HomeMy WebLinkAboutMFP18004239DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18004239
IVR Number: 18004239
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :08/01/2018Application Date:8663500040Parcel Number:303 SW LANGSTON RD
Permit Type:08/28/2018Issue Date:Franchise
Permit Work Class:08/28/2019Expiration Date:Minor Utility
Job Number:105087806Franchise Type:Electric
Description:single phase underground primary line extension to 13 Single family lots. trenching 52' to customer property from P01
to P02. Removing 145' of overhead wire/equipment from P03 to P02. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105087806
Anish Kumar
253-208-2183
anish.kumar@pse.com
303 SW Langston Rd 98057 105087806 - Ladera
Occupying W bound lane of SW Langston Rd. Single phase underground primary line extension
to 13 s/f lots. Trenching approx 52' to customer property from P01 to P02. Removing approx 145' of overhead
#2ACSR wire/equipment from P03 to P02. No pavement cuts anticipated. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
7/18/2018
Scott Warlick
MFP18004239
Justin Johnson 8-23-2018
8/28/2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
105087806 - Ladera
PSE/Potelco Inc.
Lee Brown 425-417-8620
6905 S 228th St, Kent, WA 98032
lee.brown@pse.com
303 SW Langston Rd
TBD
9/1/2018
Anish Kumar 7/18/2018
MFP18004239
Justin Johnson
8-23-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
Lind Ave SWSW L
a
n
g
s
t
o
n
R
d
Stevens Ave SWStevens Ave SWSTOPSTOP
217
221
SW La
n
g
s
t
o
n
R
d
SW S
unset
Blv
d
Hardie Ave SWHardie Ave SWSW Harri
s
P
lSTOP
SW Suns
e
t
B
l
v
dSTOPP01
UTILITY
WORK
AHEAD
W21-7
UTILITY
WORK
AHEAD
W21-7
UTILITY
WORK
AHEAD
W21-7
BE
PREPARED
TO STOP
W20-7b
BE
PREPARED
TO STOP
W20-7b
W20-7A
W20-7A
UTILITY
WORK
AHEAD
W21-7
UTILITY
WORK
AHEAD
W21-7
UTILITY
WORK
AHEAD
W21-7
BE
PREPARED
TO STOP
W20-7b
W20-7A
100'
100'
200'
200'
200'
200'
UTILITY
WORK
AHEAD
W21-7
UTILITY
WORK
AHEAD
W21-7
SPEED
LIMIT25
SPEED
LIMIT25
SIDEWALK
CLOSED
R9-9
SIDEWALK
CLOSEDR9-9
52' Trench crossing
Langston Rd.
Switch Controls
when closing the
east bound lane
Flaggers to hold traffic
and guide any peds across
the road safely
BE
PREPARED
TO STOP
W20-7b
W20-7A
W20-7A
BE
PREPARED
TO STOP
W20-7b
P03
P02
W20-7A
BE
PREPARED
TO STOP
W20-7b
Removing overhead line from
P03 to P02
CUSTOMER:
CONTACT:
LOCATION:
DATE:W/O #
Designed By:
Robert Pratt
Off: 503-723-7287 Ext 1013
Cell # 503-539-0548
WATCP@KNDSERVICES.NET
WSTCS#010077
ORTCS#05152
PSE
Greg Harwood
425-424-6425
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 10' lanes
3. Maintain local access
4. Notify Transit Authority
at least 48 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8. Adjust to field conditions
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT.1
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
Legend
Bucket truck
Cone
Flagger
SIDEWALK
CLOSED R9-9 R9-9
W20-7A Flagger Ahead
BE
PREPARED
TO STOP W20-7b be prepared to stop
UTILITY
WORK
AHEAD W21-7 utility work ahead
Work Area
Work Truck
INVENTORY:
8-UTILITY WORK AHEAD
