CITY OF RENTON
PLANNING / BUILDING / PUBLIC WORKS
MEMORANDUM
Date: November 13, 2006
To: City Clerk's Office
From: Holly Graber
Subject: Land Use File Closeout
Please complete the following information to facilitate project closeout and indexing by the City
Clerk's Office.
Project Name:
PSE Temporary Substation
LUA (file) Number:
LUA-06-115, TP
Cross -References:
Puget Sound Energy Temporary Substation
AKA's:
Substation - PSE Temporary
Project Manager:
Jill Ding
Acceptance Date:
September 11, 2006
Applicant:
Puget Sound Energy
Owner:
Renton Church of the Nazarene
Contact:
Puget Sound Energy (Andy Markos)
PID Number:
102305-9078
ERC Decision Date:
ERC Appeal Date:
Administrative Approval:
October 2, 2006
Appeal Period Ends:
October 16, 2006
Public Hearing Date:
Date Appealed to HEX:
By Whom:
HEX Decision:
Date:
Date Appealed to Council:
By Whom:
Council Decision:
Date:
Mylar Recording Number:
Project Description: The applicant is requesting a Temporary Use Permit for'the temporary use
of a mobile substation during
the replacement of the President Park electric substation that was
granted site plan approval (file no. LUA06-048). The temporary mobile substation would be
located on a 50 by 100-foot area abutting the Union Avenue NE right-of-way on the Renton Chruch
of the Nazarene property. The
subject property is zoned Residential - 10 dwelling units per acre
R-10 .
Location:
850 Union Ave NE
Comments:
Y
"'R.,u
Kathy Keolker, Mayor
November 9, 2006
Andy Marikas
Puget Sound Energy
3130 S 38th Street
Tacoma, WA 98409
CITT - OF RENTON
Planning/Building/PublieWorks Department
Gregg Zimmerman P.E., Administrator
Subject: Puget Sound Energy Temporary Substation
LUA06-115, TP
Dear Mr. Markos:
This letter is to inform you that the appeal period has ended for the Temporary Use Permit
approval. No appeals were filed. This decision is final and application for the appropriately
required permits may proceed.
If you have any questions regarding the report and decision issued for this temporary use
permit, please call me at (425) 430-7219.
Sincerely,
(rl' 1<111", 32-
xe Z7
61
Jill K. Ding
Senior Planner
cc: Renton Church of the Nazarene / Owner
FINAL NO APPEAR S I -rQ 06--115 � � � � � t T
1055 South Grady Way - Renton, Washington 98055 N
AHEAD OF THE CURVE
This paper contains 50°%recycled material, 30%post WnSumor
TEMPORARY USE PERMIT
City of Renton File Number: LUA06-115, TP
Project Name: Puget Sound Energy Temporary Substation
Location: 850 Union Avenue NE
Property Owners: Renton Church of the Nazarene
Applicant Name: Andy Markos, Puget Sound Energy
Project Description: The applicant is requesting a Temporary Use Permit for
the temporary use of a mobile substation during the replacement of the
President Park electric substation that was granted site plan approval (file no.
LUA06-048). The temporary mobile substation would be located on a 50 by
100-foot area abutting the Union Avenue NE right-of-way on the Renton Chruch
of the Nazarene property. The proposed mobile substation would be utilized for
an approximate 6 month time period,
Date of Permit Issuance: October 2, 2006
Date of Expiration: April 30, 2006
Conditions of Approval:
1. None
V .
>>
Approved by the City of Renton Date: October 2, 2006
Development Services Division Director
Appeals: Appeals of permit issuance must be filed in writing by October 16,
2006 together with the required $75.00 application fee to the City of Renton
Hearing Examiner, City of Renton, 1055 South Grady Way, Renton, WA 98055.
Appeals to the Examiner are governed by City of Renton Municipal Code
Section 4-8-110. Additional information regarding the appeal process may be
obtained from the Renton City Clerk's Office, (425) 430-6510.
WAS ' ion :�
City o...enton Department of Planning / Building / Pula _ lorks
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: Pv-,kn Pe olo—
COMMENTS DUE: SEPTEMBER 25, 2006
APPLICATION NO: LUA06-115, TP
DATE CIRCULATED: SEPTEMBER 11, 2006
APPLICANT: Andy Markos, Puget Sound Energy
PROJECT MANAGER: Jill Ding R E C/E I V E D
PROJECT TITLE: Puget Sound Energy Temporary Substation
PLAN REVIEW: Mike Dotson 2006
SITE AREA: 5,000 square feet
BUILDING AREA (gross): N/A
LOCATION: 850 Union Avenue NE
WORK ORDER NO: 77649 �i.ih. DING Di1lISI0N
SUMMARY OF PROPOSAL: The applicant is requesting a Temporary Use Permit for the temporary use of a mobile substation
during the replacement of the President Park electric substation that was granted site plan approval (file no. LUA06-048). The
temporary mobile substation would be located on a 50 by 100-foot area abutting the Union Avenue NE right-of-way on the Renton
Chruch of the Nazarene property. The subject property is zoned Residential - 10 dwelling units per acre (R-10).
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the
Environment
Probable
Minor
Impacts
Probable
Major
Impacts
More
Information
Necessary
Earth
Air
Water
Plants
LandiShorefine Use
Animals
Environmental Health
Energyl
Natural Resources
B. POLICY -RELATED COMMENTS
C. CODE -RELATED COMMENTS
46 C fs�.'Yiryw„
Element of the
Environment
probable
Minor
Impacts
Probable
Major
Impacts
More
Information
Necessary
Housing
Aesthetics
Li hUGlare
Recreation
Utilities
Transportation
Public Services
Historic/Culturaf
Preservation
Airport Environment
10,000 Feet
14,000 Feet
We have reviewed this a cation with particular attention to those areas in which we have expertise and have identified areas of probable impact or
areas where addition for atio is needed to properly assess this proposal.
