HomeMy WebLinkAboutF_Mead Short Plat_Technical Information Report_170901.pdf
Table of Contents
· Section 1: Project Overview
· Section 2: Conditions and Requirements Summary
· Section 3: Offsite Analysis
· Section 4: Flow Control and Water Quality Analysis and Design
· Section 5: Conveyance System Analysis and Design
· Section 6: Special Reports and Studies
· Section 7: Other Permits
· Section 8: CSWPPP Analysis and Design
· Section 9: Bond Quantities, Facility Summaries, and Declaration of Covenant
· Section 10: Operations and Maintenance Manual
Appendix A – Administrative Report and Decision dated June 2, 2016
ILWACO PL NE
ILWACO AVE NE NE 6TH STNE 5TH PL142ND AVE SE (HOQUIAM AVE)
N
15025EDWINJ.GRE
E
PROFES
IONAL N D S U VEYORS
LA RSTATEOF WASHI
N
GTONREGISTERED JR.TOPOGRAPHIC SURVEYTED 390717R-390717SHEET #17CITY OF
RENTONMEAD SHORT PLATMEAD SHORT PLATMEAD SHORT PLAT
TUSCANY CONSTRUCTION, LLC
522 HOQUIAM AVENUE NE LUA:16-000138U16-004534TOPOGRAPHIC/BOUNDARY SURVEY
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│
―│
―│
―│
―│
―│―│―│―│―│―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│―│―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│―│―│―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│
―│―│
―│
―│
―│―│―│―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│
―│―│
―│―│
―│
―│―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│―│―│―│―│
―│
―│―│―│―│―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│―│―│―│
―│―│
―│
―│
―│―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│―│―│
―│
―│
―│
―│―│―│―│―│
―│―│
―│
―│
―│
―│
―│
―│―│―│―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│
―│―│
―│
―│
―│
―│
―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│
―│―│
―│
―│―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│―│―│―│
―│―│
―│―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│―│
―│
―│―│―│―│
―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│―│―│
―│―│
―│
―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│
―│―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│
―│―│
―│
―│
―│―│―│―│―│―│
―│
―│―│―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│
―│―│
―│
―│
―│―│―│―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│
―│―│
―│
―│
―│―│―│―│―│―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│
―│―│
―│―│―│―│―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│
―│―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│―│―│―│
―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│―│
―│
―│―│―│―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│
―│
―│
―│
―│
―│―│―│―│―│
―│
―│―│―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│―│―│
―│
―│―│―│―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│―│―│―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│―│―│
―│
―│―│―│―│
―│―│
―│
―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│
―│―│
―│
―│
―│―│―│―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│―│
―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│
―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│
―│―│
―│
―│
―│―│
―│
―│
―│
―│
―│
―│―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│
―│
―│
―│
―│―│―│―│―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│―│―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│―│―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│―│―│―│
―│
―│―│―│―│―│
―│―│
―│
―│
―│―│―│―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│―│―│
―│
―│
―│
―│―│―│―│―│
―│
―│―│―│―│―│―│
―│
―│
―│
―│
―│―│
―│―│
―│
―│
―│
―│―│
―│―│
―│―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│―│
―│
―│
―│―│
―│―│
―│
―│››››!"
&PO
&PO
!"
!"
&PO
&PO
&PO
&PO
^
^▄n▄n
▄n
▄n▄n
▄n
▄n ▄n
▄n ▄n▄ÞÞ@TT
▄n ▄n
▄n ▄n
▄n▄n
▄n ▄n▄ÞÞ@TT ▄ÞÞ@TT ▄n
▄n
▄n ▄n
▄n ▄n ▄n
▄n▄n
▄n
▄n ▄n
▄n▄n ▄n
▄n
▄n▄n ▄n
▄n
▄n ▄n ▄n
▄n▄n
▄n
▄n
▄n ▄n ▄n
▄n▄ÞÞ@TT
▄ÞÞ@TT ▄n ▄n ▄ÞÞ@TT
▄n ▄n
F
F
F
F
F
F
F
F
F
F
F
F
F
F
F
H
H
300
100
400 300100300
500
200
400
500200400
300200100100
200
200
100 400500
600
400
5
0
0
400
500400500400400300
400
400
5
0
0 500300
300
100
300400 2
0
0
10
0
2
0
0 1004004
0
0 300400
400
100
50
0
200
300 500300
400500
500400300300
5005
0
0
400400
40
0400
500
400
50
0
50
0
3005
0
0400200
20
0
300
500
500
300
1
0
0
1
0
0
3
0
0 2003004
0
0
500
400
500400
400 400200600500400
T23N R4E
T22N R4E T22N R5E
T23N R5E
1
19
30 29
8 9
23
25
12
18
20
17
5 4
22
27
22
23
14
2324
7
31
8
20
21
10
3
2
14
11
24
19
7 8
28
16
34
10
13
36
19
6
9
22
15
23
35
11
11
13
33
11
14
24
7
20
21
9
15
10
2
35
26
11
12
12
18
32
17
16
21
26
23
23
14
11
RentonMunicipalAirport
RentonMunicipalAirport
Cedar River Trail
C
e
d
a
r Ri
ver Tr
ai
l
Cedar River Trail§¨¦405
§¨¦405
¬«181
¬«167
¬«515
¬«900
¬«167
¬«516
¬«515
¬«900
¬«900
¬«515
¬«181
¬«167
¬«515
¬«167
¬«515
¬«169
¬«169
S 220TH ST
RENTON AVE S
W JAMES STS 12 7TH ST
S 120TH ST
76TH AVE SS 130TH ST80TH AVE SS 208TH ST
RAINIER
AVE
S
TAYLOR AVE NWW PERI
METER RD94TH AVE SS 15TH STSHATTUCK AVE SS 19TH ST
102ND AVE SES E CARR RDMIL
L
A
VE
SBURNETT AVE SN 1
S
T
S
T
N 6TH ST
SE 204TH ST
108TH AVE SESE 240TH ST
SE 208TH ST
SE 186TH ST 112TH AVE SE113TH AVE SE116TH AVE SE120TH PL SE120TH AVE SE118TH AVE SEROYAL HILLS D R S ENE 6TH PL
132ND PL SE134TH AVE SESE FAIRWOOD
B
L
V
D
NE 3RD ST
144TH AVE SESE 128TH ST
SE 254TH PL
SE 160TH PL 160TH AVE SEANDOVER PARK ES LANGSTON RDCORNELL AVE SW SAAR ST
S 212TH ST78TH AVE SSW GRADY WAY
E TEMPERANCE STE VALLEY HWYE SEATTLE ST88TH AVE SLIND AVE SW87TH AVE SREITEN RD92ND AVE SHARDIE AVE SWS 248TH ST WELLS AVE SSE 228TH ST
SE 200TH ST106TH AVE SEHIGH AVE SSE 244TH ST
SE 168TH ST
SE 160TH STS PUGET DRSE CEDAR R
IDGE
D
R
SE 8TH PLNE
S
UNS
E
T
B
L
V
D
SE 218TH PL
NE 5TH PL
SE 184TH ST
SE 223RD DRKIRKLAND AVE NE125TH AVE SESE 172ND ST126TH AVE SENE 2ND ST133RD AVE SESE 180TH STSE 4TH PLHOQUIAM AVE NE146TH AVE SE147TH AVE SE154TH PL SESE 2ND ST
156TH AVE SE155TH AVE SESE 2ND PL
STRAN D E R BLVDS 228TH ST
S 135TH ST
NACHES AVE SW
E TITUS STSW 43RD ST
SW 16TH ST STEVENS AVE SWLIND AVE NWRAINIER AVE SAIRPORT WAY S
100TH AVE SESE 224TH STLOGAN AVE NMILL AVE SN 4TH ST
RENTON AVE SSE 182ND ST
112TH AVE SES E 225TH ST
SE 164TH ST
SE 188TH ST 120TH AVE SEINDEX AVE SEINDEX AV
E
NE
121ST AVE SESE 5TH ST
127TH AVE SESE 202ND PL 129
TH
P
L
S
ESPRUCE DRREDMOND AVE NE132ND AVE SEUNION AVE SE140TH AVE SE137TH AVE
S
E136TH PL SEJERICHO AVE NESE 224TH ST
SE 138TH PLNILE AVE NE156TH AVE SESE 156TH ST
SE 144TH ST 162ND AVE SE6
5
TH
A
V
E
S
W SMITH ST76TH AVE SS 128TH ST
1ST AVE N80TH AVE SOAKESDALE AVE SWPOWELL AVE SWE GUIBERSON ST
S W 1 2 T H S T
S 2 36TH PL WILLIAMS ST NN 8TH ST
SE 216TH STWELLS AVE NSE 235 T H STSE 220TH PL
SE 219TH PL116TH AVE SEHARRINGTON AVE NESE 6TH
S
T
NE 6TH ST
129TH AVE SESE 120TH ST
DUVALL AVE NESE 162ND PL
148TH AVE SESE PETR
O
V
I
T
S
K
Y
R
D
SE
183R
D
D
R SE 179TH ST160TH AVE SE158TH AVE SE164TH AVE SES 204TH ST
NADEN AVE SW GOWE ST
1ST AVE SS 222ND ST
S 216TH ST
SW LANGSTON RD
SW 41ST ST
SW 19TH ST85TH AVE S87TH AVE S89TH AVE SE VALLEY RDS 218TH ST
S 200TH STTALBOT RD SMO
R
R
I
S
A
V
E
S EAGLE RIDGE DR SBURNETT AVE NPELLY AVE NGARDEN AVE NSE 192ND STHOUSER WAY NNE 3RD ST
SE 221ST ST 125TH AVE SEMONROE AVE NE135TH AVE SESE 204TH WAY 138TH AVE SESE 159TH PL
145TH PL SESE 232ND ST
SE 240TH ST
SE JONES RD
INDUSTRY DRS 133RD ST
72ND AVE SS 196TH ST
S 114TH ST
3RD AVE SS 116TH ST
S 194TH ST
SW 39TH ST
WOODFORD AVE NE JAMES ST
SW 34TH ST
SW 7TH ST84TH AVE SSTEVENS AVE NWHILLTOP AVES 213TH P L
S GRADY WAY
104TH PL SEPARK AVE NN 3RD ST
SE 226TH ST
SE 212TH ST
SE 223RD ST
SE 227TH PL
S E 228TH PL
BE
A
C
O
N
W
A
Y
S
EEDMONDS AVE NENE 10TH ST
132ND AVE SESE 1 7 6T H S T
SE 2 3 3 R D ST
1
3
6
T
H
A
VE
SESE 4TH STSE 3 R D P L142ND AVE SE148TH AVE SESE 142ND ST
SE 148TH ST
161ST AVE SE163RD PL SE68TH AVE SS 234TH STS 12 6 T H S T
W MEEKER ST
2ND AVE SRAILROAD AVE N2ND AVE NS 188TH ST
SW 3RD PL
S 124TH ST
S 240TH ST
S 5TH STLOGAN AVE S103RD AVE SES 3 6 T H P LWILLIAMS AVE SB
E
NS
ON
R
D
S
BE
A
C
O
N
W
A
Y
S
N 1 0 T H ST
109TH AVE SESE 248TH ST106TH AVE SEROLLING HILLS AVE SEBRONSON WAY NESE 196TH STDAYTON AVE NESE
1
7
0
T
H
P
L
FER
N
D
A
L
E
A
V
E
S
E
124TH AVE SESE 158TH ST
NE 4TH ST
127TH PL SEQUEEN AVE NESE 151ST ST
SE 200TH ST140TH AVE SESE
1
7
1
S
T
W
A
Y
140TH WAY SE
S E 184TH PL144TH AVE SEHOQUIAM AVE NENILE AVE NESE 172ND PL
66TH AVE SS 190TH ST
S 132ND ST
6TH AVE N77TH AVE SLONGACRES DR SW4TH AVE N3RD AVE NCENTRAL AVE N80TH PL S84TH AVE SSW 27TH ST
SW 10TH ST
S 117TH ST
S 237TH PL
S 192ND ST
98TH AVE S100TH AVE SE102ND AVE SECEDAR AVE SGRANT AVE SSE 162ND ST
NE 9TH ST
120TH AVE SELAKE YOUNGS WAY SE
121ST PL SE124TH AVE SES E 2 21ST PL
NE 7TH ST
SE 231ST WAY131ST AVE SE128TH AVE SESE 241ST ST
SE 216TH ST
SE 141ST STBREMERTON AVE NEFIELD AVE NE146TH AVE SE143RD PL SESE 145TH PL ROSARIO PL NESE 116TH ST
SE 149TH ST
W VALLEY
RDRAINIER AVES 2ND ST
108TH AVE SECENTRAL AVE SS GRADY WAY104TH AVE SEBEN
SON
D
R
S
SE RENTON MAP
L
E
V
A
L
L
E
Y
R
DBRONSON W A Y N SUNSET BLVD N68TH AVE ST
A
L
BOT RD SMARTIN LUTHER KING JR WAY
SW SUNSET BLVD
SE KENT
KAN
GLEY
R
D
S 3RD ST
SpringbrookSprings Molasses CrMa
d
s
e
n
C
r
Big S
o
o
s CrHarrison Cr Bi
g Soos CrBlack RiverM
adsen
Cr
Ced
a
r
R
i
v
e
r
Cedar River
Green RiverGreen River
G
re
e
n RiverHam Lake
LakeYoungs
KohrPond
ClarkLake
PantherLake
Univ of PhoenixWesternWashington Campus
InternationalAcad of Designand Technology
Embry - RiddleAeronauticalUniv EverestCollRenton
RentonTechnicalColl
KaplanColl -Renton
Pima MedicalInstituteRenton
GreenwoodMemorialPark
MountOlivetCem
SaarPioneerCem
SuiseCreek Cem
KENT
RENTON
FAIRWOOD
TUKWILA
COVINGTON
Cascade
MeridianHeights
Skyway
Orillia
Maplewood
O'Brien
EastHill
East Hill-Meridian
Elliott
BrynMawr
22'
150
52
122°
56
1
557
58
59
561 62
62
5
564
52
50
52
52
27'
47°30'
30"
5248
58
61 5
122°
51
52
180
47°
30"
52
000
52
51
52
54
15'
5
5 30"
30"
60 5 E
122°
47°
55
52
60
FEET
60
52
5253
59
59
5
5
5 5
64
65 07'
49
52
54
52
30"
000 FEET
52
52
52
57
15'
E 12'10'5
52
52
52
52
000m
000
30"47°
122°
52
000m
55
5 12'10'65
1320
52
52
59
N
000 FEET
25'
30"
49
N
290
000m 58 5
000m
56
FEET
25'
22'
30'
27'
52
52
60
5
63
07'
48
52
53
57
58
30"
WASHINGTON
QUADRANGLE LOCATION
RENTON QUADRANGLEWASHINGTON-KING CO.7.5-MINUTE SERIES
RENTON, WA
2017
Expressway Local Connector
ROAD CLASSIFICATION
Ramp 4WDSecondary Hwy Local Road
Interstate Route State RouteUS RouteWX./H
U.S. DEPARTMENT OF THE INTERIOR U.S. GEOLOGICAL SURVEY
1 Seattle South
8 Black Diamond
2 Mercer Island3 Issaquah4 Des Moines5 Maple Valley6 Poverty Bay7 Auburn
ADJOINING QUADRANGLES
1 2 3
4 5
6 7 8
This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011.A metadata file associated with this product is draft version 0.6.19
CONTOUR INTERVAL 20 FEETNORTH AMERICAN VERTICAL DATUM OF 1988
SCALE 1:24 000
1000 500 0 METERS 1000 2000
21KILOMETERS00.51
1 0.5 0
MILES
1
1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000
FEET
Imagery...........................................NAIP, November 2015Roads................................ U.S. Census Bureau, 2015 - 2016Names..........................................................GNIS, 2016Hydrography....................National Hydrography Dataset, 2015Contours............................National Elevation Dataset, 1999Boundaries............Multiple sources; see metadata file 1972 - 2016Public Land Survey System..................................BLM, 2016Wetlands.........FWS National Wetlands Inventory 1977 - 2014
North American Datum of 1983 (NAD83)World Geodetic System of 1984 (WGS84). Projection and1 000-meter grid: Universal Transverse Mercator, Zone 10T
Produced by the United States Geological Survey
10 000-foot ticks: Washington Coordinate System of 1983 (northzone)
This map is not a legal document. Boundaries may begeneralized for this map scale. Private lands within governmentreservations may not be shown. Obtain permission beforeentering private lands.
U.S. National Grid100,000-m Square ID
Grid Zone Designation
ET
10T
^
Ù
MN
GN
UTM GRID AND 2017 MAGNETIC NORTHDECLINATION AT CENTER OF SHEET
0° 36´11 MILS
15° 48´281 MILS
*7643016402473*NSN.7643016402473NGA REF NO.USGSX24K71383SITE
TIR Section 2: Conditions and Requirement Summary
The Administrative Report and Decision for this project can be found within Appendix A at the back
of this Report
Section 1.2 Core Requirements
Core Requirement #1: Discharge at Natural Location
The subject property will discharge at the natural location, within the public storm system
within NE 5th Place and Ilwaco Place NE, as to not divert onto or away from downstream
properties. The proposed discharge into the public storm system should not create a
significant adverse impact of the downhill properties or drainage system. Mitigation will be
provided onsite before discharge, using a stormwater detention vault, to reduce the
developed discharge to pre-historic, forested conditions which is below existing site
discharge rates.
Core Requirement #2: Offsite Analysis
An offsite drainage analysis is provided within TIR Section 3 of this Report. There were no
identified offsite flooding, erosion, drainage or water quality problems created or
aggravated by the proposed project.
Core Requirement #3: Flow Control
The subject property is located within the City of Renton, Flow Control Duration Standard,
Forested Conditions. An onsite flow control facility will be installed (stormwater vault) in
the southeast corner of the development which will provide and be designed to perform to
the required Duration Standards. The stormwater flow control (detention) sizing of the
stormwater vault can be found within TIR Section 4 of this Report. Flow control BMP’s for
the individual lots will be evaluated and provided as shown in TIR Section 4.
Core Requirement #4: Conveyance System
The proposed onsite and offsite conveyance systems have been analyzed and designed to
meet the City of Renton amendments dated February 2010. All new pipes and catch basin
will be sized to provide capacity for the 25-year event and the catch basins will have a
minimum of 6” of freeboard above the 25-year event. The review and analysis of this
proposed conveyance system includes calculations using the “Rational Method of Analysis”
at the 25-year event. The design and analysis of the new system can be found in TIR
Section 5 of this Report. The design of the proposed new system meets this Core
requirement.
Core Requirement #5: Erosion and Sediment Control
A Temporary Erosion and Sediment Control Plan has been designed and provided as part of
utility permit plan set. The implementation of these plans during construction will provide
erosion and sedimentation control during the construction process. The erosion and
sedimentation control plans are designed to minimize downstream impacts of the public
storm system from the transportation of sediments, silts, and erosion.
A Washington State Department of Ecology construction discharge NPDES permit has been
obtained for this project. An erosion control specialist (CECIL) will be assigned to this
project to monitor and provide input to the contractor during the construction process.
Erosion and sediment control will be monitored and reported to the Department of Ecology
has required under the NPDES permit.
Core Requirement #6: Maintenance and Operations
The utility permit plans have identified the public and private storm systems on the project.
The stormwater vault and tract will be owned by the homeowner’s association. The
maintenance and operation of the internal portion of the stormwater vault will be provide
by the City of Renton. The public storm systems identified by the utility permit plans will
be maintained by the City of Renton. The private storm systems located on private
property will be maintained by the home owner. TIR Section 10 of this Report provides
routine maintenance requirements for the new facilities on this project.
Core Requirement # 7: Financial Guarantees and Liability
Financial Guarantees and Liabilities will be provided to the City of Renton as part of the
issuance of the utility construction permit to construct the flow control facilities, storm
conveyance systems, erosion control measures, road improvements and street lighting.
A Bond Quantity worksheet has been provided within TIR Section 9 to provide support
information to the City of Renton to determine financial requirements for bonds, fees, and
sureties.
Core Requirement No. 8 – Water Quality
The subject project is required to provide water quality treatment. The water quality sizing
is provided within TIR Section 4 of this Report. The water quality (dead storage) and
sedimentation will be provided in the lower portion of the proposed stormwater vault.
Section 1.3 Special Requirements
Special Requirement #1: Other Adopted Area-Specific Requirements
This project is not in a designated area included in an adopted master drainage plan, basin
plan, salmon conservation plan, stormwater compliance plan, flood hazard reduction plan,
or shared facilities drainage plan as identified under the City of Renton amendments to the
King County Surface Water Design Manual dated February 2010.
Special Requirement #2: Flood Hazard Area Delineation
This project does not contain or adjacent to a flood hazard area for a river, stream, lake,
wetland, closed depression, marine shoreline within the City of Renton. There are no
regulations within the City of Renton amendments dated February 2010 to study flood
hazards on this property.
Special Requirement #3: Flood Protection Facilities
The subject property does not rely on any flood protection facilities or proposes to modify
or construct a new flood protection faciality.
Special Requirement #4: Source Control
The proposed project does not require a commercial building or commercial site
development permit.
Special Requirement #5: Oil Control
The proposed project is a single-family residential subdivision. This project does not meet
the requirements of a high-use site.
Special Requirement #6: Aquifer Protection Area
The proposed site development is not within an Aquifer Protection Area (APA) zone 1 or
zone 2 as identified on the attached Groundwater Protection Areas map dated 01/09/2014
TIR Section 3: Offsite Analysis
TASK 1: Study Area Definition and Maps
CB 131765
PHOTO A – Sta. 0+00 (downstream)
CB#131716 – East side of Ilwaco place NE – project connection point
PHOTO B – Sta. 6+25 (downstream)
CB# 131774 - Outfall into wetland east of Ilwaco Place NE
PHOTO C – Sta. 10+25 (downstream)
Crossing Jericho Avenue NE at CB#131766
PHOTO E – Sta. 16+50 (downstream)
Control Structure of wetlands CB#143671 – north of NE 4th Place
PHOTO F – Sta. 17+30 (downstream)
CB# 131796 – South side of NE 4th Place
TASK 2: Resource Review
Online maps from Google Earth and City of Renton storm water maps were reviewed before the
downstream system was walked. Offe Engineers was the engineer that designed or supported the
construction of the surrounding projects, Cairnes Short Plat, Benner Short Plat, Langley Meadows,
Hand Short Plat, and HoneyBrooke III
TASK 3: Field Inspection
The downstream system was re-visited in June of 2017, during a storm event, to follow the
existing discharge from the property and verify the downstream system which the project flows
into. The subject property currently sheet flow discharges into three City of Renton public storm
inlets; CB#116586 (northwest corner of NE 5th Place and Ilwaco Place NE); CB’s # 131717 and
131716 (along the easterly flow line of Ilwaco Place NE – across from property). All three of these
catch basins come together within 40 feet of the southeast corner of the property at CB#131715
(southeast corner of NE 5th Place and Ilwaco Place NE). The proposed developed discharge will be
a new catch basin installed between CB#131715 and CB#131716. The existing discharge from the
property continues to flow within the public storm system south within conveyance pipes for 620
feet before entering CB#131774 (see enlargement attached to the photo section of this Section).
The storm water then turns northeast from CB#131774 and flows into a stormwater vault in the
rear area of lots between Ilwaco Avenue NE and Jericho Avenue NE, south of NE 5th Place. The
stormwater vault was not viewed, nor opened due to lack of access. There were no indications of
over topping or flooding in the rear yards of the lots, nor around CB#131774. The storm water
then continues from the stormwater vault to the east between 511 and 505 Jericho Avenue NE
into CB#131765. This catch basin is located on the easterly edge of Jericho Avenue NE. At this
point, the drainage enters a wetland area to the east within a short plat called “Cairnes Short Plat
LUA10-026. This short plat was engineered by Offe Engineers. The drainage discharges into an
open area just to the east of Jericho Avenue NE. There were no signs or indications of
overtopping, flooding, or erosion at the outfall into the open area. The wetland and buffer area
are within a recorded native growth protection area on the recorded short plat of Cairnes. The
drainage flows to the east into a ponding area on the east side of the Cairnes Short Plat,
topographic survey of the wetlands is attached to this Section. The wetland area has an old
access road that crosses the wetland from west to east that wasn’t removed as part of the Cairnes
Short Plat. This access road has a cross culvert, as seen on the topographic survey that splits the
wetland flows into two different directions; north towards May Creek and south towards
Maplewood Creek. The drainage from the Mead short plat together with the contributing area
downstream to the Cairnes wetland flow to the south. The flow continues south, just to the east
of 5316 NE 4th Place. The southerly drainage from the wetland is controlled by a bird gate, type 2
inlet called out of the City drainage map as CB#143671. There were no indications of overtopping
or flooding occurring at this catch basin. The control structure (CB#143671) appears to be well
maintain and clean. The drainage continues south across NE 4th Place within a 24” pipe that is
exposed within CB#131797 on the south side of NE 4th Place. At this point, the downstream
system has been reviewed and inspected in the field beyond the required 1250 feet. CB#131797
is located about 1750 feet downstream of the project.
There are no indications of overtopping, flooding, or capacity issues within the downstream system
a quarter mile downstream of the project.
TASK 4: Drainage System Description and Problem Descriptions
The existing downstream drainage system consists of public storm conveyance pipes, catch basins,
a stormwater vault behind private houses within HoneyBrooke III, and open channel into a
neighboring wetland area (on the Cairnes Short Plat) to the south east of the project. Photos of
the downstream system can be found in Task 1, above. There were no indications of downstream
problems during the initial downstream walk or at the June 2017 timeframe. There does not
appear to be any downstream problems.