6-BE PREPARED TO STOP
6-FLAGGER AHEAD
4-SIDEWALK WALK
4-FLAGGERS
35-CONES
N
S
EW
NOT TO SCALE
105087806
303 SE Langston Rd
Renton WA
05/25/18
Revision (07/09/18)
MFP18004239
SW 3RD CTSW LANGSTON RDSTEVENS AVE SW'LOT 303''LOT 307''LOT 311''LOT 315''LOT 323 N''LOT 335''LOT 329''LOT 323 S''LOT 317''LOT 309''LOT 301''LOT 227''LOT 223'TO BE RELOCATED#2ACSRBB#4CU-AC#6CU-BABC#2ACSR 316312LIND AVE SWSTEVENS AVE SW#2ACSR21730440131130540560'20'roa
d
a
road b
"A"25.5'55'25.5'40'TO BE REMOVED"B"FUSE @ 40TSW#T80308TO BE REMOVEDCONVERSIONSERVICEPO
W
E
R
ONL
Y 25'30'NVicinity Map47.4803, -122.2224Owner / Developer Contact InfoofficeATTN:CONNER HOMES12600 SE 38TH STREET, SUITE 250BELLEVUE, WA, 98006JIM BERGER 206-849-7057THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)PSENoNoNoYesYesYesNoYesDeveloper"Flagging Required""Outages Required""Locates Required"ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSIONSTRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)EROSION & SEDIMENT CONTROL REQUIREMENTSNOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROLEROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.FOREMAN (CHECK BOX WHEN COMPLETED)PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.Grid, Cable, and Switch numbers INSTALLED & VERIFIED.Field Changes RED-LINED on As-built.Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.Foreman's Signature _______________________________________________Print Name ___________________________________ Date ______________Material VERIFIED and CHANGES noted on Paperwork.Total PRIMARY Cable noted on As-built.Company ID#'s RECORDED in correct location on As-built.Deviations noted on the As-built and their reason.I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met.GASPHONECABLE TV505510923 105087806N/A594121525N/A108106983N/A583059607N/AN/AN/A101112868505510929 107055734N/A106336006N/AN/APROJECT PHASEPWRNOTIF#ORDER#SuperiorReconnectionRelocationRemovalXfmr RemovalJob OrderDistributionService StubsHP Svc/MSA10.9.8.7.6.5.4.3.2.1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCHPROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITESSUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVESTABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FORVAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IFREQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FORDISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALLTRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTHINDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLEDTO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARYCABLES PER THE CIRCUIT ONE-LINE DIAGRAM.UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROADCROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ONWORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PERPUGET SOUND ENERGY STANDARDS.AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES INCONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES INCONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &CONDUIT TABLE.AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.