HomeMy WebLinkAboutMFP18002444.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP18002444
IVR Number: 18002444
Permit Informaon
Permit Name:Puget Sound Energy - Electric
Address/Locaon :05/08/2018Application Date:3342700425Parcel Number:3916 LAKE WASHINGTON BLVD N
Permit Type:05/18/2018Issue Date:Franchise
Permit Work Class:05/20/2019Expiration Date:Minor Utility
Job Number:105087045Franchise Type:Electric
Description:Install new UG termination and riser on P01 to feed new plat. Trench 140' East on N 40th St to private property.
Remove down guy and anchor for ADA ramp. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
CITY OF RENTON ROW 1055 S Grady Way
Renton, WA 98057-3232
Owner
ANISH KUMAR
PUGET SOUND ENERGY - ELECTRIC
6905 S 228th St
Kent, WA 98032
B: (253) 208-2183Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 | Published: 3/30/2017
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 3/30/2017
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the
Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for
trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street
☐ Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour.
All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Puget Sound Energy - Electric
105087045
Anish Kumar
253-208-2183
anish.kumar@pse.com
1125 N 40th St 98056 105087045 Lakeview
Crew to install new UG termination and riser on P01 to feed new plat 'Lakeview'.
Trenching~140' East on N 40th St to private property. No pavement cuts anticipated.
Restoration per City of Renton standards.
Potelco Inc.253-208-2183
BL005109 Poteli*227PL
5/08/2018
3916 Lake Washington Blvd N
Scott Warlick 5/9/2018
MFP18002444
Justin Johnson 5-17-2018
CITY OF RENTON
TRAFFIC CONTROL PLAN
PROJECT NAME: PERMIT#
CONSTRUCTION COMPANY: PHONE#:
CONTACT NAME: PHONE#:
ADDRESS: CELL#:
E-MAIL ADDRESS: FAX#:
PROJECT LOCATION: N/E/S/W OF:
WORK TIME: APPROVED BY:
WORK DATE: APPROVAL DATE:
OFFICE COPY T-
CONTRACTOR
DEV. SERVICE, INSPECTION P. MILLER
DEV. SERVICE, PLAN REVIEW B. BANNWARTH
POLICE CHARLES KARLEWICZ
FIRE FIRE MARSHALL FS #13
Permit Holder agrees to all the following:
• Comply with all traffic regulations of the City of Renton and the State of Washington.
• Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for
all street and lane closures, and the plan shall be performed in compliance with the Manual on
Uniform Traffic Control Devices.
• Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
• Any lane or street closures not in conformance with the approved traffic control plan and/or without
notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200
through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
• Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments,
including all costs of defense and attorney’s fees incurred in defending against same, arising from and
related to implementation of the approved traffic control plans including claims arising from towing of
private vehicles and the acts of the Permit Holder’s agents and employees.
• The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or
judgment, and in such event shall indemnify and hold harmless the City for any such claims paid,
including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.
• In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder
will pay for legal counsel chosen by the City to defend against same.
• Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address
traffic or pedestrian safety or travel.
• By my signature herein, I acknowledge all the above requirements.
PRINT NAME: DATE:
SIGNATURE:
Reset FormPrint Form
105087045 Lakeview
PSE/Potelco Inc.
Lee Brown 425-417-8620
6905 S 228th St, Kent, WA 98032
lee.brown@pse.com
1125 N 40th St
TBD
6/11/2018
Anish Kumar 5/08/2018
MFP18002444
Justin Johnson
5-17-2018Monday through Friday
8:00 am to 3:00 pm
SKETCH
I
-- NORTH --
I
NOTES:
• Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by sketch or reference to WSDOT.
• The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three
working days prior to work.
• Approved Temporary Traffic Control Plan must be at the work site during work hours.
• Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected
by a temporary lane or road closure.
• Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded.
• Total road closure lasting more than 24 hours is subject to the approval by the City Council.
• Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a
company logo or any legally acceptable sign showing the company name, address, and telephone number at a
conspicuous place on the vehicle or equipment.
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
• Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
• Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
72 hours in advance of effective date and time.
• The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
• Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop
(3555 NE 2nd Street).
