HomeMy WebLinkAboutP_VERIZON_BOEING_FIELD_RENTON_PLANS_170524_V1DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057ADDRESS: 635 PARK AVE N, RENTON, WA 98057 PROJECT NAME: VERIZON - BOEING FIELDSITE LOCATIONSHEET INDEX1. COVER SHEET / SITE LOCATION2. LEGEND3. GENERAL NOTES4.-14.PLAN VIEWS A-K15. TYPICALS16. TYPICALS17. SITE PHOTOGRAPHSSCOPE OF WORK:FROM AN EXISTING VERIZON VAULT ON THE SECORNER OF N 3RD ST & HOUSER WAY N. TRENCHAND BORE (1) 2"Ø CONDUIT NW ON FACTORY PL N,WEST ON N 4TH ST, NORTH ON GARDEN AVE N, WESTON N 6TH ST, AND NORTH ON PARK AVE N TO AFUTURE PROPOSED MEET-ME VAULT ON THE WESTSIDE OF THE ROAD. SET VAULTS ALONG THE WAYAND PULL FIBER CABLE THROUGHOUT.Know what'sbelow.before you dig.CallRPLAN VIEW ANE 3RD
STCONFIDENTIAL/PROPRIETARYSHEET: OF 1 17CONTACTSJAKE CARPENTERMGC TECHNICAL CONSULTING, INC.8521 154TH AVE NEREDMOND, WA 98052C.425.305.1785JAKE@MGCTECHNICAL.COMVERIZON CONTACT:SCOTT CHRISTENSON11311 NE 120TH STKIRKLAND, WA 98034C.425.636.6046SCOTT.CHRISTENSON@VERIZON.COMPLAN VIEW BPLAN VIEW DPLAN VIEW CPLAN VIEW EPLAN VIEW FPLAN VIEW GPLAN VIEW HPLAN VIEW IPLAN VIEW JPLAN VIEW KN 6TH STN 8TH STPARK AVE N
GARDEN AVE N
MEADOW AVE N
FACTORY AVE N N 4TH STI - 405N 3RD STPELLY AVE N
HO
U
S
E
R
W
A
Y
N N 5TH STLOGAN AVE N
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 2 17#F#F#F##LEGEND
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057GENERAL NOTESKnow what'sbelow.before you dig.CallRGENERAL NOTES:UTILITY LOCATION CENTER AT LEAST 48 HOURS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATIONS OF EXISTINGAND AT POTENTIAL UTILITY CONFLICTS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTINGTHE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS FROM ALL APPLICABLE AGENCIES. THEDISTURBING ACTIVITY OR CONSTRUCTION ON ANY AND ALL PUBLIC IMPROVEMENTS IF REQUIRED.TO RELOCATIONS OR ADJUSTMENTS OF EXISTING UTILITIES DURING CONSTRUCTION, TO ASSURE THAT THE WORK ISFOR CONTACTING ALL PARTIES AFFECTED BY ANY DISRUPTION OF ANY UTILITY SERVICE.AND SPECIFICATIONS, AND ONE (1) COPY OF ANY PERMITS AND EXTENSION AGREEMENTS NEEDED FOR THE JOB ON-SITE AT ALLOTHER AFFECTED PARTIES WHICH COULD INDICATE A SITUATION THAT IS NOT IDENTIFIED IN THE PLANS OR SPECIFICATIONS, THECONTRACTOR SHALL CONTACT THE ENGINEER IMMEDIATELY.SPECIFICALLY STATED OTHERWISE.CONTACT THE ENGINEER FOR CLARIFICATION AND NOTE ON THE RECORD DRAWINGS.GROUND DISTURBING ACTIVITY. ALL E.S.C. MEASURES SHALL BE MAINTAINED IN GOOD REPAIR BY THE CONTRACTOR UNTIL SUCHALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY IS SUBJECT TO THE JURISDICTION OF THE CITY OF RENTON ENGINEERINGALL CONSTRUCTION OPERATIONS, INCLUDING THE WARMING UP, REPAIR, ARRIVAL, DEPARTURE OR RUNNING OF TRUCKS, EARTHCONFIDENTIAL/PROPRIETARYSHEET: OF 317The locations of utilities shown on these drawing are only approximate. MGC TECHNICAL CONSULTING, INC. hereby disclaims any responsibilityto third parties for the accuracy of this information. Persons working in the area covered by this drawing must contact the statewideCall-Before-You-Dig System to ascertain the location of underground utilities prior to performing any excavation.ALL MATERIALS, WORKMANSHIP, AND CONSTRUCTION OF UTILITY IMPROVEMENTS SHALL MEET OR EXCEED SITE WORKSTANDARDS AND THE STANDARDS AND SPECIFICATIONS SET FORTH IN THE CITY OF RENTON REGULATIONS AND