HomeMy WebLinkAboutMFP19000302DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19000302 IVR Number: 19000302 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :01/10/2019Application Date:2662500010Parcel Number:1051 UNION AVE NE Permit Type:01/30/2019Issue Date:Franchise Permit Work Class:01/30/2020Expiration Date:Minor Utility Job Number:111024709Franchise Type:Electric Description:Remove and replace 3 transmission poles. Restoration per City of Renton standards. CONDITIONS OF OVERHEAD APPROVAL: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’ 6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 111024709 Anish Kumar 253-208-2183 anish.kumar@pse.com 1050 Union Ave NE 98059 111024709 Crew to remove and replace 3 transmission poles. No pavement cuts anticipated. Restoration per City of Renton standards. Potelco Inc.253-208-2183 BL005109 Poteli*227PL 12/27/2018 1051 MFP1900302 Scott Warlick 1/17/2019 Justin Johnson 1-23-2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 111024709 PSE/Potelco Inc. Bob Carlsen 425-864-0496 6905 S 228th St, Kent, WA 98032 bob.carlsen@pse.com 1050 Union Ave NE TBD 1/28/2019 Anish Kumar 12/27/2018 MFP1900302 8:00AM - 3:30PM Monday - Friday Scott Warlick 1/17/2019 SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 17315 SE May Valley Rd Renton WA 98059 USA17315 SE May Valley Rd Renton WA 98059 USAP01P02OUT OF ROWOUT OF ROW99SE MAY VALLEY RD RE N T O N I S S A Q U A H R D S ESTOPFLAGG ER STOPFLAGG ERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD100'100'100'W20-7AROAD WORK AHEAD W20-1W20-4ONE LANE ROAD AHEAD100'100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040NPSEPUGETSOUNDENERGYJOB#111024709 17315 SE MAY VALLEY RD, RENTON, WA12/14/2018ryan.perkins@pse.com425-424-6621SHEET 1 of 1Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.WORK PIT28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWMFP1900302 P01 2121 16161515BUSSTOP18181515TACOMA AVE NEUNION AVE NENE 10TH CT NE 11TH ST STOP FLAGGER STOP FLAGGERONE LANEROADAHEADW20-4200'200'200'ROADWORKAHEADW20-1W20-7ABEPREPAREDTOSTOPW3-4ROADWORKAHEADW20-1W20-7A100'100'100' ROAD WORK AHEAD W20-1BEPREPAREDTOSTOPW3-4 W20-7AROADWORKAHEADW20-1 W20-7A 100'100'100' ONE LANE ROAD AHEAD W20-4200'BEPREPAREDTOSTOPW3-4200'X'USE MAXIMUM AVAILABLE SPACE FOR SIGNS ROADWORKAHEADW20-1100'100' DETOUR M4-9bR9-11SIDEWALK CLOSED AHEAD SIDEWALK CLOSED R9-9R9-11SIDEWALKCLOSEDAHEADSIDEWALKCLOSEDR9-9RESIDENT(S) WILL BE INFORMED OF TEMPORARY DRIVEWAY CLOSURE EMERGENCY VEHICLES WILL BE ALLOWED TO PASS WORK ZONE. CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 PSE PUGET SOUND ENERGY JOB#111024709 1050 Union Ave NE,Renton, WA 98059 11/26/2018 safaa.neema@pse.com (425) 398-6077 Sheet 1 of 1 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 008997 Card Exp. 08/13/2019 gregory.harwood@pse.com (425)424-6425N 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. MFP1900302 MFP1900302 MFP1900302 TO: City of Renton RE: PSE Job Number 111024709 TYPE OF WORK: Replacing existing poles into two locations under the same job number: 1. Replace pole number 17/3 at Grid number 318535-167128 near address 1051 Union Ave. NE, Renton 2. Replacing pole numbers 14/4 & 14/5 at grid numbers 318515-168538 & 318515- 168504 respectively, near address 17315 SE May Valley Rd, Renton. LOCATION OF WORK: 1051 Union Ave. NE, Renton; 17315 SE May Valley Rd, Renton, WA 98059. SCOPE OF WORK: At these three locations the poles as described above will be removed and replaced in the like locations. We have submitted along with this the design for approval and traffic control plans for this work. Give me a call if there are any questions on the work to be done. Sincerely, Phil Ash Potelco Inc. 18150 Redmond Way Phillip.Ash@pse.com 253.514.9986 MFP1900302 January 30, 2019 Marita Bond Puget Sound Energy - Electric P.O. Box 97034 Bellevue, WA 98009-9734 Via Email: marita.bond@pse.com SUBJECT: Request for Undergrounding Exemption (PSE#111024709, MFP19000302, 1051 Union Avenue NE) Dear Ms. Bond: The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required to be installed underground, pursuant to the standards of the section of RMC. PSE proposes to have Potelco Inc. replace three (3) PSE transmission utility poles. The poles to be replaced are at the following locations: northwest corner of 4101 NE 10th Place, west property line of 17407 SE May Valley Road, and approximately 350 feet east of west property line of 17407 SE May Valley Road. ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(g). Ordinance 5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach, connect, maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and sale of electrical energy and gas, in, upon, over, under, along, across and through the franchise area. The proposal is to replacement three (3) existing transmission poles, therefore, the City is granting an exemption with conditions, per RMC 4-6-090(D)(1)(g) which allows for replacement of three or less poles. DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C) as requested by the applicant is approved with conditions subject to the conditions below as the request complies with exemption criteria of RMC 4-6-090(D)(1)(g). Conditions of Approval: 1. Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2. Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. PSE Electric #111024709 Page 2 of 2 January 30, 2019 3. A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed with the City Clerk, along with the required appeal fee, by 5:00 pm, February 13, 2019. Sincerely, Brianne Bannwarth, PE Development Engineering Manager cc: C.E. “Chip” Vincent, CED Administrator Gregg Zimmerman, PW Administrator Jennifer Henning, Planning Director Justin Johnson, Civil Engineer II Scott Warlick, Engineering Specialist II Holly Powers, Permit Technician Pat Miller, Construction Inspection Supervisor Kerry Kriner, Puget Sound Energy Kerry.kriner@pse.com Franchise Permits DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit MFP19000302 Engineering 1 Engineering General Conditions Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial lines within the Project Reach must have a minimum vertical clearance of 15’-6”. 2 Engineering General Conditions The new aerial fiber lines within the Project Reach must be converted to underground facilities in the future, at PSE’s cost, when any one of the following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is proposed by a franchisee within the Project Reach, in which case PSE shall participate in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines. 3 Engineering General Conditions Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking place. 4 Engineering General Conditions A traffic control plan must be separately submitted to the City, and no construction may take place until the City has approved a traffic control plan. Page 1 of 1