Signature i5f Direct r Authorized Representative Date
City o nton Department of Planning / Building / Pub - Yorks
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT:
COMMENTS DUE: SEPTEMBER 25, 2006
APPLICATION NO: LUA06-115, TP
DATE CIRCULATED: SEPTEMBER 11, 2006
APPLICANT: Andy Markos, Puget Sound Energy
PROJECT MANAGER: Jill Din
PROJECT TITLE: Puget Sound Energy Temporary Substation
PLAN REVIEW: Mike Dotson R EC E I V E D
SITE AREA: 5,000 square feet
BUILDING AREA (gross): NIA Up I
LOCATION: 850 Union Avenue NE
WORK ORDER NO: 77649
J v+LVIrVIu vi v'�
SUMMARY OF PROPOSAL: The applicant is requesting a Temporary Use Permit for the temporary use of a mobile substation
during the replacement of the President Park electric substation that was granted site plan approval (file no. LUA06-048). The
temporary mobile substation would be located on a 50 by 100-fact area abutting the Union Avenue NE right-of-way on the Renton
Chruch of the Nazarene property. The subject property is zoned Residential - 10 dwelling units per acre (R-10).
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the
Environment
Probable
Minor
Impacts
Probable
Major
Impacts
More
information
Necessary
Earth
Air
Wafer
Plants
Land/Shoreline Use
Animals
Environmentai Health
Energy/
Natural Resources
B. POLICY -RELATED COMMENTS
C. CODE-RELA TED COMMENTS
Element of the
Environment
Probable
Minor
Impacts
Probable
Major
impacts
More
Information
Necessary
Housing
Aesthetics
Li VGlare
Recreation
Utilities
Trans ortatiort
Public Services
Historic/Cultural
Preservation
Airport Environment
10, 000 Feet
14,000 Feet
We have revr d this application with particular attention to those areas io which we have expertise and have identified areas of probable impact or
areas whe . additional information is needed to properly assess this proposal.
nature or Director ov,%uthorized Representative
/6
Date
City o nton Department of Planning / Building / Pub..., . /orks
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: Fir
COMMENTS DUE: SEPTEMBER 25, 2006
APPLICATION NO: LUA06-115, TP
DATE CIRCULATED: SEPTEMBER 11, 2006
APPLICANT: Andy Markas, Puget Sound Energy
PROJECT MANAGER: Jill Din
PROJECT TITLE: Puget Sound Energy Temporary Substation
PLAN REVIEW: Mike Dotson -
SITE AREA: 5,000 square feet
r-
BUILDING AREA rocs : NIA
LOCATION: 850 Union Avenue NE
WORK ORDER NO: 77649
SUMMARY OF PROPOSAL: The applicant is requesting a Temporary Use Permit for the temfiora&5Re bfl Me sgbstation
during the replacement of the President Park electric substation that was granted site plan approval (file no. LUA06-04$). The
temporary mobile substation would be located on a 50 by 100-foot area abutting the UnionjAvenue NE right-of-way. ori_thp_�Renton
Chruch of the Nazarene property, The subject property is zoned Residential - 10 dwelling units per acre
A. ENVIRONMENTAL IMPACT (e.g. Non -Code) COMMENTS
Element of the
Environment
Probable
Minor
impacts
Probable
Major
Impacts
More
Information
Necessary
Earth
Air
Wafer
Plants
LandlShorefine Use
Animals
Environmentaf Health
Energyl
Natural Resources
B. POLICY -RELATED COMMENTS
C. CODE -RELATED COMMENTS
Element of the
Environment
Probable
Minor
Impacts
Probable
Major
Impacts
More
Information
Necessary
Housing
Aesthetics
Li hUGlare
Recreation
Utilities
Transportation
Public Services
Historic/Cultural
Preservation
Airport Environment
10,000 Feet
14,000 Feet
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or
areas where additional information is needed to properly assess ttVs proposal.
ZZ/ ZZ?Z))
Signature of Director or Authorized Representativ Date
U'--
NOTICE OF APPLICATION
A Master Application has been tiled and accepted with the Development Samiees Olyisian of the City of Renton,
The following brlefSy describes the application and the necessary Public ApprOvats.
PROJECT NAMEINUMSER: Pugct Sound Ereray Temporary Substation I LIJA06-115, TP
PROJECT DESCRIPTION: the appl nart c •eq jesting a Temporary Use Permit for the temporary use of a
mobile suilStation during the replacement of the Pras,dcrt Pa* electric substation that was granted site plan approval {tile
no. LJA06-048f. The ;empoiary mobile substahon would be located on a 50 by 100-foel area abulting the Union Avenue
NE right-of-way on the Renton Chruch of -.he Nazarane property. The subject property is zoned Resident:al . 10 dwelling
units per acre (R-10).