10101414LK WASHINGTON BLVD N
N 40TH STBIKELANEENDSW
9
-
1
B
BIKESMERGE WITHTRAFFICW
4
-
1
BONE LANEROADAHEADW
2
0
-
4
100'100'100'ROADWORKAHEADW20-1
W
2
0
-
7
A
ONE LANEROADAHEADW20-4100'100'100'ROADWORKAHEADW20-1W20-7APO1STOP
FLAGGER
STOP
FLAGGER
1414STOPFLAGGER
ONE LANE
ROADAHEAD W20-4ROAD
WORK
AHEAD W20-1W20-7A100'100'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Job#1050870451125 N 40th St, Renton, WAMay 1, 2017Sheet 1 of 1 ina.ustemchuk@pse.com(425)424-6425NPSEPUGETSOUNDENERGYNotes:1. All signs and spacing to conform to the MUTCDand City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.4. Sign size can be a minimum of 48" x 48" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.m.28" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPPOLEWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYPuget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063MFP18002444
N
Vicinity Map
47.5274, -122.2027
Owner / Developer Contact Info
officeATTN:
ICAP LAKEVIEW, LLC
3535 FACTORIA BLVD SE
BELLEVUE, WA 98006
FRANCIS RZEGOCKI 425.495.1753
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
PSE
No
No
No
Yes
Yes
Yes
No
YesDeveloper
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
GAS
PHONE
CABLE TV
504195957 105087045
N/A 105087046
N/A 583059282
N/A N/A
N/A N/A
N/A N/A
505177523 107055326
N/A 106332704
N/A N/A
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
Commercial HH
Xfmr Removal
Relocation
Temporary
Job Order
Distribution
Service Stubs
HP Svc/MSA
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.THE CUSTOMER IS RESPONSIBLE FOR PROVIDING ALL TRENCHING, PER THE TRENCH
PROFILE, AND ALL EXCAVATIONS AT THE TRANSFORMER/HANDHOLE VAULT SITES
SUCH THAT PSE FACILITIES WILL MATCH FINAL GRADE. VAULT HOLES WILL HAVE
STABLE LEVEL BOTTOMS. CUSTOMER WILL PROVIDE 6" OF CRUSHED ROCK FOR
VAULT BEDDING. ALL TRENCHES WILL HAVE 6" OF WASHED SAND COVER AND 4"
BEDDING FOR ALL CONDUITS. THE CUSTOMER WILL PROVIDE SELECT BACKFILL, IF
REQUIRED, AND COMPACTION AS NECESSARY. THE CUSTOMER IS RESPONSIBLE FOR
DISPOSAL OF ALL NATIVE SPOILS NOT SUITABLE FOR USE AS BACKFILL. ALL
TRENCHES MAY BE JOINT WITH GAS, TELEPHONE AND TV CABLE.
ALL CABLES/CONDUITS TO BE INSTALLED IN CUSTOMER'S TRENCH AT THE DEPTH
INDICATED IN TRENCH DETAIL (DEPENDENT UPON SIZE OF CONDUIT BEING INSTALLED
TO MEET MIN 36" OF COVER). INSTALL CABLE ID TAGS AT EACH END OF THE PRIMARY
CABLES PER THE CIRCUIT ONE-LINE DIAGRAM.
UNLESS OTHERWISE SPECIFIED BY MUNICIPALITIES, INSTALL PVC (DB-120) ROAD
CROSSINGS AS INDICATED ON THE CROSSINGS CONDUIT TABLE & AS SHOWN ON
WORK SKETCH. CROSSINGS SHALL BE INSTALLED BY CUSTOMER/DEVELOPER PER
PUGET SOUND ENERGY STANDARDS.
AT SYMBOL: INSTALL UNDERGROUND PRIMARY CABLES IN
CONDUIT. CABLE LENGTH AND CONDUIT SIZE AS INDICATED ON PRIMARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL 600 VOLT UG SECONDARY CABLES IN
CONDUIT. CABLE/CONDUIT SIZE AND LENGTH AS INDICATED ON SECONDARY CABLE &
CONDUIT TABLE.
AT SYMBOL: INSTALL MINI-PAD HANDHOLE & PADMOUNT TRANSFORMER.
ADDITIONAL EQUIPMENT AS INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY PEDESTAL/HANDHOLE W/ (3)
MULTI-CONNECTORS. SIZE AS INDICATED ON SECONDARY HH/PEDESTAL TABLE.
(EXCAVATION: 3' SQ.)
AT SYMBOL: INSTALL JUNCTION BOX HANDHOLE. ADDITIONAL EQUIPMENT AS
INDICATED ON VAULT TABLE.