TASK 5: Mitigation of existing or potential Problems
There is no required mitigation necessary for the downstream system. The proposed project will
be developed unitizing the storm water management requirements of the 2010 City of Renton
amended King County Surface Design Manual. The developed discharge from the property will be
less than the existing discharge due to the required modeling matching the pre-developed forest
condition. No further mitigation is necessary, there were no downstream existing or potential
problems.
Existing Site Hydrology (Part A):
The project site is 58,519 square feet in size. The existing characteristics and land cover on the
project are: heavy brush of blackberries, alders, sparse cedars and fir trees; a graveled area in the
idle of the property used for construction storage. The existing site hydrology sheet flows to the
east and is collected along the west side of Ilwaco Place within an asphalt thickened edge. Based
upon the ground cover and Offe Engineers history of the area, the under lying soils are Alderwood
Series, Glacial Tills. These types of soils are hard and compact with pockets of high groundwater
during the wet weather season. A Geotechnical Report has been included within this Report to
confirm this finding.
Developed Site Hydrology (Part B):
Project Characteristics:
Total Site Area = 58,519 square feet
Offsite Improvements: Installation of a 12” storm pipe extension within Ilwaco place SE
Total Improvement: Value of development cost more than $100,000
Developed Impervious = 29,250 square feet (new plus replaced)
Drainage Review:
Based upon Table 1.1.2.A., the project drainage review meets “Full Drainage Review”.
The project will be developed to provide storm water detention (vault) within the southeast corner
of the project to control the developed runoff. The developed runoff will be released from the
vault matching the pre-developed forest conditions.
Developed Site data:
7 single-family lots ranging from 5,022 to 5,904 square feet in size.
A Storm Water Tract (Tract A) 4,630 square feet
Public Alley (ROW) 3,052 square feet
Widening of the public R/W 13,895 square feet
The project impervious and pervious surface breakdown of these areas is attached as a
Table to the Part C of this Section 4.
Developed Site Conditions (summary from table):
On-site contributing to storm water vault
Public R/W: 13,895 sq. feet
Impervious 7,340 sq. feet
Pervious 6,555 square feet
Public Alley: 3,052 square feet
Impervious 2,362 sq. feet
Pervious 690 sq. feet
Tract A: 4,630 square feet
Pervious 4,630 sq. feet
Lots 1 - 7: 36,942 square feet
Impervious 17,500 sq. feet USING 2,500 sq. ft./ lot
Pervious 19,442 sq. feet
Areas to vault (summary):
Impervious
27,202 square feet OR 0.62 acres
Pervious
31,317 square feet OR 0.72 acres
The project will be modeled using KCRTS. The existing condition (forested) was modeled to
provide parameters for the design outfall match of the proposed storm water vault. Further
modeling and calculations can be found within Part D.
Mead Short Plat 6/17/2017
Developed Condition A(T) = 58519 sq. feet
Widening/Frontage 13895 sq. feet
Paving ((PGIS))4245 sq. feet
Sidewalk 3095 sq. feet
Landscape 6555 sq. feet
13895
Lots 36942 sq. feet
House, patio, walks 15260 sq. feet Assume 2500 sq. ft. per lot
Driveway ((PGIS))2240 sq. feet
Landscape 19442 sq. feet
36942
Tracts
Tract A 4630 sq. feet
Landscape 4630 sq. feet
4630
Public Alley 3052 sq. feet
Paving ((PGIS))2362 sq. feet
Landscape 690 sq. feet
3052
TOTAL AREA 58519 sq. feet
1.34 acres
Dev. Impervious 0.62 acres
Dev. Pervious 0.72 acres
PGIS
8847 square feet
Performance Standards (Part C):
Area-specific flow control facility standards: From the “Flow Control Application Map”,
reference 11-A, the project discharge is required to meet Flow Control Duration Standard
(Forested Conditions). Flow control BMP’s are required for this project and will be further
evaluated within Part D of this Section.
Conveyance system capacity standards: The new conveyance system will be analyzed and
designed to meet the developed 25-year flow rates. Capacity within the catch basins shall have 6”
(0.5’) of freeboard above the 25-year hydraulic grade within the catch basin.
Area-specific water quality treatment menu: As identified under Section 1.2.8.1.A.
“Required Treatment Menu”, this project is NOT a commercial, industrial or multifamily land use
and is NOT a road project with 7,500 ADT. Therefore, the project is required to provide Basic
Water Quality Treatment. Water Quality sizing calculation can be found in Part D od this Section.
Flow Control System (Part D):
Stormwater vault sizing and modeling:
The City of Renton performance standard of “Flow Control Duration Standard, forest condition” is
equivalent to King County “Conservation Flow Control – level 2” standard as shown in the Table in
Section 1.2.3.1 of the City of Renton Manual. KCRTS modeling will be used to size the stormwater
flow control facility per Section 3.3.2. of the 2009 King County Surface Design Manual. The final
output of the modeling will be evaluated against the Conservation Flow Control requirements and
the performance requirements on page 3-43.
The Modeling input perimeters can be found in Part B:
Soils: Till
Area of Site: 1.34 acres
Existing Conditions (historical site): forested
Developed Conditions:
Impervious surfaces: 0.62 acres
Pervious surfaces: 0.72 acres
The KCRTS modeling is attached to this Section and is labeled with pages M1-M5. The modeling
generates a stormwater detention vault size of 4.55 feet (active storage) by 34 feet wide by 88
feet long.
Evaluate Flow Control Performance: (page 3-43 2009 KCSWDM)
1. The post-development flow duration curve lies strictly on or below the predevelopment
curve at the lower limit of the range of control (between 50% of the 2-year and the 2-
year): From the table on page M5, the lower limits of discharge are at negative values,
which shows on the graph on the same page; therefore, the modeling indicates this facility
meets the requirements of being at or below the predeveloped curve.
2. At any duration within the range of control, the post-development flow is less than 1.1
times (or 10% increase) the predeveloped flow: As shown on page M5, the maximum
positive excursion is 5.2% greater than the predeveloped flow. The facility meets this
requirement because 5.2% < 10%.
3. The target duration curve may not be exceeded along more than 50% of the range of
control: From the graph and comparison analysis table on page M5, there are 14 data
points shown for the post developed discharge across the range of required storm events.
From the Table, nine (9) of the data points are below the pre-developed where five (5)
area above. Therefore (5/14) 36% of the curve exceeds the control range. Facility meets
this design check.
4. The peak flow at the upper end of the range of control (reduced 25-year; historic 50-year)
may not exceed predeveloped levels by more than 10%: From Page M1 and M4 of the
KCRTS modeling the following table is provide:
25-year historic – 0.084 cfs (page M1)
25-year developed – 0.07 cfs (page M4)
Check at the 25 year complies with requirement
50-year historic – 0.10 cfs (page M1)
50-year developed – 0.11 cfs (page M4)
Check at the 50-year event is 10% - complies with requirement
Evaluate Level 2 requirement performance: (page 3-5 2009 KCSWDM)
Check stormwater facility complies with Level 2 requirement that the pre-developed peak flow
rates for the 2-year and 10-year runoff events are intended to be maintained: From Table on
page M1 and M4, the following comparison is provided:
2-year historic - 0.037 cfs (page M1)
2-year developed - .04 cfs (page M4)
Check of match within significant figure of modeling
10-year historic – 0.065 cfs (page M1)
10-year developed – 0.06 cfs (page M4)
Check at 10-year is meets requirement
Flow Control BMP’s evaluation:
Based upon the City of Renton Drainage Manual, the following steps are required to determine the
mitigation of storm water runoff of the developed surfaces on the project:
Full Dispersion – N/G (no good) – The property does not have adequate flow path
lengths to allow for full dispersion on the individual lots;
Full Infiltration – N/G – The soils have been classified by the Geotechnical Engineer as
“fine loamy sands” with a low permeability rate; Alderwood Series soils w/high ground
water present. These soils are not adequate for full infiltration per the Drainage Manual.
The Geotechnical Engineer does not recommend infiltration or retention of onsite runoff
due to the high ground water table and poor draining soils.
Limited Infiltration – N/G- With the presents of a high ground water table, the use of
infiltration BMP’s is not recommended by the Geotechnical Engineer or allowed by the City
Manual.
Limited Dispersion – N/G – The flat terrain of the property together with the poor
drainable soils would create localized flooding on the lot or on the neighboring lot. The lot
sizes are minimal with only 20 feet of yard available for dispersion. This is shorter than the
required flow path length or either full or limited dispersion.
Reduced Impervious Surfaces – this type of impervious surface BMP will be used on
the project to maximize the allowable impervious surface on each lot. A restrictive
covenant will be recorded on the project limiting each lot to a maximum to 2500 square
feet
Perforated Pipe Connection – This BMP will be used on the lots as each house connects
to the onsite stormwater facility.
Overflow riser check:
Using the 100-year developed flow rate form page M2, the overflow within the vault should be
checked to pass a flow rate of 0.45 cfs without exceeding the 6” (0.50’) freeboard required per the
vault design standards. Using the attached “Riser Overflow” curves Figure 5.3.4.H page 5-47
(2009 KCSWDM), verify overflow elevation above 12” design riser within vault. The flow rate on
the left side of the curves does not go below 1 cfs; therefore, the calculation figures at the bottom
of the page will be used to calculate the overflow head on the riser.
Qorifice=3.782(D**2)(H**1/2)
Where Qorifice (100 year) = 0.45 cfs, D = 1 foot (12”); calculate H
0.45 = 3.782(1)(H**1/2) (0.45/3.782)**2=H H=0.10 feet
Head required above riser to pass 100-year event is 0.10 feet. This is less than the design
freeboard of 0.50 feet; therefore, design is adequate to flow 100-year event over 12” riser.p
Historic Site Conditions
Flow Frequency Analysis
Time Series File:predev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.084 2 2/09/01 18:00 0.108 1 100.00 0.990
0.023 7 1/06/02 3:00 0.084 2 25.00 0.960 25 year #4
0.062 4 2/28/03 3:00 0.065 3 10.00 0.900
0.002 8 3/24/04 20:00 0.062 4 5.00 0.800
0.037 6 1/05/05 8:00 0.055 5 3.00 0.667
0.065 3 1/18/06 20:00 0.037 6 2.00 0.500
0.055 5 11/24/06 4:00 0.023 7 1.30 0.231
0.108 1 1/09/08 9:00 0.002 8 1.10 0.091
Computed Peaks 0.100 50.00 0.980 50 year #4
Page M1
Developed Site Conditions
Flow Frequency Analysis
Time Series File:dev.tsf
Project Location:Sea-Tac
---Annual Peak Flow Rates--- -----Flow Frequency Analysis-------
Flow Rate Rank Time of Peak - - Peaks - - Rank Return Prob
(CFS) (CFS) Period
0.215 5 2/09/01 2:00 0.445 1 100.00 0.990 overflow check
0.165 8 1/05/02 16:00 0.260 2 25.00 0.960
0.260 2 2/27/03 7:00 0.244 3 10.00 0.900
0.168 7 8/26/04 2:00 0.227 4 5.00 0.800
0.205 6 10/28/04 16:00 0.215 5 3.00 0.667
0.227 4 1/18/06 16:00 0.205 6 2.00 0.500
0.244 3 10/26/06 0:00 0.168 7 1.30 0.231
0.445 1 1/09/08 6:00 0.165 8 1.10 0.091
Computed Peaks 0.383 50.00 0.980
Page M2
Detention Vault Design 07/25/2017
Facility Definition
Type of Facility: Detention Vault
Facility Length: 90.00 ft
Facility Width: 34.00 ft
Facility Area: 3060. sq. ft
Effective Storage Depth: 4.55 ft
Stage 0 Elevation: 449.55 ft
Storage Volume: 13923. cu. ft
Riser Head: 4.55 ft
Riser Diameter: 12.00 inches
Number of orifices: 2
Full Head Pipe
Orifice # Height Diameter Discharge Diameter
(ft) (in) (CFS) (in)
1 0.00 0.63 0.023
2 3.00 1.25 0.053 4.0
Top Notch Weir: None
Outflow Rating Curve: None
Stage/Storage/Discharge Performance
Stage Elevation Storage Discharge Percolation
(ft) (ft) (cu. ft) (ac-ft) (cfs) (cfs)
0.00 449.55 0. 0.000 0.000 0.00
0.01 449.56 30. 0.001 0.001 0.00
0.02 449.57 60. 0.001 0.001 0.00
0.03 449.58 90. 0.002 0.002 0.00
0.04 449.59 120. 0.003 0.002 0.00
0.05 449.60 150. 0.003 0.002 0.00
0.15 449.70 449. 0.010 0.004 0.00
0.25 449.80 748. 0.017 0.005 0.00
0.35 449.90 1047. 0.024 0.006 0.00
0.45 450.00 1346. 0.031 0.007 0.00
0.55 450.10 1646. 0.038 0.008 0.00
0.65 450.20 1945. 0.045 0.009 0.00
0.75 450.30 2244. 0.052 0.009 0.00
0.85 450.40 2543. 0.058 0.010 0.00
0.95 450.50 2842. 0.065 0.010 0.00
1.05 450.60 3142. 0.072 0.011 0.00
1.15 450.70 3441. 0.079 0.011 0.00
1.25 450.80 3740. 0.086 0.012 0.00
1.35 450.90 4039. 0.093 0.012 0.00
1.45 451.00 4338. 0.100 0.013 0.00
1.55 451.10 4638. 0.106 0.013 0.00
1.65 451.20 4937. 0.113 0.014 0.00
1.75 451.30 5236. 0.120 0.014 0.00
1.85 451.40 5535. 0.127 0.014 0.00
1.95 451.50 5834. 0.134 0.015 0.00
2.05 451.60 6134. 0.141 0.015 0.00
2.15 451.70 6433. 0.148 0.016 0.00
2.25 451.80 6732. 0.155 0.016 0.00
2.35 451.90 7031. 0.161 0.016 0.00
2.45 452.00 7330. 0.168 0.017 0.00
2.55 452.10 7630. 0.175 0.017 0.00
2.65 452.20 7929. 0.182 0.017 0.00
2.75 452.30 8228. 0.189 0.018 0.00
2.85 452.40 8527. 0.196 0.018 0.00
2.95 452.50 8826. 0.203 0.018 0.00
3.00 452.55 8976. 0.206 0.018 0.00
3.01 452.56 9006. 0.207 0.019 0.00
3.03 452.58 9066. 0.208 0.020 0.00
3.04 452.59 9096. 0.209 0.021 0.00
3.05 452.60 9126. 0.209 0.024 0.00
3.07 452.62 9185. 0.211 0.027 0.00
3.08 452.63 9215. 0.212 0.030 0.00
Page M3
3.09 452.64 9245. 0.212 0.031 0.00
3.10 452.65 9275. 0.213 0.032 0.00
3.12 452.67 9335. 0.214 0.033 0.00
3.22 452.77 9634. 0.221 0.039 0.00
3.32 452.87 9933. 0.228 0.043 0.00
3.42 452.97 10233. 0.235 0.047 0.00
3.52 453.07 10532. 0.242 0.050 0.00
3.62 453.17 10831. 0.249 0.053 0.00
3.72 453.27 11130. 0.256 0.056 0.00
3.82 453.37 11429. 0.262 0.059 0.00
3.92 453.47 11729. 0.269 0.062 0.00
4.02 453.57 12028. 0.276 0.064 0.00
4.12 453.67 12327. 0.283 0.066 0.00
4.22 453.77 12626. 0.290 0.069 0.00
4.32 453.87 12925. 0.297 0.071 0.00
4.42 453.97 13225. 0.304 0.073 0.00
4.52 454.07 13524. 0.310 0.075 0.00
4.55 454.10 13614. 0.313 0.075 0.00
4.65 454.20 13913. 0.319 0.385 0.00
4.75 454.30 14212. 0.326 0.950 0.00
4.85 454.40 14511. 0.333 1.680 0.00
4.95 454.50 14810. 0.340 2.470 0.00
5.05 454.60 15110. 0.347 2.760 0.00
5.15 454.70 15409. 0.354 3.020 0.00
5.25 454.80 15708. 0.361 3.250 0.00
5.35 454.90 16007. 0.367 3.470 0.00
5.45 455.00 16306. 0.374 3.680 0.00
5.55 455.10 16606. 0.381 3.870 0.00
5.65 455.20 16905. 0.388 4.060 0.00
5.75 455.30 17204. 0.395 4.240 0.00
5.85 455.40 17503. 0.402 4.410 0.00
5.95 455.50 17802. 0.409 4.570 0.00
6.05 455.60 18102. 0.416 4.730 0.00
6.15 455.70 18401. 0.422 4.890 0.00
6.25 455.80 18700. 0.429 5.030 0.00
6.35 455.90 18999. 0.436 5.180 0.00
6.45 456.00 19298. 0.443 5.320 0.00
6.55 456.10 19598. 0.450 5.460 0.00
Stage/Storage/Discharge Performance at Significant Storm Events
Hyd Inflow Outflow Peak Storage
Target Calc Stage Elev (Cu-Ft) (Ac-Ft)
1 0.45 ******* 0.29 4.62 454.17 13822. 0.317
2 0.21 ******* 0.07 4.48 454.03 13406. 0.308 25-yr flow #4
3 0.26 0.06 0.06 3.91 453.46 11712. 0.269 10-yr peak flow
4 0.21 ******* 0.06 3.85 453.40 11505. 0.264
5 0.23 ******* 0.04 3.24 452.79 9681. 0.222
6 0.13 0.04 0.02 3.02 452.57 9039. 0.208 2-yr peak flow
7 0.17 ******* 0.02 2.53 452.08 7576. 0.174
8 0.17 ******* 0.01 1.48 451.03 4418. 0.101
KCRTS Routing Instructions
----------------------------------
Route Time Series through Facility
Inflow Time Series File:dev.tsf
Outflow Time Series File:RDOut
Inflow/Outflow Analysis
Peak Inflow Discharge: 0.445 CFS at 6:00 on Jan 9 in Year 8
Peak Outflow Discharge: 0.291 CFS at 10:00 on Jan 9 in Year 8
Peak Reservoir Stage: 4.62 Ft
Peak Reservoir Elev: 454.17 Ft
Peak Reservoir Storage: 13822. Cu-Ft
: 0.317 Ac-Ft Page M4
Water Quality System (Part E):
Check project for Water Quality Exemption:
Section 1.2.8.1 Surface Area Exemptions:
Project creates greater than 5,000 square feet of new PGIS (8,847 sq. feet proposed
PGIS) – new roads, access paving, and new proposed driveways. Therefore, basic water
quality treatment is required.
The proposed project will include the installation of a wet sump (dead storage) within the
proposed storm water vault for water quality treatment.
Water Quality Sizing – calculations for the water quality volume are attached to this section. The
calculated volume required is 3,780 cubic feet of dead storage. Water quality treatment will be
provided within Cell #1 and Cell #2 within the storm water vault. Cell #1 has a requirement to
contain a minimum of 4 feet of water quality.
Water Quality (provide volume) is:
Cell #1 – (449.55 – 444.30) = 5.25’ * 44’ * 17’ = 3,927 cubic feet
Cell #2 – (449.55 – 446.05) = 3.5’ * 90’ * 17’ = 5,355 cubic feet
Cell #3 – (449.55 – 446.05) = 3.5’ * 46’ * 17’ = 2,737 cubic feet
Therefore, Water Quality provide =12,019 cubic feet > 3,780 cubic feet (REQUIRED)
Check percentage of volume within Cell #1
3927 / 12,019 = 32.7% Must range between 25 -35%
Check for average sediment storage of 12” (1’)
Calculate required average sediment volume at 12” (1 foot) for Cell #1:
12” (1’) * 17’ * 44’ = 748 cubic feet of storage to obtain 12” average storage
Calculate provided sediment storage volume within each Cell #1:
Cell #1 (sediment)
Cross sectional area at south end of Cell #1: 20.66 square feet
Cross sectional area at north end of Cell #1: 24.40 square feet
Calculation of provided sediment volume in Cell #1:
((20.66*44 + (24.40-20.66) * ½ * 44)) = 991 cu. feet
AVERAGE DEPTH OF SEDIMENT STORAGE WITHIN CELL #1:
991/748 = 1’-4” > 12” (1’) OKAY
Cell #2
Cross sectional area at south end of Cell #2: 16.06 square feet
Cross sectional area at mid-point of Cell #2: 12.16 square feet
Cross sectional area at north end of Cell #2: 16.06 square feet
Calculation of provided sediment volume in Cell #2:
2 * ((12.16 * 45) + (16.06-12.15) * ½ * 45) = 1270 cu. feet
Cell #3
Cross sectional area at south end of Cell #3: 16.07 square feet
Cross sectional area at north end of Cell #3: 12.16 square feet
Calculation of provided sediment volume in Cell #3:
((12.16*46 + (16.07-12.16) * ½ * 46)) = 649 cu. feet
The sediment volume provided at 12” depth within the designed vault is 2,921 cu. feet. @
sediment elevation 446.05. The required sediment storage to provide an average of 12”
depth the volume would need to be 2,295 cu. feet. The vault floor is designed to provide
greater than a 12” average sediment storage. This exceeds the requirements within the
2009 KCSWDM. Therefore, the sediment depth within the vault would be:
2921/2295 * 12” = 15.3” provided within vault @ 446.05.
Project Name:
Project Number:
Facility Description:
Step 1:Identify required wetpool volume factor (f ).
f = 3 Per KCSWDM 6.4.1.1
Step 2:Determine rainfall (R) for the mean annual storm.
R =0.039 Per KCSWDM Fig. 6.4.1.A
Step 3: Calculate runoff from the mean annual storm (Vr) for the developed site.
Vr = (0.9Ai + 0.25Atg + 0.10Atf + 0.01Ao) x (R)
where:Ai = Impervious Surface Area =27,202 s.f.
Atg = Till Grass Area =31,317 s.f.
Atf = Till Forest Area =0 s.f.
Ao = Outwash Area =0 s.f.
Vr =1,260 c.f.
Step 4: Calculate required wetpool volume (Vb).
Vb =f x Vr
Vb =3,780 c.f.
Per 2009 King County Stormwater Management Manual
Wetpool Sizing Calculations
Mead Short Plat
Water Quality Sizing ((06/14/2017))
TIR Section 5: Conveyance System Analysis and Design
The proposed on-site conveyance improvements will include a catch basins and storm pipe being
conveyed to the proposed storm water vault. The design conveyance system will be analyzed
using Section 4 of the KCSWDM.
New conveyance pipes and catch basins will be designed to convey and contain (at a minimum)
the 25-year peak flow with a minimum of 6” of freeboard between design water surface and
structure (catch basin) grate. The entire developed site 25-year storm runoff will be calculated
using the Rational Method and conveyed through the onsite storm system as a conservative check
to verify capacity and freeboard. A Backwater analysis is attached to show there is capacity to
convey the 25-year event and provide the required freeboard.
The 25-year tail water elevation within the vault can be found on page M4 of the modeling at
454.03. Rational Method calculations are attached to provide 25-year peak flow rates.
STORMWATER CONVEYANCE BACKWATER CALCULATION SHEET(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)(11)(12)(13)BarrelEntranceEntrance Pipe25 yearPipeOutlet InletBarrelBarrelVelocityTWFrictionHGLHeadSegmentQLengthPipe"n"ElevElevAreaVelocityHeadElevLossElevLossCB to CB(cfs)(ft)SizeValue(feet)(feet)(sq. feet)(fps)(feet)(feet)(feet)(feet)(feet)vault-#21.372015"0.012447.30449.751.231.110.02454.030.056454.090.004#2-#31.377012"0.012450.00452.100.791.730.05454.120.196454.320.009#2-#41.379512"0.012450.00451.080.791.730.05454.120.266454.390.009#4-#51.379912"0.012451.08452.200.791.730.05454.440.277454.720.009#5-#61.374012"0.012452.20452.920.791.730.05454.780.112454.890.009#6-#7 1.37 122 12" 0.012 452.92 454.45 0.79 1.73 0.05 454.94 0.118 455.06 0.009vault-#9 0.66 6 12" 0.012 447.55 450.90 0.79 0.84 0.01454.030.006 454.04 0.002vault-#1 2.03 43 12" 0.012 449.12 449.55 0.79 2.57 0.10452.000.042 452.04 0.021Assume** 25 year storm elevation within vault is 454.03; see hydrology calculations.(14) (15) (16) (17) (18) (19) (20) (21)Exit Outlet Inlet Approach Bend JunctionHead Control Control Velocity Head Head HWCheckRIM ELEVLoss Elev Elev Head Loss Loss Elev6" to rimUPSTREAM (feet) (feet) (feet) (feet) (feet) (feet) (feet)(feet)CBvault-#2 0.02 454.11 450.35 0.00 0.00 0.01 454.12454.62454.62OK!#2-#3 0.05 454.37 452.70 0.00 0.00 0.00 454.37454.87455.10OK!#2-#4 0.05 454.44 451.68 0.00 0.00 0.00 454.44454.94455.00OK!#4-#5 0.05 454.78 452.80 0.00 0.00 0.00 454.78455.28455.45OK!#5-#6 0.05 454.94 453.52 0.00 0.00 0.00 454.94455.44455.92OK!#6-#7 0.05 455.12 455.05 0.00 0.00 0.00 455.12455.62457.45OK!vault-#9 0.01 454.05 451.50 0.00 0.00 0.00 454.05454.55455.40OK!vault-#1 0.10 452.16 450.15 0 0 0 452.16452.66457.60OK!