PROJECT LOCAMN: U50 'J ion Avenue NE
PUBLIC APPROVALS: Temporary Use Permit
APPLICANTIPROJECT CONTACT PERSON Andy Markus. Pugel Sound Energy, Tei (253) 476432g5,
Emi andy markos®Pse.com
Comments on the above application must be suhmitted In writing to Jill Ding, Senior Planner, Development
Senrkes Division, 1055 South Grady Way, Renton, WA 98055, by 5:00 PM on September 25, 2008. It you stave
questions about this proposal. or wish to tie made a party n`.ecord and receive additional notification by mailcontact the
Project Manager at {425) 430-7219. Anyore who 5ul,ior3 written comments will automaticVly become a party of record
and will be notified at any decision on thix project
j PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
1awa111a�w rew -
DATE OF APPLICATION; September 1, 2006
NOTICE OF COMPLETE APPLICATION: September 11, 2006
DATE OF NOTICE OF APPLICATION: September 11, 2006
It you would like to be made a party nt recerc tc renews rurthar information an this proposed project, complete this form
and return to City o1 Renton. De+elnpment Plar—g. 1p55 South Grady Way, Renton, WA 96055.
File Name 1 No.: Puget Sound Energy Ternpnrary SLLS:alion 1 LUA06-115, TP
NAME:
MAILING ADDRESS:
TELEPHONE NO:
CERTIFICATION
I,7 ds�� , hereby certify that 3 copies of the above document
were posted by me in _-j conspicuous places or nearby the described property on
DATE: 9 // ail SIGNED:
.-n; .•fr
0.' a f ATTEST: Subscribed and sworn before me, a Notary Public, in and for the State of Washington residing icy
on the
day of
NOTARY PUtLIC SIGN ktltrN*,"I.�
CITY OF RENTON
CURRENT PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAILING
On the 111h day of September, 2006, 1 deposited in the mails of the United States, a sealed envelope
containing Acceptance Ltr & NOA documents. This information was sent to:
Name
Representing
Andy Markos, Puget Sound Energy
Applicant/Contact
Renton Church of the Nazarene
Owner
Surrounding Property Owners
See Attached
(Signature of Sender)_
STATE OF WASH INGTON }
} SS
COUNTY OF KING }
I certify that I know or have satisfactory evidence that Stacy Tucker
signed this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and
purposes mentioned in the instrument.
Dated; c j - - p G
Notary (Print):
My appointment expires:
Project Name: Puget Sound Energy Temporary Substation
Project Number: LUA06-115, TP
344990017008 556145022001 556145008000
ANNAMALAI MAGESH+SUSHMA BERHANU M€NGESHA CHANG KENNETH J+SANDY W K
MINNAL 4336 NE 9TH PL 4345 NE 9TH PL
919 VASHON PL NE RENTON WA 98059 RENTON WA 98059
RENTON WA 98055
102305923306
CHEUNG BILLY M+JENNIFER L
4107 NE 9TH PL
RENTON WA 98059
297230008007
COEN JACOB P
4021 NE 10TH ST
RENTON WA 98056
556145013000
FOSEID PAUL R & MARY JO D
4317 NE 9TH PL
RENTON WA 98059
102305929501
HARDY BRENDA+OSTENBERG
KEN NETH
908 UNION AVE NE
RENTON WA 98059
556145019007
HOSKOVICH JOSEPH A
4318 NE 9TH PL
RENTON WA 98056
556145009008
KAR-GUAN TAY MICHAEL
4341 NE 9TH PL
RENTON WA 98059
556145012002
KOWNG YAM+MUI HANG IVY MAK
6010 118TH AVE SE
BELLEVUE WA 98006
556145011004
LIANG MR & MRS
4331 NE 9TH PL
RENTON WA 98059
556145023009
CHIN WENDY L+WESLEY C
4342 NE 9TH PL
RENTON WA 98059
344990002000
CRAWFORD PATRICIA P
4224 NE 9TH CIR
RENTON WA 98059-4570
556145020005
FUNG HELEN PUI-LING
4324 NE 9TH PL
RENTON WA 98059
102305937900
HAWORTH CASEY D
4108 NE 9TH PL
RENTON WA 98059
344990012009
CHU LI CHUN
4129 NE 9TH PL
RENTON WA 98059
102305912101
FACILITIES & OPERATIONS CTR
OFFICE OF THE EXECUTIVE DIR
300 SW 7TH ST
RENTON WA 98055
344990001002
ET AL HAM YOUNG 100
4218 NE 9TH CIR
RENTON WA 98055
344990006001
HUYNH PHUONG Q+PHOI G PHU
4223 NE 9TH PL
RENTON WA 98055
556145016003
KATO ALAN A
4300 NE 9TH PL
RENTON WA 98059
344990015507
LEE CHARLTON I+KAREN
4201 NE 9TH CT
RENTON WA 98059
344990005003
MARDIAN SHERI+WALSH CHRISTO
902 VASHON PL NE
RENTON WA 98059
344990014005
HERITAGE HOMES INC
845 106TH AVE NE #103
BELLEVUE WA 98004
556145017001
JERNIGAN JANICE RAGNA
10525 CRESTWOOD DR S
SEATTLE WA 98178
344990004006
KLASEY KRISTEN P+MICHAEL G
5910 128TH AVE
BELLEVUE WA 98006
344990016000
LEE WAN YIU+YEE MAI LEE KON
4202 NE 9TH PL
RENTON WA 98059
556145010006
NAPIER JAMES MICHAEL
4335 NE 9TH PL
RENTON WA 98059
556145018009 556145021003 344990003008
PAN JOHNATHAN W PETERSON REBECCA L RAM BALBIR SINGH+KOMAL
4312 NE 9TH PL 4330 NE 9TH PL 4219 NE 9TH CIR
RENTON WA 98059 RENTON WA 98059 RENTON WA 98055
102305909594
RENTON CHURCH OFNAZARENE
PO BOX 2640
RENTON WA 98056
344990018006
SUEN JAMES+ANITA
913 VASHON PL NE
RENTON WA 98059
556145014008
SUTHERLAND DARRELL S+MIHO
4611 NE 9TH PL
RENTON WA 98059
102305924304
TAYLOR KOLIN B+JACKI F
13530 407TH AVE NE
NORTH BEND WA 98045
092305901206
SAVANNAH AT THE PARK
12708 195TH PL SE
ISSAQUAH WA 98027
344990015002
SUEN JOHN
4130 NE 9TH PL
RENTON WA 98055
344990009005
TA SANG L+MENG L
4205 NE 9TH PL
RENTON WA 98056
344990011001
VASQUEZ BENEDICTO+MERLY
4133 NE 9TH PL
RENTON WA 98059
556145015005
SHIOYAMA GEORGE SCOTT+LYNNE
4301 NE 9TH PL
RENTON WA 98059
344990013007
SUN STEVEN
4123 NE 9TH PL
RENTON WA 98059
344990010003
TANG CUONG QUOC+LAN THOAI C
4137 NE 9TH PL
RENTON WA 98059
102305911806
VILAYVANH PHONEMANY
4102 NE 9TH PL
RENTON WA 98059
344990019004 344990007009 344990008007
VOYTOVICH VITALIY WONG TIMOTHY F+SUNAE PARK ZHANG JEFFREY H
907 VASHON PL NE 4217 NE 9TH PL 4211 NE 9TH PL
RENTON WA 98059 RENTON WA 98059 RENTON WA 98059
T�
NOTICE OF APPLICATION
A Master Application has been filed and accepted with the Development Services Division of the City of Renton.
