLE, AND FOR ALL VALVES WHERE PERSISTENT SNOWFALL MAY OBSCURE THE VALVE BOX. GAUGE AND MONITOR USE OF ALL STOPPERS TO ENSURE ADEQUATE FEED.12. ___________________________, PHONE______________. NOTE ALL ACTUAL FOOTAGE, LOCATION AND MATERIAL CHANGES ON THE AS-BUILT IN RED. ( ') DENOTES17. FOOTAGE BETWEEN FITTINGS. 18.EXCESS FLOW VALVE TO BE INSTALLED ON ALL NEW RESIDENTIAL SERVICES PER GOS 2500.2200. (RECORD ALL INFORMATION ON D-4 CARD) HOLE HOG TABLE CALLOUT LOCATION DEPTH LENGTH BP1 START BP2 END BP3 START BP4 END BP5 START BP6 END BP7 START BP8 END BP9 START BP10 END BP11 START BP12 END BP13 START BP14 END BP15 START BP16 END BP17 START BP18 END BP19 START BP20 END PLOT PLAN SCALE: 1" = 50'-0" 107055282DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC OP MAP Emer Sect GAS WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY CP APPROVAL MAPPING SCALE PAGE ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE Drawing Number SAP Sup Order Nbr PC APPROVAL C. FUNG 425.625.6055 M. HAACK 206.795.5834 K. HAIBECK 206.604.5448 K. HAIBECK 206.604.5448 "Locates Required" "Flagging Required" Yes No Yes No Cell Phone: Project Manager Contact Information: E-Mail: Name: 206.604.5448 kevin.haibeck@pse.com KEVIN HAIBECK REQUIRED RENTON SAPPHIRE HOMES INC 2" MPE IP MAIN EXTENSION (4 STUBS) 11427 SE 162ND ST, RENTON 98055 107055282 N/A 1" = 50'1/1 KING 32 CSPSKGPM NE 29-23-05 212.080 212.083 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A STOP TIME START TIME GAS MAIN PRESSURE & TESTING TESTED BY GAS MAIN INSTALLATION/RETIREMENT SOAP AIR NITROGEN WATER SOAP AIR NITROGEN WATER STOP TIME START TIME TESTED BY TEST RESULTS P F TESTED BY PSE PRESSURE CONTROL, SEE FORM 1928 P F Type/Work ManufacturerPipe Size Type Est Length Act Lgth TYPE TEST / / DATE OFF PRESSURE DATE ON DATE OFF TYPE TEST PRESSURE SYS MAOPDESIGN PRESS DATE ON 2023 03/10 TEST RESULTS / / / / / / SCAT 2"MPE-7 16' PLAT 2"MPE-7 239' 60 IP 058-45 TRANSITION FITTING 2" MPE 15'S C/L & 315'E C/L ____'S C/L & ____'E C/L CP WIRE #10 TEST LEAD & CP TEST LEAD BOX COMPLETE ___'S C/L & ___'E C/L END OF MAIN CAP 2" MPE 269'S C/L & 315'E C/L ____'S C/L & ____'E C/L CP TEST LEAD BOX COMPLETE (BRING WIRE UP IN BOX) ____'S C/L & ____'E C/L PROPOSED PIPE 2" MPE IP MAIN (in CUSTOMER PROVIDED CONDUIT) 315'E C/L, ____'E C/L PROPOSED EASEMENT(____')(____')PROPOSED SERVICE 1-1/8" MPE STUB STUB LENGTH ____' ____'S C/L & ____'E C/L PROPOSED SERVICE 1-1/8" MPE STUB STUB LENGTH ____' ____'S C/L & ____'E C/L PROPOSED SERVICE 1-1/8" MPE STUB STUB LENGTH ____' ____'S C/L & ____'E C/L PROPOSED SERVICE 1-1/8" MPE STUB STUB LENGTH ____' ____'S C/L & ____'E C/L TIE IN STOPPER 2"X150 B/O & ELBOW 2"X90° WELD 14'S C/L & 315'E C/L ____'S C/L & ____'E C/L TYPICAL GAS MAIN LINE TRENCH DETAIL RESIDENTIAL Excavated Dirt Pile 24" Min NOTE: Install 12" shading if the backfill contains rocks greater than 6" dia. 24" Min Cover Gas Main Line SIDE ACCESS VEHICLE Final Grade 4" Sand Bedding 12" Min. of Acceptable Backfill (See Definition Above) 6" Sand Shading 12"-18" Min Backfill for Direct Bury - The final backfill may be soil-based select material or native soil, but free of construction debris and shall not contain rocks larger than 10"-in. diameter to prevent impedence of gas system maintenance. Not to scale CP APPROVAL Only need T/L wires on main with box. This is on IC-015040 -B. JOHNSON 12/20/2017 BILL JOHNSON 206.571.8519 B. JOHNSON 206.571.8519 WORK AREA