EarthSolutionsNWLLC
EarthSolutionsNWLLC
Geotechnical Engineering
Geology
Environmental Scientists
Construction Monitoring
1805 -136th Place N.E.,Suite 201 Bellevue,WA 98005
(425)449-4704 Fax (425)449-4711
www.earthsolutionsnw.com
GEOTECHNICAL ENGINEERING STUDY
MEADE PROPERTY
PROPOSED
RESIDENTIAL DEVELOPMENT
NORTHEAST 5TH PLACE AND
ILWACO AVENUE NORTHEAST
RENTON,WASHINGTON
ES-4074
2005 2015
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutionsNWLLC and Environmental Sciences
Vicinity Map
Meade Property
Renton,Washington
MRS
HTW
08/20/2015
Aug.2015
4074
1
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
Reference:
Renton,Washington
Map 656
By The Thomas Guide
Rand McNally
SITE
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
EarthSolutionsNWLLC
EarthSolutionsNWLLC and Environmental Sciences
NORTH
NOTE:This plate may contain areas of color.ESNW cannot be
responsible for any subsequent misinterpretation of the information
resulting from black &white reproductions of this plate.
NOTE:The graphics shown on this plate are not intended for design
purposes or precise scale measurements,but only to illustrate the
approximate test locations relative to the approximate locations of
existing and /or proposed site features.The information illustrated
is largely based on data provided by the client at the time of our
study.ESNW cannot be responsible for subsequent design changes
or interpretation of the data by others.
0 30 60 1 20
Scale in Feet1"=60 '
LEGEND
Approximate Location of
ESNW Test Pit,Proj.No.
ES-4074,Aug.2015
Subject Site
Proposed Building
Test Pit Location Plan
Meade Property
Renton,Washington
MRS
HTW
08/20/2015
Aug.2015
4074
2 ILWACOPLACEN.E.N.E. 6TH STREET
N.E. 5TH PLACE
1
2
3
4
5
6
TP-1 TP-2
TP-3
TP-4
TP-1
Tract A
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction MonitoringandEnvironmentalSciences
EarthSolutionsNWLLC
EarthSolutionsNWLLC
RETAINING WALL DRAINAGE DETAILMeadeProperty
Renton,Washington
MRS
HTW
08/20/2015
Aug.2015
4074
3
NOTES:
Free Draining Backfill should consist
of soil having less than 5 percent fines.
Percent passing #4 should be 25 to
75 percent.
Sheet Drain may be feasible in lieu
of Free Draining Backfill,per ESNW
recommendations.
Drain Pipe should consist of perforated,
rigid PVC Pipe surrounded with 1"
Drain Rock.
LEGEND:
Free Draining Structural Backfill
1 inch Drain Rock
18"Min.
Structural
Fill
Perforated Drain Pipe
(Surround In Drain Rock)
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Drwn.
Checked Date
Date Proj.No.
Plate
Earth Solutions NWLLC
Geotechnical Engineering,Construction Monitoring
and Environmental Sciences
EarthSolutionsNWLLC
EarthSolutionsNWLLC
FOOTING DRAIN DETAIL
Slope
Perforated Rigid Drain Pipe
(Surround with 1"Rock)
18"(Min.)
NOTES:
Do NOT tie roof downspouts
to Footing Drain.
Surface Seal to consist of
12"of less permeable,suitable
soil.Slope away from building.
LEGEND:
Surface Seal;native soil or
other low permeability material.
1"Drain Rock
SCHEMATIC ONLY -NOT TO SCALE
NOT A CONSTRUCTION DRAWING
Meade Property
Renton,Washington
MRS
HTW
08/20/2015
Aug.2015
4074
4
TIR Section 7: Other Permits
- Building permit for vault
- NPDES permit from State DOE
This project will require a State of Washington Department of Ecology NPDES permit due to
the amount of disturbance of more than 1 acre. The NPDES permit has been applied for and is
pending approval by DOE at the time of printing of this Report.
Application Id: 16261
Facility Name: Mead Short Plat
Address: 522 Hoquiam Avenue NE Renton, WA 98059
County: King
The NPDES permit number for this project will be provided to the City prior to a pre-
construction meeting. A copy of the permit will be included within the final TIR provided at
time of the as-builts.
A SWPPP has been prepared and is included within this Section.
SWPPP
August 10, 2017
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
522 Hoquiam Avenue NE, Renton, WA
King County Tax parcel #102305-9230
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Prepared For:
Tuscany Construction, LLC
Bob Wenzl
P.O. Box 6127
Bellevue, Washington 98008
(206) 714-6707
bob@tuscanywa.com
Prepared By:
Offe Engineers, PLLC
Darrell L. Offe, Jr., P.E.
13932 SE 159th Place
Renton, Washington 98058
(425) 260-3412
darrell.offe@comcast.net
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
TABLE OF CONTENTS
1.0 – INTRODUCTION
2.0 – SITE DESCRIPTION
3.0 – CONSTRUCTION STORMWATER BMPS
4.0 – CONSTRUCTION PHASING AND BMP IMPLEMENTATION
5.0 – POLLUTION PREVENTION TEAM
6.0 – SITE INSPECTIONS & MONITORING
7.0 – REPORTING AND RECORDKEEPING
APPENDIX A – SITE PLAN WITH BMP MEASURES
APPENDIX B – SWPPP PROJECT SUMMARY
APPENDIX C – ALTERNATIVE BMPs
APPENDIX D – GENERAL PERMIT
APPENDIX E – SITE LOG AND INSPECTION FORMS
APPENDIX F – TESC CALCULATIONS
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
CSWPPP ANALYSIS & DESIGN
This report, along with the Temporary Erosion and Sediment Control (TESC) Plan contained in the
engineering drawings, is intended to serve as the Construction Stormwater Pollution Prevention Plan
(SWPPP) for the project. The SWPPP is outlined in conformance with the 2014 edition of the Washington
State Department of Ecology’s Stormwater Management Manual for Western Washington (DOE Manual).
1.0 – INTRODUCTION
The project proposes construction of seven single-family residential lots on a single existing parcel
occupying just over one-acre.
2.0 – SITE DESCRIPTION
The existing terrain on the site is relatively flat, falling slightly to the southwest. The project will
clear most of the existing site, and grade it in preparation for single-family building pads. During
construction, a number of erosion control BMPs will be installed to direct surface runoff to a
temporary sediment pond near the southern boundary of the site, prior to off-site discharge.
3.0 – CONSTRUCTION STORMWATER BMPs
3.1 – 12 BMP ELEMENTS
Element #1 – Mark Clearing Limits
To protect adjacent properties and to reduce the area of soil exposed to construction, the
limits of construction will be clearly marked before land-disturbing activities begin. Trees
that are to be preserved, as well as all sensitive areas and their buffers, shall be clearly
delineated, both in the field and on the plans. In general, natural vegetation and native
topsoil shall be retained in an undisturbed state to the maximum extent possible. The BMPs
relevant to marking the clearing limits are identified in Appendix B.
Alternate BMPs for marking clearing limits are included in Appendix C as a quick reference
tool for the onsite inspector in the event the primary BMP(s) are deemed ineffective or
inappropriate during construction to satisfy the requirements set forth in the General NPDES
Permit (Appendix D). To avoid potential erosion and sediment control issues that may cause
a violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
after the first sign that existing BMPs are ineffective or failing.
Element #2 – Establish Construction Access
Construction access or activities occurring on unpaved areas shall be minimized, yet where
necessary, access points shall be stabilized to minimize the tracking of sediment onto public
roads, and wheel washing, street sweeping, and street cleaning shall be employed to prevent
sediment from entering state waters. All wash wastewater shall be controlled on site. The
specific BMPs related to establishing construction access that will be used on this project are
identified in Appendix B.
Alternate construction access BMPs are included in Appendix C as a quick reference tool for
the onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
after the first sign that existing BMPs are ineffective or failing.
Element #3 - Control Flow Rates
In order to protect the properties and waterways downstream of the project site, stormwater
discharges from the site will be controlled. The specific BMPs for flow control that shall be
used on this project are identified in Appendix B.
Alternate flow control BMPs are included in Appendix C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit. To
avoid potential erosion and sediment control issues that may cause a violation of the NPDES
Construction Stormwater permit, the Certified Erosion and Sediment Control Lead will
promptly initiate the implementation of one or more of the alternative BMPs after the first sign
that existing BMPs are ineffective or failing.
In general, discharge rates of stormwater from the site will be controlled where increases in
impervious area or soil compaction during construction could lead to downstream erosion, or
where necessary to meet local agency stormwater discharge requirements (e.g. discharge to
combined sewer systems).
Element #4 - Install Sediment Controls
All stormwater runoff from disturbed areas shall pass through an appropriate sediment
removal BMP before leaving the construction site or prior to being discharged to an infiltration
facility. The specific BMPs to be used for controlling sediment on this project are identified in
Appendix B.
Alternate sediment control BMPs are included in Appendix C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
at the first sign that existing BMPs are ineffective or failing.
In addition, sediment will be removed from paved areas in and adjacent to construction work
areas manually or using mechanical sweepers, as needed, to minimize tracking of sediments
on vehicle tires away from the site and to minimize wash off of sediments from adjacent
streets in runoff.
Whenever possible, sediment laden water shall be discharged into onsite, relatively level,
vegetated areas (BMP C240 paragraph 4, Volume II page 116).
In some cases, sediment discharge in concentrated runoff can be controlled using permanent
stormwater BMPs (e.g., infiltration swales, ponds, trenches). Sediment loads can limit the
effectiveness of some permanent stormwater BMPs, such as those used for infiltration or
biofiltration; however, those BMPs designed to remove solids by settling (wet ponds or
detention ponds) can be used during the construction phase. When permanent stormwater
BMPs will be used to control sediment discharge during construction, the structure will be
protected from excessive sedimentation with adequate erosion and sediment control BMPs.
Any accumulated sediment shall be removed after construction is complete and the
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
permanent stormwater BMP will be restabilized with vegetation per applicable design
requirements once the remainder of the site has been stabilized.
Element #5 - Stabilize Soils
Exposed and unworked soils shall be stabilized with the application of effective BMPs to
prevent erosion throughout the life of the project. The specific BMPs for soil stabilization that
shall be used on this project are identified in Appendix B.
Seeding will be used on disturbed areas that have reached final grade or that will remain
unworked for more than thirty days. Plastic Covering will be used on the temporary stock pile
areas and elsewhere on the site as needed. Dust control will be implemented as needed, to
prevent it being required all roadways and driveways to be paved will receive early
application of gravel base.
Alternate soil stabilization BMPs are included in Appendix C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
after the first sign that existing BMPs are ineffective or failing.
The project site is located west of the Cascade Mountain Crest. As such, no soils shall
remain exposed and unworked for more than 7 days during the dry season (May 1 to
September 30) and 2 days during the wet season (October 1 to April 30). Regardless of the
time of year, all soils shall be stabilized at the end of the shift before a holiday or weekend if
needed based on weather forecasts.
In general, cut and fill slopes will be stabilized as soon as possible and soil stockpiles will be
temporarily covered with plastic sheeting. All stockpiled soils shall be stabilized from erosion,
protected with sediment trapping measures, and where possible, be located away from storm
drain inlets, waterways, and drainage channels.
Element #6 - Protect Slopes
All cut and fill slopes will be designed, constructed, and protected in a manner than minimizes
erosion. The specific BMPs that will be used to protect slopes for this project are identified in
Appendix B.
Alternate slope protection BMPs are included in Appendix C as a quick reference tool for the
onsite inspector in the event the primary BMP(s) are deemed ineffective or inappropriate
during construction to satisfy the requirements set forth in the General NPDES Permit
(Appendix D). To avoid potential erosion and sediment control issues that may cause a
violation of the NPDES Construction Stormwater permit, the Certified Erosion and Sediment
Control Lead will promptly initiate the implementation of one or more of the alternative BMPs
after the first sign that existing BMPs are ineffective or failing.
Element #7 - Protect Drain Inlets
All storm drain inlets and culverts made operable during construction shall be protected to
prevent unfiltered or untreated water from entering the drainage conveyance system.
However, the first priority is to keep all access roads clean of sediment and keep street wash
water separate from entering storm drains until treatment can be provided. Storm Drain Inlet
Protection (BMP C220) will be implemented for all drainage inlets and culverts that could
potentially be impacted by sediment-laden runoff on and near the project site. The inlet
protection measures to be applied on this project are identified in Appendix B.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
If the primary BMP options are deemed ineffective or inappropriate during construction to
satisfy the requirements set forth in the General NPDES Permit (Appendix D), or if no BMPs
are listed above but deemed necessary during construction, the Certified Erosion and
Sediment Control Lead shall implement one or more of the alternative BMP inlet protection
options.
Element #8 - Stabilize Channels and Outlets
Where site runoff is to be conveyed in channels, or discharged to a stream or some other
natural drainage point, efforts will be taken to prevent downstream erosion. The specific
BMPs for channel and outlet stabilization that shall be used on this project are identified in
Appendix B.
Alternate channel and outlet stabilization BMPs are included in Appendix C as a quick
reference tool for the onsite inspector in the event the primary BMP(s) are deemed ineffective
or inappropriate during construction to satisfy the requirements set forth in the General
NPDES Permit (Appendix D). To avoid potential erosion and sediment control issues that
may cause a violation(s) of the NPDES Construction Stormwater permit, the Certified Erosion
and Sediment Control Lead will promptly initiate the implementation of one or more of the
alternative BMPs after the first sign that existing BMPs are ineffective or failing.
The project site is located west of the Cascade Mountain Crest. As such, all temporary on-
site conveyance channels shall be designed, constructed, and stabilized to prevent erosion
from the expected peak 10 minute velocity of flow from a Type 1A, 10-year, 24-hour
recurrence interval storm for the developed condition. Alternatively, the 10-year, 1-hour peak
flow rate indicated by an approved continuous runoff simulation model, increased by a factor
of 1.6, shall be used. Stabilization, including armoring material, adequate to prevent erosion
of outlets, adjacent streambanks, slopes, and downstream reaches shall be provided at the
outlets of all conveyance systems.
Element #9 - Control Pollutants
All pollutants, including waste materials and demolition debris, that occur onsite shall be
handled and disposed of in a manner that does not cause contamination of stormwater.
Good housekeeping and preventative measures will be taken to ensure that the site will be
kept clean, well-organized, and free of debris. Any required BMPs to be implemented to
control specific sources of pollutants are identified in Appendix B.
The contractor shall implement the following measures as much as is practicable, in order to
mitigate pollutant impacts from vehicles, construction equipment, and/or petroleum product
storage/dispensing:
· All vehicles, equipment, and petroleum product storage/dispensing areas will be
inspected regularly to detect any leaks or spills, and to identify maintenance needs to
prevent leaks or spills.
· On-site fueling tanks and petroleum product storage containers shall include
secondary containment.
· Spill prevention measures, such as drip pans, will be used when conducting
maintenance and repair of vehicles or equipment.
· In order to perform emergency repairs on site, temporary plastic will be placed
beneath and, if raining, over the vehicle.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
· Contaminated surfaces shall be cleaned immediately following any discharge or spill
incident.
· The contractor shall implement the following concrete and grout pollution control
measures:
· Process water and slurry resulting from concrete work will be prevented from entering
the waters of the State by implementing Concrete Handling measures (BMP C151).
The contractor shall implement the following Solid Waste pollution control measures:
· Solid waste will be stored in secure, clearly marked containers.
Element #10 - Control Dewatering
Foundation, vault, and trench de-watering water, which shall have similar characteristics to
stormwater runoff at the site, shall be discharged into a controlled conveyance system prior to
discharge to a sediment trap, pond, or other specified facility. Channels must be stabilized as
specified in Element #8.
Clean, non-turbid de-watering water, such as well-point groundwater, can be discharged to
systems tributary to state surface waters, provided the de-watering flow does not cause
erosion or flooding of receiving waters. These clean waters should not be routed through
stormwater sediment ponds.
Highly turbid or contaminated dewatering water shall be handled separately from
stormwater.
Element #11 - Maintain BMPs
All BMPs should be monitored and maintained regularly to ensure adequate operation. A
TESC supervisor shall be identified at the beginning of the project to provide monitoring and
direct the appropriate maintenance activity. As site conditions change, all BMPs shall be
updated as necessary to maintain compliance with local regulations.
Temporary BMPs can be removed when they are no longer needed. All temporary erosion
and sediment control BMPs shall be removed within 30 days after construction is completed
and the site is stabilized.
Element #12 - Manage the Project
Erosion and sediment control BMPs for this project have been designed based on the
following principles:
· Design the project to fit the existing topography, soils, and drainage patterns.
· Emphasize erosion control rather than sediment control.
· Minimize the extent and duration of the area exposed.
· Keep runoff velocities low.
· Retain sediment on site.
· Thoroughly monitor site and maintain all ESC measures.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
· Schedule major earthwork during the dry season.
As this project site is located west of the Cascade Mountain Crest, the project will be
managed according to the following key project components:
Phasing of Construction
· The construction project is being phased to the extent practicable in order to prevent soil
erosion, and, to the maximum extent possible, the transport of sediment from the site during
construction.
· Revegetation of exposed areas and maintenance of that vegetation shall be an integral
part of the clearing activities during each phase of construction, per the Scheduling BMP (C
162).
Seasonal Work Limitations
· From October 1 through April 30, clearing, grading, and other soil disturbing activities
shall only be permitted if shown to the satisfaction of the local permitting authority that silt-
laden runoff will be prevented from leaving the site through a combination of the following:
o Site conditions including existing vegetative coverage, slope, soil type, and proximity to
receiving waters; and
o Limitations on activities and the extent of disturbed areas; and
o Proposed erosion and sediment control measures.
· Based on the information provided and/or local weather conditions, the local permitting
authority may expand or restrict the seasonal limitation on site disturbance.
· The following activities are exempt from the seasonal clearing and grading limitations:
o Routine maintenance and necessary repair of erosion and sediment control BMPs;
o Routine maintenance of public facilities or existing utility structures that do not expose the
soil or result in the removal of the vegetative cover to soil; and
o Activities where there is 100 percent infiltration of surface water runoff within the site in
approved and installed erosion and sediment control facilities.
Coordination with Utilities and Other Jurisdictions
· Care has been taken to coordinate with utilities, other construction projects, and the local
jurisdiction in preparing this SWPPP and scheduling the construction work.
Inspection and Monitoring
· All BMPs shall be inspected, maintained, and repaired as needed to assure continued
performance of their intended function. Site inspections shall be conducted by a person who
is knowledgeable in the principles and practices of erosion and sediment control. This
person has the necessary skills to:
o Assess the site conditions and construction activities that could impact the quality of
stormwater, and
o Assess the effectiveness of erosion and sediment control measures used to control the
quality of stormwater discharges.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
· A Certified Erosion and Sediment Control Lead shall be on-site or on-call at all times.
· Whenever inspection and/or monitoring reveals that the BMPs identified in this SWPPP
are inadequate, due to the actual discharge of or potential to discharge a significant amount
of any pollutant, appropriate BMPs or design changes shall be implemented as soon as
possible.
Maintaining an Updated Construction SWPPP
· This SWPPP shall be retained on-site or within reasonable access to the site.
· The SWPPP shall be modified whenever there is a change in the design, construction,
operation, or maintenance at the construction site that has, or could have, a significant effect
on the discharge of pollutants to waters of the state.
· The SWPPP shall be modified if, during inspections or investigations conducted by the
owner/operator, or the applicable local or state regulatory authority, it is determined that the
SWPPP is ineffective in eliminating or significantly minimizing pollutants in stormwater
discharges from the site. The SWPPP shall be modified as necessary to include additional or
modified BMPs designed to correct problems identified. Revisions to the SWPPP shall be
completed within seven (7) days following the inspection.
3.2 – SITE SPECIFIC BMPs
Site specific BMPs are shown on the TESC plan sheet(s) in Appendix A.
4.0 – CONSTRUCTION PHASING AND BMP IMPLEMENTATION
The BMP implementation schedule will be driven by the construction schedule. The list below provides
an estimate of the anticipated construction schedule. The project site is located west of the Cascade
Mountain Crest. As such, the dry season is considered to be from May 1 to September 30, and the wet
season is considered to be from October 1 to April 30.
5.0 – POLLUTION PREVENTION TEAM
5.1 ROLES AND RESPONSIBILITIES
The pollution prevention team consists of personnel responsible for implementation of the
SWPPP, including the following:
· Certified Erosion and Sediment Control Lead (CESCL) – primary contractor contact,
responsible for site inspections (BMPs, visual monitoring, sampling, etc.); to be called
upon in case of failure of any ESC measures.
· Resident Engineer – For projects with engineered structures only (sediment
ponds/traps, sand filters, etc.): Site representative for the owner that is the project’s
supervising engineer responsible for inspections and issuing instructions and
drawings to the contractor’s site supervisor or representative.
· Emergency Ecology Contact – Individual to be contacted at Ecology in case of
emergency.
· Emergency Owner Contact – Individual that is the site owner or representative of the
site owner to be contacted in the case of an emergency.
· Non-Emergency Ecology Contact – Individual that is the site owner or representative
of the site owner that can be contacted if required.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
· Monitoring Personnel – Personnel responsible for conducting water quality
monitoring; for most sites this person is also the CESCL.
5.2 TEAM MEMBERS
Names and contact information for those identified as members of the pollution prevention team
are provided in the project summary in Appendix B.
6.0 – SITE INSPECTIONS AND MONITORING
Monitoring includes visual inspection, monitoring for water quality parameters of concern and
documentation of the inspection and monitoring findings in a site log book. A site log book will be
maintained for all on-site construction activities and will include:
· A record of the implementation of the SWPPP and other permit requirements;
· Site inspections; and,
· Stormwater quality monitoring.
For convenience, the inspection forma and water quality monitoring forms included in Appendix E of this
report include the required information for the site log book. This SWPPP may function as the site log
book, if desired, or the forms may be separated and included in a separate site log book. However, if
separated, the site log book must be maintained on-site or within reasonable access to the site and be
made available upon request to Ecology or the local jurisdiction.
6.1 SITE INSPECTION
All BMPs will be inspected, maintained, and repaired as needed to assure continued performance
of their intended function. The inspector will be a Certified Erosion and Sediment Control Lead
(CESCL) per BMP C160. The name and contact information for the CESCL is provided in
Section 5 of this SWPPP.
Site inspection will occur in all areas disturbed by construction activities and at all stormwater
discharge points. Stormwater will be examined for the presence of suspended sediment,
turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the
effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the
BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be
documented in the site log book or forms provided in this document. All new BMPs or design
changes will be documented in the SWPPP as soon as possible.
6.1.1 Site Inspection Frequency
Site inspections will be conducted at least once a week and within 24 hours following any
rainfall event which causes a discharge of stormwater from the site. For sites with
temporary stabilization measures, the site inspection frequency can be reduced to once
every month.
6.1.2 Site Inspection Documentation
The site inspector will record each site inspection using the site log inspection forms
provided in Appendix E. The site inspection log forms may be separated from this
SWPPP document, but will be maintained on-site or within reasonable access to the site
and be made available upon request to Ecology or the local jurisdiction.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
6.2 Stormwater Quality Monitoring
6.2.1 Turbidity Sampling
Monitoring requirements for the proposed project will include turbidity sampling to monitor
site discharges for water quality compliance with the 2009 King County Storm Water
Manual. Sampling will be conducted at all site discharge points at least once per
calendar week.
Turbidity monitoring will follow the analytical methodologies described in Section S4 of
the 2005 Construction Stormwater General Permit (Appendix D). The key benchmark
values that require action include 25 NTU and 250 NTU for turbidity. If the 25 NTU
benchmark for turbidity is exceeded, the following steps will be conducted:
1. Ensure all BMPs specified in this SWPPP are installed and functioning as
intended.
2. Assess whether additional BMPs should be implemented and make revisions to
the SWPPP as necessary.
3. Sample the discharge location daily until the analysis results are less than 25
NTU (turbidity) or 32 cm (transparency).
If the turbidity is greater than 25 NTU but less than 250 NTU for more than 3 days,
additional treatment BMPs will be implemented within 24 hours of the third consecutive
sample that exceeded the benchmark value. Additional treatment BMPs will include, but
are not limited to, off-site treatment, infiltration, filtration and chemical treatment.
If the 250 NTU benchmark for turbidity is exceeded at any time, the following steps will be
conducted:
1. Notify Ecology by phone within 24 hours of analysis.
2. Continue daily sampling until the turbidity is less than 25 NTU.
3. Initiate additional treatment BMPs such as off-site treatment, infiltration, filtration
and chemical treatment within 24 hours of the first 250 NTU exceedance.
4. Implement additional treatment BMPs as soon as possible, but within 7 days of
the first 250 NTU exceedance.
5. Describe inspection results and remedial actions that are taken in the site log
book and in monthly discharge monitoring reports.
6.2.2 pH Sampling
Stormwater runoff will be monitored for pH starting on the first day of any activity that
includes more than 40 yards of poured or recycled concrete, or after the application of
“Engineered Soils” such as, Portland cement treated base, cement kiln dust, or fly ash.
This does not include fertilizers. For concrete work, pH monitoring will start the first day
concrete is poured and continue until 3 weeks after the last pour. For engineered soils,
the pH monitoring period begins when engineered soils are first exposed to precipitation
and continue until the area is fully stabilized.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Stormwater samples will be collected daily from all points of discharge from the site and
measured for pH using a calibrated pH meter, pH test kit, or wide range pH indicator
paper. If the measured pH is 8.5 or greater, the following steps will be conducted:
1. Prevent the high pH water from entering storm drains or surface water.
2. Adjust or neutralize the high pH water if necessary using appropriate technology
such as CO2 sparging (liquid or dry ice).