The following briefly describes the application and the necessary Public Approvals_
PROJECT NAME/NUMBER: Puget Sound Energy Temporary Substation I LUA06-115, TP
PROJECT DESCRIPTION: The applicant is requesting a Temporary Use Permit for the temporary use of a
mobile substation during the replacement of the President Park electric substation that was granted site ptan approval (file
no. LUA06-048). The temporary mobile substation would be located on a 50 by 100-foot area abutting the Union Avenue
NE right-of-way on the Renton Chruch of the Nazarene property. The subject property is zoned Residential - 10 dwelling
units per acre (R-10).
PROJECT LOCATION: 850 Union Avenue NE
PUBLIC APPROVALS: Temporary Ilse Permit
APPLICANTIPROJECT CONTACT PERSON: Andy Markos. Puget Sound Energy, Tel: (253) 476-6295;
Eml: andy.markos@pse.com
Comments on the above application must be submitted in writing to Jill Ding, Senior Planner, Development
Services Division, 1055 South Grady Way, Renton, WA 98055, by 5:00 PM on September 25, 2006. If you have
questions about this proposal, or wash to be made a party of record and receive additional notification by mail, contact the
Project Manager at (425) 430-7219. Anyone who submits written comments will automatically become a party of record
and will be notified of any decision on this project.
PLEASE INCLUDE THE PROJECT NUMBER WHEN CALLING FOR PROPER FILE IDENTIFICATION
DATE OF APPLICATION: September 1, 2006
NOTICE OF COMPLETE APPLICATION: September 11, 2006
DATE OF NOTICE OF APPLICATION: September 11, 2006
If you would like to be made a party of record to receive further information on this proposed project, complete this form
and return to: City of Renton, Development Planning, 1055 South Grady Way, Renton, WA 98055
File Name / No.: Puget Sound Energy Temporary Substation 1 LUA06-115, TP
NAME:
MAILING ADDRESS:
TELEPHONE NO
Y
Kathy Keolker, Mayor
September 11, 2006
Andy Markos
Puget Sound Energy
3130 S 38th Street
Tacoma, WA 98409
CITY F RENTON
Planning/Building/PublicWorks Department
Gregg Zimmerman P.E., Administrator
Subject: Puget Sound Energy Temporary Substation
LUA06-115, TP
Dear Mr. Markos:
The Development Planning Section of the City of Renton has determined that the
subject application is complete according to submittal requirements and, therefore, is
accepted for review.
You will be notified if any additional information is required to continue processing your
application.
Please contact me at (425) 430-7219 if you have any questions.
