HomeMy WebLinkAboutP_Traffic_Control_Plan(TCP)_101112382_V1_180712NE 4th St
156th Ave SE156th Ave SE155th Ave SESTOPSTOPSTOPShadow Ave NEROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
NE 4th St
NE 4th St
NE 4th St
350'
RIGHT LANE
CLOSED
AHEAD
W20-5
ROAD
WORK
AHEAD
W20-1
W4-2
350'
350'350'
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
SIDEWALK
CLOSED
R9-9
SIDEWALK
CLOSED
R9-9
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 11' lanes
3. Maintain local access
4. Notify Metro @ 477-1150
at least 48 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8. Adjust to field conditions
Designed By:
CUSTOMER:
CONTACT:
LOCATION:
DATE: WO#
Julianna Johnson
WATCS 010346
425-252-0906 EXT: 5860
PSE
Greg Harwood
425-424-6425
05-15-18 101112382
6201 NE 4th St
Renton WA
Legend
Arrowboard
Cone
Spotter
ROAD
WORK
AHEAD W20-1 Road Work Ahead
RIGHT LANECLOSED
AHEAD W20-5 right lane closed ahead
W4-2 road narrows
Work Area
Work truck
INVENTORY
6-Road Work Ahead
1-Right Lane Closed Ahead
1-Left Transition
2-Side Walk Closed
1-Spotter
1-Arrow Board
30-Cones
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT.1
4 DAYS IN ADVANCE
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
N
S
EW
NOT TO SCALE
Work on PO1.
Spotter to assist pedestrians.
www.invarion.com