3. Contact Ecology if chemical treatment other than CO2 sparging is planned.
7.0 – REPORTING AND RECORDKEEPING
7.1 RECORDKEEPING
7.1.1 Site Log Book
A site log book will be maintained for all on-site construction activities and will include:
· A record of the implementation of the SWPPP and other permit requirements;
· Site inspections; and,
· Stormwater quality monitoring.
For convenience, the inspection form and water quality monitoring forms included in
Appendix E of this report include the required information for the site log book.
7.1.2 Records Retention
Records of all monitoring information (site log book, inspection reports/checklists, etc.),
this Stormwater Pollution Prevention Plan, and any other documentation of compliance
with permit requirements will be retained during the life of the construction project and for
a minimum of three years following the termination of permit coverage in accordance with
permit condition S5.C.
7.1.3 Access to Plans and Records
The SWPPP, General Permit, Notice of Authorization letter, and Site Log Book will be
retained on site or within reasonable access to the site and will be made immediately
available upon request to Ecology or the local jurisdiction. A copy of this SWPPP will be
provided to Ecology within 14 days of receipt of a written request for the SWPPP from
Ecology. Any other information requested by Ecology will be submitted within a
reasonable time. A copy of the SWPPP or access to the SWPPP will be provided to the
public when requested in writing in accordance with permit condition S5.G.
7.1.4 Updating the SWPPP
In accordance with Conditions S3, S4.B, and S9.B.3 of the General Permit, this SWPPP
will be modified if the SWPPP is ineffective in eliminating or significantly minimizing
pollutants in stormwater discharges from the site or there has been a change in design,
construction, operation, or maintenance at the site that has a significant effect on the
discharge, or potential for discharge, of pollutants to the waters of the State. The
SWPPP will be modified within seven days of determination based on inspection(s) that
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
additional or modified BMPs are necessary to correct problems identified, and an
updated timeline for BMP implementation will be prepared.
7.2 REPORTING
7.2.1 Discharge Monitoring Reports
Discharge Monitoring Report (DMR) forms will not be submitted to Ecology because
water quality sampling is not being conducted at the site.
7.2.2 Notification of Noncompliance
If any of the terms and conditions of the permit are not met, and it causes a threat to
human health of the environment, the following steps will be taken in accordance with
permit section S5.F:
1. Ecology will be immediately notified of the failure to comply.
2. Immediate action will be taken to control the noncompliance issue and to correct
the problem. If applicable, sampling and analysis of any noncompliance will be
repeated immediately and the results submitted to Ecology within five (5) days of
becoming aware of the violation.
3. A detailed written report describing the noncompliance will be submitted to
Ecology within five (5) days, unless requested earlier by Ecology.
In accordance with permit condition S2.A, a complete application form will be submitted
to Ecology and the appropriate local jurisdiction (if applicable) to be covered by the
General Permit.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
APPENDIX A
SITE PLAN WITH BMP MEASURES
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
APPENDIX B
SWPPP PROJECT SUMMARY
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
PROJECT TEAM MEMBERS:
Title Name(s) Phone Number
Certified Erosion & Sediment Control Lead Matthew Offe (206) 643-5319
Resident Engineer Darrell Offe, P.E. (425) 260-3412
Emergency Ecology Contact Puget Sound Office (425) 649-7000
Emergency Owner Contact Bob Wenzl (206) 714-6707
Non-Emergency Ecology Contact Northwest Region (425) 649-7000
Monitoring Personnel Matthew Offe (206) 643-5319
* The remaining contacts for this project will be identified at the pre-construction meeting
and added to the job-site copy of the SWPPP.
ESTIMATED CONSTRUCTION SCHEDULE:
· Construction Start Date August 2017
· Install ESC Measures August 2017
· Construction End Date September 2018
CONSTRUCTION BMP LIST:
· High Visibility Plastic or Metal Fence (BMP C103)
· Silt Fence (BMP C233)
· Storm Drain Inlet Protection (BMP C220)
· Plastic Covering (BMP C123)
· Temporary and Permanent Seeding (BMP C120)
· Interceptor Dike and Swale (BMP C200)
· Materials on Hand (BMP C150)
· Straw Wattles (BMP C235)
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
APPENDIX C
ALTERNATIVE BMPs
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
The following includes a list of possible alternative BMPs for each of the 12 elements not described in the
main SWPPP text. This list can be referenced in the event a BMP for a specific element is not
functioning as designed and an alternative BMP needs to be implemented.
Element #1 - Mark Clearing Limits
· High Visibility Plastic or Metal Fence (BMP C103)
Element #2 - Establish Construction Access
· Wheel Wash (BMP C106)
Element #3 - Control Flow Rates
· (none)
Element #4 - Install Sediment Controls
· Straw Bale Barrier (BMP C230)
· Vegetated Strip (BMP C234)
· Materials on Hand (BMP C150)
Element #5 - Stabilize Soils
· Dust Control (BMP C140)
· Top soiling (BMP C125)
· Sodding (BMP C124)
Element #6 - Protect Slopes
· Straw Wattles (BMP C235)
· Grass-Lined Channels (BMP C201)
Element #7 - Protect Drain Inlets
· (none)
Element #8 - Stabilize Channels and Outlets
· Level Spreader (BMP C206)
Element #10 - Control Dewatering
· (none)
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
APPENDIX D
GENERAL PERMIT
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Construction Stormwater General Permit
A copy of the construction stormwater general permit will be added to this appendix once it is obtained.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
APPENDIX E
SITE LOG & INSPECTION FORMS
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Site Inspection Forms (and Site Log)
The results of each inspection shall be summarized in an inspection report or checklist that is entered into
or attached to the site log book. It is suggested that the inspection report or checklist be included in this
appendix to keep monitoring and inspection information in one document, but this is optional. However, it
is mandatory that this SWPPP and the site inspection forms be kept onsite at all times during
construction, and that inspections be performed and documented as outlined below.
At a minimum, each inspection report or checklist shall include:
a. Inspection date/times
b. Weather information: general conditions during inspection, approximate amount of precipitation
since the last inspection, and approximate amount of precipitation within the last 24 hours.
c. A summary or list of all BMPs that have been implemented, including observations of all
erosion/sediment control structures or practices.
d. The following shall be noted:
i. Locations of BMPs inspected,
ii. Locations of BMPs that need maintenance,
iii. The reason maintenance is needed
iv. Locations of BMPs that failed to operate as designed or intended, and
v. Locations where additional or different BMPs are needed, and the reason(s) why.
e. A description of stormwater discharged from the site. The presence of suspended sediment,
turbid water, discoloration, and/or oil sheen shall be noted, as applicable.
f. A description of any water quality monitoring performed during inspection, and the results of that
monitoring.
g. General comments and notes, including a brief description of any BMP r repairs, maintenance or
installations made as a result of the inspection.
h. A statement that, in the judgment of the person conducting the site inspection, the site is either in
compliance or out of compliance with the terms and conditions of the SWPPP and the NPDES
permit. If the site inspection indicates that the site is out of compliance, the inspection report shall
include a summary of the remedial actions required to bring the site back into compliance, as well
as a schedule of implementation.
i. Name, title, and signature of person conducting the site inspection; and the following statement: “I
certify under penalty of law that this report is true, accurate, and complete, to the best of my
knowledge and belief”.
When the site inspection indicates that the site is not in compliance with any terms and conditions of the
NPDES permit, the Permittee shall take immediate action(s) to: stop, contain, and clean up the
unauthorized discharges, or otherwise stop the noncompliance; correct the problem(s); implement
appropriate Best Management Practices (BMPs), and/or conduct maintenance of existing BMPs; and
achieve compliance with all applicable standards and permit conditions. In addition, if the noncompliance
causes a threat to human health or the environment, the Permittee shall comply with the Noncompliance
Notification requirements in Special Condition S5.F of the permit.
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Site Inspection Form
General Information
Project Name:
Inspector Name: Title:
CESCL # :
Date: Time:
Inspection Type: □ After a rain event
□ Weekly
□ Turbidity/transparency benchmark exceedance
□ Other
Weather
Precipitation Since last inspection In last 24 hours
Description of General Site Conditions:
Inspection of BMPs
Element 1: Mark Clearing Limits
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 2: Establish Construction Access
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Element 3: Control Flowrates
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 4: Install Sediment Controls
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 5: Stabilize Soils
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Element 6: Protect Slopes
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 7: Protect Drain Inlets
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 8: Stabilize Channels and Outlets
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Element 9: Control Pollutants
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Element 10: Control Dewatering
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
BMP:
Location Inspected Functioning Problem/Corrective Action Y N Y N NIP
Stormwater Discharges From the Site
Observed? Problem/Corrective Action Y N
Location
Turbidity
Discoloration
Sheen
Location
Turbidity
Discoloration
Sheen
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Water Quality Monitoring
Was any water quality monitoring conducted? □ Yes □ No
If water quality monitoring was conducted, record results here:
If water quality monitoring indicated turbidity 250 NTU or greater; or transparency 6
cm or less, was Ecology notified by phone within 24 hrs?
□ Yes □ No
If Ecology was notified, indicate the date, time, contact name and phone number
below:
Date:
Time:
Contact Name:
Phone #:
General Comments and Notes
Include BMP repairs, maintenance, or installations made as a result of the inspection.
Were Photos Taken? □ Yes □ No
If photos taken, describe photos below:
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
APPENDIX F
TESC CALCULATIONS
Mead Short Plat
Stormwater Pollution Prevention Plan (SWPPP)
Sediment Trap Sizing Calculations
(per KCSWDM Section D.3.5.1)
Surface Area (SA) determined by formula:
=
sV
QFSSA2
Where: Vs = 0.00096 ft/s
FS = 2
Q2 is the 2-yr peak flowrated calculated with KCRTS using 15-minute time-steps
()..61500096.0
295.02 ftsqSA==
Sediment tap design at surface area (El-454.00) = 620 sf.
TIR Section 8: CSWPPP Analysis and Design
A Temporary Erosion and Sediment Control Plan (TESCP) implementing Best Management
Practices has been included within the utility permit (U16004534) set of plans. The project site is
smaller than 3 acres, therefore a temporary sediment trap will be utilized to provide temporary
onsite storage which is shown on the TESCP. This sediment trap will be used until the permanent
facility is constructed to provide temporary and permanent storm water storage.
Sediment Trap sizing using Section D.3.5.1 2009 KCSWDM
Surface Area (SA) determined by formula:
SA=FS(Q2/Vs) where Vs=0.00096 feet/second; FS = 2; Q2 is calculated using
KCRTS modeling for the 2-year event with 15-minute time steps. Based upon the
attached Modeling, Q2=0.295 cfs
SA= (2*0.295)/0.00096 = 615 square feet.
Sediment Trap design at surface area 454.00 = 620 square feet
SEDIMENT TRAP SIZING
TIR Section 9: Bond Quantities, Facility Summaries, and Declaration of
Covenant
BOND QUANTITY WORKSHEET
CED Permit #:16004534UnitReference #PriceUnitQuantity CostBackfill & compaction-embankmentESC-16.50$ CY6204,030.00Check dams, 4" minus rockESC-2SWDM 5.4.6.380.00$ Each Catch Basin ProtectionESC-335.50$ Each6213.00Crushed surfacing 1 1/4" minusESC-4WSDOT 9-03.9(3)95.00$ CY DitchingESC-59.00$ CY Excavation-bulkESC-62.00$ CY8601,720.00Fence, siltESC-7SWDM 5.4.3.11.50$ LF7731,159.50Fence, Temporary (NGPE)ESC-81.50$ LF Geotextile FabricESC-92.50$ SY Hay Bale Silt TrapESC-100.50$ Each HydroseedingESC-11SWDM 5.4.2.40.80$ SY62004,960.00Interceptor Swale / DikeESC-121.00$ LF Jute MeshESC-13SWDM 5.4.2.23.50$ SY Level SpreaderESC-141.75$ LF Mulch, by hand, straw, 3" deepESC-15SWDM 5.4.2.12.50$ SY Mulch, by machine, straw, 2" deepESC-16SWDM 5.4.2.12.00$ SY Piping, temporary, CPP, 6"ESC-1712.00$ LF Piping, temporary, CPP, 8"ESC-1814.00$ LF Piping, temporary, CPP, 12"ESC-1918.00$ LF Plastic covering, 6mm thick, sandbaggedESC-20SWDM 5.4.2.34.00$ SY Rip Rap, machine placed; slopesESC-21WSDOT 9-13.1(2)45.00$ CY Rock Construction Entrance, 50'x15'x1'ESC-22SWDM 5.4.4.11,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23SWDM 5.4.4.13,200.00$ Each13,200.00Sediment pond riser assemblyESC-24SWDM 5.4.5.22,200.00$ Each Sediment trap, 5' high berm ESC-25SWDM 5.4.5.119.00$ LF1402,660.00Sed. trap, 5' high, riprapped spillway berm section ESC-26SWDM 5.4.5.170.00$ LF6420.00Seeding, by handESC-27SWDM 5.4.2.41.00$ SY Sodding, 1" deep, level groundESC-28SWDM 5.4.2.58.00$ SY Sodding, 1" deep, sloped groundESC-29SWDM 5.4.2.510.00$ SY TESC SupervisorESC-30110.00$ HR161,760.00Water truck, dust controlESC-31SWDM 5.4.7140.00$ HR UnitReference #PriceUnitQuantity Cost30.00$ Lin. Feet2557,650.00 EROSION/SEDIMENT SUBTOTAL:27,772.50SALES TAX @ 10%2,777.25EROSION/SEDIMENT TOTAL:30,549.75(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescription No.(A)Tree Protection Fencing WRITE-IN-ITEMS Page 1 of 1Ref 8-H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/25/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostGENERAL ITEMS Backfill & Compaction- embankmentGI-16.00$ CYBackfill & Compaction- trenchGI-29.00$ CYClear/Remove Brush, by hand (SY)GI-31.00$ SYBollards - fixedGI-4240.74$ EachBollards - removableGI-5452.34$ EachClearing/Grubbing/Tree RemovalGI-610,000.00$ Acre0.252,500.001.0510,500.00Excavation - bulkGI-72.00$ CYExcavation - TrenchGI-85.00$ CYFencing, cedar, 6' highGI-920.00$ LFFencing, chain link, 4'GI-1038.31$ LFFencing, chain link, vinyl coated, 6' highGI-1120.00$ LFFencing, chain link, gate, vinyl coated, 20' GI-121,400.00$ EachFill & compact - common barrowGI-1325.00$ CYFill & compact - gravel baseGI-1427.00$ CYFill & compact - screened topsoilGI-1539.00$ CYGabion, 12" deep, stone filled mesh GI-1665.00$ SYGabion, 18" deep, stone filled mesh GI-1790.00$ SYGabion, 36" deep, stone filled meshGI-18150.00$ SYGrading, fine, by handGI-192.50$ SYGrading, fine, with graderGI-202.00$ SY320640.0012252,450.00Monuments, 3' LongGI-21250.00$ EachSensitive Areas SignGI-227.00$ EachSodding, 1" deep, sloped groundGI-238.00$ SYSurveying, line & gradeGI-24850.00$ Day1850.0043,400.0032,550.00Surveying, lot location/linesGI-251,800.00$ AcreTopsoil Type A (imported)GI-2628.50$ CY1203,420.00Traffic control crew ( 2 flaggers )GI-27120.00$ HR242,880.00Trail, 4" chipped woodGI-288.00$ SYTrail, 4" crushed cinderGI-299.00$ SYTrail, 4" top courseGI-3012.00$ SYConduit, 2"GI-315.00$ LF8004,000.00Wall, retaining, concreteGI-3255.00$ SFWall, rockeryGI-3315.00$ SFSUBTOTAL THIS PAGE:4,370.0015,770.0013,050.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)Page 1 of 3Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/25/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000syRI-130.00$ SY96829,040.00AC Grinding, 4' wide machine 1000-2000syRI-216.00$ SYAC Grinding, 4' wide machine > 2000syRI-310.00$ SYAC Removal/DisposalRI-435.00$ SY351,225.00Barricade, Type III ( Permanent )RI-556.00$ LF12672.00Guard RailRI-630.00$ LFCurb & Gutter, rolledRI-717.00$ LFCurb & Gutter, verticalRI-812.50$ LF3003,750.006307,875.00Curb and Gutter, demolition and disposalRI-918.00$ LFCurb, extruded asphaltRI-105.50$ LFCurb, extruded concreteRI-117.00$ LFSawcut, asphalt, 3" depthRI-121.85$ LF7261,343.10Sawcut, concrete, per 1" depthRI-133.00$ LFSealant, asphaltRI-142.00$ LF7261,452.00Shoulder, gravel, 4" thickRI-1515.00$ SYSidewalk, 4" thickRI-1638.00$ SYSidewalk, 4" thick, demolition and disposalRI-1732.00$ SYSidewalk, 5" thickRI-1841.00$ SYSidewalk, 5" thick, demolition and disposalRI-1940.00$ SYSign, Handicap RI-2085.00$ EachStriping, per stallRI-217.00$ EachStriping, thermoplastic, ( for crosswalk )RI-223.00$ SFStriping, 4" reflectorized lineRI-230.50$ LFAdditional 2.5" Crushed SurfacingRI-243.60$ SYHMA 1/2" Overlay 1.5" RI-2514.00$ SYHMA 1/2" Overlay 2"RI-2618.00$ SY96817,424.00HMA Road, 2", 4" rock, First 2500 SYRI-2728.00$ SYHMA Road, 2", 4" rock, Qty. over 2500SYRI-2821.00$ SYHMA Road, 4", 6" rock, First 2500 SYRI-2945.00$ SY1406,300.0072532,625.00HMA Road, 4", 6" rock, Qty. over 2500 SYRI-3037.00$ SYHMA Road, 4", 4.5" ATBRI-3138.00$ SYGravel Road, 4" rock, First 2500 SYRI-3215.00$ SYGravel Road, 4" rock, Qty. over 2500 SYRI-3310.00$ SYThickened EdgeRI-348.60$ LF1621,393.20SUBTOTAL THIS PAGE:61,206.1041,893.20(B)(C)(D)(E)Page 2 of 3Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/25/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)PARKING LOT SURFACINGNo.2" AC, 2" top course rock & 4" borrowPL-121.00$ SY2" AC, 1.5" top course & 2.5" base coursePL-228.00$ SY4" select borrowPL-35.00$ SY1.5" top course rock & 2.5" base coursePL-414.00$ SYSUBTOTAL PARKING LOT SURFACING:(B)(C)(D)(E)LANDSCAPING & VEGETATIONNo.Street TreesLA-1225.00$ each184,050.00Median LandscapingLA-2Right-of-Way LandscapingLA-312.00$ SY6788,136.00Wetland LandscapingLA-4SUBTOTAL LANDSCAPING & VEGETATION:4,050.008,136.00(B)(C)(D)(E)TRAFFIC & LIGHTINGNo.SignsTR-1650.00$ each42,600.00Street Light System ( # of Poles)TR-24,800.00$ each943,200.00Traffic SignalTR-3Traffic Signal ModificationTR-4SUBTOTAL TRAFFIC & LIGHTING:45,800.00(B)(C)(D)(E)WRITE-IN-ITEMSSUBTOTAL WRITE-IN ITEMS:STREET AND SITE IMPROVEMENTS SUBTOTAL:115,426.1065,799.2013,050.00SALES TAX @ 10%11,542.616,579.921,305.00STREET AND SITE IMPROVEMENTS TOTAL:126,968.7172,379.1214,355.00(B)(C)(D)(E)Page 3 of 3Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/25/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/DD-126.00$ SY1142,964.00* (CBs include frame and lid)BeehiveD-290.00$ EachThrough-curb Inlet FrameworkD-3400.00$ Each1400.00CB Type ID-41,500.00$ Each913,500.0011,500.00CB Type ILD-51,750.00$ Each11,750.00CB Type II, 48" diameterD-62,300.00$ Each12,300.00 for additional depth over 4' D-7480.00$ FT41,920.00CB Type II, 54" diameterD-82,500.00$ Each for additional depth over 4'D-9495.00$ FTCB Type II, 60" diameterD-102,800.00$ Each for additional depth over 4'D-11600.00$ FTCB Type II, 72" diameterD-126,000.00$ Each for additional depth over 4'D-13850.00$ FTCB Type II, 96" diameterD-1414,000.00$ Each for additional depth over 4'D-15925.00$ FTTrash Rack, 12"D-16350.00$ EachTrash Rack, 15"D-17410.00$ EachTrash Rack, 18"D-18480.00$ EachTrash Rack, 21"D-19550.00$ EachCleanout, PVC, 4"D-20150.00$ EachCleanout, PVC, 6"D-21170.00$ EachCleanout, PVC, 8"D-22200.00$ EachCulvert, PVC, 4" D-2310.00$ LFCulvert, PVC, 6" D-2413.00$ LFCulvert, PVC, 8" D-2515.00$ LFCulvert, PVC, 12" D-2623.00$ LFCulvert, PVC, 15" D-2735.00$ LFCulvert, PVC, 18" D-2841.00$ LFCulvert, PVC, 24"D-2956.00$ LFCulvert, PVC, 30" D-3078.00$ LFCulvert, PVC, 36" D-31130.00$ LFCulvert, CMP, 8"D-3219.00$ LFCulvert, CMP, 12"D-3329.00$ LFSUBTOTAL THIS PAGE:19,470.001,900.002,964.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)Page 1 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/26/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)DRAINAGE (Continued)Culvert, CMP, 15"D-3435.00$ LFCulvert, CMP, 18"D-3541.00$ LFCulvert, CMP, 24"D-3656.00$ LFCulvert, CMP, 30"D-3778.00$ LFCulvert, CMP, 36"D-38130.00$ LFCulvert, CMP, 48"D-39190.00$ LFCulvert, CMP, 60"D-40270.00$ LFCulvert, CMP, 72"D-41350.00$ LFCulvert, Concrete, 8"D-4242.00$ LFCulvert, Concrete, 12"D-4348.00$ LFCulvert, Concrete, 15"D-4478.00$ LFCulvert, Concrete, 18"D-4548.00$ LFCulvert, Concrete, 24"D-4678.00$ LFCulvert, Concrete, 30"D-47125.00$ LFCulvert, Concrete, 36"D-48150.00$ LFCulvert, Concrete, 42"D-49175.00$ LFCulvert, Concrete, 48"D-50205.00$ LFCulvert, CPE Triple Wall, 6" D-5114.00$ LFCulvert, CPE Triple Wall, 8" D-5216.00$ LFCulvert, CPE Triple Wall, 12" D-5324.00$ LFCulvert, CPE Triple Wall, 15" D-5435.00$ LFCulvert, CPE Triple Wall, 18" D-5541.00$ LFCulvert, CPE Triple Wall, 24" D-5656.00$ LFCulvert, CPE Triple Wall, 30" D-5778.00$ LFCulvert, CPE Triple Wall, 36" D-58130.00$ LFCulvert, LCPE, 6"D-5960.00$ LFCulvert, LCPE, 8"D-6072.00$ LFCulvert, LCPE, 12"D-6184.00$ LF36730,828.0012210,248.00Culvert, LCPE, 15"D-6296.00$ LF201,920.00Culvert, LCPE, 18"D-63108.00$ LFCulvert, LCPE, 24"D-64120.00$ LFCulvert, LCPE, 30"D-65132.00$ LFCulvert, LCPE, 36"D-66144.00$ LFCulvert, LCPE, 48"D-67156.00$ LFCulvert, LCPE, 54"D-68168.00$ LFSUBTOTAL THIS PAGE:32,748.0010,248.00(B)(C)(D)(E)Page 2 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/26/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)DRAINAGE (Continued)Culvert, LCPE, 60"D-69180.00$ LFCulvert, LCPE, 72"D-70192.00$ LFCulvert, HDPE, 6"D-7142.00$ LFCulvert, HDPE, 8"D-7242.00$ LFCulvert, HDPE, 12"D-7374.00$ LFCulvert, HDPE, 15"D-74106.00$ LFCulvert, HDPE, 18"D-75138.00$ LFCulvert, HDPE, 24"D-76221.00$ LFCulvert, HDPE, 30"D-77276.00$ LFCulvert, HDPE, 36"D-78331.00$ LFCulvert, HDPE, 48"D-79386.00$ LFCulvert, HDPE, 54"D-80441.00$ LFCulvert, HDPE, 60"D-81496.00$ LFCulvert, HDPE, 72"D-82551.00$ LFPipe, Polypropylene, 6"D-8384.00$ LFPipe, Polypropylene, 8"D-8489.00$ LFPipe, Polypropylene, 12"D-8595.00$ LFPipe, Polypropylene, 15"D-86100.00$ LFPipe, Polypropylene, 18"D-87106.00$ LFPipe, Polypropylene, 24"D-88111.00$ LFPipe, Polypropylene, 30"D-89119.00$ LFPipe, Polypropylene, 36"D-90154.00$ LFPipe, Polypropylene, 48"D-91226.00$ LFPipe, Polypropylene, 54"D-92332.00$ LFPipe, Polypropylene, 60"D-93439.00$ LFPipe, Polypropylene, 72"D-94545.00$ LFCulvert, DI, 6"D-9561.00$ LFCulvert, DI, 8"D-9684.00$ LFCulvert, DI, 12"D-97106.00$ LF424,452.00Culvert, DI, 15"D-98129.00$ LFCulvert, DI, 18"D-99152.00$ LFCulvert, DI, 24"D-100175.00$ LFCulvert, DI, 30"D-101198.00$ LFCulvert, DI, 36"D-102220.00$ LFCulvert, DI, 48"D-103243.00$ LFCulvert, DI, 54"D-104266.00$ LFCulvert, DI, 60"D-105289.00$ LFCulvert, DI, 72"D-106311.00$ LFSUBTOTAL THIS PAGE:4,452.00(B)(C)(D)(E)Page 3 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/26/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)Specialty Drainage ItemsDitching SD-19.50$ CYFlow Dispersal Trench (1,436 base+)SD-328.00$ LF French Drain (3' depth)SD-426.00$ LFGeotextile, laid in trench, polypropyleneSD-53.00$ SYMid-tank Access Riser, 48" dia, 6' deepSD-62,000.00$ EachPond Overflow SpillwaySD-716.00$ SYRestrictor/Oil Separator, 12"SD-81,150.00$ Each11,150.00Restrictor/Oil Separator, 15"SD-91,350.00$ EachRestrictor/Oil Separator, 18"SD-101,700.00$ EachRiprap, placedSD-1142.00$ CYTank End Reducer (36" diameter)SD-121,200.00$ EachInfiltration pond testingSD-13125.00$ HRPermeable PavementSD-14Permeable Concrete SidewalkSD-15Culvert, Box __ ft x __ ftSD-16SUBTOTAL SPECIALTY DRAINAGE ITEMS:1,150.00(B)(C)(D)(E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention PondSF-1Each Detention TankSF-2Each Detention VaultSF-3Each Infiltration PondSF-4Each Infiltration TankSF-5Each Infiltration VaultSF-6Each Infiltration TrenchesSF-7Each Basic Biofiltration SwaleSF-8Each Wet Biofiltration SwaleSF-9Each WetpondSF-10Each WetvaultSF-11145,000.00$ Each 1145,000.00Sand FilterSF-12Each Sand Filter VaultSF-13Each Linear Sand FilterSF-14Each Proprietary FacilitySF-15Each Bioretention FacilitySF-16Each SUBTOTAL STORMWATER FACILITIES:145,000.00(B)(C)(D)(E)Page 4 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/26/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESQuantity Remaining (Bond Reduction) (B)(C)WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)WI-1WI-2WI-3WI-4WI-5WI-6WI-7WI-8WI-9WI-10WI-11WI-12WI-13WI-14WI-15SUBTOTAL WRITE-IN ITEMS:DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:52,218.0012,148.00149,114.00SALES TAX @ 10%5,221.801,214.8014,911.40DRAINAGE AND STORMWATER FACILITIES TOTAL:57,439.8013,362.80164,025.40(B) (C) (D) (E)Page 5 of 5Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/26/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostConnection to Existing WatermainW-12,000.00$ EachDuctile Iron Watermain, CL 52, 4 Inch DiameterW-250.00$ LFDuctile Iron Watermain, CL 52, 6 Inch DiameterW-356.00$ LFDuctile Iron Watermain, CL 52, 8 Inch DiameterW-460.00$ LFDuctile Iron Watermain, CL 52, 10 Inch DiameterW-570.00$ LFDuctile Iron Watermain, CL 52, 12 Inch DiameterW-680.00$ LFGate Valve, 4 inch DiameterW-7500.00$ EachGate Valve, 6 inch DiameterW-8700.00$ EachGate Valve, 8 Inch DiameterW-9800.00$ EachGate Valve, 10 Inch DiameterW-101,000.00$ EachGate Valve, 12 Inch DiameterW-111,200.00$ EachFire Hydrant AssemblyW-124,000.00$ EachPermanent Blow-Off AssemblyW-131,800.00$ EachAir-Vac Assembly, 2-Inch DiameterW-142,000.00$ EachAir-Vac Assembly, 1-Inch DiameterW-151,500.00$ EachCompound Meter Assembly 3-inch DiameterW-168,000.00$ EachCompound Meter Assembly 4-inch DiameterW-179,000.00$ EachCompound Meter Assembly 6-inch DiameterW-1810,000.00$ EachPressure Reducing Valve Station 8-inch to 10-inchW-1920,000.00$ EachWATER SUBTOTAL:SALES TAX @ 10%WATER TOTAL:(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B)(C)Page 1 of 1Ref 8-H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/26/2017
CED Permit #:16004534ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostClean OutsSS-11,000.00$ Each77,000.00Grease Interceptor, 500 gallonSS-28,000.00$ EachGrease Interceptor, 1000 gallonSS-310,000.00$ EachGrease Interceptor, 1500 gallonSS-415,000.00$ EachSide Sewer Pipe, PVC. 4 Inch DiameterSS-580.00$ LFSide Sewer Pipe, PVC. 6 Inch DiameterSS-695.00$ LF484,560.00989,310.0018617,670.00Sewer Pipe, PVC, 8 inch DiameterSS-7105.00$ LFSewer Pipe, PVC, 12 Inch DiameterSS-8120.00$ LFSewer Pipe, DI, 8 inch DiameterSS-9115.00$ LFSewer Pipe, DI, 12 Inch DiameterSS-10130.00$ LFManhole, 48 Inch DiameterSS-116,000.00$ EachManhole, 54 Inch DiameterSS-136,500.00$ EachManhole, 60 Inch DiameterSS-157,500.00$ EachManhole, 72 Inch DiameterSS-178,500.00$ EachManhole, 96 Inch DiameterSS-1914,000.00$ EachPipe, C-900, 12 Inch DiameterSS-21180.00$ LFOutside DropSS-241,500.00$ LSInside DropSS-251,000.00$ LSSewer Pipe, PVC, ____ Inch DiameterSS-26Lift Station (Entire System)SS-27LSSANITARY SEWER SUBTOTAL:4,560.009,310.0024,670.00SALES TAX @ 10%456.00931.002,467.00SANITARY SEWER TOTAL:5,016.0010,241.0027,137.00(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B)(C)Page 1 of 1Ref 8-H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/26/2017
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a)Existing Right-of-Way Improvements Subtotal (b)(b)131,984.71$ Future Public Improvements Subtotal(c)82,620.12$ Stormwater & Drainage Facilities (Public & Private) Subtotal(d)(d)234,828.00$ (e)(f)Site RestorationCivil Construction PermitMaintenance Bond89,886.57$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. 425-260-3412darrell.offe@comcast.netMead Short Plat16-000138522 Hoquiam Avenue NE102305-9230FOR CONSTRUCTION1600453413932 SE 159th Place463,354.82$ P (a) x 100%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS7/25/2017Darrell L. Offe, Jr.#27460Offe Engineers, PLLCR((b x 150%) + (d x 100%))S(e) x 150% + (f) x 100%Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2T(P +R - S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)EST1((b) + (c) + (d)) x 20%-$ MAINTENANCE BOND */**(after final acceptance of construction)30,549.75$ 131,984.71$ 432,805.07$ 30,549.75$ -$ 234,828.00$ -$ Page 1 of 1Ref 8-H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 7/26/2017
RESTRICTIVE COVENANT
TIR Section 10: Operations and Maintenance Manual
The utility permit plans have identified the public and private storm systems on the project. The
stormwater vault and tract will be owned by the homeowner’s association. The maintenance and
operation of the internal portion of the stormwater vault will be provide by the City of Renton. The
public storm systems identified by the utility permit plans will be maintained by the City of Renton.