Sincerely,
2
l
Jill K. Ding
Senior Planner
cc: Renton Church of the Nazarene / Owner
1055 South Grady Way - Renton, Washington 98055
MThis Raper contains 5C % recvcled material. 300/o oast consumer
kENTON
AHEAD OP THE CURVE
City of Renton
LAND USE PERMIT
MASTER APPLICATION
PROPERTY OWNER(S)
NAME:
7E N-To K 64ue--qor-Tff61Y
ADDRESS: 63—`�D- , !1 Aelvcrf-
CITY: ZIP:
TELEPHONE NUMBER:
APPLICANT (if other than owner)
NAME:
tau
COMPANY (if applicable)-
ADDRESS:
CITY: � ZIP:
TELEPHONE NUMBER
2S 3 -e4 76, -Ce z � S
CONTACT PERSON
NAME:
COMPANY (if applicable):
ADDRESS:
CITY: � , I } � ZIP:
TELEPHONE NUMBER AND E-MAIL ADDRESS:
w) 253 -q74-6,z?5-&-) z67'3bo-
j, a7 f�vs '� :S e , C&1,4
W5
PROJECT INFORMATION
PROJECT OR DEVELOPMENT NAME:
PROJECT/ADDRESS(S)/LOCATION AND ZIP CODE:
g ,5o Lin 1 �-l�U K1
KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S):
�az3o,5-9o70)
EXISTING LAND USE(S):
PROPOSED LAND USE(S): —r-wtP0v- `� t wdk�11141
t
EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
P-z s, n-co p �,✓ s c
PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION
(if applicable):
EXISTING ZONING:
PROPOSED ZONING (if applicable):
SITE AREA (in square feet): SO X /00
SQUARE FOOTAGE OF PUBLIC ROADWAYS TO BE
DEDICATED: J,//-
SQUARE FOOTAGE OF PRIVATE ACCESS EASEMENTS:
AIZA
PROPOSED RESIDENTIAL DENS)TY IN UNITS PER NET
ACRE (if applicable): l,(/%4-
NUMBER OF PROPOSED LOTS (d appl' able):
NUMBER OF NEW DWELLING UNITS (i applicable):
Q: %veb/pwldevserv/forms/plauning/mas Icrapp.doc l 07/24/05
PROJECT INFORMA
NUMBER OF EXISTING DWELLING UNITS (if applicable):
/v &" e�:
SQUARE FOOTAGE OF PROPOSED RESIDENTIAL
BUILDINGS (if applicable): x//4
SQUARE FOOTAGE OF EXISTING RESIDENTIAL
BUILDINGS TO REMAIN (if applicable): /(/ /4-
SQUARE FOOTAGE OF PROPOSED NqN-RESIDENTIAL
BUILDINGS (if applicable): � 4
SQUARE FOOTAGE OF EXISTING NON-RESDNENTIAL
BUILDINGS TO REMAIN (if applicable): 1/A
NET FLOOR AREA OF NON-RESIDENTIAL BUILDINGS (if
applicable): X/�4
NUMBER OF EMPLOYEES TO BE EMPI DYED BY THE
NEW PROJECT (if. applicable): /V/A
TION (continued
PROJECT VALUE. # lD l D 0 CD
IS THE SITE LOCATED IN ANY TYPE OF
ENVIRONMENTALLY CRITICAL AREA, PLEASE INCLUDE
SQUARE FOOTAGE (if applicable): A%%A—
❑ AQUIFER PROTECTION AREA ONE
❑ AQUIFER PROTECTION AREA TWO
❑ FLOOD HAZARD AREA
sq. ft.
❑ GEOLOGIC HAZARD
sq. ft.
❑ HABITAT CONSERVATION
sq. ft.
❑ SHORELINE STREAMS AND LAKES
sq. ft.
❑ WETLANDS
sq. ft.
LEGAL. DESCRIPTION OF PROPERTY
Attach legal description on separate sheet with the following information included
SITUATE IN THE N_��L QUARTER OF SECTION %v, TOWNSHl13�'JRANGE.��1N THE CITY
OF RENTON, KING COUNTY, WASHINGTON.
TYPE OF APPLICATION & FEES
List all land use applications being applied for:
.Pay..L�s� PEr2 OA 3.
2. 4.
Staff will calculate applicable fees and postage: $
AFFIDAVIT OF OWNERSHIP
1, (Print Names) m An a V MAa� S . declare that I am (please check one) _ the current owner of the property
involved in this application or ` - .the authorized representative to act for a corporation (please attach proof of authorization) and that the foregoing
statements and answers ein contained and the information herewith are in all respects true and correct to the best of my knowledge and belief.
I certify that I know or have satisfactory evidence that
signed this instrument and. acknowledged it to be hls/herltheir free and voluntary act for the
uses and purposes mentioned in the instrument.
(Signature of _Chww"/Representative)
(Signature of Owner/Representative)
Notary Punic in and for the State of Washington
Notary (Print) I,At t't� 1-11 LA—) LLICi
My appointment expires:_ 31q 1, C
Q:weWpw/devserv/forms/planninVmasterapp_doc 2 07/29/05
ABATEMENT AGREEMENT
TEMPORARY USE
City of Renton Development Services Division
1055 South Grady Way, Renton, WA 98055
Phone: 425-430-7200 Fax: 425-430-7231
-Sc-- F I-- tL4,�, hA L- t J( t v,
Use Permit at the Location of:
being the Applicant for the Temporary
50 tk,urvK AV xIr= , 12F-r4 rs1, W0-
Hereby authorize the City of Renton to summarily eliminate the Temporary Use and all evidence
of the use if it has not been removed as required by the terms of the permit. I also agree to
reimburse the City foray expense incurred in abating this Temporary Use.
Signature:
Print Name: / of F r.A c A eeI-, l %.I
Date: 0 - 03 - o ca
STATE OF WASHINGTON )
) SS
COUNTY OF KING )
I certify that I know or have satisfactory evidence that 5 114C Me- signed
this instrument and acknowledged it to be his/her/their free and voluntary act for the uses and
purposes mentioned in the instrument.
Dated: ��ap
�Nota- b is in and for the State of Wjhington
Notary (Print): 10" K)e- N1 -
My appointment expires:. -7— 2cl r D
PW/DevServlFormslPIan ningfrempuseabatement 8 GV06
EPA
DEVELOPMENT SERVICES DIVISION
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPLICATIONS
LAND USE PERMIT SUBMITTAL
REQUIREMENTS:
WAIVED
BY:
MODIFIED
BY:
COMMENTS:
Calculations 1
Colored Maps for Display 4
Construction Mitigation Description 2AND 4
Deed of Right -of -Way Dedication 2
Density Worksheet 4
Drainage Control Plans
_.
