HomeMy WebLinkAboutMFP18002335DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18002335
IVR Number: 18002335
Permit Informaon
Permit Name:Century Link Permits
Address/Locaon :05/02/2018Application Date:7227900095Parcel Number:2833 NE SUNSET BLVD
Permit Type:07/30/2018Issue Date:Franchise
Permit Work Class:07/30/2019Expiration Date:Minor Utility
Job Number:N.351569Franchise Type:Telephone
11/19/2018Finalize Date:
Description:REVISION: Access additional pole at end of path (Pole 9), place aerial fiber from pole 8 to pole 9, place 2 4'X4' bore
pits, remove/replace 10'X10' sidewalk panel, bore 63' across kirkland ave, trench 7', access Ped and replace with
3048HH, place riser on pole 9, place new 233LA HH. Restoration per City of Renton standards.
Conditions of Approval: 1. Any existing height violations would need to be resolved at the time of construction. New
aerial fiber must have a minimum vertical clearance of 15' 6". 2. Any abandoned or unused cable would need to be
removed at the time that construction is taking place. 3. A traffic control plan must be separately submitted to the City,
and no construction may take place until the City has approved a traffic control plan. 4. The new aerial fiber lines within
the Project Reach must be converted to underground facilities in the future, at Century Link’s cost, when any one of the
following events occurs: (1) any other utilities are undergrounded within the Project Reach, (2) a joint use trench is
proposed by a franchisee within the Project Reach, in which case Century Link shall participate in the joint use trench
installation for the purpose of undergrounding its aerial lines, or (3) a conduit is made available within the Project
Reach that will accommodate the aerial lines. The new aerial lines must be undergrounded within one year, or
approved otherwise by the City, from the first event triggering the requirement to underground the aerial lines.
Contacts
Name Address PhoneTypeBilling
C/O QWEST CORP 1801 CALIFORNIA ST #4600
Denver, CO 80202
Applicant
Kim Parker
QWest Corporation
931 14th St, Suite 1000A
Denver, CO 80202
B: (303) 992-0752Contact
Heather Binkly
Dycom Industries dba North Sky
11770 Us Hwy 1, SUITE 101
Palm Beach Gardens, FL 33408
B: (360) 254-6920
O: (360) 450-3287
Contractor
Business License Number: 36846Construction Contractor: NORTHSC857Q4
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
QWest/Century Link - Billing 7850 S TRAFTON St
TACOMA, WA 98409
Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Page 1 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18002335
(Date)(Signature)
Page 2 of 2THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
REVISION - FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Only Current Issued Permits Qualify for a Revision. For any work related to an expired or
finaled permit, a new Franchise Permit Application shall be required. Submit an electronic copy of the plans
with the Revision Franchise Permit Application to franchisepermits@rentonwa.gov.
Permit #
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Approved Description of Work:
Proposed Description of Work:
Reason for change of work:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Amy Silbaugh
MFP18002335
Qwest Corp d/b/a CenturyLink
N.351569
Amy Silbaugh
253-372-5311
amy.silbaugh@centurylink.com
2833 NE Sunset Blvd
Access to MH509, HH23021, and 8 poles. No disturbance of surface
Access additional pole at end of path (pole 9), place aerial fiber from pole 8 to pole 9, place two
4'x4' bore pits, remove/replace 10'x10' sidewalk panel, bore approx 63' across Kirkland Ave, trench approx. 7', access Ped and