The private storm systems located on private property will be maintained by the home owner. The
required routine maintenance requirements are attached to this Section.
APPENDIX A
Administrative Report and Decision
DEPARTMENTOFCOMMUNITYANDECONOMICDEVELOPMENTA.ADMINISTRATIVEREPORT&DECISION—Renton0SHORTPLATDECISION:ElAPPROVEDAPPROVEDSUBJECTTOCONDITIONSElDENIEDMODIFICATIONDECISION:ElAPPROVEDElAPPROVEDSUBJECTTOCONDITIONSDENIEDREPORTDATE:June2,2016ProjectName:MeadShortPlatOwner:TheHeirsandDeviseesofLaverneR.Mead,DeceasedApplicant:BobWenzl,TuscanyConstruction,LLCP.O.Box6127,Bellevue,WA98008Contact:DarrellOffe,OffeEngineers,13932SE159thPL,Renton,WA98058FileNumber:LUA16-000138,SHPL-A,MODProjectManager:ClarkH.Close,SeniorPlannerProjectSummary:Theapplicantisrequestingpreliminaryshortplatapprovalforthesubdivisionofanexisting58,591squarefoot(1.35acre)siteinto7residentiallotsand2tracts.TheprojectsiteislocatedwithintheResidential-8fR-8)zone.Theproposedlotsrangeinsizefrom5,000to5,613sfinareawithanaveragelotsizeof5,199sfandanetdensityof7.5du/ac.TractAisproposedasa5,122sfstormwatervaultandTractBisproposedasanalley.ThepropertyisborderedtothesouthbyNE5thP1,totheeastbyllwacoAveNEandtothenorthbyNE6thSt.Theabuttingroadswouldbewidenedandimprovedwithhalf-streetfrontageimprovements.TheapplicantisalsorequestingamodificationfromstreetimprovementswithinthepipestemportionoftheexistinglotalongNE6thSt.Nocriticalareaswereidentifiedonthesubjectproperty.Theapplicantisproposingtoretainfour(4)ofthe53existingonsitetrees.ProjectLocation:NE6thStandliwacoAveNE(APN102305-9230)SiteArea:58,591squarefeet(1.35acres)—-—-—
.—-—
__ProjectLocationMapAdministrativeShortPlatReport16-000138
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page2of19B.EXHIBITS:UExhibit1:StaffReportExhibit2:ShortPlatPlan(Sheets1&2)Exhibit3:ArboristReport(reviseddateMay3,2016)Exhibit4:TreeRetentionPlanExhibit5:LandscapeandTreeReplacementPlanExhibit6:StreetWideningPlanExhibit7:DrainageReport,preparedbyOffeEngineers,PLLC(reviseddateMay2,2016)Exhibit8:ConceptualDrainagePlanExhibit9:ConceptualUtilityPlanExhibit10:GeotechnicalAssessment,preparedbyRobertM.Pride,LLC(dateMay19,2014)Exhibit11:KingCountyWaterDistrict90WaterAvailabilityCertificate(dateDecember29,2015)Exhibit12:WetlandandStreamDetermination,preparedbyWetlandResources,Inc.(dateJune4,2014)Exhibit13:ConstructionMitigationDescriptionExhibit14:BuildingHeightCodeInterpretation(Cl-73)Exhibit15:AdvisoryNotestoApplicantC.GENERALINFORMATION:1.Owner(s)ofRecord:TheHeirsandDeviseesofLaverneR.Mead,Deceased2.ZoningClassification:Residential-8(R-8)3.ComprehensivePlanLandUseDesignation:ResidentialMediumDensity(RMD)4.ExistingSiteUse:Vacant,usedasequipmentstorage5.CriticalAreas:None6.NeighborhoodCharacteristics:aNorth’ResidentialMediumDensity(RMD)ComprehensivePlanLandUseDesignation;Residential-8DU/AC(R-8)zonebEast’ResidentialMediumDensity(RMD)ComprehensivePlanLandUseDesignation;Residential-8DU/AC(R-8)zonecSouth’ResidentialMediumDensity(RMD)ComprehensivePlanLandUseDesignation;Residential-8DU/AC(R-8)zonedWest’ResidentialMediumDensity(RMD)ComprehensivePlanLandUseDesignation;Residential-8DU/AC(R-2)zone6.SiteArea:1.35acresD.HISTORICAL/BACKGROUND:ActionLandUseFileNo.OrdinanceNo.DateComprehensivePlanN/A575806/22/2015AdministrativeShortPlatReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentMEADSHORTPLATJune2,2016ZoningN/A575806/22/2015PieleAnnexationA-01-001492412/05/2001E.PUBLICSERVICES:1.ExistingUtilitiesa.Water:WaterservicewillbeprovidedbyKingCountyWaterDistrict90.AwateravailabilitycertificatefromKingCountyWaterDistrict90wasprovided(Exhibit11).b.Sewer:SewerserviceisprovidedbytheCityofRenton.Thereisanexisting8”sewereastofthesiteinllwacoAveNEthatflowsfromnorthtosouth.Thereisanexisting8”sewersouthofthesiteinNE5thP1thatflowsfromwesttoeast.ThesewerinllwacoAveNEintersectsthesewerinNE5thP1ata48”SanitarySewerManhole(CORFacilityID#MH4617)SEofthesite.ThereisnosewernorthofthesiteinNE6thSt.c.Surface/StormWater:Thereisanexisting12”stormdrainalongtheeasternfrontageofllwacoAveNEeastofthesiteandtherearetwo(2)Type1catchbasins(CORFacilityID#131717and131716)alongthisstormdrainrun.ThereisanexistingType1catchbasin(CORFacilityID#116586)locatedneartheSEcornerofthesitealongthenorthernfrontageofNE5thP1.Thisdrainstothesouthandeastbya12”stormdraintothe12”stormdraininllwacoAveNE.ThereisnostormdrainnorthofthesiteinNE6thSt.2.Streets:ThesubjectpropertyisboundedtothenorthbyNE6thSt,totheeastbyllwacoAveNEandtothesouthbyNE5thP1.NE6thStandNE5thP1currentlyendwithapipesteminthevicinityofthesite’swesternboundary.Allthreestreetsareclassifiedasresidentialaccessstreets.3.FireProtection:CityofRentonFireDepartmentF.APPLICABLESECTIONSOFTHERENTONMUNICIPALCODE:1.Chapter2LandUseDistrictsa.Section4-2-020:PurposeandIntentofZoningDistrictsb.Section4-2-060:ZoningUseTable—UsesAllowedinZoningDesignationsc.Section4-2-110:ResidentialDevelopmentStandardsd.Section4-2-115:ResidentialDesignandOpenSpaceStandards2.Chapter4City-WidePropertyDevelopmentStandards3.Chapter6StreetsandUtilityStandardsa.Section4-6-060:StreetStandards4.Chapter7SubdivisionRegulationsa.Section4-7-070:DetailedProceduresforShortSubdivision5.Chapter9Permits-Specifica.Section4-9-250:Variances,Waivers,Modifications,andAlternates6.Chapter11DefinitionsAdministrativeReport&DecisionLUA16-000138,SHPL-A,MODPage3of19AdministrativeShortPlatReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA6-000138,SHPL-A,MODJune2,2016Page4of19HG.APPLICABLESECTIONSOFTHECOMPREHENSIVEPLAN:I1.LandUseElementHH.FINDINGSOFFACT(FOF):1.ThePlanningDivisionoftheCityofRentonacceptedtheabovemasterapplicationforreviewonFebruary23,2016anddeterminedtheapplicationcompleteonMarch1,2016.Theprojectcomplieswiththe120-dayreviewperiod.2.TheprojectsiteislocatedattheSWcornetofNE6thStandllwacoAveNE(APN102305-9230).3.Theprojectsiteiscurrentlyvacantandbeingusedasequipmentstorage.4.AccesstothesitewouldbeprovidedfromNE6thSt,llwacoAveNEandNE5thP1.AproposedsharedaccesstractfromllwacoAveNEwouldprovidealleyaccesstothestormwatertractandLots1,2,3,and7.Theabuttingroadswouldbewidenedandimprovedwithhalfstreetfrontageimprovements.5.ThepropertyislocatedwithintheResidentialMediumDensity(RMD)ComprehensivePlanlandusedesignation.6.ThesiteislocatedwithintheResidential-8(R-8)zoningclassification.7.Thereareapproximately53treeslocatedwithintheproposeddevelopmentareaandallbutfour(4)ofthesetreeswouldberemovedaspartoftheshortplat.8.Therearenocriticalareasonsiteorwithintheimmediatevicinityoftheproperty(Exhibit12).9.Theprojectwouldbebalancedbetweenexcavation(cut)andembankment(fill).Theapproximately465cubicyardsofexcavationwouldbeplacedoverTractAforlandscaping.10.Theapplicantisproposingtobeginconstructioninsummerandendbythewinterof2016(Exhibit13).11.Noformalpublicoragencycommentsfortherecordwerereceived.12.Representativesfromvariouscitydepartmentshavereviewedtheapplicationmaterialstoidentifyandaddressissuesraisedbytheproposeddevelopment.Thesecommentsarecontainedintheofficialfile,andtheessenceofthecommentshasbeenincorporatedintotheappropriatesectionsofthisreportandtheDepartmentalRecommendationattheendofthisreport(Exhibit15).13.ComprehensivePlanCompliance:ThesiteisdesignatedResidentialMediumDensity(RMD)ontheCity’sComprehensivePlanMap.ThepurposeoftheRMDdesignationistoallowavarietyofsingle-familyandmulti-familydevelopmenttypes,withcontinuitycreatedthroughtheapplicationofdesignguidelines,theorganizationofroadways,sidewalks,publicspaces,andtheplacementofcommunitygatheringplacesandcivicamenities.TheproposaliscompliantwiththefollowingComprehensivePlanGoalsandPoliciesifallconditionsofapprovalaremet:ComplianceComprehensivePlanAnalysisPolicy1-3:Encouragemulldevelopmentofsingle-familyunitsasameanstomeetgrowthtargetsandprovidenewhousing.GoalL-l:Utilizemultiplestrategiestoaccommodateresidentialgrowth,including:.Developmentofnewsingle-familyneighborhoodsonlargetractsoflandoutsideVtheCityCenter,.Infilldevelopmentonvacantandunderutilizedlandinestablishedneighborhoodsandmulti-familyareas.AdministrativeShortPlotReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016PageSo119PolicyL-25:Manageurbanforeststomaximizeecosystemservicessuchas,..-stormwatermanagement,airquality,aquiferrecharge,otherecosystemservices,andwildlifehabitat.GoalL-BB:MaintainahighqualityoflifeasRentongrowsbyensuringthatnew1’developmentisdesignedtobefunctionalandattractive.GoalL-FF:StrengthenthevisualidentityofRentonanditsCommunityPlanning‘Areasandneighborhoodsthroughqualitydesignanddevelopment.Policy1-49:Addressprivacyandqualityoflifeforexistingresidentsbyconsidering“scaleandcontextininfillprojectdesign.Policy1-56:Preservenaturallandforms,vegetation,distinctivestandsoftrees,,.—naturalslopes,andscenicareasthatcontributetotheCity’sidentity,preservepropertyvalues,andvisuallydefinethecommunityandneighborhoods.14.ZoningDevelopmentStandardCompliance:ThesiteisclassifiedResidential-S(R-8)ontheCity’sZoningMap.DevelopmentintheR-8Zoneisintendedtocreateopportunitiesfornewsinglefamilyresidentialneighborhoodsandtofacilitatehigh-qualitymulldevelopmentthatpromotesreinvestmentinexistingsinglefamilyneighborhoods.Itisintendedtoaccommodateusesthatarecompatiblewithandsupportahigh-qualityresidentialenvironmentandaddtoasenseofcommunity.Theproposaliscompliantwiththefollowingdevelopmentstandardsifallconditionsofapprovalaremet:ComplianceR-8ZoneDevelopStandardsandAnalysisDensity:ThealloweddensityrangeintheR-8zoneisaminimumof4.0toamaximumof8.0dwellingunitspernetacre.Netdensityiscalculatedafterthedeductionofsensitiveareas,areasintendedforpublicright-of-way,andprivateaccesseasements.VStaffComment:Basedonanetdensityof40,688squarefeet(58,591sfgrossdensity—17,831sfpublicstreets),theproposalfor7residentiallotsontheprojectsitewouldresultinanetdensityof7.5dwellingunitsperacre(7lots/0.934acres=7.5du/ac),whichmeetstheminimumandmaximumdensityrequirementsoftheR-8zone.LotDimensions:TheminimumlotsizepermittedintheR-8zoneis5,000sq.ft.Aminimumlotwidthof50feetisrequired(60feetforcornerlots)andaminimumlotdepthof80feetisrequired.ThefollowingtableidentifiestheproposeddimensionsforLots1-7andTractsA&B.ProposedLotLotSize(sq.ft.)LotWidth(feet)LotDepth(feet)Lot15,03352.3095.59Lot25,01252.3094.28‘Lot35,00057.0087.72Lot45,00156.9987.09Lot5(cornerlot)5,61360.0092.44Lot65,37458.1492.45Lot75,36258.0092.45TractA5,122N/AN/ATractB2,391N/AN/AStaffComment:Theproposedlotswouldcomplywiththeminimumlotsize,width,AdministrativeShortPlatReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page6of19anddepthrequirementsoftheR-8zone(Exhibit2).Setbacks:TherequiredminimumsetbacksintheR-8zoneareasfollows:frontyardis20feetexceptwhenallvehicleaccessistakenfromanalley,then15feet,sideyardis5feet,sideyardalongthestreet15feet,andtherearyardis20feet.StaffComment:ExceptforLot3,theproposedlotsareorientedsothatthefrontyardsofeachlotwouldfacethepublicstreet.AccesstoLot3isproposedviaa16-footpavedshareddrivewaytract(20feetofright-of-way).Orientationofthefrontyardwouldthereforebetotowardstheaccesspointortothesouth.Theproposedlotsappeartocontainadequateareatoprovidealltherequiredsetbackareas.CompliancewithbuildingsetbackrequirementsfortheresidencesproposedtobeconstructedonLots1-7wouldbeverifiedatthetimeofbuildingpermitreview.BuildingStandards:TheR-$zonehasamaximumbuildingcoverageof50%,amaximumimpervioussurfacecoverageof65%,andamaximumbuildingheightof2Compliancestorieswithawallplateheightof24feet.notyetdemonstratedStaffComment:Buildingheight(Exhibit14),buildingcoverage,andimpervioussurfacecoverageforthenewsinglefamilyresidenceswouldbeverifiedatthetimeofbuildingpermitreview.Landscaping:TheCity’slandscaperegulations(RMC4-4-070)requirea10-footlandscapestripalongallpublicstreetfrontages.AdditionalminimumplantingstripwidthsbetweenthecurbandsidewalkareestablishedaccordingtothestreetdevelopmentstandardsofRMC4-6-060.Streettreesand,ataminimum,groundcover,aretobelocatedinthisareawhenpresent.SpacingstandardsshallbeasstipulatedbytheDepartmentofCommunityandEconomicDevelopment,providedthereshallbeaminimumofone(1)streettreeplantedperaddress.Anyadditionalundevelopedright-of-wayareasshallbelandscapedunlessotherwisedeterminedbytheAdministrator.Wherethereisinsufficientright-of-wayspaceornopublicfrontage,streettreesarerequiredinthefrontyardsubjecttoapprovaloftheAdministrator.Aminimumoftwo(2)treesaretobelocatedinthefrontyardpriortofinalinspectionforthenewSingleFamilyResidence.StaffComment:AConceptualLandscapePlan(Exhibit5)wassubmittedwiththeCompliantifshortplotapplicationmaterials.A10-footonsitelandscapestripisproposedalongconditionofthestreetfrontagesofNE6thSt,llwacoAveNEandNE5thP1.APlantSchedulewasapprovalisincludedontheLandscapePlan,thefollowingtreesandplantsareproposedwithinmettheonsitelandscapestrip:maple,vinemaple,Himalayanbirch,serviceberry,Japanesesnowbell.nandina,maidengrasS,redleafbarberry,Englishlavender.euonymus,kinnikinnick,heather.andelephantear.TractAwouldalsoincludesodwithintheonsitelandscapestrip.Inaddition,theapplicantisproposing16katsuratreeswithinthe8-footwideplanterstripswithinthepublicstreetfrontages.ThespacingoftheproposedStreettreesistoocloseonNE5thP1withdistancesasshortas24feetbetweentrees.Staffrecommends,asaconditionofapproval,thattheapplicantonlyusethefollowingplantingdesign:uptothree(3)Princetonelm(Ulmusamericana)StreettreeonNE6St;uptoseven(7)RedmondLinden(Tiliaamericana)StreettreesonllwacoAveNE;andonNE5thP1useuptofive(5)KatsuratreesinordertomeettheminimumSpacingrequirementsfromstopsigns,streetlightsandothertrees.Staffrecommends,asaconditionofapprovaI.thatadetailedlandscapeplanbesubmittedatthetimeofUtilityConstructionPermitReviewforreviewandapprovalAdministrativeShortPlatReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA6-000138,SHPL-A,MODJune2,2016Page7of19bytheCurrentPlanningProjectManager.On-sitelandscapingshallbeinstalledpriortoCertificateofOccupancyfortheindividualhomes,landscapingwithintheright-of-wayshallbeinstalledpriortoshortplotrecording.Staffrecommends,asaconditionofapproval,thataHomeOwnersAssociationshallbeestablishedpriortorecordingoftheshortplat.TheHomeOwnersAssociationshallberesponsiblefortheownershipandmaintenanceofallcommonimprovements.HOAdocumentsshallbesubmittedforreviewandapprovalbytheCurrentPlanningProjectManagerandtheCityAttorneypriortoshortplatrecording.TreeRetention:TheCity’sadoptedTreeRetentionandLandCleatingRegulationsrequitetheretentionof30percentoftreesinaresidentialdevelopment.Significanttreesshallberetainedinthefollowingpriorityorder:PriorityOne:Landmarktrees;significanttreesthatformacontinuouscanopy;significanttreesonslopesgreaterthantwentypercent(20%);Significanttreesadjacenttocriticalareasandtheirassociatedbuffers;andSignificanttreesoversixtyfeet(60’)inheightorgreaterthaneighteeninches(18”)caliper.PriorityTwo:Healthytreegroupingswhoseassociatedundergrowthcanbepreserved;othersignificantnativeevergreenordeciduoustrees;andOthersignificantnon-nativetrees.PriorityThree:Aldersandcottonwoodsshallberetainedwhenallothertreeshavebeenevaluatedforretentionandarenotabletoberetained,unlessthealdersand!orcottonwoodsareusedaspartofanapprovedenhancementprojectwithinacriticalareaoritsbuffer.Aminimumtreedensityshallbemaintainedoneachresidentiallyzonedlot.Fordetachedsinglefamilydevelopment,theminimumtreedensityistwo(2)significanttreesforeveryfivethousand(5,000)squarefeet.ThetreedensitymayconsistofCompliantifexistingtrees,replacementtrees,treesrequiredpursuanttoRMC4-4-070F.1,StreetconditionofFrontageLandscapingRequired,oracombination.approvalisStaffComment:AnArboristReport(Exhibit3),TreeRetentionPlan(Exhibit4)andmetConceptualLandscapePlan(Exhibit5)weresubmittedwiththeprojectapplicationmaterials.AccordingtotheArboristReport,atotalof53treesarelocatedwithinthevicinityofthedevelopableportionoftheprojectsite.Oftheexisting53trees,atotalofthree(3)weredeemeddangerousand23treeswerelocatedwithintheproposedpublicstreets.Ofthe27remainingtrees,30%oreight(8)treesarerequiredtoberetained.Theapplicantisproposingtoretainfour(4)trees.Theyincludeatwo(2)14”mapletreesonLot3,a20”DouglasFiranda10”WesternRedCedarbothwithinthededicatedright-of-waysonNE6thStandllwacoAveSE.Thetwo(2)existingtreesproposedtoberetainedwithinthepublicright-of-waywouldcapture,onaminorlevel,theexistingcharacterofthesite.However,thearboristreportdidnotprovidedacompletedescriptionofeachtreeproposedtoberetainedwithinthepublicright-of-wayforhealth,conditionandviability.Therefore,staffrecommendsasaconditionofapproval,thattheapplicantshallprovidearevisedarboristreportthatassessesthehealth,conditionandviabilityofalltreestoberetained.ArevisedarboristreportshallbesubmittedtotheCurrentPlanningProjectManagerforreviewandapproval.Inaddition,thelocation,healthandviabilityoftheproposedstreettreeswouldalsobesubjecttoapprovaloftheCityArboristpriortoconstructionpermitissuance.Theproposedretentionoffour(4)treeswouldrequiretheapplicanttoreplacethebalanceoftherequiredeight(8)trees.Thefour(4)deficienttreeswouldberequiredtobereplacedbyreplanting12”foreachtreeorinthiscaseatleast48caliperinchesAdministrativeShortPlatReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page8of19(48”).AtreeplantingplanwasincludedontheConceptualLandscapePlan.Tomeettheminimumtreedensityrequirements,theapplicantisproposingtoplantnine(9)treesat1-1/2inchcaliperor13.5caliperinchesonsite.Theconceptuallandscapingplanis34.5caliperinchesshyofmeetingthetreereplacementratiosectionofcode.Compliancewiththisrequirementmaybeachievedthroughtheinstallationofadditionaltrees,retentionofexistingtrees(e.g.,retentionofTree#051),oracombinationthereof.Thetreesproposedforretentionmaybeimpactedafterinitialclearing,finalgradingorduetochangingsiteconditions.Thereforestaffrecommends,asaconditionofapproval,thattheapplicantberequiredtoprovide,totheCurrentPlanningProjectManager,treeretentioninspection/monitoringreportsafterinitialclearing,finalgrading,andannuallyfortwo(2)yearsbyaqualifiedprofessionalforester.Theinspection/monitoringreportsshallidentifyanyretainedtreesthatdevelopproblemsduetochangingsiteconditionsandprescribemitigation.Tocomplywiththeminimumtreedensityrequirements,theapplicantisrequiredtoretainorplanttwo(2)significanttrees,orgrossequivalentcaliperinches,per5,000squarefeetoflotarea.Basedonthelotareasproposed,theapplicantwouldberequiredtoprovideaminimumoftwo(2)treesoneachresidentiallotinordertocomplywiththeminimumtreedensityrequirementsandtreeretention(orreplacement)requirements.Staffrecommends,asaconditionofapproval,thatadetailedlandscapeplanbesubmittedatthetimeofUtilityConstructionPermitApplication.Thedetailedlandscapeplanshalldemonstratecompliancewithminimumtreedensityandtreeretention(orreplacement)requirements.Compliancewiththeserequirementsmaybeaccomplishedthroughtheinstallationofminimum2inchcalipertreesorthroughtheretentionofexistingtreesoracombinationthereof.TherevisedlandscapeplanshallbesubmittedtotheCurrentPlanningProjectManagerforreviewandapproval.ThetreesplantedoneachlotshallbeinstalledpriortotheissuanceofaCertificateofOccupancyforthenewhomes.Inaddition,treesrequiredtoberetained(i.e.,protectedtrees),and/orAdministratorapprovedreplacementtrees(excludingrequiredstreettreespursuanttoRMC4-4-070F,AreasRequiredtobeLandscaped),thatarenotnecessarytoprovidetherequiredminimumtreedensityforresidentiallots,shallbepreservedbyestablishingatreeprotectiontractthatencompassesthedriplineofallprotectedtrees.Duetothehighnumberoftreereplacementcaliperinches,staffisrecommending,asaconditionofapproval,thattheapplicantcreateatreeprotectiontractfornewreplacementtreeswithinthestormwatervaulttract(TractA).Parking:Parkingregulationsrequirethataminimumoftwo(2)parkingspacesbeprovidedforeachdetacheddwelling.Drivewaycutsarerequiredtobeaminimumof5feetfrompropertylinesandnewdrivewaysmaybeamaximumof16feetinwidthatthepropertyline.MaximumCompliance..notetdrivewayslopesshallnotexceedfifteenpercent(15%);providedthatdrivewaysexceedingeightpercent(8%)shallprovideslotteddrainsatthelowerendwithdemonstrated..
