Loading...
HomeMy WebLinkAboutRenton Franchise App Bridge 15125-113312 - SignedDEPARTMENT OF COMMUNITY CITY OF AND ECONOMIC DEVELOPMENT Renton .� Planning Division 1 1055 South Grady Way, 6th Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.eov FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $36750. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 nar hn+ir Franchise Agency: Zayo Group Franchise Job Number: Contact Name: Matthew Travis Phone: 206-832-4853 Email: matthew.travis@zayo.com Job Site Address: 710 S 2nd St Renton, WA 98057 Project Name: Bridge: 15125-113312 Description of Work: New Underground 41':Locate existing manhole. Tie (1) 144ct fiber into existing Zayo splice case. Leave 1 00'of 144ct fiber in storage or match existing. Saw cut and trench asphalt roadway. Install (1) 4" conduit and pull fiber through. Trench concrete sidewalk panel, sweep conduit into existing ELI manhole, pull. Please check all that apply: ❑ New Construction ❑ Repair/Relocate 0 Underground ❑ Overhead ❑ Sidewalk ❑ Street 0 Open Trench ❑ Bore # of feet: Contractor Name: Zayo Group Phone: 206-832-4853 State Contractors License #: ZAYOGGL898PJ City of Renton Business License #: "I certify that I am the owner or applicant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit d shall comply wi he City of Renton's Trench Restoration and Street Overlay Requirements. " Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINEAT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date ❑ Approved as submitted ❑ Pre -Construction Meeting required Site Construction Inspector Date ❑ Approved with comments or redlines ❑ Camera inspection of utilities required Development Engineering Manager Date Page 1 of 1 Published: 2/1/2018