replace with 3048HH, place riser on Pole 9, place new 233LA HH. Disturbance of hard and soft surface to be restored to city standard
Original path found not viable once in field. New path required to bring service to customer
09/04/2018
4
Scott Warlick 9/11/2018
Justin Johnson 9-24-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
N.351569 MFP18002335
North Sky Communications 206-962-5116
Amy Silbaugh 253-372-5311
23315 66th Ave S Kent, WA 98032
amy.silbaugh@centurylink.com 253-372-5176
2833 NE Sunset Blvd
Reset FormPrint Form
Amy Silbaugh
Amy Silbaugh 09/04/18
Justin Johnson
9-24-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
Comments:
SIGN SPACING
MPH "X"
45+ 500'
35 350'
30 200'
25 100'
150' Seattle
200' Sea Tac
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'
25 / 30 20' 40'
ONE LANE TWO WAY
TAPER 50' TO 100' max
TRAFFIC CONTROL PLAN
JOB # N.351569 C.46
PERMIT #
KIRKLAND AVE NE @ NE 11TH ST
SET UP BP 1 & BP 2
BORE
SHOULDER WORK
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON
TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com
Date:08/31/2018 Author:Sharon Martos, Traffic Control Supervisor Project:N.351569 C.46
CERT:TCS # 010745 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retroreflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
MERGING TAPER LENGTH
TAPER ('L') LANE WIDTH
L
MPH 10' 11' 12'
SHIFTING 20 70 75 80
TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
Sharon Martos
Project # N.351569 C.46
Designed for CenturyLink by
Sharon Martos
Approved 08/31/2018
Traffic Control Supervisor
TCS # 010745
Expires: 5/30/2021
Phone 253-737-5198
sharon.martos@gmail.com
Legend
Not to scale Scale Marker
Work Truck
Work Area
Cone
SpotterNot to scaleNOT TO SCALE
KIRKLAND AVE NE
Comments:
SET UP BORE PITS, EAST & WEST
SIDES OF KIRKLAND AVE NE,
SOUTH OF
NE SUNSET BLVD NE.
BORE FROM BP1 - BP2.
SHOULDER WORK.
PARKING RESTRICTED.
SIDEWALK CLOSED.
CURB WILL BE RAMPED PER ADA
REQUIREMENTS TO ACCOMMODATE
PEDESTRIANS.
SPOTTER WILL ASSIST PEDESTRIANS.
SPEED
LIMIT25
ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1ROADWORKAHEADW20-1SHOULDERWORKW21-5N
E
1
1
T
HPLDWYNE SUNSET BLVD34'
N
BP 2
BP 1
WORK AREA
8 X 45
DETOURM4-9bDETOURM4-9bNO
FROM
TO
TOW AWAY AREA
PHONE 684-5444YOUR COMPANY NAME 555-5555
PARKING
R7-T39
2833
NE SUNSET BLVD
www.invarion.com
MFP18002335
Comments:
SIGN SPACING
MPH "X"
45+ 500'
35 350'
30 200'
25 100'
150' Seattle
200' Sea Tac
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'
25 / 30 20' 40'
ONE LANE TWO WAY
TAPER 50' TO 100' max
TRAFFIC CONTROL PLAN
JOB # N.351569 C.46
PERMIT #
KIRKLAND AVE NE @ NE 11TH ST
P8 - P9 AERIAL
MOVING OPERATION
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON
TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com
Date:08/31/2018 Author:Sharon Martos, Traffic Control Supervisor Project:N.351569 C.46
CERT:TCS # 010745 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retroreflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
MERGING TAPER LENGTH
TAPER ('L') LANE WIDTH
L
MPH 10' 11' 12'
SHIFTING 20 70 75 80
TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
Sharon Martos
Project # N.351569 C.46
Designed for CenturyLink by
Sharon Martos
Approved 08/31/2018
Traffic Control Supervisor
TCS # 010745
Expires: 5/30/2021
Phone 253-737-5198
sharon.martos@gmail.com
Legend
Not to scale Scale Marker
Work Area
Work Truck
flagger symbol
Not to scaleNOT TO SCALE
KIRKLAND AVE NE
Comments:
SE CORNER KIRKLAND AVE NE & NE 11TH ST.
MOVING OPERATION WITH FLAGGERS.
WORK TRUCKS WILL TRAVEL WITH TRAFFIC.
PARKING RESTRICTED.
FLAGGERS WILL HOLD ALL TRAFFIC FOR CROSSINGS.
SIDEWALK ACCESSIBLE.
FLAGGERS WILL ASSIST PEDESTRIANS.