rainage Report 2
Elevations, Architectural 3 AND
Environmental Checklist 4
Existing Covenants (Recorded Capy)4
Existing Easements (Recorded Copy) 4
Flood Hazard Data 4
Floor Plans 3AND 4
Geotechnical Report 2 AND 3
Grading Plan, Conceptual 2
Grading Plan, Detailed 2
Habitat Data Report 41V(,d,Clt
a A1.� d1r
Improvement Deferral 2
Irrigation Plan 4
King County Assessor's Map Indicating Site 4
Landscape Plan, Conceptua14
Landscape Plan, Detailed 4
Legal Description 4
List of Surrounding Property Owners 4
Mailing Labels for Property Owners 4
Map of Existing Site Conditions 4
Master Application Form 4
Monument Cards (one per monument) 1
Neighborhood Detail Map 4
This requirement may be waived by:
1- Property Services Section
2. Public Works Plan Review Section
3. Building Section
4. Development Planning Section
Q.NWEBIPIMDEVSERV1FormslPlanninglwaiver.xis 11/0412005
DEVELOPMENT SERVICES DIVISION
WAIVER OF SUBMITTAL REQUIREMENTS
FOR LAND USE APPLICATIONS
LAND USE PERMIT SUBMITTAL
REQUIREMENTS:
WAIVED
BY:
MODIFIED
BY:
COMMENTS:
Parking, Lot Coverage & Landscaping Analysis 4
Plan Reductions (PMTs) 4
Plat Name Reservation 4
Postage 4
Preapplication Meeting Summary 4
Public Works Approval Letterz
Rehabilitation Plan 4
Screening Detail 4
Site Plan 2 ANo 4
Stream or: Lake Study, Standard 4
Stream or Lake Study, Supplemental4�
Stream or Lake Mitigation Plan 4
Street Profiles 2
Title Report or Plat Certificate 4
Topography Map 3
Traffic Study 2
Tree Cutting/Land Clearing Plan 4
j i( Ilk
Urban Center Design Overlay District Report a .
Utilities Plan, Generalized 2
Wetlands Mitigation Plan, Final 4
Wetlands Mitigation Plan, Preliminary 4
Wetlands Report/Delineation 4Ifle-vz
Wireless:
Applicant Agreement Statement 2 AND 3
Inventory of Existing Sites 2 AND 3
Lease Agreement, Draft 2AND 3
Map of Existing Site Conditions 2 AND 3
Map of View Area 2 AND 3
Photosimulations 2AND 3
This requirement may be waived by:
1. Property Services Section
2. Public Works Plan Review Section
3. Building Section
4. Development Planning Section
PROJECT ft &4
.A� r
Q:%WFBIPW\DEVSERV1Forms\Planninglwaiver.xls 11104/2005
PUGET SOUND ENERGY, INC
MOBILE SUBSTATION IN SUPPORT OF THE PRESIDENT PARK
SUBSTATION REBUILD
PERMIT SUBMITTAL PROJECT NARRATIVE
Project Narrative gemporary Use Permit Submittal Requirement #5
• The proposed project is the temporary use of mobile substation in support of the
rebuild of the President Park electric distribution substation. The temporary location
of the mobile substation is on a 50 x 100 ft area immediately adjacent to the Union
Ave NE right of way on the Renton. Church of the Nazarine Property, tax parcel #
1023059078. The President Park Substation re -construction project is located on a
1.03-acre site at 475 Union Avenue NE, Renton WA, tax parcel #0923059164.
• Land Use Permit required is a Temporary Use Permit.
• The property is zoned Residential R10, as are the adjacent properties to the south and
west. The adjacent property to the north is zoned Residential R-1. The site is within
the Comprehensive Plan Designation Residential Moderate Density.
• The 50x100 ft site currently is graveled and is not specifically used. The property is a
church facility.
• There are no special features on the site.
• The site is underlain by Alderwood gravelly sandy loam, with tested infiltration rates
ranging from 8.1 to 5.1 inchesihour.
• At the completion of this proposed use, the 50x100-ft area is proposed to be planted
with grass sod.
• This project does not include plat development.
• Site access will utilize existing driveways.
• No offsite improvements are proposed.
• Total estimated construction costs and estimated fair market value of the project is
$10,000.
• There will be no materials excavated or imported as a result of this project.
• There will be no trees or vegetation removed as a result of this project. The 50x100-ft
site will be re -landscaped with grass sod the completion of the proposed use.
• This project does not include land dedication to the City.
• The temporary use will be for an approximate 6 month period.
PUGET SOUND ENERGY, INC
MOBILE SUBSTATION IN SUPPORT OF THE PRESIDENT PARK
SUBSTATION REBUILD
PERMIT SUBMITTAL PROJECT NARRATIVE
Construction Mitigation (Temporary Use Submittal Requirement #6
• PSE proposes to locate the mobile substation and connect the sub to existing
transmission and distribution systems on or about October 1, 2006 dependent on
Temporary Use Permit Approval. PSE anticipates that the President Park substation
will be back on line on or about February, 2007, at which time the mobile substation
will be removed from the site, and the area will be landscaped with grass sod.
• The substation will operate continually during the October through February time
period. There will be no transportation/hauling requirements, there will be no noise,
dust or other impacts, there will be no need for special hours of operation or
preliminary traffic control plan.
RIGHT OF ENTRY, LICENSE AND
TEMPORARY CONSTRUCTION EASEMENT
This Right of Entry and Temporary Construction Easement between Puget Sound Energy, Inc., a
Washington Corporation (PSE), hereinafter c�IJed Grantee, and _Renton Church ,of the Nazarene,
hereinafter called Grantor, is made this V day of Me. , 2006.