.
..positivedrainagedischargetorestrictrunofffromenteringthegarage/residenceorcrossinganypublicsidewalk.StaffComment:Parkingrequirementsanddrivewaygradesforthenewresidencesproposedwouldbeverifiedatthetimeofbuildingpermitreview.N/AFencesandRetainingWalls:Inanyresidentialdistrict,themaximumheightofanyfence,hedgeorretainingwallshallbeseventytwoinches(72”).ExceptinthefrontAdministrativeShortPlatReport16-000138—MeadShortPlot
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA6-000138,SHPL-A,MODJune2,2016Page9of19yardandsideyardalongastreetsetbackwherethefenceshallnotexceedfortyeightinches(48”)inheight.Thereshallbeaminimumthree-foot(3’)landscapedsetbackatthebaseofretainingwallsabuttingpublicrights-of-way.StaffComment:Nofencesorretainingwallsareproposed.15.DesignStandards:ResidentialDesignandOpenSpaceStandards(RMC4-2-115)areapplicableintheR-8zone.TheStandardsimplementpoliciesestablishedintheLandUseElementoftheComprehensivePlan.CompliancewithSiteDesignStandardsmustbedemonstratedpriortoapprovalofthesubdivision.CompliancewithResidentialDesignStandardswouldbeverifiedpriortoissuanceofthebuildingpermitforthenewsinglefamilyhomes.Theproposalisconsistentwiththefollowingdesignstandards,unlessnotedotherwise:LotConfiguration:Oneofthefollowingisrequired:1.Lotwidthvariationof10feet(10’)minimumofoneperfour(4)abuttingstreet-frontinglots,or2.Minimumoffour(4)lotsizes(minimumoffourhundred(400)grosssquarefeetsizedifference),or3.Afrontyardsetbackvariationofatleastfivefeet(5’)minimumforatleasteveryfour(4)abuttingstreetfrontinglots.StaffComment:Thelotsizesgoashighas5,613squarefeetandaslowas5,000withadditionallotsizesof5,374squarefeetand5,362squarefeetprovidingsomevariationtotheminimumlotsizeof5,000squarefeetanddifferencesof400grosssquarefeetsizewithintheR-8zone.Theproposalalsoincludesacornerlotandinteriorlotswhichprovidesforlotwidthvariationandnomorethanthreeconsecutivehomesfrontonestreet.Inaddition,severalofthelotsareservedviaanalley,whichallowsforfrontyardsetbackvariationoffivefeet(5’).Asproposed,theshortplatwouldcomplywithamixtureofeachlotconfigurationitem.Garages:Oneofthefollowingisrequired;thegarageis:1.Recessedfromthefrontofthehouseand/orfrontporchatleasteightfeet(8’),or2.Locatedsothattheroofextendsatleastfivefeet(5’)(notincludingeaves)beyondthefrontofthegarageforatleastthewidthofthegarageplustheporch/stooparea,or3.AlleyaccessedorCompliancenotyet4.Locatedsothattheentrydoesnotfaceapublicand/orprivatestreetorandemonstratedaccesseasement,or5.Sizedsothatitrepresentsnogreaterthanfiftypercent(50%)ofthewidthofthefrontfacadeatgroundlevel,or6.Detached.Theportionofthegaragewiderthantwentysix-feet(26’)acrossthefrontshallbesetbackatleasttwofeet(2’).StaffComment:Complianceforthisstandardwouldbeverifiedatthetimeofbuildingpermitreview.AdministrativeShortPlatReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page10of19PrimaryEntry:Oneofthefollowingisrequired:1.Stoop:minimumsizefourfeetbysixfeet(4’x6’)andminimumheighttwelveinches(12”)abovegrade,orCompliance2.Porch:minimumsizefivefeet(5’)deepandminimumheighttwelveinchesnotyet(12”)abovegrade.demonstrated......Exception:incaseswhereaccessibility(ADA)isapriority,anaccessibleroutemaybetakenfromafrontdriveway.StaffComment:Complianceforthisstandardwouldbeverifiedatthetimeofbuildingpermitreview.FaçadeModulation:Oneofthefollowingisrequired:1.Anoffsetofatleastonestorythatisatleasttenfeet(10’)wideandtwofeetCompliance(2’)indepthonfacadesvisiblefromthestreet,ornotyet2.Atleasttwofeet(2’)offsetofsecondstoryfromfirststoryononestreetdemonstratedfacingfacade.StaffComment:Complianceforthisstandardwouldbeverifiedatthetimeofbuildingpermitreview.ComplianceWindowsandDoors:Windowsanddoorsshallconstitutetwenty-fivepercent(25%)notyetofallfaçadesfacingstreetfrontageorpublicspaces.demonstratedStaffComment:Complianceforthisstandardwouldbeverifiedatthetimeofbuildingpermitreview.N/AScale,Bulk,andCharacter:N/ARoofs:Oneofthefollowingisrequiredforalldevelopment:1.Hiporgabledwithatleastasixtotwelve(6:12)pitchfortheprominentform.oftheroof(dormers,etc.,mayhavelesserpitch),orCompliancenotyet2.Shedroof.demonstratedAdditionally,forsubdivisionsgreaterthannine(9)lots:Avarietyofroofformsappropriatetothestyleofthehomeshallbeused.StaffComment:Complianceforthisstandardwouldbeverifiedatthetimeofbuildingpermitreview.Eaves:Bothofthefollowingarerequired:1.EavesprojectingfromtheroofoftheentirebuildingatleasttwelveinchesCompliance(12”)withhorizontalfasciaorfasciagutteratleastfiveinches(5”)deeponnotyetthefaceofalleaves,anddemonstrated2.Rakesongableendsmustextendaminimumoftwoinches(2”)fromthesurfaceofexteriorsidingmaterials.StaffComment:Complianceforthisstandardwouldbeverifiedatthetimeofbuildingpermitreview.ArchitecturalDetailing:Ifonesidingmaterialisusedonanysideofthedwellingthat.istwostoriesorgreaterinheight,ahorizontalbandthatmeasuresatleasteightCompliance.,,..inches(8)isrequiredbetweenthefirstandsecondstory.notyetdemonstratedAdditionally,oneofthefollowingisrequired:1.Threeandonehalfinch(3W’)minimumtrimsurroundsallwindowsanddetailsalldoors,orAdministrativeShortPlatReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA6-000138,SHPL-A,MODJune2,2016Page11of192.Acombinationofshuttersandthreeandonehalfinches(314”)minimumtrimdetailsallwindows,andthreeandonehalfinches(314”)minimumtrimdetailsalldoors.StaffComment:Complianceforthisstandardwouldbeverifiedatthetimeofbuildingpermitreview.MaterialsandColor:Forsubdivisionsandshortplats,abuttinghomesshallbeofdifferingcolor.Colorpalettesforallnewdwellings,codedtothehomeelevations,shallbesubmittedforapproval.Additionally,oneofthefollowingisrequired:1.Aminimumoftwo(2)colorsisusedonthehome(bodywithdifferentcolorCompliancetrimisacceptable),ornotyet....
...2.Aminimumoftwo(2)differingsidingmaterials(horizontalsidinganddemonstrated..
.shingles,sidingandmasonryormasonry-likematerial,etc.)isusedonthehome.Onealternativesidingmaterialmustcompriseaminimumofthirtypercent(30%)ofthestreetfacingfacade.Ifmasonrysidingisused,itshallwrapthecornersnolessthantwentyfourinches(24”).StaffComment:Complianceforthisstandardwouldbeverifiedatthetimeofbuildingpermitreview.16.CriticalAreas:Projectsites,whichcontaincriticalareas,arerequiredtocomplywiththeCriticalAreasRegulations(RMC4-3-050).AGeotechnicalAssessment,preparedbyRobertM.Pride,LLC(datedMay19,2014;Exhibit10)andaWetlandandStreamDetermination,preparedbyWetlandResources,Inc.(dateJune4,2014;Exhibit12)wereprovidedwiththeshortplatapplicationmaterials.Accordingtothesubmittedreports,nocriticalareaswereidentifiedontheprojectsite.17.CompliancewithSubdivisionRegulations:RMC4-7Providesreviewcriteriaforthesubdivisions.Theproposalisconsistentwiththefollowingsubdivisionregulationsifallconditionsofapprovalarecompliedwith:ComplianceSubdivisionRegulationsandAnalysisAccess:Eachlotmusthaveaccesstoapublicstreetorroad.Accessmaybebyashareddrivewaypertherequirementsofthestreetstandards.Themaximumwidthofsingleloadedgaragedrivewaysshallnotexceedninefeet(9’)anddoubleloadedgaragedrivewaysshallnotexceedsixteenfeet(16’).StaffComment:DirectaccesstothesitewouldbeprovidedfromNE6thStandllwacoAveNE.AlleyaccesswouldalsobeprovidedfromllwacoAveNEinordertoserveLots1,2,3and7.Theabuttingroadswouldbewidenedandimprovedwithhalf-streetCompliantfrontageimprovements.Half-streetfrontageimprovementsforaresidentialaccessifconditionstreetrequires,butisnotlimitedto,a0.5-footwidecurb,an8-footwideplantingstrip,ofapprovalanda5-footwidesidewalkalongtheentireprojectfrontages.ismetTheprojectsitewouldalsodedicatea30-footpipestemofpropertyinthefarnorthwesternpropertycorner,totheCity,fortheextensionofNE6thSttoHoquiamAveNE.TheCityrequiresahalf-streetpavedroadfortheextensionofNE6thStreettoHoquiamAvenueNE.Theproposedshareddriveway(TractB),alsoidentifiedasapublicalley(Exhibit2),wouldhavealengthof149.45feet,whichisunderthemaximumthresholdlengthof200feetallowedforashareddriveway.Shareddrivewaysmaybeallowedforaccesstofour(4)orfewerresidentiallots,providedatleastoneofthefour(4)lotsabutsapublicAdministrativeShortPlotReport16-000138—MeadShortP/at
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page12of19right-of-waywithatleastfifty(50)linearfeetofproperty.Lots1,and2wouldhavepublicstreetfrontagealongNE5thP1andLot7wouldhavepublicstreetfrontagealongllwacoAveNE.AlleyaccessisthepreferredStreetpatternexceptforpropertiesintheResidentialLowDensitylandusedesignation,inparttoreducethenumberofdrivewaycurbcutsonresidentialaccessstreets.Accesstotheprivatestormwatervaulttract(TractA)isalsoproposedtooriginatefromtheshareddriveway(Tract8)orpublicalley.InordertocomplywithRMC4-6-060F.4,staffrecommends,asaconditionofapprovalthatTractAandLots1,2,3and7berequiredtotakeaccessfromadedicatedpublicalley.TheapplicantisrequestingavariancefromthefireaccesswidthrequirementoftheInternationalFireCode(IFC).PursuanttoChapter5,Section503.2.1oftheIFC,therequiredaccessdimensionof20feetofpavedwidthisrequired.Afiresprinklingsystem,onLot3,isproposedasmitigationforareducedpavedroadwidthfrom20feetto16feet.ApprovaloftheproposedvarianceissubjecttotheRentonFireAuthority.Insummary,andifallconditionsofapprovalaremet,accesstoeachlotwouldbeasfollows:Lot4wouldhaveaccesstoNE6thSt,Lots5and6wouldhaveaccesstoIlwacoAveNEnearNE6thSt,andLots1,2,3,7andTractAwouldhaveaccessfromI/wacoAveNEnearNE5thP1.Thewidthoftheindividualdrivewayswouldbeverifiedatthetimeofbuildingpermitreviewforthenewresidences.N/ABlocks:Blocksshallbedeepenoughtoallowtwotiersoflots.StaffComment:Noblocksareproposed.Lots:Thesize,shape,orientation,andarrangementoftheproposedlotscomplywiththerequirementsoftheSubdivisionRegulationsandtheDevelopmentStandardsoftheR-8zoneandallowforreasonableinfillofdevelopableland.Alloftheproposedlotsmeettherequirementsforminimumlotsize,depth,andwidth.StaffComment:AlllotsmeettheminimumlotdimensionalrequirementsintheR-8vzone,asdiscussedunderFOF14.Theproposedlotsarerectangularinshapeandareorientedtoprovidefrontyardareasfacingtheirrespectivepublicstreet,alleyorproposedshareddriveway.TheresidencetobeconstructedonLot3,attheendoftheproposedshareddrivewayoralley,wouldhaveitsprimaryentryorientedtothesouth.Anotetothiseffectwouldberequiredtoberecordedonthefaceoftheshortp/at.Thebuildingdesignofthenewresidenceswouldbereviewedandapprovedatthetimeofbuildingpermitapplication.Streets:TheproposedstreetsystemshallextendandcreateconnectionsbetweenexistingstreetspertheStreetStandardsoutlinedinRMC4-6-060StreetStandards.StaffComment:TheproposedprojectfrontsNE6thSt.llwacoAveNE,NE5thPI.andapipestemportionofthepropertyrunswestalongNE6thSttoHoqulamAveNE.OnlyHoquiamAveNEisclassifiedasaneighborhoodcollectorarterial,wheretheremainderofthepublicroadsareallclassifiedasresidentialaccessstreets(NE6thSt,liwacoAveNandNE5thP1).Theminimumright-of-way(ROW)widthrequiredforaresidentialaccessstreetis53feet(RMC4-6-060).ROWimprovementsconsistofa0.5-foorverticalcurb,8-footwideplantingstrip,and5-footwidesidewalk.Frontageimprovementswouldberequiredalongthefrontagesoftheentireproject.Theminimumpavementwidthis26feetwithtwo(2)20-footwidetravellanesandsixfeet(6’)ofparkingononeside.Therequiredturningradiusforaresidentialaccessstreetis25feet.Right-of-waydedicationwouldberequiredtoprovidetherequiredright-of-waywidth.Thefinalright-of-wayAdministrativeShortPlotReport16-000138—MeadShortP/at
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA6-000138,SHPL-A,MODJune2,2016Page13of19dedicationwouldbedeterminedthroughafinalsurveyTheapplicantsubmittedaformalmodificationrequestdatedFebruary13,2016regardingthestreetstandardfortheextensiononNE6thStinthededicatedROWtoHoqulamAveNE.Staffisrecommendingdenialoftheapplicant’smodificationrequest.Seetheformalresponsetothemodificationrequestformoreinformation(FOF18StreetModificationAnalysis).AhalfStreetpavedroadfortheextensionofNE6thSttoHoquiamAveNEwouldberequired.TheROWforahalfstreetimprovementincludesaminimumofthirtyfivefeet(35’)withtwentyfeet(20’)paved.Acurb,plantingstriparea,andsidewalkshallbeinstalledonthedevelopmentsideofthestreetaccordingtotheminimumdesignstandardsforpublicstreets.Areductionofthe20-footwidepavementsectiontoa15-footwidepavementsectionwouldbeallowedinordertofitthehalf-streetwithinthenew30-footwideROWdedication.Inadditiontothemodifiedhalfstreetpavementsection,a0.5-footwidecurb,an8-footwideplanterstrip,anda5-footwidesidewalkwouldbetheminimumrequireddesignstandardsforpublicstreets.AnadditionalstreetsectionfortheextensionofNE6thStwouldberequiredonthestreetplansheetaspartoffinalshortplatsubmittal.TheapplicantwouldberequiredtomeettheminimumdesignstandardsattheintersectionoftheextensionofNE6thStandHoqulamAveNE.Appropriatetransitionsforthecurb,sidewalk,androadwaywouldbeneededtobedesignedandincorporatedintothefinalstreetplans.Paymentofthetransportationimpactfeeisapplicableontheconstructionofthesinglefamilyhousesatthetimeofapplicationforthebuildingpermit.Thecurrentrateoftransportationimpactfeeis$2,951.17pernewsinglefamilyhouse.Thetrafficimpactfeethatiscurrentatthetimeofthebuildingpermitapplicationwouldbelevied.Paymentofthetransportationimpactfeeisdueatthetimeofissuanceofthebuildingpermit.BasedontheCity’scurrentfeeschedule,estimatedtrafficimpactfeesfortheproposeddevelopmentwouldbe$20,658.19.Allfeesaresubjecttochange.Astreetlightinganalysiswouldberequiredtobeconductedbythedeveloperalongthepropertyfrontages(NE6thStreet,liwacoAveNE.andNE5thP1).ThedevelopermustalsoanalyzestreetlightingattheproposedintersectionofNE6thStandHoquiamAveNE.TherequiredstreetlightingshallbeprovidedbythedeveloperwiththecivilplansubmittaltoCitystandards.RelationshiptoExistingUses:Theproposedprojectiscompatiblewithexistingsurroundinguses.StaffComment:Theproposedshortplatissurroundedbyexistingdetachedsingle‘familyresidenceslocatedwithintheR-8zone.Theproposalwouldbeinharmonywiththeexistinguses.TheproposedlotsaresimilarinsizeandshapetotheexistingsurroundingdevelopmentpatternintheareaandwouldbeconsistentwiththeComprehensivePlanandZoningCode,whichencouragesresidentialinfilldevelopment.Compatibility:Ifasubdivisionislocatedintheareaofanofficiallydesignedtrail,provisionsshallbemadeforreservationoftheright-of-wayorforeasementstotheCityfortrailpurposes.“StaffComment:TheCityofRentonCommunityServicesDepartmenthasreviewedtheproposalandhasdeterminedthesiteisnotlocatedinanareaofficiallydesignatedforatrail.Theshortplatfrontageimprovementswouldprovideorimprovepedestrianconnectionalongfour(4)differentpublicstreets.AdministrativeShortP/atReport16-000138—MeadShortPlat
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA6-000138,SHPL-A,MODJune2,2016Page14of1918.StreetModificationAnalysis:TheapplicantisrequestingamodificationfromRMC4-6-060F.2“MinimumDesignStandardsTableforPublicStreetsandAlleys”toprovideonlya5-footsidewalkextensionfromtheexistingwestterminusofNE6thStreet,aResidentialStreet,toHoquiamAvenueNE,aCollectorStreet,asopposetoafullhalfstreetimprovementthroughthe30footwidenorthpropertypanhandle.Theproposalisnotincompliancewiththefollowingmodificationcriteria,pursuanttoRMC4-9-250D.Therefore,staffisrecommendingdenialoftherequestedmodification,perthefollowing:ComplianceStreetModificationCriteriaandAnalysisa.SubstantiallyimplementsthepolicydirectionofthepoliciesandobjectivesoftheComprehensivePlanLandUseElementandtheCommunityDesignElementandtheproposedmodificationistheminimumadjustmentnecessarytoimplementthesepoliciesandobjectives.StaffComment:TheComprehensivePlanLandUseElementhasapplicablepolicieslistedunderaseparatesectionlabeledPromotingaSafe,Healthy,andAttractiveCommunity.DoesNotThesepoliciesaddresswalkableneighborhoods,safetyandshareduses.OnespecificComplypolicysupportsthedenialofthemodificationrequest.ThispolicyisPolicyL-58whichstatesthatthegoalistoprovide“completestreet”that“arearrangedasaninterconnectingnetworkorgrid.Locateplanterstripsbetweenthecurbandthesidewalkinordertoprovideseparationbetweencarsandpedestrians.Discouragedead-endstreetsandcul-de-sacs.”Therequestedstreetmodificationisnotconsistentwiththehalfstreetconstructionofthecompletestreetstandard(20’minimumpavementwidth,8’wideplanterand5’widesidewalk)andisthereforenotconsistentwiththispolicyguideline.b.Willmeettheobjectivesandsafety,function,appearance,environmentalprotectionandmaintainabilityintendedbytheCoderequirements,baseduponPartiallysoundengineeringjudgment.CompliesStaffComment:Themodifiedstreetimprovementsprovideforasafewalkablepath,however,itdoesnotmeetthefunctionandappearanceofinterconnectingnetworkorgridofroadwaysthatdiscouragedead-endstreets.c.Willnotbeinjurioustootherproperty(ies)inthevicinity.StaffComment:WhilethemodificationrequestallowsforpedestrianstoaccessDoesNotHoqulamAvenueNE,itdoesnotprovideforadirectvehicularaccesstoHoqulamComplyAvenueNE.Thelackofdirectvehicularaccesswillcausethetripsgeneratedbytheprojecttoutilizethesurroundingstreetnetworkadverselyimpactingthepropertiesinthevicinityofthedevelopment.PartiallyU.ConformstotheintentandpurposeoftheCode.CompliesStaffComment:Seecommentsundercriterion‘b’.Partiallye.Canbeshowntobejustifiedandrequiredfortheuseandsituationintended;andCompliesStaffComment:Seecommentsundercriterion‘b’.DoesNot1.Willnotcreateadverseimpactstootherproperty(ies)inthevicinity.ComplyStaffComment:Seecommentsundercriterion“c’.19.AvailabilityandImpactonPublicServices:AdministrativeShortP/atReport16-000138—MeadShortP/at
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page15of19ComplianceAvailabilityandimpactonPublicServicesAnalysisPoliceandFire:PoliceandFirePreventionstaffindicatesthatsufficientresourcesexisttofurnishservicestotheproposeddevelopment;subjecttotheconditionthatthe“applicantprovidesCoderequiredimprovementsandfees.Fireimpactfeesareapplicableattherateof$495.10persinglefamilyunit.Thisfeeispaidattimeofbuildingpermitissuance.Schools:ItisanticipatedthattheRentonSchoolDistrictcanaccommodateanyadditionalstudentsgeneratedbythisproposalatthefollowingschools:SierraHeightsElementarySchool,McKnightMiddleSchool(NewVeraRisdonMiddleSchoolbeginninginSeptember2017)andHazenHighSchool.RCW58.17.110(2)providesthatnosubdivisionbeapprovedwithoutmakingawrittenfindingofadequateprovisionmadeforsafewalkingconditionsforstudentswhowalktoandfromschool.Anynewstudentsfromtheproposeddevelopmentwouldbebussedtoandfromtheirrespectiveschools.AccordingtotheonlineRentonSchoolDistrictbusroutesWebQuery,thebusstopislocatedattheintersectionofHoquiam,,-AveNE&NE5thSt.SidewalksorwideshoulderwouldallowHighSchoolAgestudentstowalktoHazenHighSchoolfromthedevelopment,northonllwacoAveNE,westonNE7thSt,andnorthonHoquiamAveNEto1101HoquiamAveNE.Aspartoftheproposedproject,sidewalkswouldbeconstructedalongonsiteroadways.Theadditionoffrontageimprovementsincludea5-footsidewalkoneachoftheresidentialaccessstreetsandadequateprovisionshavebeenmadeforsafewalkingconditionsforstudentswhowouldwalksouthonllwacoAveNEandwestonNE5thSttoHoquiamAveNE(approximately0.13mi)toandfromschoolbusstop.ASchoolImpactFeewouldbecollectedonbehalfoftheRentonSchoolDistrictforthenewresidenceatthetimeofbuildingpermitissuance.ThecurrentRentonSchoolDistrictfeefornewsinglefamilydwellingis$5,643.00perunit.Parks:AlthoughtherewouldbenosignificantimpactstotheCityofRentonParkvSystemanticipatedfromtheproposedproject,aParkImpactFeeisrequiredofallnewresidentialdevelopment.ThecurrentParkImpactFeeis$1,887.94pernewresidenceandispayableatthetimeofbuildingpermitissuance.StormWater:Anadequatedrainagesystemshallbeprovidedfortheproperdrainageofallsurfacewater.StaffComment:APreliminaryDrainagePlanandTechnicalInformationReport(TIR)waspreparedbyOffeEngineers,PLLCandsubmittedtotheCityonFebruary23,2016(reviseddatedMay2,2016;Exhibit7).Thesiteisapproximately1.35acresinsizeandislocatedintheCity’sFlowControlDurationStandard(ForestedConditions).ThesitecontainstwoThresholdDrainageAreas(TDA).ThemajorityofthesiteisintheMayCreekdrainagebasin.Thepanhandle/pipestemportionofthesite,westoftheNE6th‘Stpipestem,ispartoftheLowerCedarRiverdrainagebasin.Theprojectisproposingacombinationdetention/wetvaultdesignthatdischargesatthesite’snaturaldischargepointtomeettheCity’sFlowControlandBasicWaterQualitystandards(Exhibit8).Theproposedvaultwouldbeapublicstormwaterfacility.Thestormwatervaultisproposedtobelocatedundergroundand/orcoveredinsoil.Nopartofthevaultwouldbepermittedtoprotrudefromthegroundsurface.IfitisdeterminedthatsuchapplicationisnotfeasibleanalternativemethodcouldbeproposedforapprovalbythePlanningDivision.Accesstothevault,pertheCity’samendmentstotheKCSWDM,shallbeprovided.TheAdministrativeShortPlatReport16-000138—MeadShortPlot