AT SYMBOL: INSTALL SECONDARY CABLE & CONDUIT STUB-OUT.
AT SYMBOL: INSTALL STREET LIGHTING STANDARD. SIZE AND TYPE OF
STANDARD/LUMINARIE AS INDICATED ON STREET LIGHTING TABLE. (CUSTOMER TO
EXCAVATE & INSTALL CORRUGATED STREET LIGHT TUBES FOR PLACEMENT OF THE
STREET LIGHT STANDARDS. )
INCLEMENT WEATHER CONDITIONS MAY CAUSE DELAYS IN CONSTRUCTION TIMES
AND DATES.
POWER GENERAL NOTES - PLAT PROJECT
105087045107055326DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Lee Brown 425-417-8620 12.14.17
Joanna Yang 206-503-0706 12.14.17
Joanna Yang 206-503-0706 12.14.17
E. HAUSER .12.14.17
RW-103693 City of Renton
LAKEVIEW
1Ø PRIMARY U/G LINE EXTENSION - 17 S/F LOTS
1125 N 40TH ST, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 081-60
107055326 105087045
N/A 1 OF 3
KING 30 CIKNC QCSOKE
32NW-T24N-R05E 200.080 202.082
2405E126 2405E136 2405E126 HAZ-15
COMCAST
BILL WALKER
253-288-7538
CENTURYLINK/QWEST
KENNETH LUU
206-346-0144
RIGHT OF WAY
VAL CONNELL
425-462-3518
.
.
.
11.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:LEE BROWN
425-417-8620
Lee.Brown@pse.com
x
x xx
Standoff Bracket
15" Min Length
Conduit Clamp
Conduit Field Face
Quadrant
Climbing
SpaceRoad Face
Quadrant
Climbing
Space
5" Min
CL LCDirection of Vehicular Traffic
CONDUIT RISER PLACEMENT DETAIL
TOP VIEW
NOT TO SCALE
...
...
...
FRANCIS@ICAPEQUITY.COM
VAULT DETAIL @ V02, V03
NOT TO SCALE
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTTYPICAL NOTCH-OUT FOR TRANSFORMER,
NOT TO SCALE
& SECONDARY PEDESTAL/HANDHOLE
BACK OF EASEMENT
STANDARD
EASEMENT
LINE
ROW
10'
PL
1'
4' - 5'
Min.
1'
7'7'
TRANSFORMER
(WHEN PRESENT)
42"
45°42"
1'
45°Property LineRoad Side
Top View of Mainline Trench for
Single Stubout Location
3'Property LineRoad Side
Top View of Mainline Trench for Pedestal
or Double Stubout Location
42"45°
3'
45°
STUBOUT EXCAVATION DIMENSIONS
NOT TO SCALE
JOINT TRENCH DETAIL
NOT TO SCALE JOINT TRENCH DETAIL
NOTES:
1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. *
If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. *
2. Rocks greater than 10 inches diameter are not permitted in the final backfill.
3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the
side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line.
4. Utilities shall not be stacked over the gas line in the trench.
5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements.
6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies.
* Alternatives to full-width trench shading require PSE approval.
Primary & Secondary-Mainline Gas & Communications (NTS)
ROAD SIDE
NATIVE
SECONDARY POWER
PEDESTAL
MATERIAL
P/L
Power
Secondary
Power
Primary
Conduit
Tel. & TV
12" Min
12" Sand
Cover when
gas line is in
trench
Sand
6" or 12"
4" Sand Bedding
1'
36"
Cover
42"
Gas
12"
18"
Lower 2"
10"
Pedestal
PSE 10' FRONTAGE
EASEMENT
1'
Cover
ROAD SIDE
MINIPAD
MINIPAD
FIELD SIDE
VAULT
6" of crushed rock
(base for vault)
P/L
Power
Secondary
Power
Primary
Gas
12" Min Horizontal Separation
Communications
42" Min
21"1'
Feeder
38"
2"
4" Sand Bedding
12" Sand
Cover
36"
Cover
4" Sand Bedding
42"
6" Additional depth when
Feeder is required
PSE 10' FRONTAGE EASEMENT
1'
TRANSFORMER
Final
Backfill
Initial
Backfill
Trench Depth
42" - 48"
Primary
Dirt Pile
Final Grade
24" Min
36"
Min Cover
Over Power 48"
Max
Depth
Final Backfill
Gas
4" Sand Bedding
Property Line
intercept (depth varies).
