HomeMy WebLinkAboutF_Civil_Plans_20180206.pdfCONDITION OF APPROVAL:
CONTRACTOR SHALL POT-HOLE THE EXISTING WATER MAIN IN S 132ND ST PRIOR TO
INSTALLATION OF UTILITIES/STRUCTURES TO ENSURE NO CONFLICTS WITH THE STREET
LIGHTS, OR OTHER STRUCTURES. IF CONFLICTS EXIST, A PLAN REVISION WILL NEED TO
BE SUBMITTED TO ADDRESS THE CONFLICT. MAINTAIN A MINIMUM OF 5-FT SEPARATION
BETWEEN THE WATER MAIN AND STREET LIGHT BASES. ADEQUATE SEPARATION
BETWEEN THE WATER MAIN AN ALL OTHER UTILITIES SHALL BE PROVIDED.
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
REGIONAL FIRE AUTHORITY
cthomas 02/05/2018
APPROVED
WASTEWATER UTILITY
dchristen 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
WATER UTILITY
Abdoul Gafour 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
2
2
2
2
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
alley b
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
CONDITION OF APPROVAL:
CONTRACTOR SHALL POT-HOLE THE EXISTING WATER MAIN IN S 132ND ST PRIOR TO INSTALLATION OF
UTILITIES/STRUCTURES TO ENSURE NO CONFLICTS WITH THE STREET LIGHTS, OR OTHER STRUCTURES. IF
CONFLICTS EXIST, A PLAN REVISION WILL NEED TO BE SUBMITTED TO ADDRESS THE CONFLICT. MAINTAIN A
MINIMUM OF 5-FT SEPARATION BETWEEN THE WATER MAIN AND STREET LIGHT BASES. ADEQUATE SEPARATION
BETWEEN THE WATER MAIN AN ALL OTHER UTILITIES SHALL BE PROVIDED.
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
CONDITION OF APPROVAL:
CONTRACTOR SHALL POT-HOLE THE EXISTING WATER MAIN IN S 132ND ST PRIOR TO INSTALLATION OF
UTILITIES/STRUCTURES TO ENSURE NO CONFLICTS WITH THE STREET LIGHTS, OR OTHER STRUCTURES.
IF CONFLICTS EXIST, A PLAN REVISION WILL NEED TO BE SUBMITTED TO ADDRESS THE CONFLICT.
MAINTAIN A MINIMUM OF 5-FT SEPARATION BETWEEN THE WATER MAIN AND STREET LIGHT BASES.
ADEQUATE SEPARATION BETWEEN THE WATER MAIN AN ALL OTHER UTILITIES SHALL BE PROVIDED.
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
SURFACE WATER UTILITY
rstraka 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WASTEWATER UTILITY
dchristen 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WASTEWATER UTILITY
dchristen 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WASTEWATER UTILITY
dchristen 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
C d
WASTEWATER UTILITY
dchristen 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
E
WASTEWATER UTILITY
dchristen 02/05/2018
CONDITION OF APPROVAL:
CONTRACTOR SHALL POT-HOLE THE EXISTING WATER MAIN IN S 132ND ST PRIOR TO
INSTALLATION OF UTILITIES/STRUCTURES TO ENSURE NO CONFLICTS WITH THE STREET
LIGHTS, OR OTHER STRUCTURES. IF CONFLICTS EXIST, A PLAN REVISION WILL NEED TO
BE SUBMITTED TO ADDRESS THE CONFLICT. MAINTAIN A MINIMUM OF 5-FT SEPARATION
BETWEEN THE WATER MAIN AND STREET LIGHT BASES. ADEQUATE SEPARATION
BETWEEN THE WATER MAIN AN ALL OTHER UTILITIES SHALL BE PROVIDED.
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WASTEWATER UTILITY
dchristen 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WASTEWATER UTILITY
dchristen 02/05/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018 WATER UTILITY
Abdoul Gafour 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WATER UTILITY
Abdoul Gafour 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WATER UTILITY
Abdoul Gafour 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
C d
WATER UTILITY
Abdoul Gafour 02/06/2018
WITH 2" DCVA PER STD
PLAN NO. 340.8
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WATER UTILITY
Abdoul Gafour 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WATER UTILITY
Abdoul Gafour 02/06/2018
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
WATER UTILITY
Abdoul Gafour 02/06/2018
ARMORCAST PRODUCTS CO. METER BOX PART NO. A6001946TX18 AND CAST IRON LID 13"x24"x2" PART NO. A6001969RCI-H7
DEVELOPMENT ENGINEERING
Ann Fowler 02/05/2018
NORTHState ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222TYPICAL SHRUB PLANTING DETAIL1TYPICAL GROUNDCOVER PLANTING DETAIL2DECIDUOUS TREE PLANTING IN PLANTING STRIP3TYPICAL DECIDUOUS TREE PLANTING DETAIL5TYPICAL EVERGREEN TREE PLANTING DETAILNOTE:45454R-397133CURRENT PLANNINGcclose 02/05/2018
NORTHState ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222R-397134CURRENT PLANNINGcclose 02/05/2018
NORTHState ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222R-397135CURRENT PLANNINGcclose 02/05/2018
NORTHState ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222STACKSTONE SEATING WALL34` SPLIT RAIL FENCE2TYPE 6 FENCE (WSDOT STANDARD PLANS FS-2)1R-397136CURRENT PLANNINGcclose 02/05/2018
NORTHState ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222R-397137CURRENT PLANNINGcclose 02/05/2018
NORTHState ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222R-397138CURRENT PLANNINGcclose 02/05/2018
NORTHState ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222R-397139CURRENT PLANNINGcclose 02/05/2018
State ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222R-397140CURRENT PLANNINGcclose 02/05/2018
NORTHState ofWashingtonregisteredLandscape ArchitectDevin Petersoncertificate no. 1222R-397141CURRENT PLANNINGcclose 02/05/2018