Loading...
HomeMy WebLinkAboutP_Design_101107973_V2_180716LO 318094-166145 37.5kVA 120/240v 335335 1/2 ROWROWROWROWROWROWROWROWROWROW ROW ROW ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW ROWROWROW ROWROWROWROWROWROWROWROWLO LO LO WORK SITE LO LO NEW 3" NEW 2" NEW 2"ROWROWROWROWROWROWROWROWROWROWROWROWLO LO 329 LANDSCAPE STRIPSIDEWALKE.O.P.E.O.P.335 335 1/2 58' 32' 16' 4' 6' 325 337 9. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. POWER GENERAL NOTES GAS PHONE CABLE TV N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service OH Expense Removal Temporary Job Order Distribution HP Main HP Svc/MSA PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773)101107973N Vicinity Map NOT TO SCALE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Correct QC Checklist(s) reviewed. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP M. REYNA 425-748-6365 06/18/18 S. FOX 714-893-2405 06/18/18 D.FIELDS 714-893-2405 06/18/18 EXISTING EASEMENT RENTON GRA-17, CREW2, 335 PELLY AVE N CONVERT OH SERVICE TO UG SERVICE 335 PELLY AVE N, RENTON, WA 98057 ASPLUNDH CONSTRUCTION CORP. 101107973 AS NOTED 1/1 KING FAC-SVC NW 17-23N-05E 2305E066 2305E088 GRA-172305E066 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE MAP#:2305E088 11332125 101107973 SITE MAP SCALE: 1" = 50' CIRCUIT FEET ADDED: NONE Owner / Developer Contact Info officeATTN: E-Mail: Cell Phone: Project Manager Contact Information: Manager:MIGUEL REYNA 425-429-1201 MIGUEL.REYNA@PSE.COM SITE SPECIFIC NOTES P01 TO HH1 -TRENCH & INSTALL 350 UG TPLX SECONDARY IN 3" DB120 CONDUIT L= ± 50' HH1 TO M01 -TRENCH & INSTALL 1/0 UG TPLX SERVICE IN 2" DB120 CONDUIT L= ± 76' HH1 TO M02 -TRENCH & INSTALL 1/0 UG TPLX SERVICE IN 2" DB120 CONDUIT L= ± 35' P01 (318094-166145) -EXISTING 40' POLE SET IN 1965 TO REMAIN -INSTALL NEW 3" RISER ON STANDOFF BRACKET (RIS3CSS) PER STD. 6042.1000 -REMOVE EXISTING OH SERVICES TO 335 & 335 1/2 PELLY AVE N HH1 -INSTALL NEW 13" X 24" HH W/ 4-POS FARGOS (HH14350) PER STD. 6050.2000 **EXISTING 5' EASEMENT ALONG SOUTHERN PROPERTY LINE **REPLACE CONCRETE SIDEWALK TO JOINTS ON EACH SIDE **NO EXISTING UTILITIES IN PROPOSED TRENCH PATH THOMAS GUIDE 656-C1 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. N/A SIDE VIEW 15" 23-1/4" 32-3/4" 2" Captive L-Bolt Lock Cover, 10 lbs 24" Approx Approx 13" Customer's service conductors 4-3/4" X 4-3/4" KNOCKOUT IN 2 PLACES Conductors enter from beneath and shall be folded back with handhole Set handhole flush to final grade Captive L-Bolt Lock Cover SINGLE PHASE SECONDARY HANDHOLE Not to scale 6050.2000 CONDUIT DIAGRAM SCALE: 1" = 50' DETAIL DRAWING SCALE: 1" = 20' Electric Service Cable Direct Buried or in PSE provided Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover Final Backfill for Direct-Buried See requirements above 3" Sand Bedding 12" Typical (6" Min) 3" Sand Shading 36" MINIMUM COVER IN RIGHT OF WAY TRENCH DETAIL Electric Service Cable Direct Buried (NTS) To Excavated Dirt Pile Final Backfill for Direct Bury - The backfill layer above the sand shading shall be soil that is free from rocks larger than 8" in diameter, construction debris, glass, sharp rocks, and frozen clods with standard shading depth per trench figures shown below. DB120 Grade Conduit RISER DETAIL SCALE: NONE PER STD. 6042.1000