SidewalkCurb
Location of roof drain
48" Typical
Width may vary per
Number of Utilities
and Conduits
6" or 12" Min Sand Shading
Over Gas after Compaction
12" Min
R/W or
Excavated
12" Typical
Power
Secondary
Power
TV & TEL
12" Min
12" Min
Separation
4,5
1,2
1
3
6
6" or 12" Min Sand Shading
Over Power after Compaction1
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
OIL-FILLED EQUIPMENT
TRANSFORMER
APPROVED
AREA
COMBUSTIBLE BUILDING WALLS & ROOF10'
10'
10'
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PSE EQUIPMENT
NOT TO SCALE
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
3'
MIN
3' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
3' MIN
@ H1A,H2A
SHALL BE STAGGERED
CONNECTOR BARS
IN THE FRONT
NEUTRALS SHALL BE 18"
16"
13"
12"10"
2"
10"
Pedestal will accept up to six 3" conduits
SEALED WITH FOAM
CONDUIT SHALL BE
120 PVC CONDUIT ELBOWS
TYPICAL 24" RADIUS DB
SIDE VIEW WITH CONDUIT
10"
18"
16"
13"
10"
2"
36"
FRONT VIEW WITH CONDUIT
SECONDARY PEDESTAL DETAIL
NOT TO SCALE
SITE
644 HH
Excavation - 11-1/4 cubic yards
SIDE VIEW
Rock
Crushed
6"
4'-4"
2"
4'-0"6'-0"
6"6'-7"
3'-6"
4'-8"
7'
10'
TOP VIEW
VAULT DETAIL @ V01
NOT TO SCALE
MFP18002444
8
9
12
14
15
16
11
13
7
17
10
6
5
OPEN SPACE TRACT
2
1
SD AND MONUMENT
TRACT
3
4
PARK AVE NN 40TH ST
86LAKE WASHINGT
ON BLVD N#2ACSR#2ACSRFUSE @100T
SW#T80233
4/O CU4/O CU115kV115kVFUT: 1-2"
GAS ONLY
DEVELOPER RESPONSIBLE
FOR CONDUIT/WIRE FROM
H1B TO METER LOCATION
N 39TH CT WELLS AVE N'A''B'
'C''D'
'F''E'
1'' = 50'
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
SITE PLAN
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
HAZ-15
1.13.18
201 261 240
8 0 0
209 261 240
...
...
...
SCHED.SQ. FT.
MAX LRC =
CIRCUIT FEET ADDED: 1075
27 2495
109 AMPS
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
DEDICATED FACILITIES (105087045) for Dedicated Stub Location
SPAN ADDITIONAL REMARKS LABOR UNITS
FROM TO FOOTAGE
H1A LOT 12 60 DED. CONDUIT & WIRE 2-36, 2-54A
V03 LOT 14 60 DED. CONDUIT & WIRE 2-36, 2-54A
TOTAL FT=120
CROSSINGS CONDUIT TABLE
X-ING
NO.
LOCATION GAS POWER Length
Remarks (type of crossing)
SIZE Type Qty Location SIZE Type Qty
(Primary, Feeder, Secondary, St.
FROM TO (in)sched each N-S-E-W (in)sched each (ft)Light, Gas Only, etc.)
