Franchise Permit: MFP18006908
IVR Number: 18006908
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :12/20/2018Application Date:1463400045Parcel Number:13609 156TH AVE SE
Permit Type:02/01/2019Issue Date:Franchise
Permit Work Class:02/01/2020Expiration Date:Minor Utility
Job Number:105088365Franchise Type:Electric
Description:Relocating existing poles and OH wire to the North side of SE 2nd Pl. Feeding the 6 lot plat off transformers off the
new proposed pole (P1A and P2A). Trenching south across SE 2nd Pl to customer property. Restoration per City of
Renton standards.
APPROVED WITH COMMENTS OR REDLINES
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: BL.005109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105088365
Anish Kumar
253-208-2183
anish.kumar@pse.com
13609 156th Ave SE 98059 105088365
Relocating existing poles & OH wire to the North side of SE 2nd Pl. Feeding the
6 lot plat off transformers off the new proposed pole (P1A & P2A). Trenching South across SE
2nd Pl to customer property. Pavement cuts anticipated. Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
12/4/2018
MFP18006908
Justin Johnson 12-28-2018
Scott Warlick 2/1/2019
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
105088365
PSE/Potelco Inc.
Lee Brown 425-417-8620
6905 S 228th St, Kent, WA 98032
lee.brown@pse.com
13609 156th Ave SE
TBD
1/14/2019
Anish Kumar 12/4/2018
MFP18006908
Justin Johnson
12-28-2018
8:00 am to 3:00 pm
Monday through Friday
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
SE 2nd Pl
6304
SE 2nd PlSE 2nd Pl
Toledo AVE SEShadow Place SoutheastSE 2nd Ln 156th AVE SE 156th AVE SE P1A P2A
PO1 PO2
SLOW
SLOWSTOPSTOP200'
100'
100'
100'
100'
100'
ROAD
WORK
AHEAD W20-1
ONE LANE
ROAD
AHEAD W20-4
W20-7
W20-7
ONE LANE
ROAD
AHEADW20-4
ROAD
WORK
AHEADW20-1
ROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4W20-7
200'200'
200'
200'
200'
200'
200'
ROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4
W20-7
W20-7
ONE LANE
ROAD
AHEAD
W20-4
ROAD
WORK
AHEAD
W20-1
ROAD
WORK
AHEAD
W20-1
ONE LANE
ROAD
AHEAD
W20-4 W20-7
200'200'
SCOPE OF WORK
Relocate existing poles and OH wire to
the North side of SE 2nd Place. Feeding
the 6 lot plat off XFMRS off the new
proposed pole (P1A and P2A). Trenching
South across SE 2nd Place to customers
property.
Designed By:
CUSTOMER:
CONTACT:
LOCATION:
DATE: WO#
Julianna Johnson
WATCS 010346
425-252-0906 EXT: 5860
PSE
Mitch Peterson
425-398-6071
11-14-18 105088365
13609 156th AVE SE
Renton WA 156th AVE SE Lane Width 10'
Posted Speed 25
Flagger Taper 55'
Buffer 125'
Sign Spacing 200'+/-
Devices Taper 20'
Devices Tangent 40'
Notes:
1. Maintain ped. access to
and through crosswalks
2. Maintain Min. 11' lanes
3. Maintain local access
4. Notify Metro @ 477-1150
at least 48 hrs. in advance
of bus stop closure
5. Traffic control plan and all
devices shall comply with
MUTCD, PROWAG & WSDOT
6. DEVICE SPACING
Flag Taper 20'
Signs per WSDOT
Tapers per WSDOT
7. 28" Cones
36" Barrels
48" Signs
24" Paddle
8.Adjust to field conditions
PLEASE SCHEDULE
WITH DISPATCH
@ 800-343-4049 OPT. 1
4 DAYS IN ADVANCE
AND PROVIDE A
COPY OF THE APPROVED
TRAFFIC CONTROL PLAN
INVENTORY
2-Flaggers
6-Road Work Ahead
6-One Lane Road Ahead
6-Flagger Ahead
30-Cones
Legend
Cone
SLOW Flagger
Pole
ROAD
WORK
AHEAD W20-1 Road Work Ahead
ONE LANE
ROAD
AHEAD W20-4 One Lane Road Ahead
W20-7 Flagger
Work Area
Work Truck
K&D Services, as the preparer of this traffic
control plan makes no representation as to its'
general adequacy or being approved for implementation.
Approval must result from the Traffic Engineer or
other Public Official having statutory enforcement authority
in the jurisdiction. Utilization and implementation of this
plan shall be a result of that approval.