RECITALS
A. Description of Property. Renton Church of. the Nazarene (Grantor) warrants that they are the
owners of the real property ("The Property") legally described as:
102305 78 LOT A of RENTON LUA-03-098 REC #20040212900008 SD LLA LOCATED iN N'/i
OF S % OF SW V, OF NW'/4 POR TAXABLE LOT A OF RENTON LLA-03-098 REC #
20040212900008 SD LLA LOCATED IN N'/z OF S % OF SW'/4 OF NW'/4 POR EXEMPT
(Tax Parcel Number: 10230 -9078
IN CONSIDERATION of the premises and the mutual covenants and agreements herein set forth, it is
agreed by and between the parties as follows:
1 Rift of Entry. License. and Construction Easement. Grantor grants a Right of Entry, License and
Temporary Construction Easement to PSE, its agents, employees and contractors, to enter and use
the Temporary Construction Easement for the accommodation of construction equipment and materials
necessary for completion of PSE's gas pipeline. The easement area is delineated on the drawing
attached as Exhibit "A" and further described as follows: An area located In the west 75 feet of said
parcel # 102305-9078, which is 50 feet wide by 100 feet long, and situated in between the two
existing driveways, and directly east of existing Church sign and planter area. Ingress and
egress will be In existing driveways,
2. Restoration_ Upon completion of its construction project. PSE or its agent shall return the Temporary
Construction Easement area and all portions of the property affected by use of the easement to a
condition reasonably comparable to the condition in which it existed prior to PSE's use of this
easement. PSE will also replace Grantor's3 existing poles with new ones, when use of the easement is
complete. The poles are to be 4-inch poles, one pole is a flag pole, and one pole is a lamp pole, with
power to be run to it.
3. Indeynnhy. Grantee agrees to indemnify Grantor from and against liability incurred by Grantor as a
result of Grantee's negligence in the exercise of the rights herein granted to Grantee, but nothing
herein shall require Grantee to indemnify Grantor for that portion of any such liability attributable to the
negligence of Grantor or the negligence of others,
4. Term. This Agreement shall be effective from the date PSE notifies its contractor to proceed with
construction, and shall terminate within 180 days of acceptance.
If due to circumstances beyond PSE's control, which does not allow for the construction to be
completed by the above scheduled date, PSE will present to the Grantor, in writing, a revised
construction schedule for their approval, which shall not be unreasonably withheld.
5. Payment. In return for the rights granted to PSE herein, PSE agrees to pay Grantor the sum of
$60_ 00,00 far the 180 days and this amount is to be paid up front. The Grantor is entitled to entire
$ 000.00, even if PSE does not use the Temporary Construction for the entire 180-day.period. Should
PSE have a need to go beyond the initial 180 days, the monthly amount will be increased by 25% to
$1 2. , 50.00 per month for each month over.
6. Succ ssors and Assigns. Without limiting the generality of the foregoing, the rights and obligations of
the parties shall inure to the bereft of and be binding upon their respective successors and assigns.
GRANTOR
Print Name, Boar Me ber
Signature
PSE Job No.
SfT/R:
Op Map Number:
j -I
STATE OF WASHINGTON )
)SS
COUNTY OF KING )
On this _ day of , 2005, before me, a Notary Public in and for
the State of Wash' gton, duly commissioned and sworn, personally appeared
{ 1 7v.►�tL� 4rAr6 e. D 6%OWW10—to me known to be the individual(s)
who .executed the within and foregoing instrument, and acknowledged that �- signed the same as
free and voluntary act and deed, for the uses and purposes therein mentioned.
GIVEN UNIDER my hand and official seal heret axed the y a y in this certificate first
above written.
�R*ti�����r1111t t l t l
!ly�`, (Signature of Notary)
pTA,♦ 'Y �� (Print or stamp name of Notary)
PSE Job No.
SMR:
Op Map Number:
�. 4k — +�
s
NOTARY PUBLIC in and for the State of
Washington,residing at 4'kl
My Appointment Expires;
DEVELOPMENT SERVICES DIVISION
ENVIRONMENTAL CHECKLIST
City of Renton Development Services Division
1055 South Grady Way, Renton, WA 98055
Phone: 425-430-7200 Fax: 425-430-7231
PURPOSE OF CHECKLIST:
The State Environmental Policy Act (SEPA), Chapter 43.21 C RCW, requires all governmental agencies to
consider the environmental impacts of a proposal before making decisions. An Environmental Impact
Statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the
quality of the environment. The purpose of this checklist is to provide information to help you and the
agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can be
done) and to help the agency decide whether an EIS is required.
INSTRUCTIONS FOR APPLICANTS:
This environmental checklist asks you to describe some basic information about your proposal.
Governmental agencies use this checklist to determine whether the environmental impacts of your
proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most
precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your Knowledge. In most cases,
you should be able to answer the questions from your own observations or project plans without the need
to hire experts. If you really do not know the answer, or if a question does not apply to your proposal, write
"do not know" or "does not apply". Complete answers to the questions now may avoid unnecessary
delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if you can. If you have problems, the governmental agencies can
assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your proposal
or its environmental effects. The agency to which you submit this checklist may ask you to explain your
answers or provide additional information reasonably related to determining if there may be significant
adverse impact_
USE OF CHECKLIST FOR NONPROJECT PROPOSALS:
Complete this checklist for nonproject proposals, even though questions may be answered "does not
apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions (actions involving decisions on policies, plans and programs), the references in the
checklist to the words "project," "applicant," and "property or site" should be read as "proposal,"
"proposer," and "affected geographic area," respectively.