X01 'A''B'4 80 1 N 3 80 2 60 PRIMARY & GAS MAIN
X02 LOT 2 LOT 10 2 80 1 N 3 80 2 60 SECONDARY & GAS SERVICE
X03 LOT 12 LOT 8 4 80 1 N 2 80 2 60 PRIMARY & GAS MAIN
X04 'C''D'4 80 1 N 3 80 1 25 SECONDARY & GAS MAIN
X05 'E''F'4 80 1 N GAS ONLY 30 GAS MAIN
2'' YELLOW SCH 80 PVC = 60 FT 2'' GREY SCH 80 PVC = 120
4'' YELLOW SCH 80 PVC = 175 FT
2" PVC Plug / Caps = 2
4" PVC Plug / Caps = 8 3'' GREY SCH 80 PVC = 265
2" PVC Plug / Caps = 4
3" PVC Plug / Caps = 10
SITE SPECIFIC NOTES
AT P01 319560-166182
-INSTALL NEW L/B OH TO UG TERMINATION (1ɸ - 4/0CU) (TSU1C1) 6043.1000
--TAP Aɸ & FUSE AT 100T (MID: 3412700)
--INSTALL NEW SWITCH NUMBER T80233
-INSTALL NEW 2'' PRIMARY RISER (RIS2CSS) 6042.1000
Removed at site:
Grid Number:
kVA Rating:
Foreman to redline the following information
TRANSFORMER REMOVAL
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
P01
319560-166182
37.5 KVA
Lee Brown 425-417-8620 12.14.17
Joanna Yang 206-503-0706 12.14.17
Joanna Yang 206-503-0706 12.14.17
E. HAUSER .12.14.17
RW-103693 City of Renton
LAKEVIEW
1Ø PRIMARY U/G LINE EXTENSION - 17 S/F LOTS
1125 N 40TH ST, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 081-60
107055326 105087045
1" = 50'2 OF 3
KING 30 CIKNC QCSOKE
32NW-T24N-R05E 200.080 202.082
2405E126 2405E136 2405E126 HAZ-15
COMCAST
BILL WALKER
253-288-7538
CENTURYLINK/QWEST
KENNETH LUU
206-346-0144
RIGHT OF WAY
VAL CONNELL
425-462-3518
.
.
.
Lock Cover
Captive L-Bolt
service
Customer's
conductors
Set handhole flush
to final grade
Side View
17"
Approx
30"
Approx
2"
18"
Captive L-Bolt
Lock Cover, 10 lbs
40-1/2"27-1/4"
Conductors enter from
beneath and shall be
folded back with handhole
SINGLE PHASE SECONDARY HANDHOLE @ H1B
NOT TO SCALE 6050.2000
2-24
SIDE LOT OF LOT 1 AT STEEP
SLOPE; NO EXCAVATION
POSSIBLE; DEVELOPER TO
EXCAVATE IN ROW UNDER
SIDEWALK
MFP18002444
FUSE @ 100T
SW#T-80233
NEW 1/0
(+;$
NEW 1/0
(+;$
NEW 1/0
(+;$
129#
119#
180#
198#96#116#LOT 9
LOT 10
LOT 1
LOT 2
LOT 11
LOT 12
LOT 13
LOT 8LOT 7
LOT 3
LOT 4
LOT 5
LOT 6
LOT 17
LOT 16
LOT 15
LOT 14
EX OVERHEAD CIRCUIT MAP 2405E136
SCALE: 6" = 1 MILE
NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM
NOT TO SCALE
EX UNDERGROUND CIRCUIT MAP 2405E126
SCALE: 1" = 100'
PRIMARY CABLE & CONDUIT TABLE
LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE
FROM TO SIZE
(IN)QTY.
DESIGN
LENGTH
(FT)
BENDS PULL
(LBS)
PULL
REV
(LBS)
CABLE
SIZE
DESIGN
LENGTH
(FT)
PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGE INSTALLED
90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT CABLE
P01 V01 2 1 275 1 3 119 129 1/0 AL JKT 315 EHX870 ---
V01 V02 2 1 235 1 116 96 1/0 AL JKT 255 EHX871 ---
V01 V03 2 1 485 2 198 180 1/0 AL JKT 505 EHX872 ---
V02 E01 2 1 220 1 CONDUIT ONLY
2" PVC (FT) & BENDS =1215 5 3 1/0 AL JKT TOTAL (FT) =1075
VAULT & EQUIPMENT TABLE
SITE #GRID #
VAULT SIZE &
COVER
TYPE & SIZE
EQUIPMENT IN
VAULT
PRIMARY
BUSHINGS TRANSFORMER ID NUMBERS
