Loading...
HomeMy WebLinkAboutAdden 1 - Sunset Air *girl visa CAG-16-174, Adden #j INTERAGENCY Amendment Department of Enterprise Services Date: November 19,2018 Agreement No: K4137 Project No.: 2017-299, 2018-027 Amendment No: 3 Interagency Agreement Between the State of Washington Department of Enterprise Services and City of Renton The parties to this Agreement,the Department of Enterprise Services, Engineering& Architectural Services, hereinafter referred to as"DES",and City of Renton,hereinafter referred to as the "CLIENT AGENCY",hereby amend the Agreement as follows: 1. Statement of Work DES shall furnish the necessary personnel and services and otherwise do all things necessary for or incidental to the performance of the work set forth in Attachment"A-1"and Attachment"C-1", attached hereto and incorporated herein by reference. Unless otherwise specified, DES shall be responsible for performing all fiscal and program responsibilities as set forth in Attachment"A-1"and Attachment"C-1". Energy/Utility Conservation projects shall be authorized by Amendment to this Agreement. 1.1 Renton Senior Center Energy Efficiency Improvements outlined in the Sunset Air, Inc. Energy Services Proposal dated July 18,2017. 1.2 Review of Measurement and Verification reports for the Renton Senior Center Energy Efficiency Improvements outlined in the Sunset Air, Inc. Energy Services Proposal dated July 18, 2017. 1.3 ESP Addendum for Renton Senior Center Energy Efficiency Improvements outlined in the Sunset Air Inc.Energy Services Proposal dated October 20, 2017. 1.4 City of Renton, City Hall Phase 1 outlined in the McKinstry Essention,LLC Energy Services Proposal dated October 19,2018,revised November 5,2018. 4. Consideration Compensation under this Agreement shall be by Amendment to this Agreement for each authorized project. Each Amendment will include a payment schedule for the specific project. Interagency Agreement No.K4137 Page 1 of 3 Noe *Nit For Project Management Services provided by DES under Attachment"A-1"of this Agreement,the CLIENT AGENCY will pay DES a Project Management Fee for services based on the total project value per Project Management Fees Schedule set forth in Attachment"B-2". If the CLIENT AGENCY decides not to proceed with an Energy/Utility Conservation project that meets the CLIENT AGENCY's cost effective criteria,then the CLIENT AGENCY will be charged a Termination Fee per Attachment"B-2". The Termination Fee will be based on the estimated Total Project Value outlined in the Energy Audit and Energy Services Proposal prepared by the Energy Services Company(ESCO). If measurement and verification services are requested by the CLIENT AGENCY and provided by DES under Attachment"C-1"of this Agreement,the CLIENT AGENCY will pay DES $2,000.00 annually for each year of monitoring and verification services requested. Compensation for services provided by the ESCO shall be paid directly to the ESCO by the CLIENT AGENCY, after DES has reviewed, approved and sent the invoices to the CLIENT AGENCY for payment. 4.1 Energy Project Management Fee for the work described in Section 1.1 is$13,800.00. Anticipated billing date for this Amendment is September 30, 2017. 4.2 Measurement and Verification Fee for the work described in Section 1.2 is $4,000.00. Anticipated billing dates for this Amendment are December 14,2019 and 2020. 4.3 Revised Energy Project Management Fee for added kitchen scope of work described in Section 1.3 is increased by$6,000.00 to a new fee of$19,800.00. Anticipated billing date for this Amendment is January 31,2018. 