SPEED
LIMIT25 ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1ROADWORKAHEADW20-1N
E
1
1
T
HPLDWYNE SUNSET BLVD34'BE PREPAREDTO STOPW20-7bBE
PREPA
R
E
D
TO STO
P
W20-7bBE PREPAREDTO STOPW20-7bBE
PREPA
R
E
D
TO ST
O
P
W20-7
bBE PREPAREDTO STOPW20-7bW20-7aW20-7
aW20-7aSPEED
LIMIT
35
350 ft
350 ft
100 ft 100 ft
100 ft
100 ft
100 ft
100 ft
X
X
P8
P9
N
2833
NE SUNSET BLVD
www.invarion.com
MFP18002335
Comments:
SIGN SPACING
MPH "X"
45+ 500'
35 350'
30 200'
25 100'
150' Seattle
200' Sea Tac
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'
25 / 30 20' 40'
ONE LANE TWO WAY
TAPER 50' TO 100' max
TRAFFIC CONTROL PLAN
JOB # N.351569 C.46
PERMIT #
KIRKLAND AVE NE @ NE 11TH ST
PED REPLACEMENT - NEW HH
SHOULDER WORK
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON
TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com
Date:08/31/2018 Author:Sharon Martos, Traffic Control Supervisor Project:N.351569 C.46
CERT:TCS # 010745 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retroreflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
MERGING TAPER LENGTH
TAPER ('L') LANE WIDTH
L
MPH 10' 11' 12'
SHIFTING 20 70 75 80
TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
Sharon Martos
Project # N.351569 C.46
Designed for CenturyLink by
Sharon Martos
Approved 08/31/2018
Traffic Control Supervisor
TCS # 010745
Expires: 5/30/2021
Phone 253-737-5198
sharon.martos@gmail.com
Legend
Not to scale Scale Marker
Work Truck
Work Area
Cone
SpotterNot to scaleNOT TO SCALE
N
KIRKLAND AVE NE
Comments:
ACCESS EXISTING PED.
EAST SIDE KIRKLAND AVE NE, SOUTH
OF NE SUNSET BLVD.
SHOULDER WORK.
PARKING RESTRICTED.
SIDEWALK IS ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS.
SPEED
LIMIT25
PED
WORK AREA
8 X 40 ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1ROADWORKAHEADW20-1SHOULDERWORKW21-5100 ft
N
E
1
1
T
HPLDWYNE SUNSET BLVD34'
NO
FROM
TO
TOW AWAY AREA
PHONE 684-5444YOUR COMPANY NAME 555-5555
PARKING
2833
NE SUNSET BLVD
www.invarion.com
MFP18002335
Comments:
SIGN SPACING
MPH "X"
45+ 500'
35 350'
30 200'
25 100'
150' Seattle
200' Sea Tac
Comments:
CHANNELIZATION SPACING
MPH TAPER TANGENT
35 / 45 30' 60'
25 / 30 20' 40'
ONE LANE TWO WAY
TAPER 50' TO 100' max
TRAFFIC CONTROL PLAN
JOB # N.351569 C.46
PERMIT #
KIRKLAND AVE NE @ NE 11TH ST
TRENCH - RISER PLACEMENT - P9
SHOULDER WORK
UNLAWFUL FOR ANYONE OTHER THAN THE CITY OF RENTON
TO ALTER THIS CERTIFIED TRAFFIC CONTROL PLAN
IN ANY FORM WITHOUT EXPRESS WRITTEN CONSENT FROM:
SHARON MARTOS, TCS# 010745 sharon.martos@gmail.com
Date:08/31/2018 Author:Sharon Martos, Traffic Control Supervisor Project:N.351569 C.46
CERT:TCS # 010745 CENTURYLINK:Certified Traffic Control Plan (DO NOT ALTER)
Comments:
General Requirements
1. All signs and spacing to conform to the MUTCD and CITY OF RENTON
requirements.
2. Channelizing devices are 28" traffic cones with retroreflective material.
3. All signs are 48" x 48" B/O unless otherwise specified.
4. Alert affected local residents and businesses.
5. Crew is required to leave a minimum of 11' for lane width.
6. Work hours will be ____am to ____pm.
Comments:
MERGING TAPER LENGTH
TAPER ('L') LANE WIDTH
L
MPH 10' 11' 12'
SHIFTING 20 70 75 80
TAPER 25 105 115 165
1/2 L 30 150 165 180
35 205 225 245
SHOULDER 40 270 295 320
TAPER 45 450 495 540
1/3 L
Sharon Martos
Project # N.351569 C.46
Designed for CenturyLink by
Sharon Martos
Approved 08/31/2018
Traffic Control Supervisor
TCS # 010745
Expires: 5/30/2021
Phone 253-737-5198
sharon.martos@gmail.com
Legend
Not to scale Scale Marker
Work Truck
Work Area
Cone
SpotterNot to scaleNOT TO SCALE
KIRKLAND AVE NE
Comments:
TRENCH FROM NEW HH - P9.