(EXCAVATION: 3' SQ.)AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT ASINDICATED ON VAULT TABLE.AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OFSTANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TOEXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THESTREET LIGHT STANDARDS. )INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMESAND DATES.POWER GENERAL NOTES - PLAT PROJECT105087806107055734DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL. BROWN425.417.8620.A.PAULSEN253.259.17404.25.18A.PAULSEN253.259.17404.25.18C. SNYDER.2.23.18REDT # ( RW-104132 )RENTONLADERA1Ø PRIMARY U/G LINE EXTENSION - 13 S/F LOTS303 SE LANGSTON RD, RENTON, WA 98057PUGET SOUND ENERGYN/AIP 058-451070557341050878061"=50'1 OF 3KING29CIKNCQCSOKE18SW-T23N-R05E208.080209.0802305E0712305E0762305E071EAR-17COMCASTDANIEL LAROCHE253.358.5460CENTURY LINKKENNETH LUU206.346.0144RIGHT OF WAYALEX MELISIS425.462.3436PSE Project ManagerLee J. Brown425.417.862011.E-Mail:Cell Phone:Project Manager Contact Information:Manager:LEE BROWN425.417.8620Lee.Brown@pse.comxxxxRETIREMENT POLE TABLESITE#POLE DATAPOLETRANSFERSREMARKSGRID #HEIGHTCLASSYEARXFMR CO.ID#TOPPEDRMVDTELTVFIBERST. LIGHT(ADDITIONAL INFORMATION)P0231782316568540'31986SERVICE NEEDS TO BE CONNECTED FROMH2B TO METER 217 BEFORE THE START OFCONSTRUCTION.........JIMB@CONNERHOMES.COM JOINT TRENCH DETAILNOTES:1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *2. Rocks greater than 10 inches diameter are not permitted in the final backfill.3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.4. Utilities shall not be stacked over the gas line in the trench.5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.* Alternatives to full-width trench shading require PSE approval.Primary & Secondary-Mainline Gas & Communications (NTS)PrimaryDirt PileFinal Grade24" Min36"Min CoverOver Power48"MaxDepthFinal BackfillGas4" Sand BeddingProperty Lineintercept (depth varies).SidewalkCurbLocation of roof drain48" TypicalWidth may vary perNumber of Utilitiesand Conduits6" or 12" Min Sand ShadingOver Gas after Compaction12" MinR/W orExcavated12" TypicalPowerSecondaryPowerTV & TEL12" Min12" MinSeparation4,51,21366" or 12" Min Sand Shading Over Power after Compaction1SITE1" = 50'SITE PLANSCHED.SQ. FT.MAX LRC = CIRCUIT FEET ADDED: 575'272900115 AMPSCIRCUIT LOADING TABLEAS OFEXIST. PEAK LOADEST. NEW LOADTOTALCIRCUIT:A PHASE B PHASE C PHASEEAR-176.6.18159130166070159137166SITE SPECIFIC NOTESP01- (317832-165711) EXISTING PRIMARY POLEINSTALL (1) 2" PRIMARY RISER ON STANDOFF BRACKETS (RIS2CSS) 6041.1000)-STIRRUP (2254000)-FUSE @40T (3412500) TAP 'B' PHASE-INSTALL SWITCH#T80308P02- (317823-165685) EXISTING PRIMARY POLEEXISTING SERVICE TO 401 IS TO BE TRANSFERRED ONTO NEW HH (H1A)EXISTING SERVICE TO 304 IS TO BE TRANSFERRED ONTO NEW HH (H1A)-HH13350SP (6050.2020)REMOVE ALL PSE RELATED EQUIPMENTP03-(317828-165670) EXISTING PRIMARY POLEREMOVING EXISTING SERVICE AND EQUIPMENT FROM THE POLE-REMOVE EXISTING 1Ø TAP SERVICE FROM POLEP04-(317819-165700) EXISTING