HomeMy WebLinkAboutP_Design_101113110_V1_18071960'
R/W
317551-168021
25kVA 120/240V
317551-168021
25kVA 120/240V
317553-168035
65T
X78205
317562-168037
317572-168031
25kVA 120/240V
317552-168061
50kVA 120/240V
317551-168021
25kVA 120/240V
317551-168021
25kVA 120/240V
317551-168021
25kVA 120/240V
317554-168000
25kVA 120/240V SE 144TH ST
160TH AVE SE14326 16020 16028
16036
17
18192016005
1440515917
15911
15903
15906 15914
15928
15823
15903
14423
1
2
22
21
14419
16
100T
X78204
MAP
15
336.4MCM ACSR
ABC
#2 ACSRBABC336.4MCM ACSRABC MAP
15
MAP
15
MAP
15
317551-168021
25kVA 120/240V
317551-168021
25kVA 120/240V
PSE PROVIDED CUSTOMER
INSTALLED (2) SCH80 PVC CONDUIT
PSE INSTALLED
(2) RUNS 4/0 AL TPLX SVC
CUSTOMER PROVIDED & INSTALLED
(2) 3" GRAY SCH40 PVC CONDUIT
±110'
±120'90°
R=36"
90°
R=36"
CUSTOMER PROVIDED
4' X 4' WORK PIT
CUSTOMER PROVIDED
4' X 4' WORK PIT
CUSTOMER PROVIDED
4' X 4' WORK PIT
CUSTOMER PROVIDED
3/4 YARD 5/8" MINUS
CUSTOMER PROVIDED
3/4 YARD SAND
CUSTOMER PROVIDED
3/4 YARD SAND
SITE PLAN
POWER GENERAL NOTES - RESIDENTIAL PROJECT
N
Vicinity Map
N/A
Owner / Developer Contact Info
officeATTN:
Toll Wa LP
8815 122nd AVE NE #200
Kirkland, WA 98033
Paul Ollestad (425) 825-5365
SITE SPECIFIC NOTES
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
SCALE: NONE
CABLE & CONDUIT DIAGRAM
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-15
6/6/18
196 163 156
---
196 163 156
HP Svc/MSA
Distribution
Job Order
Temporary
Removal
Relocation
Shop. Service
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
N/AN/A
N/A
N/AN/A
N/AN/A
N/AN/A
N/A506
108107243
CABLE TV
PHONE
GAS
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
10.
7.
6.
5.
4.
3.
2.
1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Inclement weather conditions may cause delays in construction times and dates.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
8.
9.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Fabian Gomez
(206) 573-0031
Fabian.Gomez@PSE.com
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
X
X
X
X
SCALE: 1" = 50'101113110THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Service Stubs
101113110
N/A
N/A
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Fabian Gomez (253) 395-6838 6/11/18
Nate Linville (253) 970-7284 6/11/18
Nate Linville (253) 970-7284
N/A King County
Webber's Conversion
OH to UG Service Conversion
16005 SE 144th ST, Renton, WA 98059
101113110
As Noted 1 of 1
King CSPSKEPM
SE-19-23N-06E
2306E076 2305E089 2305E076 MAP-15
CenturyLink
Amy Alliston
(206) 794-8534
Comcast
Bill Walker
(253) 288-7538
505996697
N/A
AT P01: EXISTING 317551-168021
EXISTING DISTRIBUTION POLE AND TRANSFORMER TO REMAIN
-INSTALL (2) 3" SERVICE RISERS ON NEW STANDOFF BRACKETS PER STD 6042.1000 (RIS3CSS)
AT M01: NEW
INSTALL (1) 200A METER
AT M02: NEW
INSTALL (1) 200A METER
SPAN NOTES
P01 TO M01
INSTALL (1) RUN 4/0 AL TPLX SERVICE ±120' ____' ACTUAL
P01 TO M02
INSTALL (1) RUN 4/0 AL TPLX SERVICE ±130' ____' ACTUAL
DEVELOPER & CUSTOMER NOTES:
THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, SELECT BACKFILL,
COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS 6750.6500 AND
MUST FOLLOW ALL TRENCHING REQUIREMENTS OF THE PERMITTING AGENCY
-REQUIRED TO PROVIDE AND INSTALL 3" SCH40 PVC FROM PROPERTY LINE TO 2' SHORT
OF M01 & M02
-REQUIRED TO PROVIDE & INSTALL 3/8" NON-POLY PULL ROPE IN ALL CONDUITS FROM
PROPERTY LINE TO M01 & M02
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 1 CUBIC YARD OF 5/8" MINUS AT P01
-REQUIRED TO PROVIDE 4' X 4' WORK PIT & 3/4 CUBIC YARD OF SAND AT M01 & M02
-REQUIRED TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL
-REQUIRED TO PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS & TRENCH AT
ALL TIMES
-EXCAVATE & EXPOSE EXISTING PSE UG FACILITIES 48 HOURS PRIOR TO CONSTRUCTION
-PSE INSPECTION IS REQUIRED PRIOR TO FINAL BACKFILL
-PSE WILL NOT ENERGIZE FACILITIES UNTIL BACKFILL IS COMPLETE
-L&I INSPECTION & APPROVAL IS REQUIRED 72 HOURS PRIOR TO CONNECTION
-RESPONSIBLE FOR ALL TREE TRIMMING AND BRUSH CLEARING
JOB
SITE
SE 144TH ST
TRENCH DETAIL
Electric Service Cable in Conduit (NTS)
Electric Service Cable in Conduit
Excavated Dirt Pile
Final Grade
24" Min
24" Min
to
36" Max
Cover
12" Typical
(6" Min)
Backfill for Conduit
Free of rocks
larger than 8"
in diameter)
36" MINIMUM COVER
IN RIGHT OF WAY
To Excavated Dirt Pile
3" Schedule 40 Grey PVC
Backfill for In Conduit - The backfill layer shall be soil that is free from construction debris,
glass, sharp rocks, frozen clods, and rocks larger than 8" in diameter.
UTILITY POLE EROSION CONTROL DETAIL
TOP VIEW
DRY DRAINAGE DITCH or DRY VEGETATED SITE
SLOPE
Place gravel bags for
Sediment Trap
Place straw mulch
on disturbed areaExcavated or
Augered Hole
Pole
SLOPE
Not to scale Drainage ditches or Dry vegetated sites
kWh Mtr
Elec. Mtr Base
12" Min 36" Typical
24" to 36" Max
Conduit Depth
Power Cable Conduit
Customer Provided
3" Schedule 40 Grey PVC
Regulator Vent
Utility-Provided
Gas Meter Assembly
Min
36"
Customer Provided
Conduit Stakes
48"
48"
Top View 4'
2 1/2" Conduit Service Riser
from Gas Service Lines
12" Minimum Clearance
Customer Provided
Drainage Pipe
Work Pit Dimensions
Electric & joint Utility
4'
MTR BASE DETAIL
SCALE: NONE
Field Face
Quadrant
Road Face
Quadrant
Climbing
Space
5" Min
CL Direction of Vehicular TrafficCL
TOP VIEW
CONDUIT RISER PLACEMENT DETAIL (P01)
SCALE: NONE
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
CIRCUIT FEET ADDED: 0
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
1260SQ.
200 AMPS
GAS
6KW
65A
1.7%
2.1%