PLACE RISER.
EAST SIDE KIRKLAND AVE NE, SOUTH
OF NE SUNSET BLVD.
SHOULDER WORK.
PARKING RESTRICTED.
SIDEWALK IS ACCESSIBLE.
SPOTTER WILL ASSIST PEDESTRIANS.
SPEED
LIMIT25
ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1ROADWORKAHEADW20-1ROAD
WORK
AHEAD
W20-1ROADWORKAHEADW20-1SHOULDERWORKW21-5100 ft
N
E
1
1
T
HPLDWYNE SUNSET BLVD34'
N
X
P9
WORK AREA
8 X 45
NEW HH
NO
FROM
TO
TOW AWAY AREA
PHONE 684-5444YOUR COMPANY NAME 555-5555
PARKING
R7-T39
2833
NE SUNSET BLVD
www.invarion.com
MFP18002335
CONFIDENTIAL - Disclose and
Distribute Soley to CTL Employees
Having a Need to Know
SHEET NUMBER:
SHEET 01 OF 07
Name:
Phone Number:
Name:
Phone Number:
Name:
Phone Number:
Engineering Contact
Contact Engineer
Construction Coordinator
Revision Number:
WC CLLI:
Remote Switch Key:
Project Description:
Project #:
Community Name:
Exchange Key:
GOLDEN WEST DIAMOND CORP
N.351569
RENTON
RNTNWA01
EMILY STARKEL
(206) 379-6516
JOSE ORTIZ
(360) 929-5338
BILL JIRA
(425) 451-5031
TOWNSHIP:
RANGE:
SECTION:
23N
05E
9
Revision Date:
---------
---------
NARRATIVE / SPECIAL REMARKS
HELD ORDER INFORMATION
ASSOCIATES PROJECTS MISC. INFORMATION
Site Survey For: 2833 NE SUNSET BLVD, RENTON, WA 98056, USA
WORK LOCATION
T.23N R.05E
9
T.23N R.05E
4
Rev 3 - Per Pole Attachment Info
Rev Date - 08/30/2018
Reviewed By - Nadim Serhal
MFP18002335
CONFIDENTIAL - Disclose and
Distribute Soley to CTL Employees
Having a Need to Know
SHEET NUMBER:
SHEET 02 OF 07
Name:
Phone Number:
Name:
Phone Number:
Name:
Phone Number:
Engineering Contact
Contact Engineer
Construction Coordinator
Revision Number:
WC CLLI:
Remote Switch Key:
Project Description:
Project #:
Community Name:
Exchange Key:
GOLDEN WEST DIAMOND CORP
N.351569
RENTON
RNTNWA01
EMILY STARKEL
(206) 379-6516
JOSE ORTIZ
(360) 929-5338
BILL JIRA
(425) 451-5031
TOWNSHIP:
RANGE:
SECTION:
23N
05E
9
Revision Date:
---------
---------
MARGIN LABELS
MFP18002335
CONFIDENTIAL - Disclose and
Distribute Soley to CTL Employees
Having a Need to Know
SHEET NUMBER:
SHEET 03 OF 07
Name:
Phone Number:
Name:
Phone Number:
Name:
Phone Number:
Engineering Contact
Contact Engineer
Construction Coordinator
Revision Number:
WC CLLI:
Remote Switch Key:
Project Description:
Project #:
Community Name:
Exchange Key:
GOLDEN WEST DIAMOND CORP
N.351569
RENTON
RNTNWA01
EMILY STARKEL
(206) 379-6516
JOSE ORTIZ
(360) 929-5338
BILL JIRA
(425) 451-5031
TOWNSHIP:
RANGE:
SECTION:
23N
05E
9
Revision Date:
---------
---------
MARGIN LABELS
POF: MH VIEW
SCALE: 1:20
MFP18002335
CONFIDENTIAL - Disclose and
Distribute Soley to CTL Employees
Having a Need to Know
SHEET NUMBER:
SHEET 04 OF 07
Name:
Phone Number:
Name:
Phone Number:
Name:
Phone Number:
Engineering Contact
Contact Engineer
Construction Coordinator