SECONDARY POLEREMOVE ALL PSE RELATED EQUIPMENT-CUTOUT EXISTING DOWNGUY/ANCHORP05-(317814-165714)REMOVE ALL PSE RELATED EQUIPMENT-CUTOUT EXISTING DOWNGUY/ANCHORP05P0431781916570040'31986WIRE REMOVAL TABLE31781416571435'FROM32011Removed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageP04317819-16570025Removed at site:Grid Number:kVA Rating:Foreman to redline the following informationTRANSFORMER REMOVALCompany ID#:Primary phase connected to:Tested Secondary VoltageP02317823-16568525Remarks295 Total Feet (#2 ACSR) RemovedNO COMMUNICATIONSVAULT DETAIL @ V02NOT TO SCALETOP VIEWSIDEVIEWEXCAVATION:4-2/3 CUBIC YARDSRockCrushed6"3'-6"2"6'6'48"42"36"38"42"StrutsFRONTFRONT 150 Total Feet (#1/O OH TPX) RemovedNO COMMUNICATIONSNO COMMUNICATIONSLocation GAS POWERLengthX-INGLocationSizeTypeQtyLocationSizeTypeQtyNO.fromto(in)schedeachN-S-E-W(in)schedeach(ft)X1ALOC ALOT 303280160X1BLOC ALOT 3034401EGAS ONLY35X01LOT 223LOC B380125X02LOT 303LOT 3014401W280135X03LOT 309LOT 3032401W380225X04LOT 323 SLOT 3152401W380225X05LOT 335LOT 323 N2401E3801352" SCHED 40 YELLOW PVC (ft) =85 4" SCHED 40 YELLOW PVC (ft) =70130 2" SCHED 80 GREY PVC (ft) 160 3" SCHED 80 GREY PVC (ft) Total 2" PVC Plug /Caps =6Total 4" PVC Plug /Caps =46 = Total 2" PVC Plug Caps12 = Total 3" PVC Plug CapsTotal Glue =1.0PtsTotal G & ESECONDARY , GAS SERVICESECONDARY, GAS SERVICESECONDARY, GAS SERVICERemarks (type of crossing)(Primary, Feeder, Secondary, St. Light, Gas only, etc.,)PRIMARY SERVICE ONLYGAS MAIN ONLYSECONDARY SERVICE ONLYPRIMARY SERVICE, GAS MAINCROSSINGS CONDUIT TABLEELECTRIC ONLYELECTRIC ONLYPOWER AND GAS ARE TO BE IN THE SAME TRENCHWIRE SIZE&TYPEQUANTITYLENGTH(PERCONDUCTOR)#2 ACSR#2 ACSR#1/0 OH TPXTOP03P02P02P04P04P05111150150145%120240V%120240VMFP18004239
FUSE @ 40TSW#T80308DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL. BROWN425.417.8620.A.PAULSEN253.259.17404.25.18A.PAULSEN253.259.17404.25.18C. SNYDER.2.23.18REDT # ( RW-104132 )RENTONLADERA1Ø PRIMARY U/G LINE EXTENSION - 13 S/F LOTS303 SE LANGSTON RD, RENTON, WA 98057PUGET SOUND ENERGYN/AIP 058-451070557341050878061" = 50'2 OF 3KING29CIKNCQCSOKE18SW-T23N-R05E208.080209.0802305E0712305E0762305E071EAR-17COMCASTDANIEL LAROCHE253.358.5460CENTURY LINKKENNETH LUU206.346.0144RIGHT OF WAYALEX MELISIS425.462.3436PSE Project ManagerLee J. Brown425.417.8620.........THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)COOLING5' MIN5' MIN10' MIN5'MINFINSACCESSCONCRETE PADMINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALECURB OR EDGE OF PAVEMENTCURB OR EDGE OF PAVEMENT5' MINROAD ORPARKING AREATYP. PAD& TRANS-FORMER3'MIN3' MINDOORACCESSDOORREQUIREDWORK SPACEAREA3' MINPRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAMNOT TO SCALEVault & Equipment TableSiteGridVault SizeType & Size PrimaryBushingsTransformerASBUILT INFORMATIONNumber& CoverEquipmentID NumbersForeman-Completein VaultLBDC(Company ID)(Include Trf Phase tapped)4-8X4-8X3-6317818504 TFMR HH20SVSB20 (6051.1500) CØ165685Matid LID:766850042X48X3850kVA RF MP317810Unistrut HH120/24011MINU1SR 