Loading...
HomeMy WebLinkAboutC_Conditions to Issuance of Permit_180207.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit C17004096 Engineering 1 Submit acceptable Performance Surety Device in the amount of $1,011,019.57. 2 Submit A copy of the Civil Contractor's City of Renton business license. 3 Pay All Permit Issuance Fees. 4 Hold pre-construction meeting prior to start of work. 5 Submit A copy of the Civil Contractor’s license. 6 Signed Declaration of Covenant for Maintenance and Inspection of Stormwater Facilities and Flow Control BMP 7 A signed Authorization of Special Billing Form. 8 Contractor shall pothole the existing water main in S 132nd ST prior to installation of utilities/structures to ensure no conflicts with the street lights, or other structures. If conflicts exist, a plan revision will need to be submitted to address the conflict. Maintain a minimum of 5-ft separation between the water main and street light bases. Adequate separation between the water main and all other utilities shall be provided. 9 Provide contact information for the new property owners once the sale is final. 10 Submit Certificate of Insurance with coverage as outlined in the City’s Certificate of Insurance Guidelines. Page 1 of 1