Loading...
HomeMy WebLinkAboutIssued construction permit sewer Extension SE 132nd ( NE 2nd) Street U16006822.pdfDEPARTMENT OF COMMUNITYCITY OF AND ECONOMIC DEVELOPMENT --•••••" ��Rent•n v Constiruction PermitiU16006822 IVR Number: 16006822 Permiti Name SE 132nd (NE 2ND) STREET SEWER EXTENSION Address/Location: 15522 SE 132ND ST Parcel Number: 1423059092 Application Datie 12/29/2016 Permiti Type Engineering Issue Datie 07/26/2017 Permiti Work Class Constiruction Expiration Datie 07/26/2018 Inspectioc Todd Freih 206-999-1832 Plan Reviewer: Rohini Nair 425-430-7298 Description: SANITARY SEWER MAIN EXTENSION ALONG WITH SEWER STUBS ON SE 132nd (NE 2ND) STREET KING COUNTY ROW. Billing Type X Applicanti Contiacti Contiractior Owner Name KUSHAL S+KAJAL A RAM VARMA Touma Engineers & Land Surveyors, PLLC Brian Bowen Bowen Constiruction Inc Constiruction ContiractiolBOWENC1993QR RAM KAJAL A Address 10906 144tih Ave SE RENTON, WA 98059 255 SW 41sti Sti Rention WA 98057 PO Box 42 Buckley, WA 98321-0042 Business License Number: BL.032696 10906 144TH AVE SE RENTON , WA 98059 Phone B: (206) 353-3168 B: (206) 30-4356x7 B: (360) 829-6632 C: (253) 208-9412 • Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. • This permit and plans must be posted at the job site at all times. • I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton codes and ordinances. • Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. • Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. • In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010 ) (Olympic Pipeline at 206.510.0575)(Puget Sound Energy at 425.457.5816) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. �!/-If (Signatiure) (Datil THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Page 1 of 1