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page16of19projectwouldalsorequireindividuallotFlowControlBMPs(seeSection1.23.3andSectionC.1.3.1oftheCityamendmentstotheKCSWDMforFlowControlBMPrequirements).AllcoreandspecialrequirementsshallbeaddressedintheupdatedTIR.DrainageimprovementsalongallstreetfrontagesshallconformtotheCity’sStreetstandards.Stormdrainsshouldbelocatedoutsideoftheplanterandthesidewalk.Requiredhorizontalandverticalseparationfromotherutilitiesshallbeprovided(Exhibit9).CatchbasinsshouldbelocatedatthePCandPTofcurbreturnswherepossible.TheupdateddrainageplanandTIRwouldberequiredtobesubmittedaspartoftheutilitypermitsubmittal.Theapplicantsubmittedageotechnicalreport.preparedbyRobertM.PrideLLC,datedMay19,2014(Exhibit10).Theprovidedgeotechnicalreportwasstampedandsignedbyanengineerwhoselicenseisoutofdate.Acurrentgeotechnicalreportisrequiredwiththeutilitypermitsubmittal.ThisreportneedstobestampedandsignedbyalicensedCivilEngineerintheStateofWashington.Inaddition,aConstructionStormwaterGeneralPermitfromtheWashingtonDepartmentofEcologywouldberequiredsinceclearingofthesiteexceedsoneacre.Thedevelopmentissubjecttosystemdevelopmentcharges(SDC).ThecurrentSDCfeesare$1,425.00perlot.Theprojectproposestheadditionofseven(7)newsinglefamilyresidences.Thetotalfeewouldbe$10,395.00.ThisSDCfeewouldbepayablepriortoissuanceoftheutilityconstructionpermit.Water:WaterserviceisprovidedbyKingCountyWaterDistrict90.Awateravailabilitycertificate,datedDecember29,2015,wasprovidedfromKingCountyWaterDistrict90(Exhibit11).ApprovedwaterplansfromKingCountyWaterDistrict90shallbeprovidedtotheCityattheutilityconstructionpermitstage.NewhydrantsmustbeinstalledperRenton’sFireDepartmentstandardsinordertoprovidetherequiredcoverageforallresidentiallots.SanitarySewer:SewerserviceisprovidedbytheCityofRenton.Thereisanexisting8”sewereastofthesiteinllwacoAveNEthatflowsfromnorthtosouth.Thereisanexisting8”sewersouthofthesiteinNE5thP1thatflowsfromwesttoeast.ThesewerinllwacoAveNEintersectsthesewerinNE5thP1ata48”SanitarySewerManhole(CORFacilityID#MH4617)SEofthesite.ThereisnosewernorthofthesiteinNE6thSt.Theparcelasproposeddoesnotrequireanysewermainextensions.ThesidesewersforLots3and4wouldrequireprivateeasementswheretheypassthroughneighboringparcels.Thedevelopmentissubjecttoasystemdevelopmentcharge(SDC)forsewerservice.TheSDCforsewerserviceisbasedonthesizeofthedomesticwaterservice.ThecurrentSDCforsewerservicewitha1”watermeterinstallationis$2,242perinstallation.ThissiteisalsointheEastRentonInterceptorSpecialAssessmentDistrict(SAD)andthefeeis$316.80perlot.Feesarepayableattimeofpermitissuance.I.CONCLUSIONS:1.ThesubjectsiteislocatedintheResidentialMediumDensity(RMD)ComprehensivePlandesignationandcomplieswiththegoalsandpoliciesestablishedwiththisdesignationifallconditionsofapprovalaremet,seeFOF13.2.ThesubjectsiteislocatedintheResidential-8(R-8)zoningdesignationandcomplieswiththezoninganddevelopmentstandardsestablishedwiththisdesignationprovidedtheapplicantcomplieswithCityCodeandconditionsofapproval,seeFOF14.AdministrativeShortPlatReport16-000138—MeadShortP/at
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA6-000138,SHPL-A,MODJune2,2016Page17of193.TheproposedshortplatcomplieswiththeResidentialDesignandOpenSpaceStandardsprovidedtheapplicantcomplieswithCityCodeandconditionsofapproval,seeFOE15.4.TherearenoCriticalAreaslocatedontheprojectsite,seeFOE16.5.TheproposedshortplatcomplieswiththesubdivisionregulationsasestablishedbyCityCodeandstatelawprovidedalladvisorynotesandconditionsarecompliedwith,seeFOE17.6.TheproposedshortplatcomplieswiththestreetstandardsasestablishedbyCityCode,providedtheprojectcomplieswithalladvisorynotesandconditionsofapprovalcontainedherein,seeFOE17andFOE18.7.TherequestedstreetmodificationfromRMC4-6-060E.2“MinimumDesignStandardsTableforPublicStreetsandAlleys”isnotincompliancewithRMC4-9-250Dmodificationdecisioncriteria.Therefore,staffisrecommendingdenialoftherequestedmodification,seeFOF18.8.Therearesafewalkingroutestotheschoolbusstop,seeFOE19.9.Thereareadequatepublicservicesandfacilitiestoaccommodatetheproposedshortplat,seeFOF19.10.Safeandefficientaccessandcirculationhasbeenprovidedforallusers.J.DECISION:TheMeadShortPlatStreetModification,FileNo.LUA16-000138MODisdeniedforthereasonsidentifiedinConclusionsNo.7.TheMeadShortPlat,FileNo.LUA16-000138,SHPL-A,asdepictedinExhibit2,isapprovedandissubiecttothefollowingconditions:1.TheapplicantshallsubmitaDetailedLandscapePlanthatcomplieswithRMC4-8-120D.12totheCurrentPlanningProjectManagerforreviewandapprovalatthetimeofUtilityConstructionPermitReview.Staffrecommendsthefollowingstreettreeplantschedule:uptothree(3)Princetonelm(Ulmusamericana)streettreeonNE6St;uptoseven(7)RedmondLinden(Tiliaamericana)streettreesonllwacoAveNE;anduptofive(5)KatsuratreesonNE5thP1tomeettheminimumspacingrequirementsfromstopsigns,streetlightsandothertrees.Thedetailedlandscapeplanshalldemonstratecompliancewithminimumtreedensityrequirement.Compliancewiththeserequirementsmaybeaccomplishedthroughtheinstallationofminimum2inchcalipertreesorthroughtheretentionofexistingtreesoracombinationthereof.TheonsitetreesshallbeinstalledpriortotheissuanceofaCertificateofOccupancyforthenewhomes.2.TheapplicantshalldesignatedTractAasacombinedstormwaterandtreeprotectiontract.3.TractAandLots1,2,3and7shallberequiredtotakeaccessfromthepublicalley.4.Theapplicantshallprovidearevisedarboristreportthatassessesthehealth,conditionandviabilityofalltreestoberetained.ArevisedarboristreportshallbesubmittedtotheCurrentPlanningProjectManagerforreviewandapproval.Inaddition,thelocation,healthandviabilityoftheproposedstreettreeswouldalsobesubjecttoapprovaloftheCityArboristpriortoconstructionpermitissuance.5.Theapplicantshallberequiredtoprovide,totheCurrentPlanningProjectManager,treeretentioninspection/monitoringreportsafterinitialclearing,finalgrading,andannuallyfortwo(2)yearsbyaqualifiedprofessionalforester.Theinspection/monitoringreportsshallidentifyanyretainedtreesthatdevelopproblemsduetochangingsiteconditionsandprescribemitigation.6.ThestormwatervaultproposedinTractAshallbedesignedtobelocatedundergroundand/orcoveredinsoil.Nopartofthevaultshallbepermittedtoprotrudefromthegroundsurface.IfitisdeterminedthatsuchapplicationisnotfeasibleanalternativemethodcouldbeproposedforapprovalbytheAdministrativeShortP/atReport16-000138—MeadShortP/at
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page18of19PlanningDivision.Allground/soillocatedaroundandoverthevaultshallbelandscaped.ArevisedvaultandlandscapingplanshallbesubmittedtotheCurrentPlanningProjectManagerforreviewandapprovalpriortoconstructionpermitissuance.7.AHomeOwnersAssociationshallbeestablishedpriortorecordingoftheshortplat.TheHomeOwnersAssociationshallberesponsiblefortheownershipandmaintenanceofallcommonimprovements.HOAdocumentsshallbesubmittedforreviewandapprovalbytheCurrentPlanningProjectManagerandtheCityAttorneypriortoshortplatrecording.DATEOFDECISIONONLANDUSEACTION:SIGNATURE:/a/otJenniferHenning,PlanningDirectoDateTRANSMuTEDthis21d1dayofJune,2016totheOwner/Applicant/Contact:Owner:Applicant:Contact:TheHeirsandDeviseesofBobWenzlDarrellOffeLaverneR.Mead,DeceasedTuscanyConstruction,LLCOffeEngineers,PLLCP.O.Box612713932SE159thPLBellevue,WA98008Renton,WA98058TRANSMITTEDthis2nddayofJune,2016tothePartiesofRecord:ElisaFitzpatrick568HoquiamAveNERenton,WA98059TRANSMITTEDthis2nddayofJune,2016tothefollowing:ChipVincent,CEDAdministratorBrianneBannwarth,DevelopmentEngineeringManagerJanConklin,DevelopmentServicesVanessaDo/bee,CurrentPlanningManagerFireMarshalK.LANDUSEACTIONAPPEALS,REQUESTFORRECONSIDERATION,&EXPIRATION:Theadministrativelandusedecisionwillbecomefinalifthedecisionisnotappealedwithin14daysofthedecisiondate.APPEAL:ThisadministrativelandusedecisionwillbecomefinalifnotappealedinwritingtotheHearingExamineronorbefore5:00PMonJune16,2016.Anappealofthedecisionmustbefiledwithinthe14-dayappealperiod(RCW43.21.C.075(3);WAC197-11-680),togetherwiththerequiredfeetotheHearingExaminer,CityofRenton,1055SouthGradyWay,Renton,WA98057.RMC4-8-110.BgovernsappealstotheHearingExaminerandadditionalinformationregardingtheappealprocessmaybeobtainedfromtheCityClerk’sOffice,(425)430-6510.EXPIRATION:Theadministrativeshortplatdecisionwillexpiretwo(2)yearsfromthedateofdecision.Asingleone(1)yearextensionmayberequestedpursuanttoRMC4-7-070M.RECONSIDERATION:Within14daysofthedecisiondate,anypartymayrequestthatthedecisionbereopenedbytheapprovalbody.TheapprovalbodymaymodifyhisdecisionifmaterialevidencenotreadilydiscoverableAdministrativeShortP/atReport16-000138—MeadShortP/at
CityofRentonDepartmentofCommunity&EconomicDevelopmentAdministrativeReport&DecisionMEADSHORTPLATLUA16-000138,SHPL-A,MODJune2,2016Page19of19priortotheoriginaldecisionisfoundorifhefindstherewasmisrepresentationoffact.Afterreviewofthereconsiderationrequest,iftheapprovalbodyfindssufficientevidencetoamendtheoriginaldecision,therewillbenofurtherextensionoftheappealperiod.Anypersonwishingtotakefurtheractionmustfileaformalappealwithinthe14-dayappealtimeframe.THEAPPEARANCEOFFAIRNESSDOCTRINE:providesthatnoexparte(privateone-on-one)communicationsmayoccurconcerningthelandusedecision.TheDoctrineappliesnotonlytotheinitialdecision,buttoAppealstotheHearingExamineraswell.Allcommunicationsafterthedecision/approvaldatemustbemadeinwritingthroughtheHearingExaminer.Allcommunicationsarepublicrecordandthispermitsallinterestedpartiestoknowthecontentsofthecommunicationandwouldallowthemtoopenlyrebuttheevidenceinwriting.AnyviolationofthisdoctrinecouldresultintheinvalidationoftheappealbytheCourt.AdministrativeShortPlotReport16-000138—MeadShortP/at
SE 1/4, SE 1/4, SEC 10, T 23N, R 5E, W.M.PRELIMINARY SHORT SUBDIVISIONMEAD SHORT PLATNE 6TH ST & ILWACO PL NERENTON, WA TOPOGRAPHIC SURVEY
AS ALWAYS,
CALL 1-800-424-5555 BEFORE
CONSTRUCTION.
Exhibit
2
SE 1/4, SE 1/4, SEC 10, T 23N, R 5E, W.M.PRELIMINARY SHORT SUBDIVISIONMEAD SHORT PLATNE 6TH ST & ILWACO PL NERENTON, WA PROPOSED SITE PLAN
Exhibit
3
Full Document
Available upon Request
Exhibit4
Exhibit5
Exhibit6
Exhibit
7
Full Document
Available upon Request
Exhibit8
Exhibit9
Robert M. Pride, LLC Consulting Engineer
Robert M. Pride, LLC Page 1
13203 Holmes Point Drive NE Kirkland, WA 98034
May 19, 2014
Mr. Darrell Offe
Offe Engineers
13932 SE 159th Place
Renton, WA 98058
Re: Geotechnical Assessment
Proposed Short Plat
NE 6th Street & Ilwaco Place
Renton, Washington
Dear Mr. Offe,
This report provides subsurface soil information regarding discharge of storm water on
this new short plat development located on the west side of Ilwaco Place and south of
NE 6th Street in Renton. It is understood that this short plat of eight new residences will
include a storage pond at the northeast corner of this site.
This rectangular property measures 295 x 161 feet and is relatively flat. There is an
existing residence and garage on the northwesterly side of this property (568 Hoquiam
Avenue). Field exploration included the excavation of four auger borings as shown on
the attached Drawing No. 1. Summary logs of these test pits are attached to this report.
Based on our site investigation and geologic research the upper loose topsoils are
underlain by dense to very dense glacial till soils. Shallow groundwater is perched on
top of these dense glacial deposits that will prevent onsite infiltration into the subsoils.
Onsite storm water will be directed into the pond at the NE corner of the site for
eventual discharge to the storm system. Foundations for the new residence should
extend down 18 inches onto the medium dense to dense native soils using a soil bearing
value of 2000 psf. Please call if there are any questions.
Robert M. Pride
Principal Geotechnical Engineer
dist: (1) addressee
rmp: JayMarc6thSt1
Exhibit
10
Full Document
Available upon Request
Exhibit11
Wetland Resources, Inc. JayMarc – Ilwaco Pl
June 4, 2014 WRI # 14122 1
June 4, 2014
JayMarc Homes, LLC
Attn: Jay Mezistrano
PO Box 2566
Renton, WA 98056
RE: Wetland and Stream Determination for King County Tax Parcels 1023059230
Wetland Resources, Inc. (WRI) completed a site investigation on June 4, 2014 to locate
jurisdictional wetlands and streams on and in the vicinity of the aforementioned tax parcels. The
investigation area is an assemblage of 1.34 acres located in and around Ilwaco Pl NE & NE 5th Pl
in the City of Renton, WA. The site is further located in Section 10, Township 23N, Range 05E,
W.M.
The investigation area is a disturbed undeveloped site with an existing gravel parking area near
its center. Surrounding parcels are dominated by single-family residential (SFR) development.
On-site vegetation consists of a patchwork of small tree stands made up of mostly black
cottonwood, Oregon ash, and Douglas fir, with an understory of mostly Himalayan blackberry
and reed canarygrass with sporadic patches of hardhack. The non-forested portion of the site is
dominated by Himalayan blackberry and reed canarygrass, and contains a parking pad for
vehicles at the center of the property. Soils throughout the investigation area are generally a very
dark brown (10YR 2/2) silt loam from the surface to 14 inches below. From 14 inches to greater
than 18 inches, the soils change to a dark yellowish brown (10YR 3/4) silt loam. All sampled soils
were dry at the time of investigation. Topography of the subject property is generally flat with
slight undulations throughout.
METHODOLOGY
Prior to conducting the on-site investigation of the subject site, public resource information was
reviewed to identify the presence of wetlands, streams, and other critical areas within and near
the project area. These sources included: the USFWS National Wetlands Inventory (NWI);
USDA/NRCS Web Soil Survey; WDFW SalmonScape Interactive Mapping System; WDFW
Priority Habitat and Species (PHS) Interactive Map; and the King County iMap Interactive
Mapping Tool. None to the available on-line resources illustrated any wetlands or streams on or
immediately adjacent to the investigation area.
The presence of wetland areas was determined in the field using the routine determination
approach described in the Corps of Engineers Wetlands Delineation Manual (Environmental
Laboratory 1987) and the Regional Supplement to the Corps of Engineers Wetland Delineation Manual:
Exhibit
12
Wetland Resources, Inc JayMarc Homes, LLC
June 4, 2014 WRI# 14122 2
Western Mountains, Valleys, and Coast Region (Version 2.0) (U.S. Army Corps of Engineers 2010).
Under this method, the process for making a wetland determination is based on three steps:
1.) Examination of the site for hydrophytic vegetation (species present and percent cover);
2.) Examination of the site for hydric soils;
3.) Determining the presence of wetland hydrology
The presence or absence of ordinary high water marks (OHWM) of streams and waterbodies
were evaluated using the methodology described in the Washington State Department of
Ecology document Determining the Ordinary High Water Mark on Streams in Washington State (Second
Review Draft) (Olson and Stockdale 2010). Streams were classified according to the water typing
system provided in the Washington Administrative Code (WAC), section 222-16-030.
BOUNDARY DETERMINATION FINDINGS/RESULTS
All area of the subject property lack the three necessary criteria to meet the definition of wetland.
No wetlands or streams were observed within the boundary of the investigation area.
USE OF THIS REPORT
This Wetland Determination Report is supplied to JayMarc Homes, LLC as a means of
determining on-site critical area conditions, as required by the City of Renton. This report is
based largely on readily observable conditions and, to a lesser extent, on readily ascertainable
conditions. No attempt has been made to determine hidden or concealed conditions.
The laws applicable to critical areas are subject to varying interpretations and may be changed at
any time by the courts or legislative bodies. This report is intended to provide information
deemed relevant in the applicant's attempt to comply with the laws now in effect.
This delineation and report conforms to the standard of care employed by wetland ecologists.
No other representation or warranty is made concerning the work or this report and any implied
representation or warranty is disclaimed.
Wetland Resources, Inc.
Scott Brainard, PWS
Principal Ecologist
Mead Short Plat
NE 5th Place / Ilwaco Place NE
8 Single Family Residence
CONSTRUCTION MITIGATION
Proposed Construction Dates (begin and end dates): Start of construction is proposed for the summer
of 2016 with clearing and grading of the property and installation of utilities/frontage improvements along
abutting streets. Project is proposed to be completed by winter 2016.
Hours and days of operation: 7:30 am to 3:30 pm, Monday through Friday or as otherwise allowed by City
of Renton.
Proposed Hauling/ Transportation routes: Materials and labor to the site are proposed off of NE 5th
Street using the existing gravel parking area on the property. Construction parking and material storage will
occur on the NE 5th Street side of the project (south). Proposed additional materials to the project (such as
backfill, gravel base, pipe, bedding, etc.) will be hauled to the site using the access off of NE 5th Street. Haul
routes to the site will be from Hoquiam Avenue NE.
Measures to minimize construction activities: The construction activities proposed are to provide the
necessary public and private improvements for the project. In an effort to minimize disruption of the public,
frontage improvements of half-street widening is necessary along three sides of the property. These
improvements can be made from the property side of the frontage. This will allow for construction to occur
and minimizing disturbance of the existing roadway. Temporary closures of the frontage streets may be
necessary to make utility crossings.
Special hours: No special hours are necessary to complete construction. Weekend work may be necessary
to complete the project on schedule; this will be determined by owner, contractor, and City of Renton.
Preliminary Traffic Control Plan: Coordination with the City of Renton staff will be necessary to minimize
disruption to traffic around the property for water main connections and curb, gutter, and sidewalk
installation. Once a contractor is selected, a traffic control plan will be submitted and approved prior to the
pre-construction meeting with the City of Renton. This plan will be implemented prior to any construction
activities.
Exhibit
13
Exhibit
14
Full Document
Available upon Request
ADVISORY NOTES TO APPLICANT
LUA16-000138
February 23, 2016
Name: Mead Short Plat
Application Date:Site Address:
PLAN - Planning Review - Land Use Version 1 | May 11, 2016
Planning Review Comments Contact: Clark Close | 425-430-7289 | cclose@rentonwa.gov
Recommendations: 1. RMC section 4 4 030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise
approved by the Development Services Division.
2. New single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and
eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and
eight o’clock (8:00) p.m. No work shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion
of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative
measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual
as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development
Services Division’s approval of this work is required prior to final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment,
install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained.
6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained
trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO
TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or
groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide
supervision whenever equipment or trucks are moving near trees.
7. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish
and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit.
Fire Review - Building Comments Contact: Corey Thomas | 425-430-7024 | cthomas@rentonwa.gov
Recommendations: Environmental Impact Comments:
1.The fire impact fees are applicable at the rate of $495.10 per single family unit. This fee is paid at time of building permit issuance.