APPLICABLE STATEAND FEDERAL REGULATIONS. WHERE THERE IS CONFLICT BETWEEN THESE PLANS AND THE SPECIFICATIONS, OR ANY APPLICABLESTANDARDS, THE HIGHER QUALITY STANDARD SHALL APPLY. ALL WORK WITHIN PUBLIC R.O.W. OR EASEMENTS MAY REQUIREINSPECTED AND APPROVED BY THE CITY OF RENTON INSPECTOR. INSPECTION SERVICES AND CONSTRUCTION CERTIFICATION TOBE PROVIDED BY DESIGNEE OF PROJECT SPONSOR/OWNER.THE CONTRACTOR IS SPECIFICALLY CAUTIONED THAT THE LOCATION AND/OR ELEVATION OF EXISTING UTILITIES, AS SHOWN ONTHESE PLANS, IS BASED ON RECORDS OF THE VARIOUS UTILITY COMPANIES AND, WHERE POSSIBLE, MEASUREMENTS TAKEN IN THEFIELD. THE INFORMATION IS NOT TO BE RELIED UPON AS BEING EXACT OR COMPLETE. THE CONTRACTOR MUST CALL THE LOCALUTILITIES. THE CONTRACTOR SHALL VERIFY PERTINENT LOCATIONS AND ELEVATIONS, ESPECIALLY AT THE CONNECTION POINTSUTILITIES THAT CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THESE PLANS.CONTRACTOR SHALL NOTIFY THE CITY OF RENTON INSPECTOR AT LEAST 48 HOURS PRIOR TO THE START OF ANY EARTHTHE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE CITY OF RENTON AND ALL UTILITY COMPANIES WITH REGARDACCOMPLISHED IN A TIMELY FASHION, AND WITH A MINIMUM DISRUPTION OF SERVICE. THE CONTRACTOR SHALL BE RESPONSIBLETHE CONTRACTOR SHALL HAVE ONE (1) SIGNED COPY OF THE APPROVED PLANS, ONE (1) COPY OF THE APPROPRIATE STANDARDSTIMES.THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ASPECTS OF SAFETY INCLUDING, BUT NOT LIMITED TO: EXCAVATION,TRENCHING, SHORING, TRAFFIC CONTROL, AND SECURITY.IF, DURING THE CONSTRUCTION PROCESS, CONDITIONS ARE ENCOUNTERED BY THE CONTRACTOR, HIS SUBCONTRACTORS, ORALL REFERENCES TO ANY PUBLISHED STANDARDS SHALL REFER TO THE LATEST REVISION OF SAID STANDARD, UNLESSFOR WORK AFFECTING PUBLIC ROADWAYS OR IF REQUIRED BY THE CITY OF RENTON, THE CONTRACTOR SHALL SUBMIT ATRAFFIC CONTROL AND PHASING PLAN IN ACCORDANCE WITH M.U.T.C.D. FOR APPROVAL. PRIOR TO ANY CONSTRUCTION ACTIVITIESWITHIN OR AFFECTING THE RIGHT-OF-WAY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ANY AND ALL TRAFFICCONTROL DEVICES AS MAY BE REQUIRED BY SAID PLANS. PRIOR TO INSTALLATION A PRECONSTRUCTION CONFERENCE SHALL BEHELD WITH CITY OF RENTON.THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING ALL LABOR AND MATERIALS NECESSARY FOR THE COMPLETION OF THEINTENDED IMPROVEMENTS SHOWN ON THESE DRAWINGS OR DESIGNATED TO BE PROVIDED, INSTALLED, CONSTRUCTED, REMOVEDOR RELOCATED UNLESS SPECIFICALLY NOTED OTHERWISE.PER AGENCY STANDARDS THE CONTRACTOR SHALL BE RESPONSIBLE FOR KEEPING ROADWAYS FREE AND CLEAR OF ALLCONSTRUCTION DEBRIS AND DIRT TRACKED FROM THE SITE.THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING RECORD INFORMATION ON A SET OF RECORD DRAWINGS KEPT ATTHE CONSTRUCTION SITE AND AVAILABLE TO THE CITY OF RENTON INSPECTOR AT ALL TIMES.DIMENSIONS FOR LAYOUT AND CONSTRUCTION ARE NOT TO BE SCALED FROM ANY DRAWING. FOR ADDITIONAL INFORMATIONALL EROSION AND SEDIMENT CONTROL (E.S.C.) MEASURES SHALL BE INSTALLED AT THE LIMITS OF CONSTRUCTION PRIOR TOTIME AS THE ENTIRE DISTURBED AREAS ARE STABILIZED WITH HARD SURFACE OR LANDSCAPING.DEPARTMENT STANDARD DETAILS AND SPECIFICATIONS.MOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOCIATED EQUIPMENT SHALL GENERALLY BE LIMITED TO THETIME PERIOD APPROVED BY THE CITY OF RENTON.1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.16.