Revision Number:
WC CLLI:
Remote Switch Key:
Project Description:
Project #:
Community Name:
Exchange Key:
GOLDEN WEST DIAMOND CORP
N.351569
RENTON
RNTNWA01
EMILY STARKEL
(206) 379-6516
JOSE ORTIZ
(360) 929-5338
BILL JIRA
(425) 451-5031
TOWNSHIP:
RANGE:
SECTION:
23N
05E
9
Revision Date:
---------
---------
MARGIN LABELS
HH/POLE VIEW
SCALE: 1:10
MFP18002335
CONFIDENTIAL - Disclose and
Distribute Soley to CTL Employees
Having a Need to Know
SHEET NUMBER:
SHEET 05 OF 07
Name:
Phone Number:
Name:
Phone Number:
Name:
Phone Number:
Engineering Contact
Contact Engineer
Construction Coordinator
Revision Number:
WC CLLI:
Remote Switch Key:
Project Description:
Project #:
Community Name:
Exchange Key:
GOLDEN WEST DIAMOND CORP
N.351569
RENTON
RNTNWA01
EMILY STARKEL
(206) 379-6516
JOSE ORTIZ
(360) 929-5338
BILL JIRA
(425) 451-5031
TOWNSHIP:
RANGE:
SECTION:
23N
05E
9
Revision Date:
---------
---------
MARGIN LABELS
POLE VIEW
SCALE: 1:20
MFP18002335
CONFIDENTIAL - Disclose and
Distribute Soley to CTL Employees
Having a Need to Know
SHEET NUMBER:
SHEET 06 OF 07
Name:
Phone Number:
Name:
Phone Number:
Name:
Phone Number:
Engineering Contact
Contact Engineer
Construction Coordinator
Revision Number:
WC CLLI:
Remote Switch Key:
Project Description:
Project #:
Community Name:
Exchange Key:
GOLDEN WEST DIAMOND CORP
N.351569
RENTON
RNTNWA01
EMILY STARKEL
(206) 379-6516
JOSE ORTIZ
(360) 929-5338
BILL JIRA
(425) 451-5031
TOWNSHIP:
RANGE:
SECTION:
23N
05E
9
Revision Date:
---------
---------
MARGIN LABELS
POLE VIEW
SCALE: 1:20
MFP18002335
CONFIDENTIAL - Disclose and
Distribute Soley to CTL Employees
Having a Need to Know
SHEET NUMBER:
SHEET 07 OF 07
Name:
Phone Number:
Name:
Phone Number:
Name:
Phone Number:
Engineering Contact
Contact Engineer
Construction Coordinator
Revision Number:
WC CLLI:
Remote Switch Key:
Project Description:
Project #:
Community Name:
Exchange Key:
GOLDEN WEST DIAMOND CORP
N.351569
RENTON
RNTNWA01
EMILY STARKEL
(206) 379-6516
JOSE ORTIZ
(360) 929-5338
BILL JIRA
(425) 451-5031
TOWNSHIP:
RANGE:
SECTION:
23N
05E
9
Revision Date:
---------
---------
MARGIN LABELS
BUILDING VIEW
SCALE : 1:10
MFP18002335
City of Renton
Dept. of Community & Economic Development
Phone: 425-430-7266 / franchise@rentonwa.gov
This letter is in response to an Aerial Variance request for explanation regarding CenturyLink permit
request to place fiber on job N.351569 to provide fiber to CenturyLink customer order.
This customer is currently being fed by an existing underground copper feed from the east side of
Kirkland Ave NE and their conduit stops 65ft out of the MPOP. The most efficient and cost-effective way
to upgrade the customer to fiber is to bore across Kirkland Ave NE and replace the Ped with a new HH.
