Loading...
HomeMy WebLinkAboutCity of Renton ROW App 10097913 - SignedDEPARTMENT OF COMMUNITY CITY OF AND ECONOMIC DEVELOPMENTf �V n Planning Division 1 1055 South Grady Way, 6th Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits:@rentonwa.eov Website: rentonwa.eov FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 Franchise Agency: Zayo Group Franchise Job Number: Phone: 206-832-4853 Contact Name: Doug Carson Email: wwapermits@zayo.com Job Site Address: 2439 SE Maple Valley Hwy Renton, 98057 Project Name: 10097913 Cedar River Description of Work: Perform Centurylink duct verification. Should take no longer that 1 hour per manhole. 'lease check all that apply: ❑ New Construction ❑ Repair/Relocate ® Underground ❑ Overhead ❑ Sidewalk ❑ Street ❑ Open Trench ❑ Bore It of feet: 9913' Proofing MH Contractor Name: Zayo Group Phone: 206-832-4853 State Contractors License #: ZAYOGGL898PJ City of Renton Business License #: "I certify that I �ri lid i��erplica4t's at iorized agent and do hereby agree to abide to the terms and conditions set forth under this per t a h I ith p, City f Renton's Trench Restoration and Street Overlay Requirements. " Signature Date 8/2/18 INSPECTIONS SHALL BE REQUgSTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LI EAT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT. COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Fire -construction meetings snarl De scneaulea at a maximum of 14 days prior to the jov start date. Plan Review/Development Engineering Date Site Construction Inspector Development Engineering Manager Cate Date ❑ Approved as submitted ❑ Pre -Construction Meeting required ❑ Approved with comments or redlines ❑ Camera inspection of utilities required Page 1 of 11 Published: 2/1/2018