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR1531 N 3RD STFACTORY PL NCONFIDENTIAL/PROPRIETARYSHEET: OF 417PLAN VIEW A CONSTRUCTION NOTES1EXISTING VERIZON VAULT. CORE VAULT AND PLACECONDUIT FROM TRENCH. COIL (1) FIBER CABLE THROUGH.CONTRACTOR TO VERIFY CORRECT EXISTING VAULT PRIORTO CONSTRUCTION.1MATCH TO SHEET3NE
3RD
STHOUSER WAY NN
E
3
R
D
S
T1526 N 3RD ST310 FACTORY PL NPARCEL #1723059033BNSF R/WPARCEL #1723059006BNSF R/W2
1
'
6
1
'73'204'6'3'7'5'80'43'13'2PROPOSED TRENCH (1) 2"∅ CONDUIT. PULL (1) FIBERCABLE THROUGH. REPAIR SURFACE PER LOCALJURISDICTION.3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.5PROPOSED (1) 444LA VAULT. CORE VAULT AND PLACECONDUITS FROM TRENCH. COIL (1) FIBER CABLETHROUGH.123434532342#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR1515 N MARION STFACTORY PL NCONFIDENTIAL/PROPRIETARYSHEET: OF 517PLAN VIEW B CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET6N
M
A
R
I
O
N
S
T 320 FACTORY PL N345 FACTORY PL N236'137'MATCH TO SHEET42'3'5'80'42'3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.434
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR501 HOUSER WAY NCONFIDENTIAL/PROPRIETARYSHEET: OF 617PLAN VIEW C CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO
SHEET5MATCH TO SHEET7FACTORY PL NN 4TH STFACTORY AVE N358 MEADOW AVE N355 FACTORY AVE N501 HOUSER WAY N67'39'266'5'3'2'70'44'3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.6PROPOSED (1) 25TA VAULT. CORE VAULT AND PLACECONDUITS FROM TRENCH. COIL (1) FIBER CABLETHROUGH.436434
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR356 GARDEN AVE NCONFIDENTIAL/PROPRIETARYSHEET: OF 717PLAN VIEW D CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET 6 MATCH TO SHEET8N 4TH STGARDEN AVE NMEADOW AVE N501 HOUSER WAY N420PARKAVE N339'118'5'7'5'3'5'69'44'3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.5PROPOSED (1) 444LA VAULT. CORE VAULT AND PLACECONDUITS FROM TRENCH. COIL (1) FIBER CABLETHROUGH.43544'
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR501 HOUSER WAY NCONFIDENTIAL/PROPRIETARYSHEET: OF 817PLAN VIEW E CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET 7 MATCH TO SHEET9GARDEN AVE N420 PARK AVE N19'353'4'7'7'5'60'35'3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.434
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR525 GARDEN AVE NCONFIDENTIAL/PROPRIETARYSHEET: OF 917PLAN VIEW F CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET 8 MATCH TO SHEET10GARDEN AVE NN 5TH ST 501 HOUSER WAY N420 PARK AVE N373'3'2'5'60'33'11'11'11'4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.4
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 1017PLAN VIEW G CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET 9 MATCH TO SHEET11GARDEN AVE N501 HOUSER WAY N535 GARDEN AVE N284'2'4'3'61'34'89'3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.434
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR501 HOUSER WAY NCONFIDENTIAL/PROPRIETARYSHEET: OF 1117CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET10MATCH TO SHEET12GARDEN AVE N N 6TH ST535 GARDEN AVE NPARCEL #7223000115231'2'4'2'2'58'45'121'PLAN VIEW H 3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.5PROPOSED (1) 444LA VAULT. CORE VAULT AND PLACECONDUITS FROM TRENCH. COIL (1) FIBER CABLETHROUGH.4354
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR535 GARDEN AVE NCONFIDENTIAL/PROPRIETARYSHEET: OF 1217CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET13MATCH TO SHEET 11
PARK AVE N