6045.1010 CØ165704Matid:7663001Matid:9995529V01V02EX OVERHEAD CIRCUIT MAP 2305E076SCALE: 6" = 1 MILEEX UNDERGROUND CIRCUIT MAP 2305E071SCALE: 1" = 100'SITESITENEW 1/O AL(+4%NEW 1/O AL(+4%PRIMARY CABLE & CONDUIT TABLECONDUIT ASBUILT INFORMATION LOCATIONSizeQtyDesignBENDSPULLPULLCableDesignCable NumbersForeman- Completefromto(in)Length (ft)90°45°22°11°(lbs)Rev (lbs)SizeLength(ft)ABCManufacturerCompoundYear Actual Amount Installed (Conduit & Cable)P01V0121285211232621/0 AL JKT425EHQ198V02E0121100V01V022119596961/0 AL JKT205EHQ1992" PVC (ft) & Bends =580210.510.06Qts630 = Total 1/0 AL JKT (ft) PRIMARY CABLEForeman Please RecordCONDUIT ONLYCustomer's ServiceConductorsfolded backConductor shall beSet Handhole flushto final grade6" Crushed Rockdoor openingCoil wire to allow fullhole near steel door hinge providedConnect equipotential jumper toby vault manufacturer Typical Knockout Entrance Side View37.5kVA RF MP120/240Matid:9995528Matid VLT:7663900CLEAR WORKING SPACE FOR VAULTSNOT TO SCALEFIELD SIDE (PREFERRED)ROAD SIDE (PREFERRED)6' MIN3'MIN3'MIN3' MINMINIMUM CLEARANCES FOR PSE EQUIPMENTNOT TO SCALEOIL-FILLED TRANSFORMERTRANSFORMERAPPROVEDAREACOMBUSTIBLE BUILDING WALLS & ROOF3'3'REDUCED FLAMMABILITY3'MFP18004239
'LOT 303''LOT 307''LOT 311''LOT 315''LOT 323 N''LOT 335''LOT 329''LOT 323 S''LOT 317''LOT 309''LOT 301''LOT 227''LOT 223'FUSE @ 40TSW#T80308217DESIGNED BYUTILITIESCONTACTPHONE#COUNTY1/4 SECU-MAP NO (POWER)OP MAPEmer SectGas Wk CtrPOWER WK CTRPLAT MAPJOINT FACILITIES ARRANGEMENTSDRAWN BYCHECKED BYAPPROVED BYFOREMAN #1FOREMAN #2MAPPINGINCIDENTMAOPGas OrderElect OrderSCALEPAGEENGR - POWERENGR - GASFUNCTIONPROJECT MGRPERMITREAL ESTATE/EASEMENT21REV#3DATEDESCRIPTIONBYCONTACTPHONE NODATEOH CKT MAPCIRCUIT NOUG CKT MAPL.BROWN425.417.8620.A.PAULSEN253.259.17404.25.18A.PAULSEN253.259.17404.25.18C.SNYDER..REDT # ( RW-104132 )RENTONLADERA1 Ø PRIMARY U/G LINE EXTENSION - 13 S/F LOTS303 SE LANGSTON RD, RENTON, WA 98057PUGET SOUND ENERGYN/AIP 058-451070557341050878061" = 50'3 OF 3KING29CIKNCQCSOKE18SW-T23N-R05E208.080209.0802305E0712305E0762305E071EAR-17COMCASTDANIEL LAROCHE253.358.5460CENTURY LINKKENNETH LUU206.346.0144RIGHT OF WAYALEX MELISIS425.462.3436PSE Project ManagerLee J. Brown425.417.8620THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIESCALL (800) 424-55552 BUSINESS DAYS BEFORE YOU DIGFor contacts below dial 1-888-CALL PSE (225-5773)DEDICATED FACILITIES (105087806)SITESPANADDITIONALREMARKSLABOR UNITS#FROMTOFOOTAGEV01REDUCED FLAMABILITY XFMRV02REDUCED FLAMABILITY XFMRV01LOT 33555DED. CONDUIT & WIRE2-36, 2-54AV01LOT 32935DED. CONDUIT & WIRE2-36, 2-54AV02LOT 30335DED. CONDUIT & WIRE2-36, 2-54AV02LOT 22725DED. CONDUIT & WIRE2-36, 2-54ATOTAL FT=150Oil-Filled Equipment Clearances per PSE Std 0700.1500,IWKHRLOILOOHGHTXLSPHQWLVDGMDFHQWWR« ClearanceRequirementCombustible walls or roof (including stucco).10 FTCombustible walls using a reduced-flammability transformer. Gasservice meter relief vent.3 FTNoncombustible walls, soffits, and roofs (including brick, concrete,steel and stone) providing