Loading...
HomeMy WebLinkAboutP_Design_101113110_V1_18071960' R/W 317551-168021 25kVA 120/240V 317551-168021 25kVA 120/240V 317553-168035 65T X78205 317562-168037 317572-168031 25kVA 120/240V 317552-168061 50kVA 120/240V 317551-168021 25kVA 120/240V 317551-168021 25kVA 120/240V 317551-168021 25kVA 120/240V 317554-168000 25kVA 120/240V SE 144TH ST 160TH AVE SE14326 16020 16028 16036 17 18192016005 1440515917 15911 15903 15906 15914 15928 15823 15903 14423 1 2 22 21 14419 16 100T X78204 MAP 15 336.4MCM ACSR ABC #2 ACSRBABC336.4MCM ACSRABC MAP 15 MAP 15 MAP 15 317551-168021 25kVA 120/240V 317551-168021 25kVA 120/240V PSE PROVIDED CUSTOMER INSTALLED (2) SCH80 PVC CONDUIT PSE INSTALLED (2) RUNS 4/0 AL TPLX SVC CUSTOMER PROVIDED & INSTALLED (2) 3" GRAY SCH40 PVC CONDUIT ±110' ±120'90° R=36" 90° R=36" CUSTOMER PROVIDED 4' X 4' WORK PIT CUSTOMER PROVIDED 4' X 4' WORK PIT CUSTOMER PROVIDED 4' X 4' WORK PIT CUSTOMER PROVIDED 3/4 YARD 5/8" MINUS CUSTOMER PROVIDED 3/4 YARD SAND CUSTOMER PROVIDED 3/4 YARD SAND SITE PLAN POWER GENERAL NOTES - RESIDENTIAL PROJECT N Vicinity Map N/A Owner / Developer Contact Info officeATTN: Toll Wa LP 8815 122nd AVE NE #200 Kirkland, WA 98033 Paul Ollestad (425) 825-5365 SITE SPECIFIC NOTES OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE SCALE: NONE CABLE & CONDUIT DIAGRAM ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE MAP-15 6/6/18 196 163 156 --- 196 163 156 HP Svc/MSA Distribution Job Order Temporary Removal Relocation Shop. Service Superior ORDER#NOTIF# PWR PROJECT PHASE N/AN/A N/A N/AN/A N/AN/A N/AN/A N/A506 108107243 CABLE TV PHONE GAS FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. 10. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. 9. E-Mail: Cell Phone: Project Manager Contact Information: Manager:Fabian Gomez (206) 573-0031 Fabian.Gomez@PSE.com PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" X X X X SCALE: 1" = 50'101113110THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) Service Stubs 101113110 N/A N/A UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Fabian Gomez (253) 395-6838 6/11/18 Nate Linville (253) 970-7284 6/11/18 Nate Linville (253) 970-7284 N/A King County Webber's Conversion OH to UG Service Conversion 16005 SE 144th ST, Renton, WA 98059 101113110 As Noted 1 of 1 King CSPSKEPM SE-19-23N-06E 2306E076 2305E089 2305E076 MAP-15 CenturyLink Amy Alliston (206) 794-8534 Comcast Bill Walker (253) 288-7538 505996697 N/A AT P01: EXISTING 317551-168021 EXISTING DISTRIBUTION POLE AND TRANSFORMER TO REMAIN -INSTALL (2) 3" SERVICE RISERS ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS) AT M01: NEW INSTALL (1) 200A METER AT M02: NEW INSTALL (1) 200A METER SPAN NOTES P01 TO M01 INSTALL (1) RUN 4/0 AL TPLX SERVICE ±120' ____' ACTUAL P01 TO M02 INSTALL (1) RUN 4/0 AL TPLX SERVICE ±130' ____' ACTUAL DEVELOPER & CUSTOMER NOTES: THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 AND MUST FOLLOW ALL TRENCHING REQUIREMENTS OF THE PERMITTING AGENCY -REQUIRED TO PROVIDE AND INSTALL 3" SCH40 PVC FROM PROPERTY LINE TO 2' SHORT OF M01 & M02 -REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS FROM PROPERTY LINE TO M01 & M02 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT P01 -REQUIRED TO PROVIDE 4' X 4' WORK PIT & 3/4 CUBIC YARD OF SAND AT M01 & M02 -REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL -REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT ALL TIMES -EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION -PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL -PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE -L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION -RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING JOB SITE SE 144TH ST TRENCH DETAIL Electric Service Cable in Conduit (NTS) Electric Service Cable in Conduit Excavated Dirt Pile Final Grade 24" Min 24" Min to 36" Max Cover 12" Typical (6" Min) Backfill for Conduit Free of rocks larger than 8" in diameter) 36" MINIMUM COVER IN RIGHT OF WAY To Excavated Dirt Pile 3" Schedule 40 Grey PVC Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris, glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter. UTILITY POLE EROSION CONTROL DETAIL TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE Not to scale Drainage ditches or Dry vegetated sites kWh Mtr Elec. Mtr Base 12" Min 36" Typical 24" to 36" Max Conduit Depth Power Cable Conduit Customer Provided 3" Schedule 40 Grey PVC Regulator Vent Utility-Provided Gas Meter Assembly Min 36" Customer Provided Conduit Stakes 48" 48" Top View 4' 2 1/2" Conduit Service Riser from Gas Service Lines 12" Minimum Clearance Customer Provided Drainage Pipe Work Pit Dimensions Electric & joint Utility 4' MTR BASE DETAIL SCALE: NONE Field Face Quadrant Road Face Quadrant Climbing Space 5" Min CL Direction of Vehicular TrafficCL TOP VIEW CONDUIT RISER PLACEMENT DETAIL (P01) SCALE: NONE FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 CIRCUIT FEET ADDED: 0 LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 1260SQ. 200 AMPS GAS 6KW 65A 1.7% 2.1%