N 6TH STPARCEL #7223000115541 PARK AVE NPARCEL #7223000115600 PARK AVE N207'111'6'2'10'3'65'56'PLAN VIEW I 3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.5PROPOSED (1) 444LA VAULT. CORE VAULT AND PLACECONDUITS FROM TRENCH. COIL (1) FIBER CABLETHROUGH.43543
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallR618 PARK AVE NCONFIDENTIAL/PROPRIETARYSHEET: OF 1317PLAN VIEW J CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET 12 MATCH TO SHEET14PARK AVE NPARCEL #0823059209635 PARK AVE N800 PARK AVE N367'5'4'5'75'57'3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.434
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057Know what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 14 17PLAN VIEW K CONSTRUCTION NOTES#SYMBOL CORRESPONDS TO PHOTO LOCATIONS ANDORIENTATION. SEE SHEET #17 FOR SITE PHOTOGRAPHS.MATCH TO SHEET 13 PARK AVE N635 PARK AVE N800 PARK AVE N820 N 6TH ST203'18'2'7'87'56'12'12'2PROPOSED TRENCH (1) 2"∅ CONDUIT. PULL (1) FIBERCABLE THROUGH. REPAIR SURFACE PER LOCALJURISDICTION.3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.7PROPOSED (1) 17"X30" FUTURE MEET-ME VAULT. COREVAULT AND PLACE CONDUITS FROM TRENCH. COIL (1)FIBER CABLE THROUGH.43274
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057UNDERGROUND TYPICALSKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 1517COVER withADJUSTABLE FRAMENo. 25P ASSEMBLYBASENo. 25-BTPLAN VIEWSECTION AAEND VIEWAATYPICAL 25TA VAULT DETAILSCALE: NTS3/8 " L-BOLT (CAPTIVE)LIFT SLOTANCHORTABS4-3/4"X4-3/4"KNOCK OUT(2 PLACES)40-1
/2
"37-1/2"32-1/2"30-1/2"19-1/2"24-1/2"27-1/2"17-1/2"18"2"1730HH VAULT DETAILSCALE: NTS444LA VAULT DETAIL W/ROUND LIDSCALE: NTS
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057UNDERGROUND TYPICALSKnow what'sbelow.before you dig.CallRCONFIDENTIAL/PROPRIETARYSHEET: OF 161724"12"6"6"3' MIN.PANEL WIDTH PER PLAN12"MIN.12"MIN.3" HMA (CL 12") (MATCHEX. IF GREATER)EX. ASPHALT SURFACE11" HMA (CL 12" OR 1)6" MIN. COMPACT MINERALAGGREGATE TYPE 2COMPACTED BACKFILL6" SAND COVER6" SAND BEDDINGTYPICAL ASPHALT TRENCH DETAILSCALE: NTSTYPICAL TRENCH IN SOIL DETAILSCALE: NTSEXISTING GROUNDWARNING TAPEBACKFILL(8" LAYERS)6" MIN.12"36" MIN. DEPTH4"BACKFILL(COMPACTED @ 90%)HDPE DUCTCLEAN BACKFILLBACKFILL(COMPACTED EARTH @ 90%)TYPICAL CONCRETE TRENCH DETAILSCALE: NTS24"12"6"6"EX. CONCRETEREPLACE EX. CURBPER STD PLAN 410C6" MIN. TYPE 2 CRUSHEDROCKCOMPACTED BACKFILL6" SAND COVER6" SAND BEDDINGPANEL WIDTH PER PLAN12"MIN.12"MIN.ZONE OF INFLUENCE12" PCC CLASS 6.5 (CL 1-1/2")
DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123DRAWING NAME:ENGINEERING FIRM:PROJECT NUMBER:LOCATION:VERIZON - WIRELESS - BOEING FIELD.dwgNO.123----VERIZON ENGINEER:SCOTT CHRISTENSONMGC TECHNICAL CONSULTING INC.BOEING FIELD635 PARK AVE NRENTON, WA 98057SITE PHOTOGRAPHSKnow what'sbelow.before you dig.CallRPHOTO #1: FACING SW ON SOUTH SIDE OF NE 3RD STPHOTO #2: FACING WEST ON SOUTH SIDE OF FACTORY PL NPHOTO #3: FACING EAST ON NORTH SIDE OF N 6TH STPHOTO #4: FACING SOUTH ON WEST SIDE OF PARK AVE NCONFIDENTIAL/PROPRIETARYSHEET: OF 17 17CONSTRUCTION NOTES1EXISTING VERIZON VAULT. CORE VAULT AND PLACECONDUIT FROM TRENCH. COIL (1) FIBER CABLE THROUGH.CONTRACTOR TO VERIFY CORRECT EXISTING VAULT PRIORTO CONSTRUCTION.2PROPOSED TRENCH (1) 2"∅ CONDUIT. PULL (1) FIBERCABLE THROUGH. REPAIR SURFACE PER LOCALJURISDICTION.3PROPOSED 4'X6' BORE PIT. REPAIR SURFACE PER LOCALJURISDICTION.4PROPOSED BORE (1) 2"∅ CONDUIT. CONTRACTOR TOPOTHOLE UTILITIES PRIOR TO BORE. PULL (1) FIBER CABLETHROUGH.5PROPOSED (1) 444LA VAULT. CORE VAULT AND PLACECONDUITS FROM TRENCH. COIL (1) FIBER CABLETHROUGH.7PROPOSED (1) 17"X30" FUTURE MEET-ME VAULT. COREVAULT AND PLACE CONDUITS FROM TRENCH. COIL (1)FIBER CABLE THROUGH.453412472343534