HomeMy WebLinkAboutSummary of Bidder Inquiries No. 1Page 1 of 3  Summary of Bidders Inquiries No. 1     Renton Avenue South Resurfacing Project  Federal Aid Number: STP(UL)‐1201(023)    Date: January 30, 2019    The responses to bidder inquiries, unless incorporated into a formal addendum to the contract,  are not part of the contract and are provided for the bidders’ convenience only. The responses  may be considered along with all other information furnished to prospective bidders for the  purpose of bidding on the project. The use of information provided in the responses to bidder  inquiries is not to be construed in any way as a waiver of the provisions nor excuse the contractor  from full compliance with the contract requirements. Bidders are cautioned that subsequent  responses or contract addenda may affect or vary a response previously given and any such  subsequent response or addenda should be taken into consideration when submitting a bid for  the project.       Bidder Inquiry No. 1  What is the Engineer’s Estimate for the project?  City of Renton Response to Bidder Inquiry No. 1  The Engineer’s Estimate for the project is $1,200,000. This information is currently posted on the  project summary page.      Bidder Inquiry No. 2  Sheets 4/TE‐1 to 8/TE‐5 call out for a High Visibility Silt Fence, but sheet 9/TE‐6 shows a  standard plan for a High Visibility Fence. Please clarify.  City of Renton Response to Bidder Inquiry No. 2  Please refer to Addendum No. 1 for clarification.        Bidder Inquiry No. 3  As you know, this particular project has a large overlay and would be more advantageous to do  during warmer and more consistent weather conditions. Would this project begin in the middle  of June?   Page 2 of 3  City of Renton Response to Bidder Inquiry No. 3  This is a federally funded project and it will be held to the standards outlined in the 2018  Standard Specifications. We plan to award and begin construction as soon as feasible taking  into consideration that the project must be approved by our City Council.       Bidder Inquiry No. 4  In Section 8‐22.2 of the Special Provisions, the plastic pavement marking materials shall be Type  A – liquid hot applied thermoplastic unless indicated otherwise in the Contract Documents.  However, on sheets 33/CH‐1 to 37/CH‐5 general note 3 states that all plastic markings shall be  Type D‐1 MMA unless indicated otherwise. Please clarify.  City of Renton Response to Bidder Inquiry No. 4  Please refer to Addendum No. 1 for clarification.       Bidder Inquiry No. 5  Conduit run 16 in the Wiring Schedule on sheet 45/TS2 under “Remarks” say to see paving plan,  however there is no reference to conduit run 16 on the Paving Plans. Please clarify.  City of Renton Response to Bidder Inquiry No. 5  Please refer to Addendum No. 1 for clarification.       Bidder Inquiry No. 6  Bid Item A53 has a quantity of 525 SF, there is one construction note calling for a Landscape  Block Wall and that is Note (20) on sheet 16/RD‐2. The detail for the Landscape Block Wall  found on sheet 26/RD‐12 restricts the height of the wall to a maximum of 2.5 feet, so there is  not enough wall length shown in the plans to justify 525 SF. Please clarify.  City of Renton Response to Bidder Inquiry No. 6  Please refer to Addendum No. 1 for clarification.       Bidder Inquiry No. 7  Sheets 15/RD‐1 to 19/RD‐5, shows Paving Note 10 incorrectly. Please clarify.  City of Renton Response to Bidder Inquiry No. 7  Please refer to Addendum No. 1 for clarification.     Page 3 of 3    Bidder Inquiry No. 8  Sheets 15/RD‐1, 18/RD‐4 and 19/RD‐5, shows Paving Note 10 as adjust existing catch basin to  grade per Std Plan 101.1, see sheet 24/RD‐10. What is the intention with these catch basins? Do  they all need to be adjusted?  City of Renton Response to Bidder Inquiry No. 8  Please refer to Addendum No. 1 for clarification.       Bidder Inquiry No. 9  On sheet 16/RD‐2, please clarify paving plan notes 13 and 15.   City of Renton Response to Bidder Inquiry No. 9  Please refer to Addendum No. 1 for clarification.                                 End of Summary of Bidder Inquiries No. 1