HomeMy WebLinkAboutAdden 1 / ,,.
���+++++++iiiii�i�p��'
��ni� L.�,�r Maycr� � uuiu»»u»»»��»J��r���i ' �
� ��; ���/lll��,,,,
i'
%
Public tN''orks C�e�ai��m�nt ��egg Zimmerrrnan,V�.E.,Admi'niistcator
2019 Stormwater Facility Fencing Project-SWP-27-3677
Addendum No. 1
Date of Issue:January 28,2019
Date of bidding: February 6,2019
Notice to All Planholders:
Addendum No. 1, containing the following revisions, additions, deletions and/or clarifications, is hereby made
part of the plans and Contract Provisions for the above-named project. Bidders shall take this addendum into
consideration when preparing and submitting their bids and shall be attached to the Contract Provisions.
Bidders shall acknowledge the receipt of this Addendum No. 1 in the place provided in the Acknowledgement of
Receipt of Addenda. Failure to do so may disqualify the bidders from consideration of its bid.
CONTRACT PROVISIONS
• The following information will be added in the Special Provisions, Section 2-02 Removal of Structure and
obstructions; 2.02.1 Description:
"The existing post concrete footing resulting from the installation of current existing wooden
fences/gates for the Maureen Div. 1 Pond shall be removed when they conflict with the post concrete
footing installation of the new chain link fence and/or gate."
CONSTRUCTION PLANS
• The Construction Note No. 3 called out on the construction plan drawing sheet 6 of 11, Chinquapin
Pond Plan, located approximately 12 feet northerly from the edge of the existing concrete sidewalk
pavement on SE 192nd St, is changed to the Construction Note No. 4.
ALL OTHER REQUIREMENTS OF THE CONTRACT PROVISIONS REMAIN IN EFFECT.
/��"„ �r,���
��-_
Date: January 28, 2019
Ken Srilofung, PE
Project Manager
H:\File Sys\SWP-Surface Water Projects\SWP-27-Surface Water Projects(CIP)\27-3677 Stormwater Facility FENCE Project\2018
Stormwater Facility Fence Project\1100 DesignPlanning\Bid Ready Set\2019 Fencing Project_Addendum No.l.docx
1(155 South� G�nadly t�a"ay, I��nton,'rJwt"A 98�57� n�nt�nwa.gov