Loading...
HomeMy WebLinkAboutRenton Franchise App & TCP - SE03XC382 - SignedDEPARTMENT OF COMMUNITY CITY of AND ECONOMIC DEVELOPMENT entonO Planning Division 1 1055 South Grady Way, 6"' Floor I Renton, WA 98057 1425-430-7200 Email: franchisepermits:@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 2/1/2018 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $367.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 Franchise Agency: Zayo Group Franchise Job Number: Contact Name: Joe Morton Phone: 206-832-4853 Email: wwapermits@zayo.com Job Site Address: 3410 NE 12th St. Renton, WA 98056 Project Name: SE03XC382 Description of Work: Locate existing fiber storage and move to new location and install new mid -sheath splice case. Overlash (1) 144ct fiber to existing Zayo strand. Install new riser with innerducts. Trench in grass area. Install new 24"x36" vault in grass area, sweep conduit in existing Sprint vault and pull fiber through. Exit ROW please check all that apply: ❑ New Construction ❑ Repair/Relocate ® Underground ❑ Overhead ❑ Sidewalk ❑ Street ❑✓ Open Trench ❑ Bore # of feet: Contractor Name: Zayo Group Phone: 206-832-4853 State Contractors License #: ZAYOGGL898PJ City of Renton Business License #: "I certify that I am th&o�Arn r r a pl ant's authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit anq %h P r vit, the City of Renton's Trench Restoration and Street Overlay Requirements. " Signature 1 '-kff7k 1) T -N- Date 9/12/18 INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINEAT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re -inspection and project final. Re -inspection fees are billed at $75/hour. All Pre -Construction meetinas shall be scheduled at a maximum of 14 days prior to the iob start date. Pian Review/Development Engineering Date p Approved as submitted © Pre -Construction Meeting required Site Construction Inspector Hate El Approved with comments or redlines ❑ Camera inspection of utilities required Development Engineering Manager Date Page 1 of 1 I Published: 2/1/2018 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: SE03XC382 CONSTRUCTION COMPANY: Zayo Group CONTACT NAME: Joe Morton ADDRESS: 20829 72nd Ave S Ste. 300 Kent, WA 98032 E-MAIL ADDRESS: joseph.morton@zayo.com PROJECT LOCATION:3410 NE 12th St. Renton, WA 98056 WORK TIME: 7am - 5pm WORK DATE: TBD Permit Holder agrees to all the following: Print Form Reset Farm PERMIT# PHONE#: PHONE#: CELL#: FAX#: cilyot 206-832-4853 253-255-1917 N/E/S/W OF: NE 12th St & Monroe® APPROVED BY: APPROVAL DATE: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney's fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder's agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City's reasonable attorney's fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: charlotte r ter DATE: 9/12/2018 SIGNATURE: 00 OFFICE COPY T - CONTRACTOR DEV. SERVICE, INSPECTION K. KITTRICK/ DEV. SERVICE, PLAN REVIEW A. FIENNINGER/1. ILLIAN POLICE CLARK WILCOX FIRE DAVID PARGARS/STA. H13 NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City's PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow -away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City's maintenance shop (3555 NE 2nd Street). SKETCH -- NORTH --