(COMPANY ID)
AS-BUILT INFORMATION
LB DC FOREMAN: INCLUDE PHASE TAPPED
V01 319540
166201
6'x4'x3'6"
Unistrut HH W/
4'X6'7''X6'' Cover
Matid: 7663001
Matid:7655800
1ɸ Jbox W/ 37.5KVA
MP TRF
120/240
Matid: 6247050
5 1 CMBO15LS 6045.1050 AØ
ELB10J 6041.1000
CAP 7630600
V02 319527
166188
42"x48"x38"
Unistrut HH
Matid: 7663001
37.5KVA MP TRF
120/240
Matid: 6247050
1 1
MINU1SR 6045.1010 AØ
V03 319523
166222
42"x48"x38"
Unistrut HH
Matid: 7663001
37.5KVA MP TRF
120/240
Matid: 6247050
1 1
MINU1SR 6045.1010 AØ
SITE
SECONDARY 2"
SECONDARY 3"
PRIMARY 2"
CONDUIT LEGEND
SECONDARY HH/PEDESTAL TABLE
Site
Pedestal
or
Handhole
Number of
Positions
Required
Remarks
H1A PEDESTAL 4 - SEPS4 6050.1000
H2A PEDESTAL 5 - SEPL6 6050.1000
H1B HANDHOLE 2 - HH13350 6050.2000 CHARGE TO WO#105087046
SECONDARY CABLE & CONDUIT TABLE
LOCATION
CABLE CONDUIT VOLTAGE ASBUILT INFORMATION
SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete
FROM TO (1/O,4/O,350)Design (ft)Lot Corner to
Meter (ft)(in)Design (ft)(Percent)(Percent)Actual Amount Installed Cable Conduit
V01 H1A 350 130 -3 130 2 ---2.1 2.5
V01 H1B 4/0 160 3 160 3 1.5 3.2 CHARGE TO WO#105087046
V01 LOT 1 4/0 80 60 3 80 1 ---2.2 3.5
V01 LOT 2 4/0 85 60 3 85 2 ---2.3 3.5
V01 LOT 9 1/0 15 60 2 15 1 ---2.1 3.0
V01 LOT 10 1/0 15 60 2 15 1 ---2.1 3.0
H1A LOT 11 1/0 -60 2 ----2.6 3.5
H1A LOT 12 4/0 60 60 2 60 1 ---2.6 3.6 LABEL YELLOW TAG "MUST BE 4/0 TO METER"
H1A LOT 13 4/0 65 60 2 65 1 ---2.6 3.7 LABEL YELLOW TAG "MUST BE 4/0 TO METER"
-------------
V02 H2A 350 130 -3 130 3 ---2.1 2.5
V02 LOT 7 1/0 15 60 2 15 1 ---2.0 3.0
V02 LOT 8 1/0 15 60 2 15 1 ---2.0 3.0
H2A LOT 3 4/0 70 60 2 70 1 --1 2.5 3.6 LABEL YELLOW TAG "MUST BE 4/0 TO METER"
H2A LOT 4 1/0 -60 2 -----2.5 3.5
H2A LOT 5 1/0 -60 2 -----2.5 3.5 -
H2A LOT 6 4/0 65 60 2 65 1 --1 2.5 3.6 LABEL YELLOW TAG "MUST BE 4/0 TO METER"
-------------
V03 LOT 14 4/0 75 60 2 75 1 ---1.7 3.3
V03 LOT 15 1/0 15 60 2 -1 ---1.5 2.8
V03 LOT 16 4/0 85 60 3 85 1 ---1.7 3.4
V03 LOT 17 4/0 155 60 3 155 1 ---1.8 3.6 LABEL YELLOW TAG "MUST BE 4/0 TO METER"
1/O UG Triplex (ft) =75 2" PVC & BENDS (ft)=410 10 0 0 2 0.1
4/O UG Triplex (ft) =900 3" PVC & BENDS (ft)=825 13 0 0 0 0.1
350 UG Triplex (ft) =260 TOTAL QTS OF GLUE 0.2
NEW CONDUIT DIAGRAM
NOT TO SCALE
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
###
###
###
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
Lee Brown 425-417-8620 12.14.17
Joanna Yang 206-503-0706 12.14.17
Joanna Yang 206-503-0706 12.14.17
E. HAUSER .12.14.17
RW-103693 City of Renton
LAKEVIEW
1Ø PRIMARY U/G LINE EXTENSION - 17 S/F LOTS
1125 N 40TH ST, RENTON, WA 98056
PUGET SOUND ENERGY
N/A IP 081-60
107055326 105087045
1" = 50'3 OF 3
KING 30 CIKNC QCSOKE
32NW-T24N-R05E 200.080 202.082
2405E126 2405E136 2405E126 HAZ-15
COMCAST
BILL WALKER
253-288-7538
CENTURYLINK/QWEST
KENNETH LUU
206-346-0144
RIGHT OF WAY
VAL CONNELL
425-462-3518
.
.
.
MFP18002444