HomeMy WebLinkAboutMFP19000302DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19000302
IVR Number: 19000302
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :01/10/2019Application Date:2662500010Parcel Number:1051 UNION AVE NE
Permit Type:01/30/2019Issue Date:Franchise
Permit Work Class:01/30/2020Expiration Date:Minor Utility
Job Number:111024709Franchise Type:Electric
Description:Remove and replace 3 transmission poles. Restoration per City of Renton standards.
CONDITIONS OF OVERHEAD APPROVAL: 1. Any existing height violations within the Project Reach must be resolved
at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’
6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the
City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to
underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities
are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project
Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its
aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The
new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event
triggering the requirement to underground the aerial lines.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
111024709
Anish Kumar
253-208-2183
anish.kumar@pse.com
1050 Union Ave NE 98059 111024709
Crew to remove and replace 3 transmission poles. No pavement cuts
anticipated. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
12/27/2018
1051
MFP1900302
Scott Warlick 1/17/2019
Justin Johnson 1-23-2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
111024709
PSE/Potelco Inc.
Bob Carlsen 425-864-0496
6905 S 228th St, Kent, WA 98032
bob.carlsen@pse.com
1050 Union Ave NE
TBD
1/28/2019
Anish Kumar 12/27/2018
MFP1900302
8:00AM - 3:30PM
Monday - Friday
Scott Warlick
1/17/2019
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
17315 SE May Valley Rd Renton WA 98059 USA17315 SE May Valley Rd Renton WA 98059 USAP01P02OUT OF ROWOUT OF ROW99SE MAY
VALLEY
RD
RE
N
T
O
N
I
S
S
A
Q
U
A
H
R
D
S
ESTOPFLAGG
ER
STOPFLAGG
ERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD
WORK
AHEAD W20-1W20-4ONE LANE
ROAD
AHEAD100'100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#111024709 17315 SE MAY VALLEY RD, RENTON, WA12/14/2018ryan.perkins@pse.com425-424-6621SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWMFP1900302
P01
2121
16161515BUSSTOP18181515TACOMA AVE NEUNION AVE NENE 10TH CT
NE 11TH ST
STOP
FLAGGER
STOP
FLAGGERONE LANEROADAHEADW20-4200'200'200'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7A100'100'100'
ROAD
WORK
AHEAD W20-1BEPREPAREDTOSTOPW3-4 W20-7AROADWORKAHEADW20-1 W20-7A
100'100'100'
ONE LANE
ROAD
AHEAD W20-4200'BEPREPAREDTOSTOPW3-4200'X'USE MAXIMUM AVAILABLE
SPACE FOR SIGNS
ROADWORKAHEADW20-1100'100'
DETOUR M4-9bR9-11SIDEWALK
CLOSED
AHEAD
SIDEWALK
CLOSED R9-9R9-11SIDEWALKCLOSEDAHEADSIDEWALKCLOSEDR9-9RESIDENT(S) WILL BE INFORMED OF TEMPORARY
DRIVEWAY CLOSURE
EMERGENCY VEHICLES WILL BE ALLOWED TO PASS
WORK ZONE.
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
PSE PUGET
SOUND
ENERGY
JOB#111024709
1050 Union Ave NE,Renton, WA 98059
11/26/2018
safaa.neema@pse.com
(425) 398-6077
Sheet 1 of 1
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 008997
Card Exp. 08/13/2019
gregory.harwood@pse.com
(425)424-6425N
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
POLE
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.
MFP1900302
MFP1900302
MFP1900302
TO: City of Renton
RE: PSE Job Number 111024709
TYPE OF WORK: Replacing existing poles into two locations under the same job
number:
1. Replace pole number 17/3 at Grid number 318535-167128 near address 1051
Union Ave. NE, Renton
2. Replacing pole numbers 14/4 & 14/5 at grid numbers 318515-168538 & 318515-
168504 respectively, near address 17315 SE May Valley Rd, Renton.
LOCATION OF WORK: 1051 Union Ave. NE, Renton; 17315 SE May Valley Rd,
Renton, WA 98059.
SCOPE OF WORK:
At these three locations the poles as described above will be removed and replaced in the
like locations. We have submitted along with this the design for approval and traffic
control plans for this work.
Give me a call if there are any questions on the work to be done.
Sincerely,
Phil Ash
Potelco Inc.
18150 Redmond Way
Phillip.Ash@pse.com
253.514.9986
MFP1900302
January 30, 2019
Marita Bond
Puget Sound Energy - Electric
P.O. Box 97034
Bellevue, WA 98009-9734
Via Email: marita.bond@pse.com
SUBJECT: Request for Undergrounding Exemption
(PSE#111024709, MFP19000302, 1051 Union Avenue NE)
Dear Ms. Bond:
The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from
Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities
shall be required to be installed underground, pursuant to the standards of the section of RMC.
PSE proposes to have Potelco Inc. replace three (3) PSE transmission utility poles. The poles to be replaced
are at the following locations: northwest corner of 4101 NE 10th Place, west property line of 17407 SE May
Valley Road, and approximately 350 feet east of west property line of 17407 SE May Valley Road.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(g). Ordinance
5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect,
maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of
electrical energy and gas, in, upon, over, under, along, across and through the franchise area.
The proposal is to replacement three (3) existing transmission poles, therefore, the City is granting an
exemption with conditions, per RMC 4-6-090(D)(1)(g) which allows for replacement of three or less poles.
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(g).
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
PSE Electric #111024709
Page 2 of 2
January 30, 2019
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any
other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed
by a franchisee within the Project Reach, in which case PSE shall participate in the joint use
trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made
available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City, from the first
event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, February 13, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer II
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Pat Miller, Construction Inspection Supervisor
Kerry Kriner, Puget Sound Energy Kerry.kriner@pse.com
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP19000302
Engineering
1 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
2 Engineering General Conditions
The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at
PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the
Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE
shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a
conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines
must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the
requirement to underground the aerial lines.
3 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
4 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
Page 1 of 1