Ref. MUTCD 2009 6A-01 (10)
N
S
EW
NOT TO SCALE
www.invarion.com
MFP18006908
#2ACSRABC #2ACSR
13527
#2ACSR
ABC336.4ACSR336.4TW#6CU
#2ACSR
6304
TO BE RELOCATED
TO BE RELOCATED
C13615
13616
ST LT
DEVELOPER RESPONSIBLE FOR
CONDUIT/WIRE FROM HANHOLE TO
STREET LIGHT METER LOCATION
60'
"A"
"B"
60'
1" = 50'
N
Vicinity Map
47.480922, -122.133178
Owner / Developer Contact Info
officeATTN:
CEDAR RIDGE LLC
15445 53RD AVE S SUITE 120
TUKWILA, WA 98188
LOU LARSEN 206.431.7970
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
505745603 105088365
N/A 105088366
N/A 101116202
N/A 108109917
N/A 583060739
N/A 593201537
505745629 107055872
N/A 106338182
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Street Light
Relocation
Removal
OH XFMR's
OH Wire
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECTSITE SPECIFIC NOTES
105088365107055872SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 600'
27 4000
140 AMPS
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
L. BROWN 425.417.5958 .
E. PASAYE .4.19.18
E. PASAYE .4.19.18
E. PASAYE .4.19.18
REDT # ( RW-108935 )PERMIT TBD
CEDAR RIDGE
1Ø SECONDARY U/G LINE EXTENSION - 6 S/F LOTS
13609 156TH AVE SE, RENTON, WA 98059
PUGET SOUND ENERGY
N/A IP 088-60
107055872 105088365
1" = 50'1 OF 3
KING 30 CIKNC QCSOKE
14SW-T23N-R05E 208.086 209.088
2305E055 2306E076 2305E055 MAP-13
COMCAST
BILL WALKER
253-288-7538
CENTURYLINK
AMY ALLISTON
206-794-8534
RIGHT OF WAY
CHAD WALIMAKI
425-462-3292
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LEE BROWN
425.417.5958
Lee.Brown@pse.com
SITE PLAN
x
x
x
x
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
MAP-13
6.6.18
162 165 204
0 5 0
162 170 204
RETIREMENT POLE TABLE
SITE
#
POLE DATA POLE TRANSFERS REMARKS
GRID #HEIGHT CLASS YEAR XFMR CO.
ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION)
P01 317824
167871 40'UNK 1970 CenturyLink/Comcast
P02 317823
167888 40'UNK 1991 CenturyLink/Comcast
P03 317806
167906 40'UNK 1959 CenturyLink/ Comcast/ Wave/ MCI Metro Access Trans. Serv.
...
...
...
LLARSEN@PACENG.COM
JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter , install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller , install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power
48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P1A 317828-167868 45 1 2018 PSE Equip #
P2A 317827-167888 45 1 2018 PSE Equip #
P3A 317808-167907 45 1 2018 PSE Equip #
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P1A
317828-167868
50kVA
6211350
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
317824-167871
10kVA
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P2A
317827-167888
50kVA
6211350
Installed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER INSTALLATION
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
P3A
317808-167907
15kVA
6211200
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P02
317823-167888
37.5kVA
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P03
317806-167906
15kVA
CIRCUIT FEET REMOVED: 585'
MFP18006908
PSE or the applicant
is required to install
conduit along the
frontage of the 6
lots that will be used
for future under
grounding of the
overhead power lines.
TO: City of Renton
RE: PSE Job Number 105088365 – Cedar Ridge (6 lots Single-Family)
TYPE OF WORK: Relocation (2) existing poles on SE 2nd Pl.
LOCATION OF WORK: 13609 156th Ave. SE - Renton WA 98059
SCOPE OF WORK:
PSE proposes to relocate (2) poles that currently reside on the south side of SE 2nd Pl. to
the north side. These poles sit in the developer’s proposed improvements which include
new streetlights. PSE proposes to relocate these poles in an effort to comply with the
City of Renton’s requirements for streetlight installation and to prevent violating WAC
rule conductor-to-streetlight clearance requirement. PSE has asked the developer’s
engineer (Lou Larsen) to persue the question of trees needing to be removed on the north
side and clear the way for the relocation. Please feel free to give me a call if you have
any questions. Thank you.
Sincerely,
Lee J. Brown
Puget Sound Energy
Project Manager
Customer & System Projects
Cell: (425) 417-8620
Lee.Brown@PSE.com
MFP18006908
February 1, 2019
Marita Bond
Puget Sound Energy - Electric
P.O. Box 97034
Bellevue, WA 98009-9734
Via Email: marita.bond@pse.com
SUBJECT: Request for Undergrounding Exemption
(PSE#105088365, MFP18006908, 13609 156th Avenue SE)
Dear Ms. Bond:
The City of Renton has reviewed your request to grant Puget Sound Energy (PSE) an exemption from
Renton Municipal Code (RMC) 4-6-090(C) which states that all new electrical or communication facilities
shall be required to be installed underground, pursuant to the standards of the section of RMC.