the side of the transformer facing the walldoes not have doors. Materials that pass UBC Std. 2-1 or ASTME136-79 are considered to be noncombustible.3 FTGenerators, customer-owned transformers, fire sprinkler valves,standpipes, and fire hydrants.6 FTDoors, windows, vents, fire escapes, or other building openings.10 FTThe water's edge of a swimming pool or any body of water.15 FTFacilities used to dispense or store LP, hazardous liquids, or fuel.20 FTIndividual domestic and irrigation wells. Clearance not required onpole mounted transformers (pole placement still applies as stated in6450.3000), TUT's installed in sealed vaults, 7200V single-phasepadmount transformers 50kva or less, and reduced flammability oil.100 FTSECONDARY CABLE & CONDUIT TABLELOCATIONCABLEAssumedCONDUITVOLTAGEVOLTAGEASBUILT INFORMATIONSIZELENGTHLot CornerSIZELENGTHBENDSDROPFLICKERForeman - CompleteFROMTO(1/O,4/O, 350)Design (ft)to Meter (ft)(in)Design (ft)(Percent)(Percent)Actual Amount Installed (Conduit & Cable)V01H1A4/O125312522.83.0V01LOT 3114/O656034532.63.5V01LOT 3154/O606034022.53.5V01LOT 323 N4/O12560310522.63.64/O TO METER V01LOT 3354/O11060311012.53.54/O TO METER V01LOT 3294/O606026012.53.5V01LOT 323 S1/O156021512.43.2V01LOT 3174/O656026512.63.5H1ALOT 30435011060311033.34.1350 TO METER WITH 4/O TAILV02H2B4/O140311432.12.6V02LOT 3034/O14060312022.63.7V02LOT 3074/O15060313032.73.8V02LOT 3091/O706027012.63.6V02LOT 3011/O156021512.22.6V02LOT 2271/O556025512.53.3V02LOT 2231/O606026012.53.4H2BLOT 2174/O406024022.53.64/O TO METER 1/O UG Triplex (ft) =2152" PVC & Bends =380130.94/O UG Triplex (ft) =10803" PVC & Bends =859242.6350 UG Triplex (ft) =110Total Qts of Glue =3.5SIDE VIEW15"23-1/4"32-3/4"2"Captive L-BoltLock Cover, 10 lbs24"ApproxApprox13"Customer'sserviceconductors4-3/4" X 4-3/4"KNOCKOUT IN 2 PLACESConductors enter frombeneath and shall befolded back with handholeSet handhole flushto final gradeCaptive L-BoltLock CoverSINGLE PHASE SECONDARY HANDHOLE @H2BNot to scale6050.2000(101112868)SECONDARYHH/PEDESTAL TABLESitePedestalNumber ofRemarksorPositions(Include phasing information)HandholeRequiredH1AHandhole3HH13350SP (6050.2020)H2BHandhole2HH13350 (6050.2000)TYPICAL NOTCH-OUT FOR TRANSFORMER,NOT TO SCALE& SECONDARY PEDESTAL/HANDHOLEBACK OF EASEMENTSTANDARDEASEMENTLINEROW10'PL1'4' - 5'Min.1'7'7'TRANSFORMER(WHEN PRESENT)NOT TO SCALECONDUIT DIAGRAMSECONDARY 2"SECONDARY 3"PRIMARY 2"CONDUIT LEGEND FUTURE 2"TOP VIEWSIDE VIEW2'-4"EXCAVATION: 5-1/3 CUBIC YARDS7'-0"6'-0"2"2'-6"Install PVC bell endsand grout into wall2'-6"Handhole820 lbsConduits and conductors shall enter fromends of handhole through knockouts providedTypical customer runservice conductors in ductSteel DoorSeal conduitwith foamCustomer-installed grounding wires ( the "4th" wire on thesingle-phase systems and the "5th" wire onthe three-phase systems)shall not be connected to PSE'sground or neutral bus. They shall be removed by customeror cut off at the vault wall.6" Crushed rock SINGLE PHASE SECONDARYCONCRETE HANDHOLE @ H1A6050.2020-1 Not to scaleMFP18004239