Construction Permit: C17004398
IVR Number: 17004398
Permit Informaton
Permit Name: Southport Lake Washington Blvd. Phase 3 Improvements
Address/Locaton:09/19/2017Application Date:0823059055Parcel Number: 1101 LAKE WASHINGTON BLVD N
Permit Type:08/13/2018Issue Date:Engineering
Permit Work Class:08/13/2019Expiration Date:Construction
Inspector: Brad Stocco 425-282-2373 Plan Reviewer: Rohini Nair 425-430-7298
Description: Widen Lake Washington Blvd. south of Southport entrance roadway. Correct pavement and curb defect at the SE
corner of LWB and Houser Way constructed under Phase 1 of the Southport LWB Improvements. Install storm
drainage box or bridge for routing of existing storm drainage culverts under LWB. Phase 3/3 of the Southport LWB
Improvements.
Contacts
Name Address PhoneTypeBilling
SCOTT ROSENSTOCK
SECO DEVELOPMENT
B: (425) 282-5833Applicant
Kelly Lynn Bosa
KLB Construction Inc
PO Box 158
Mukilteo, WA 98275-0158
B: (425) 355-7335
C: (425) 297-9316
Contractor
Business License Number: 30136Construction Contractor: KLBCOI*153B8
Jaedi Stevens
TENW
11400 SE 8th St, Suite 200
BELLEVUE, WA 98004
B: (425) 250-0868
C: (425) 891-7467
Engineer
Tim Brockway
Coughlin Porter Lundeen
Engineer
Office at Southport, LLC 1133 Lake Washington Blvd N, 90
Renton, WA 98056
OwnerX
SOUTHPORT LLC 1083 Lake Washington Blvd N
Renton, WA 98056
Owner
General Conditons & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Ÿ
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES