HomeMy WebLinkAboutCO 2 CAG-18-237, CO #2-19
CITY OF RENTON
Community Services Department
CONTRACT CHANGE ORDER AGREEMENT
125.2019
CONTRACT: City of Renton
CAG-18-237
CONTRACTOR: All Play Systems,LLC.
CHANGE ORDER: No.2
SUMMARY OF PROPOSED CHANGE:
Reason/Justification:
Installation of an underground drainage system,including drainage pipe,drainage gravel,filter cloth,
connection to existing storm drainage and other components to drain playground area.
DESCRIPTION:
Item Qty. Description Unit Price Amount
No, WI WSST
1 Drainage improvements to playground. $ 26,761,00 $ 29,437.10
Total this Change Order: $ 29,437.10
ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT
AMOUNT(W/WSST) AMOUNT THIS ORDER ON/WSST) TOTAL AFTER CHANG E
152,282.69 $ 152,282.69 $ 29,437.10 $ 181,719.79
Additional Calendar Days:
Extension of Time 28 Calendar Days.Completion Date is February 28,2019
The payment specified and agreed to in this change order includes every claim by the contractor for any
extra payment with respect to the work described in this change order. The work covered by this change
order must be performed under the same terms and conditions as that included in the original
agreement. All of the other terms of the original agreement remain in effect
SIGNATURES:
„, t'
Contractor: Date:
Project Manager: Date //2,--7.20/
4. A AI/0P Date:
Approved By:
7
,
(co ot Adm,mstrat,)
AllPlay Systems, LLC P.O. Box 1886 Quotation
Sequim, WA 98382
Toll Free: 888.531.4881 Jeff Hansen
Fax: 888.655.6412 (425) 766-7822
Our 4, QY Email: jeff@allplaysystems.com
Project: Teasdale Park Change Order
Date: 1/24/2018
Bill To: Ship To:
city of Renton Teasdale Park
•
Contact: Alan Wyatt Contact:
Phone: 425-430-6571 Phone:
Email: awyatt@rentonwa.gov Email:
This quote and purchase will be administered in accordance with the terms of NASPO ValuePoint Master Agreement
#6479, executed 12/1/2016. The customer is responsible for final quantity count and unloading of freight at site,
unless otherwise specified. All freight damage or missing items must be reported within two business days.
Vendor Item Description Model Qty Unit Price Total Price
North Star Install 4"OD pipe grid in use zone, pipe to drain, 1 $16,274.00 $16,274.00
North Star lay fabric, provide/install 4"drain rock 5/8 minus
Playcraft PC2474 Enclosed Stand-N-Spin 1
NASPO NASPO Washington State contract discount (12%) 1
Playcraft Freight to Renton 1
Superior Cut, remove and haul away up to 55 yards of dirt 1 $10,487.00 $10,487.00
Superior Grade remaining dirt to a 1% to 2%slope from back to
Superior sidewalk area
Additional Info:
Subtotal $26,761.00
Tax10.0% $2,676.10
Total $29,437.10
Jeff Hansen Accepted By:
(425) 766-7822
jeff@allplaysystems.com Date:
Page 1 of 1