From there we can trench in the grass and place a riser to pole A0505526. Then we can place aerial to
pole A0505527 and proceed as originally requested. This costs us approximately, $18,000. If we were to
replace this with an underground, this would cost us nearly double at $30,000. The aerial path allows for
less ground disturbance, concrete disturbance, restoration, and traffic impact. If this is acceptable to the
City of Renton we will proceed as planned, otherwise we will not be able to provide this service to the
customer as requested.
Thank You,
Emily Starkel
CenturyLink Engineering
CDFS Fiber Engineer
23315 66th Ave S
Kent, WA 98032
206-379-6516
Emily.starkel@centurylink.com
MFP18002335
January 22, 2019
Amy Silbaugh
Qwest Corp d/b/a CenturyLink
23315 66th Avenue S
Kent, WA 98032
Via Email: amy.silbaugh@centurylink.com
SUBJECT: Revision Request for Undergrounding Exemption
(N.351569, MFP18002335, 2833 NE Sunset Blvd)
Dear Ms. Silbaugh:
The City of Renton has reviewed your request to grant CenturyLink an exemption from Renton Municipal
Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities shall be required
to be installed underground, pursuant to the standards of the section of RMC.
CenturyLink proposes to have North Sky Communications install a new 48-count aerial fiber connection
on existing Puget Sound Energy (PSE) power poles along Kirkland Avenue NE beginning approximately 100
feet south of NE 10th Street on the west side of Kirkland Avenue NE. The new fiber connection will extend
north approximately 650 lineal feet to north property line of 1033 Kirkland Avenue NE, then cross to the
east side of Kirkland Avenue NE to the south property line of 1058 Kirkland Avenue NE, and continue north
to south property line of 3005 NE Sunset Blvd.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(h) i and ii. City
of Renton Municipal Code 5-19-2.B.1 and 2 states that “Except as otherwise provided herein, any
telecommunications carriers who desire to construct, install, operate, maintain, or otherwise locate
telecommunications facilities in, under, over or across any public way of the City, and to also provide
telecommunications service to persons or areas in the City, shall first obtain a franchise granting the use
of such public ways from the City pursuant to Section 5-19-3 of this Chapter.”
CenturyLink does not have a franchise agreement with the City, as its predecessor-in-interest held a
blanket grant of authority, dating back to territorial times, and therefore has unique status as compared
to other telecommunications purveyors. Per Eric J. Schwalb, Senior Corporate Counsel for CenturyLink,
RCW Section 35.99.030 states that a city or town may not require a “master permit” from service
providers seeking access to public rights-of-way who have an existing statewide grant, as Century Link
has. Furthermore, the Washington State Constitution, Article XII, Section 19, grants the right to construct
and maintain lines of telegraph and telephone within this state. While we concur that VOIP is allowed per
the RCW and Washington State Constitution, cable service is not a right granted without a franchise.
CenturyLink N.351569 (Revision)
Page 2 of 2
January 22, 2019
Therefore, this analysis will focus on the overhead fiber proposed to be installed for Data/VOIP, and not
the provision of future cable.
In evaluating this proposal, staff considered RMC 4-6-090.D. which allows for exemptions due to
technological difficulties; when costs outweigh the general welfare consideration implicit in underground
installation; or, if the growth pattern of the area has not been sufficiently established to determine the
ultimate service routes. In this instance, the portion of the route proposed for aerial installation is an
area with existing overhead facilities that are likely to remain for a period of time.
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(h) i and ii.
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. The new aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at Century Link’s cost, when any one of the following events occurs: (1)
any other utilities are undergrounded within the Project Reach, (2) a joint use trench is
proposed by a franchisee within the Project Reach, in which case Century Link shall participate
in the joint use trench installation for the purpose of undergrounding its aerial lines, or (3) a
conduit is made available within the Project Reach that will accommodate the aerial lines.
The new aerial lines must be undergrounded within one year, or approved otherwise by the
City, from the first event triggering the requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, February 5, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer II
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Pat Miller, Construction Inspection Supervisor
Emily Starkel, CenturyLink Engineering Emily.starkel@centurylink.com
Franchise Permits