4.4 Energy Project Management Fee for the work described in Section 1.4 is $58,300.00. Anticipated billing date for this Amendment is June 1,2019. The new total Agreement value is$82,100.00. This Amendment also revises the Interagency Reimbursement Costs outlined in Attachment "B-1"of the Agreement to reflect the current DES project management fees. A new Attachment"B-2" is included with this Amendment. All sections above have been fully amended and are shown in their entirety. All other terms and conditions of this Agreement remain in full force and effect. The requirements of RCW 39.34.030 are satisfied by the underlying Agreement and are incorporated by reference herein. Interagency Agreement No.K4137 Page 2 of 3 0 "lye *eso Each party signatory hereto,having first had the opportunity to read this Amendment and discuss the same with independent legal counsel, in execution of this document hereby mutually agree to all terms and conditions contained herein,and as incorporated by reference in the original Agreement. City of Renton Department of Enterprise Services I Engineering & Architectural Services Li v 2 koger,A. Wigfipfd,P. ., Denis Law, Mayor s `,g Energy Program Manager ; Title /Date Title `Date K41371AAamd33co / Attest: ' '` _' ' '_ i r .' ' p',;# Jason A.Se ,CMC,City leek / oostitinonti,,, SEAL _ �///,,, 'S'A TED S Ep;,‘\��liNit Interagency Agreement No.K4137 Page 3 of 3 ATTACHMENT B-2 Fee Schedule 2017-19 Interagency Reimbursement Costs for Project Management Fees to Administer Energy/Utility Conservation Projects PROJECT TOTAL PROJECT VALUE MANAGEMENT FEE TERMINATION 5,000,001 6,000,000 $68,800 25,700 4,000,001 5,000,000 67,700 25,400 3,000,001.......4,000,000 66,700 25,000 2,000,001.......3,000,000 62,500 23,400 1,500,001.......2,000,000 58,300 21,800 1,000,001 1,500,000 51,600 19,300 900,001. ... 1,000,000 43,800 16,400 800,001 ..900,000 41,300 15,400 700,001 ..800,000 38,300 14,400 600,001 700,000 36,500 13,700 500,001 600,000 33,800 12,600 400,001 500,000 30,200 11,300 300,001 .400,000 25,800 9,700 200,001 300,000 20,700 7,700 100,001 .200,000 14,400 5,400 50,001 ..100,000 7,800 3,500 20,001 50,000 4,200 2,000 The project management fee on projects over$6,000,000 is 1.15% of the project cost. The maximum DES termination fee is $25,700. 1. These fees cover project management services for energy/utility conservation projects managed by DES's Energy Program. 2. Termination fees cover the selection and project management costs associated with managing the ESCO's investment grade audit and energy service proposal. No termination fee will be charged unless the CLIENT AGENCY decides not to proceed to construction based on an energy services proposal that identifies projects that met the CLIENT AGENCY'S cost effectiveness criteria. 3. If the project meets the CLIENT AGENCY's cost effectiveness criteria and the CLIENT AGENCY decides not to move forward with a project,then the CLIENT AGENCY will be invoiced per Attachment B Termination or$25,700.00 whichever is less. If the CLIENT AGENCY decides to proceed with the project then the Agreement will be amended per Attachment B for Project Management Fee. 4. If the audit fails to produce a project that meets the CLIENT AGENCY's established Cost Effectiveness Criteria, then there is no cost to the CLIENT AGENCY and no further obligation by the CLIENT AGENCY. Interagency Agreement No.K4137 Rev.4/5/18 ATTACHMENT C-1 Scope of Work Energy/Utility Conservation Projects Monitoring Services Statewide Energy Performance Contracting Program Master Energy Services Agreement No. 2017-193 If requested DES will provide the following monitoring services for each specific project for the CLIENT AGENCY. 1. Monitor actual energy use and dollar costs, compare with the ESCO's annual Measurement and Verification (M&V) report and any ESCO guarantee, resolve differences, if needed, and approve any vouchers for payment. 2. Monitor facility operations including any changes in operating hours, changes in square footage, additional energy consuming equipment and negotiate changes in baseline energy use which may impact energy savings. 3. Provide annual letter report describing the ESCO's performance, equipment performance and operation, energy savings and additional opportunities, if any, to reduce energy costs. Interagency Agreement No.K4137