Loading...
HomeMy WebLinkAboutN.354323 - Aerial Variance Cost Breakdown SheetCost Breakdown - 2725 NE Sunset BLVD, Renton, WA 98056 Underground vs. Overhead Construction Partial Underground Installation (Initial Plan) New conduit installation (trench) 2,031.48$ Temporary Restoration, backfill, disposal fees 14,356.00$ Permanent Sidewalk Restoration 126,852.00$ Conduit Prep & Tie ins 995.21$ Underground fiber placement 694.62$ Aerial Placement 2,241.70$ Cost to build 147,171.01$ Total Underground Installation New conduit installation (bore & trench) 37,761.48$ Restoration, backfill, disposal fees 6,606.00$ Conduit Prep & Tie ins 2,263.60$ Fiber Placement 3,285.54$ Handhole placement 1,484.42$ Cost to build 51,401.04$ Overhead Installation Make ready work 1,708.62$ Aerial fiber placement 2,216.95$ Cost to build 3,925.57$ Cost Difference - Partial Ug. vs. Overhead 143,245.44$ Cost Multiplier 37.49 Cost Difference - Underground vs. Overhead 47,475.47$ Cost Multiplier 13.09