Loading...
HomeMy WebLinkAboutAdden 2 / ,,. ���+++++++iiiii�i�p��' ��ni� L.�,�r Maycr� � uuiu»»u»»»��»J��r���i ' � � ��; ���/lll��,,,, i' % Public tN''orks C�e�ai��m�nt ��egg Zimmerrrnan,V�.E.,Admi'niistcator 2019 Stormwater Facility Fencing Project SWP-27-3677 Addendum No. 2 Date of Issue: February 1,2019 Date of bidding: February 6,2019 Notice to All Planholders: Addendum No. 2, containing the following revisions, additions, deletions and/or clarifications, is hereby made part of the plans and Contract Provisions for the above-named project. Bidders shall take this addendum into consideration when preparing and submitting their bids and shall be attached to the Contract Provisions. Bidders shall acknowledge the receipt of this Addendum No. 2 in the place provided in the Acknowledgement of Receipt of Addenda. Failure to do so may disqualify the bidders from consideration of its bid. CONSTRUCTION PLANS • The construction plan sheet 11 of 11, Pond Fencing and Gate-Post Detail Plan; the gate post in the member column of POST AND RAIL SPECIFICATIONS is revised to be 3-1/2" in NOM. SIZE (SCH.40) I.D. with 9.10 Ib./ft. in weight. ALL OTHER REQUIREMENTS OF THE CONTRACT PROVISIONS REMAIN IN EFFECT. /��"„ �r,��� ��-_ Date: February 1, 2019 Ken Srilofung, P.E. Project Manager \\rvl2rfps02\Depts\PW\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3677 Stormwater Facility FENCE Project\2018 Stormwater Facility Fence Project\1100 DesignPlanning\Bid Ready Set\2019 Fencing Project_Addendum No. 2.docx 1(155 South� G�nadly t�a"ay, I��nton,'rJwt"A 98�57� n�nt�nwa.gov