PSE proposes to have Potelco Inc. relocate two (2) existing PSE utility poles and approximately 600 lineal
feet of overhead wires. The replacement of the overhead wires would begin at the southeast corner of
the 154th Ave SE and SE 2nd Place intersection, crossing to the north side of SE 2nd Place and ending at the
northwest corner of the SE 2nd Place and 156th Ave SE intersection.
The relocation of the utility poles is to facilitate the construction of the Cedar Ridge Short Plat that is
anticipated to be constructed under City of Renton Civil Construction Permit C17004067. The Cedar Ridge
Short Plat project is vested to utility standards in place prior to the latest code amendment (Ordinance
5875) adopted January 22, 2018.
ANALYSIS: The City has considered the request for an exemption from RMC 4-6-090(D)(1)(g)(i).
Ordinance 5834 grants Puget Sound Energy, the right to construct, operate, set, erect, support, attach,
connect, maintain, repair, replace, enlarge and use facilities for purposes of transmission, distribution and
sale of electrical energy and gas, in, upon, over, under, along, across and through the franchise area.
The proposal would relocate overhead electrical facilities. Therefore, the City is granting an exemption
with conditions, per RMC 4-6-090(D)(1)(g)(i) which allows for exceptions when lines are being relocated
when existing poles are still currently needed. The code does however require conduit to be installed
whenever feasible to facilitate undergrounding in the future. In this case, the Cedar Ridge Short Plat will
be constructing the street improvements on the south side of the SE 2nd Place and reasonable
accommodating the construction of a joint use trench within a proposed utility easement to facilitate
future undergrounding of the facilities. In addition, the Cedar Ridge Short Plat has received approved to
remove existing trees within the right of way that will affect the relocation of the overhead utilities.
PSE Electric #105088365
Page 2 of 2
February 1, 2019
DECISION: The requested exemption from underground utility installation requirements (RMC4-6-090 (C)
as requested by the applicant is approved with conditions subject to the conditions below as the request
complies with exemption criteria of RMC 4-6-090(D)(1)(g)(i).
Conditions of Approval:
1. Any existing height violations within the Project Reach must be resolved at the time of
construction. New aerial lines within the Project Reach must have a minimum vertical
clearance of 15’-6”.
2. Any abandoned or unused lines within the Project Reach must be removed at the time that
construction is taking place.
3. A traffic control plan must be separately submitted to the City, and no construction may take
place until the City has approved a traffic control plan.
4. A joint use trench shall be constructed along the south side of SE 2nd Place within a utility
easement provided by the Cedar Ridge Short Plat (City Permit C17004067) to facilitate future
undergrounding activities.
5. The relocated aerial fiber lines within the Project Reach must be converted to underground
facilities in the future, at PSE’s cost, when a future permit application is proposed within the
Project Reach that triggers undergrounding. The new aerial lines must be undergrounded
within one year, or approved otherwise by the City, from the first event triggering the
requirement to underground the aerial lines.
This decision to approve the exemption with conditions is subject to a fourteen (14) day appeal period
from the date of this letter per RMC 4-8-110. Any appeals of the administrative decision must be filed
with the City Clerk, along with the required appeal fee, by 5:00 pm, February 15, 2019.
Sincerely,
Brianne Bannwarth, PE
Development Engineering Manager
cc: C.E. “Chip” Vincent, CED Administrator
Gregg Zimmerman, PW Administrator
Jennifer Henning, Planning Director
Justin Johnson, Civil Engineer III
Scott Warlick, Engineering Specialist II
Holly Powers, Permit Technician
Pat Miller, Construction Inspection Supervisor
Rohini Nair, Civil Engineer III
Lee Brown, Puget Sound Energy lee.brown@pse.com
Franchise Permits
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Conditions for Permit MFP18006908
Engineering
1 Engineering General Conditions
The relocated aerial fiber lines within the Project Reach must be converted to underground facilities in the future,
at PSE’s cost, when a future permit application is proposed within the Project Reach that triggers
undergrounding. The new aerial lines must be undergrounded within one year, or approved otherwise by the City
from the first event triggering the requirement to underground the aerial lines.
2 Engineering General Conditions
A traffic control plan must be separately submitted to the City, and no construction may take place until the City
has approved a traffic control plan.
3 Engineering General Conditions
Any existing height violations within the Project Reach must be resolved at the time of construction. New aerial
lines within the Project Reach must have a minimum vertical clearance of 15’-6”.
4 Engineering General Conditions
Any abandoned or unused lines within the Project Reach must be removed at the time that construction is taking
place.
5 Engineering General Conditions
A joint use trench shall be constructed along the south side of SE 2nd Place within a utility easement provided by
the Cedar Ridge Short Plat (City Permit C17004067) to facilitate future undergrounding activities.
Page 1 of 1