Code Related Comments:
1.The fire flow requirement for a single family home is 1,000 gpm minimum for dwellings up to 3,600 square feet (including garage and
basements). If the dwelling exceeds 3,600 square feet, a minimum of 1,500 gpm fire flow would be required. A minimum of one fire
hydrant is required within 300 feet of the proposed buildings and two hydrants if the fire flow goes up to 1,500 gpm. Existing hydrants can
be counted toward the requirement as long as they meet current code, including 5 inch storz fittings. Existing hydrants are not within 300
feet of the furthest proposed dwellings, so new hydrants are required. A water availability certificate is required from King County Water
District 90.
2.Fire department apparatus access roadways are required to be minimum 20 feet wide fully paved, with 25 feet inside and 45 feet
outside turning radius. Fire access roadways shall be constructed to support a 30 ton vehicle with 75 psi point loading. Access is
required within 150 feet of all points on the buildings.
Community Services Review Comments Contact: Leslie Betlach | 425-430-6619 | LBetlach@rentonwa.gov
Recommendations: 1. Parks Impact fee per Ordinance 5670 applies.
2. Street Trees: On 5th Pl, use only 3 street trees; on Ilwaco, use only 6 street trees; on NE 6 Street, use only 1 street tree. On 5th Pl, use
only Katsuratrees; on Ilwaco, use only Redmond Linden (Tilia americana), on NE 6 St. use only Princeton elm (Ulmus americana). Trees
shall be spaced 50 feet on center, a minimum distance of 40 feet from stop signs (non shown on plan) and 30 feet from street lights (non
shown on plan).
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
Recommendations: DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
Page 1 of 10Ran: May 31, 2016
Exhibit
15
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 1 | May 11, 2016
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
DATE:March 15, 2016
TO:Clark Close, Senior Planner
FROM:Ian Fitz James, Civil Plan Reviewer
SUBJECT:Utility and Transportation Comments for the Mead Short Plat
NE 5th Place and Ilwaco Place NE
LUA 16 000138
I have reviewed the application for the Mead Short located at NE 5th Place and Ilwaco Place NE and have the following comments:
EXISTING CONDITIONS
WATER: Water service is provided by King County Water District 90. A water availability certificate from King County Water District 90 will
need to be provided.
SEWER: Sewer service is provided by the City of Renton. There is an existing 8” sewer east of the site in Ilwaco Place NE that flows from
north to south. There is an existing 8” sewer south of the site in NE 5th Place that flows from west to east. The sewer in Ilwaco Place NE
intersects the sewer in NE 5th Place at a 48” Sanitary Sewer Manhole (COR Facility ID #MH4617) SE of the site. There is no sewer north
of the site in NE 6th Street.
STORM DRAINGE: There is an existing 12” storm drain along the eastern frontage of Ilwaco Place NE east of the site. There are two Type
1 catch basins (COR Facility ID # 131717 and 131716) along this storm drain run. There is an existing Type 1 catch basin (COR Facility ID
#116586) located near the SE corner of the site along the northern frontage of NE 5th Place. This drains to the south and east by a 12”
storm drain to the 12” storm drain in Ilwaco Place NE. There is no storm drain north of the site in NE 6th Street.
Hoquiam Avenue NE in the vicinity of the site contains a ditch conveyance system along the eastern frontage. There is an existing 12”
storm drain that flows south in the western half of Hoquiam Avenue NE. This is a continuation of a ditch along the western road frontage
north of the site. Along the western frontage of Hoquiam Avenue NE there is an additional 12” storm drain that flows from north to south.
STREETS: The site is bounded to the north by NE 6th Street, to the east by Ilwaco Place NE, and to the south by NE 5th Place. NE 6th
Street and NE 5th Place currently end with a pipe stem in the vicinity of the site’s western boundary. All three streets are classified as
residential access streets.
The panhandle/ pipe stem portion of the site west of the existing NE 6th Street pipe stem is bordered by Hoquiam Avenue NE. Hoquiam
Avenue NE is classified as a neighborhood collector arterial.
Per the King County Assessor’s Map, the existing right of way of NE 6th Street is approximately 26 feet, the existing right of way of Ilwaco
Place NE is approximately 30 feet, and the existing right of way for NE 5th Place is approximately 34 feet.
Per the provided survey, the existing pavement width for NE 6th Street is 16 feet, the existing pavement width for Ilwaco Place NE is 28 feet,
and the existing pavement width for NE 5th Place is 28 feet.
CODE REQUIREMENTS
WATER COMMENTS
1.Please obtain a water availability certificate from King County Water District 90 and provide it with the utility permit submittal.
2.Review of the water plans will be conducted by King County Water District 90 and the City of Renton Fire Department.
3.Plans approved by King County Water District 90 shall be routed to the City for final review prior to permit issuance.
SEWER COMMENTS
1.The parcel as proposed does not require any sewer main extensions.
2.The side sewers for Lots 3 and 4 will require private easements where they pass through neighboring parcels.
3.The development is subject to a system development charge (SDC) for sewer service. The SDC for sewer service is based on the
size of the domestic water service. The current SDC for sewer service with a 1” water meter installation is $2,242 per installation. Fees
Page 2 of 10Ran: May 31, 2016
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 1 | May 11, 2016
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
are payable at time of permit issuance.
4.This site is in the East Renton Interceptor Special Assessment District (SAD) and the fee is $316.80 per lot. Fees are payable at time
of permit issuance.
STORM DRAINAGE COMMENTS
1.A Preliminary Drainage Plan and Technical Information Report (TIR) completed by Offe Engineers were submitted to the City on
February 20, 2016. The site is approximately 1.34 acres in size and is located in the City’s Flow Control Duration Standard (Forested
Conditions). The site contains two Threshold Drainage Areas (TDA). The majority of the site is in the May Creek drainage basin. The
panhandle/pipe stem portion of the site west of the NE 6th Street pipe stem is part of the Lower Cedar River drainage basin.
The project is proposing a combination detention / wetvault design that discharges at the site’s natural location to meet the City’s Flow
Control and Basic Water Quality standards. The proposed vault will be a public stormwater facility. Access to the vault per the City’s
amendments to the KCSWDM shall be provided. The project will also require individual lot Flow Control BMPs. Please section 1.2.3.3 and
Section C.1.3.1 of the City amendments to the KCSWDM for Flow Control BMP requirements. All core and special requirements shall be
addressed in the updated TIR.
Drainage improvements along all street frontages shall conform to the City’s street standards. Storm drains should be located outside of
the planter and the sidewalk. Required horizontal and vertical separation from other utilities shall be provided. Catch basins should be
located at the PC and PT of curb returns where possible.
The updated drainage plan and TIR will be required as part of the utility permit submittal.
2.The geotechnical report provided was stamped and signed by an engineer whose license is out of date. A current geotechnical report
is required with the utility permit submittal. This report needs to be stamped and signed by a licensed Civil Engineer in the State of
Washington.
3.A Construction Stormwater General Permit from the Washington Department of Ecology will be required since clearing of the site
exceeds one acre.
4.The development is subject to system development charges (SDC). The current SDCs are $1,485.00 per lot. Fees are payable at the
time of permit issuance.
TRANSPORTATION/STREET COMMENTS
1.NE 6th Street, Ilwaco Place NE, and NE 5th Place are all residential access streets. Per RMC 4 6 060, the minimum right of way for a
residential access street is 53’. A 0.5’ curb, 8’ planting strip, and 5’ sidewalk is required along the entire project frontage (NE 6th Street,
Ilwaco Place NE, and NE 5th Place). The minimum pavement width is 26’ with 20’ as travel lanes and 6’ of parking on one side. The
required turning radius for a residential access street is 25’. The proposed street sections meet the street standards for residential
access streets.
a.Please have the surveyor confirm the existing right of way dimensions for all streets. The existing right of way of NE 6th Street was
surveyed as 21’ where the King County Assessor’s Map shows it as approximately 26’.
b.The 30’ pipe stem of property in the far northwestern property corner will be dedicated to the City for the extension of NE 6th Street to
Hoquiam Avenue NE.
c.The applicant submitted a formal modification request dated February 13, 2016 regarding the street standard for the extension on NE
6th Street in the dedicated right of way to Hoquiam Avenue NE. City staff is recommending denial of the applicant’s modification request.
Please see the formal response to the modification request for more information.
d.The City requires a half street paved road for the extension of NE 6th Street to Hoquiam Avenue NE. The City will allow a reduction of
the 20' wide pavement section to a 15' wide pavement section in order to fit within the new 30 foot dedication. In addition to the modified
half street pavement section, a 0.5’ curb, 8’ planter, and 5’ sidewalk are required. Please provide an additional street section on the street
plan sheet for the extension of NE 6th Street.
Page 3 of 10Ran: May 31, 2016
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 1 | May 11, 2016
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
e.The surveyed subdivision of lots shows a proposed half street right of way of 29.5’ along the NE 6th Street frontage. The NE 6th Street
section shows a half street right of way of 27.5’. Please update the street section so that it corresponds with the survey.
f.The City will require that the minimum design standards be met to the best of the ability at the intersection of the extension of NE 6th
Street and Hoquiam Avenue NE. Please provide a design for right of way improvements for this intersection. The City will work with the
developer as needed to provide design guidance.
2.Hoquiam Avenue NE is a neighborhood collector arterial. Per RMC 4 6 060, the minimum right of way for a neighborhood collector
arterial with 2 lanes is 83’. A 0.5’ curb, 8’ planting strip, and 8’ sidewalk is required. The minimum pavement width is 46’ with 30’ as travel
lanes and 8’ of parking on both sides. Bicycle lanes are also required. The required turning radius for a collector arterial is 35’.
3.Appropriate transitions for the curb, sidewalk, and roadway will need to be designed and incorporated into the final street plans.
4.Please label curb return radius at the corner of NE 6th Street and Ilwaco Place NE and at the corner of NE 5th Place and Ilwaco Place
NE. Right of way dedication at corner lots appears to be adequate to accommodate the required turning radius, curb, 8’ planter, and 5’
sidewalk.
5.Street lighting analysis is required to be conducted by the developer along all frontages (NE 6th Street, Ilwaco Place NE, and NE 5th
Place). The developer will also need to analyze street lighting at the proposed intersection of NE 6th Street and Hoquiam Avenue NE.
Required street lighting shall be provided by the developer and be to City standards.
6.The maximum width of a single loaded garage driveway shall not exceed 9’ and double loaded garage driveway shall not exceed 16’.
7.Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay requirements.
8.The current transportation impact fee rate is $2,951.17 per single family home. The transportation impact fee that is current at the
time of the building permit application will be levied. Payment of the transportation impact fee is due at the time of issuance of the building
permit.
GENERAL COMMENTS
1.The SDCs listed are for 2016. The fees that are current at the time of the building permit application will be levied. Please see the
City of Renton website for the current SDCs.
2.The survey and all civil plans shall conform to the current City of Renton survey and drafting standards. Current drafting standards can
be found on the City of Renton website.
3.A final survey that is stamped and signed by the professional land surveyor of record will need to be provided. All existing utilities
need to be surveyed and shown. Please reference COR Maps for mapping and records of existing utilities in the project vicinity.
4.Separate plan submittals will be required for construction permits for utility work and street improvements. All plans shall be
prepared by a licensed Civil Engineer in the State of Washington.
5.Separate permits and fees for side sewers will be required. Please see the City of Renton website for current SDCs. Separate
permits for water services shall be obtained from King County Water District 90.
6.Rockeries or retaining walls greater than 4 feet in height will require a separate building permit. Structural calculations and plans
prepared by a licensed engineer will be required.
7.Structural plans for the storm drainage vault shall be included with the civil plan submittal.
8.A final tree removal/retention plan and landscape plan shall be included with the civil plan submittal.
9.When utility plans are complete, please submit four (4) copies of the plans, two (2) copies of the drainage report, an electronic copy of
Page 4 of 10Ran: May 31, 2016
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 1 | May 11, 2016
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
each, the permit application, an itemized cost of construction estimate
Police Plan Review Comments Contact: Cyndie Parks | 425-430-7521 | cparks@rentonwa.gov
Recommendations: Minimal impact on police services.
Technical Services Comments Contact: Amanda Askren | 425-430-7369 | aaskren@rentonwa.gov
Basis of Bearing as shown is unclear on Sheet 1 of the Preliminary Short Plat.
Boundary determination is unclear as section subdivision information is not shown nor are the references listed as called out.
Project narrative states a 8 lot short plat, but is submitted as a 7 lot short plat.
Title Report Schedule B #9 Easement 347794 is not shown on boundary survey and a copy is not provided in the submittal package.
Please provide.
Page 5 of 10Ran: May 31, 2016
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 2 |
Technical Services Comments Contact: Amanda Askren | 425-430-7369 | aaskren@rentonwa.gov
RESOLVED:
Basis of Bearing as shown is unclear on Sheet 1 of the Preliminary Short Plat.
Boundary determination is unclear as section subdivision information is not shown nor are the references listed as called out.
Project narrative states a 8 lot short plat, but is submitted as a 7 lot short plat.
Title Report Schedule B #9 Easement 347794 is not shown on boundary survey and a copy is not provided in the submittal package.
Please provide.
Planning Review Comments Contact: Clark Close | 425-430-7289 | cclose@rentonwa.gov
Recommendations: 1. RMC section 4 4 030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise
approved by the Development Services Division.
2. New single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and
eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and
eight o’clock (8:00) p.m. No work shall be permitted on Sundays.
3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion
of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative
measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual
as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development
Services Division’s approval of this work is required prior to final inspection and approval of the permit.
4. A National Permit Discharge Elimination System (NPDES) permit is required when more than one acre is being cleared.
5. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment,
install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained.
6. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained
trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO
TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or
groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide
supervision whenever equipment or trucks are moving near trees.
7. This permit is shall comply with the Bald and Golden Eagle Protection Act. The permitted is responsible for adhering to the U.S. Fish
and Wildlife Service National Bald Eagle Management Guidelines (2007) and /or your U.S. Fish and Wildlife Service permit.
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
Recommendations: DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE:May 25, 2016
TO:Clark Close, Senior Planner
FROM:Ian Fitz James, Civil Plan Reviewer
SUBJECT:Utility and Transportation Comments for the Mead Short Plat
NE 5th Place and Ilwaco Place NE
LUA 16 000138
I have reviewed the application for the Mead Short located at NE 5th Place and Ilwaco Place NE and have the following comments:
Page 6 of 10Ran: May 31, 2016
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 2 |
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
EXISTING CONDITIONS
WATER: Water service is provided by King County Water District 90. A water availability certificate from King County Water District 90 will
need to be provided.
SEWER: Sewer service is provided by the City of Renton. There is an existing 8” sewer east of the site in Ilwaco Place NE that flows from
north to south. There is an existing 8” sewer south of the site in NE 5th Place that flows from west to east. The sewer in Ilwaco Place NE
intersects the sewer in NE 5th Place at a 48” Sanitary Sewer Manhole (COR Facility ID #MH4617) SE of the site. There is no sewer north
of the site in NE 6th Street.
STORM DRAINGE: There is an existing 12” storm drain along the eastern frontage of Ilwaco Place NE east of the site. There are two Type
1 catch basins (COR Facility ID # 131717 and 131716) along this storm drain run. There is an existing Type 1 catch basin (COR Facility ID
#116586) located near the SE corner of the site along the northern frontage of NE 5th Place. This drains to the south and east by a 12”
storm drain to the 12” storm drain in Ilwaco Place NE. There is no storm drain north of the site in NE 6th Street.
Hoquiam Avenue NE in the vicinity of the site contains a ditch conveyance system along the eastern frontage. There is an existing 12”
storm drain that flows south in the western half of Hoquiam Avenue NE. This is a continuation of a ditch along the western road frontage
north of the site. Along the western frontage of Hoquiam Avenue NE there is an additional 12” storm drain that flows from north to south.
STREETS: The site is bounded to the north by NE 6th Street, to the east by Ilwaco Place NE, and to the south by NE 5th Place. NE 6th
Street and NE 5th Place currently end with a pipe stem in the vicinity of the site’s western boundary. All three streets are classified as
residential access streets.
The panhandle/ pipe stem portion of the site west of the existing NE 6th Street pipe stem is bordered by Hoquiam Avenue NE. Hoquiam
Avenue NE is classified as a neighborhood collector arterial.
Per the King County Assessor’s Map, the existing right of way of NE 6th Street is approximately 26 feet, the existing right of way of Ilwaco
Place NE is approximately 30 feet, and the existing right of way for NE 5th Place is approximately 34 feet.
Per the provided survey, the existing pavement width for NE 6th Street is 16 feet, the existing pavement width for Ilwaco Place NE is 28 feet,
and the existing pavement width for NE 5th Place is 28 feet.
CODE REQUIREMENTS
WATER COMMENTS
1.Please obtain a water availability certificate from King County Water District 90 and provide it with the utility permit submittal.
2.Review of the water plans will be conducted by King County Water District 90 and the City of Renton Fire Department.
3.Plans approved by King County Water District 90 shall be routed to the City for final review prior to permit issuance.
SEWER COMMENTS
1.The site as proposed does not require any sewer main extensions.
2.The side sewers for Lots 3 and 4 will require private utility easements where they pass through neighboring parcels.
3.The development is subject to system development charges (SDC) for sewer service. The SDCs for sewer service are based on the
size of the domestic water service. The current SDC for sewer service with a 1” water meter installation is $2,242 per installation. Fees
are payable at time of permit issuance.
4.This site is in the East Renton Interceptor Special Assessment District (SAD) and the fee is $316.80 per lot. Fees are payable at time
of permit issuance.
STORM DRAINAGE COMMENTS
1.A Preliminary Drainage Plan and Technical Information Report (TIR) completed by Offe Engineers were submitted to the City on May 5,
2016. The site is approximately 1.34 acres in size and is located in the City’s Flow Control Duration Standard (Forested Conditions). The
site contains two Threshold Drainage Areas (TDA). The majority of the site is in the May Creek drainage basin. The panhandle/pipe stem
portion of the site west of the NE 6th Street pipe stem is part of the Lower Cedar River drainage basin.
The project is proposing a combination detention / wetvault design that discharges at the site’s natural location to meet the City’s Flow
Control and Basic Water Quality standards. The discharge point is a new catch basin connected to the existing storm drain east of the
site. The proposed vault will be a public stormwater facility. Access to the vault per the City’s amendments to the KCSWDM shall be
provided. The project will also require individual lot Flow Control BMPs. Please section 1.2.3.3 and Section C.1.3.1 of the City
Page 7 of 10Ran: May 31, 2016
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 2 |
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
amendments to the KCSWDM for Flow Control BMP requirements. All core and special requirements shall be addressed in the updated
TIR.
Drainage improvements along all street frontages shall conform to the City’s street standards. Storm drains should be located outside of
the planter and the sidewalk. Required horizontal and vertical separation from other utilities shall be provided. Catch basins should be
located at the PC and PT of curb returns where possible.
The updated drainage plan and TIR will be required as part of the utility permit submittal.
2.The geotechnical report provided was stamped and signed by an engineer whose license is out of date. A current geotechnical report
is required with the utility permit submittal. This report needs to be stamped and signed by a licensed Civil Engineer in the State of
Washington.
3.A Construction Stormwater General Permit from the Washington Department of Ecology will be required since clearing of the site
exceeds one acre.
4.The development is subject to system development charges (SDC). The current SDCs are $1,485.00 per lot. Fees are payable at the
time of permit issuance.
TRANSPORTATION/STREET COMMENTS
1.NE 6th Street, Ilwaco Place NE, and NE 5th Place are all residential access streets. Per RMC 4 6 060, the minimum right of way for a
residential access street is 53’. A 0.5’ curb, 8’ planting strip, and 5’ sidewalk are required along the entire project frontage (NE 6th Street,
Ilwaco Place NE, and NE 5th Place). The minimum pavement width is 26’ with 20’ as travel lanes and 6’ of parking on one side. The
required turning radius for a residential access street is 25’. Right of way dedication will be required to provide the required right of way
width. Final right of way dedication will be determined by survey.
a.Please have the surveyor confirm the existing right of way dimensions for all streets. The existing right of way of NE 6th Street was
surveyed as 21’ where the King County Assessor’s Map shows it as approximately 26’.
b.The 30’ pipe stem of property in the far northwestern property corner will be dedicated to the City for the extension of NE 6th Street to
Hoquiam Avenue NE.
c.The applicant submitted a formal modification request dated February 13, 2016 regarding the street standard for the extension on NE
6th Street in the dedicated right of way to Hoquiam Avenue NE. City staff is recommending denial of the applicant’s modification request.
Please see the formal response to the modification request for more information.
d.The City requires a half street paved road for the extension of NE 6th Street to Hoquiam Avenue NE. The City will allow a reduction of
the 20' wide pavement section to a 15' wide pavement section in order to fit within the new 30 foot dedication. In addition to the modified
half street pavement section, a 0.5’ curb, 8’ planter, and 5’ sidewalk are required. Drainage improvements along the NE 6th Street
extension will be required to conform to the City’s street standards. Provide an additional street section on the street plan sheet for the
extension of NE 6th Street.
e.The City will require that the minimum design standards be met to the best of the ability at the intersection of the extension of NE 6th
Street and Hoquiam Avenue NE. Provide a design for right of way improvements for this intersection. The City will work with the developer
as needed to provide design guidance. Address the impacts on the existing stormwater ditch along the eastern Hoquiam Avenue NE
frontage. A perpendicular curb ramp at the intersection with Hoquiam Avenue NE will be required for pedestrian traffic crossing Hoquiam
Avenue NE.
2.Hoquiam Avenue NE is a neighborhood collector arterial. Per RMC 4 6 060, the minimum right of way for a neighborhood collector
arterial with 2 lanes is 83’. A 0.5’ curb, 8’ planting strip, and 8’ sidewalk is required. The minimum pavement width is 46’ with 30’ as travel
lanes and 8’ of parking on both sides. Bicycle lanes are also required. The required turning radius for a collector arterial is 35’.
3.The applicant proposes to use a 16’ shared driveway with 12’ of pavement to access Lots 1, 2, 3, and 7. Tract A will also be accessed
Page 8 of 10Ran: May 31, 2016
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 2 |
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
from the shared driveway. The shared driveway shall conform to the standards found in RMC 4 6 060. Shared driveways shall be wholly
in a tract. The shared driveway shall not be more than 200’ in length. The paved surface shall be a minimum of 16’. Drainage
improvements per City standards are required along the shared driveway. An access easement shall cover the entirety of the tract.
4.Appropriate transitions for the curb, sidewalk, and roadway for the extension of NE 6th Street will need to be designed and
incorporated into the final street plans.
5.Label the curb return radius at the corner of NE 6th Street and Ilwaco Place NE and at the corner of NE 5th Place and Ilwaco Place NE.
Right of way dedication at corner lots appears to be adequate to accommodate the required turning radius, curb, 8’ planter, and 5’
sidewalk.
6.Perpendicular curb ramps per WSDOT standards shall be installed at the Ilwaco Place NE and NE 6th Street and Ilwaco Place NE
and NE 5th Place intersections.
7.The proposed jog in the sidewalk near the northeastern site corner will be permitted so long as it doesn’t affect the placement of the
perpendicular curb ramps. A modified curb ramp design may be considered in this location. Show the existing tree on the street widening
plan and add stationing to the sidewalk jog so that it can be correctly installed.
8.Street lighting analysis is required to be conducted by the developer along all frontages (NE 6th Street, Ilwaco Place NE, and NE 5th
Place). The developer will also need to analyze street lighting at the proposed intersection of NE 6th Street and Hoquiam Avenue NE.
Required street lighting shall be provided by the developer and be to City standards.
9.Per RMC 4 4 080, the maximum width of a single loaded garage driveway is 9’ and the maximum width of a double loaded garage
driveway is 16’. If a garage is not present, the maximum driveway width is 16’. Driveways shall be closer than 5’ to any property line.
10.Paving and trench restoration shall comply with the City’s Trench Restoration and Overlay requirements.
11.The current transportation impact fee rate is $2,951.17 per single family home. The transportation impact fee that is current at the
time of the building permit application will be levied. Payment of the transportation impact fee is due at the time of issuance of the building
permit.
GENERAL COMMENTS
1.The SDCs listed are for 2016. The fees that are current at the time of the building permit application will be levied. Please see the
City of Renton website for the current SDCs.
2.The survey and all civil plans shall conform to the current City of Renton survey and drafting standards. Current drafting standards can
be found on the City of Renton website.
3.A final survey that is stamped and signed by the professional land surveyor of record will need to be provided. All existing utilities
need to be surveyed and shown. Please reference COR Maps for mapping and records of existing utilities in the project vicinity.
4.Separate plan submittals will be required for construction permits for utility work and street improvements. All plans shall be
prepared by a licensed Civil Engineer in the State of Washington.
5.Separate permits and fees for side sewers will be required. Please see the City of Renton website for current SDCs. Separate
permits for water services shall be obtained from King County Water District 90.
6.Rockeries or retaining walls greater than 4 feet in height (from top of wall to bottom of footing) will require a separate building permit.
Structural calculations and plans prepared by a licensed engineer will be required.
7.Structural plans for the storm drainage vault shall be included with the civil plan submittal.
8.A final tree removal/retention plan and landscape plan shall be included with the civil plan submittal.
Page 9 of 10Ran: May 31, 2016
ADVISORY NOTES TO APPLICANT
LUA16-000138
PLAN - Planning Review - Land Use Version 2 |
Engineering Review Comments Contact: Ian Fitz-James | 425-430-7288 | ifitz-james@rentonwa.gov
9.When utility plans are complete, please submit four (4) copies of the plans, two (2) copies of the drainage report, an electronic copy of
each, the permit application, an itemized cost of construction estimate, and application fee to the counter of the sixth floor.
Page 10 of 10Ran: May 31, 2016