Loading...
HomeMy WebLinkAboutSIGNINSHEET.doc PRECONSTRUCTION MEETING Project: Heritage Apartments  Date: July 30, 2015   Location: 207 Main Ave S. Permit: U14006554 Drawing Number: 3872   ATTENDEES NAME RELATIONSHIP TO PROJECT COMPANY NAME & ADDRESS PHONE/ EMAIL   Jan Illian  Project Coordinator  City of Renton 1055 S. Grady Way 98055 425-430-7216 jillian@rentonwa.gov   Patrick Miller  Utility Inspector  City of Renton 1055 S. Grady Way 98055 206-794-6162 pmiller@rentonwa.gov   Corey Thomas  Fire Department  City of Renton 1055 S. Grady Way 98055 425-430-7024 cthomas@rentonwa.gov   Rocale Timmons  Planning  City of Renton 1055 S. Grady Way 98055 425-430.-7219 rtimmons@rentonwa.gov   Abdoul Gafour  Water Engineering  City of Renton 1055 S. Grady Way 98055 425-430-7210 agafour@rentonwa.gov                  NAME RELATIONSHIP TO PROJECT COMPANY NAME AND ADDRESS PHONE /EMAIL