NARenton Pres Park mobile sub SEPA checklist.doc08122J06
A. BACKGROUND
Name of proposed project, if applicable:
Mobile Substation in support of the President Park Substation Reconstruction
2. Name of applicant:
Puget Sound Energy, Inc.
3_ Address and phone number of applicant and contact person:
Andy Markos, AICP
Municipal Land Planner
3130 South 38th Street
Tacoma, WA 98409
(253) 476-6295
4. Date checklist prepared:
August, 2006
5, Agency requesting checklist:
City of Renton Planning/Building/Public Works
6. Proposed timing or schedule (including phasing, if applicable):
Reconstruction of the President Park substation is currently scheduled to occur over the
fall and winter of 2006/07. The siting and operation of the mobile substation is critical to
meet the electrical demands during cold weather periods while the President Park
substation is off line. It is anticipated that the mobile substation will be required through
the end of the 1st Quarter of 2007, at which time President Park Substation will be back on
line.
7. Do you have any plans for future additions, expansion, or further activity related to or connected
with this proposal? If yes, explain.
No.
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal.
None
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
None known at this time.
10. List any governmental approvals or permits that will be needed for your proposal, if known.
Temporary Use Permit
NARenton Pres Park mobile sub SEPA checklist.doc 2
11. Give brief, complete description of your proposal, including the proposed uses and the size of the
project and site.
PSE owns and operates the existing President Park electric distribution substation.
During construction, when the President Park Substation is off line, PSE will need to
provide temporary back up electrical energy support, particularly during high demand
associated with cold temperatures. PSE owns a trailer -mounted mobile substation (see
pictures attached) which, when appropriately located adjacent to transmission and
distribution lines, can provide the necessary support to the electrical system. PSE has
identified an ideal location for this temporary usage. PSE has entered into an agreement
with the property owners (attached) which provides for temporary use, ingress and egress
for these facilities.
12. Location of the proposal. Give sufficient information for a person to understand the
precise location of your proposed project, including a street address, if any, and section, township,
and range if known. If a proposal would occur over a range of area, provide the range or
boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic
map, if reasonably available. While you should submit any plans required by the agency, you are
not required to duplicate maps or detailed plans submitted with any permit applications related to
this checklist.
The proposed site for the Temporary Use Permit for the operation of the Mobile Substation
is 850 Union Ave NE. The site of the temporary use is a 50 X 100 ft area adjacent to the
Union Ave Right of Way, on the Renton Church of the Nazarene, tax parcel 1023059078.
[The President Park electric distribution substation is located on a 1.03-acre site at 475
Union Avenue NE, Renton WA, tax parcel #0923059164.)
B. ENVIRONMENTAL ELEMENTS
EARTH
a. General description of the site (circle one); flat, rolling, hilly, steep slopes, mountainous,
other.
The Site is a graveled area adjacent to Union Ave NE in front of the church parking
lot.
b_ What is the steepest slope on the site (approximate percent slope?)
The site is flat.
C. What general types of soils are found on the site (for example, clay, sand, gravel, peat,
muck)? If you know the classification of agricultural sails, specify them and note any
prime farmland.
The site has been mapped as Alderwood gravelly sandy loam.
Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
No.
WRenton Pres Park mobile sub SEPA checklist,doc
e. Describe the purpose, type, and approximate quantities of any filling or grading proposed.
Indicate source of fill.
None.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
No.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
None of the 50 X 100 ft area is impervious.
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
None.
2. AIR
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile,
odors, industrial wood smoke) during construction and when the project is completed? If
any, generally describe and give approximate quantities if known.
None.
b. Are there any off -site sources of emission or odor that may affect your proposal? If so,
generally describe.
There are no known off -site emission or odors that will affect this proposal.
C. Proposed measures to reduce or control emissions or other impacts to air, if any:
There are no measures proposed to reduce or control emissions or other impacts
to air.
3. WATER
a. Surface Water:
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type
and provide names. If appropriate, state what stream or river it flows into.
There are no surface water bodies or wetlands on site or immediately adjacent to
this site that PSE is aware of.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
No.
NARenton Pres Park mobile sub SEPA checklist.doc 4
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
None.
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
No.
5) Does the proposal lie within a 100-year flood plain? If so, note location on the site plan.
No.
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
IM
b. Ground Water:
1) Will ground water be withdrawn, or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known.
There will be no ground water withdrawls or discharges associated with this
project.
2) Describe waste material that will be discharged into the ground from septic tanks or other
sources, if any (for example: Domestic sewage; industrial, containing the following
chemicals...; agricultural; etc.). Describe the general size of the system, the number of
such systems, the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve.
There will be no waste material discharges.
C. Water Runoff (including storm water):
1) Describe the source of runoff (including storm water) and method of collection and
disposal, if any (include quantities, if known). Where will this water flow? Will this water
flow into other waters, If so, describe.
There will be no change in existing conditions that would increase or decrease
stormwater runoff.
2) Could waste material enter ground or surface waters? If so, generally describe.
No.
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if
any:
None proposed,
WRenton Pres Park mobile sub SEPA checklist.doc 5
4. PLANTS
a. Check or circle types of vegetation found on the site:
_x— deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
x_ grass
pasture
crop or grain
wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants: water lily, eel grass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
No vegetation will be removed or altered as a result of this project.
C. List threatened or endangered species known to be on or near the site.
There are no known threatened or endangered plant species on or near the site.
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
None proposed.
5. ANIMALS
a. Circle any birds and animals which have been observed on or near the site or are known
to be on or near the site:
Birds: hawk, heron, eagle, songbirds, other
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon, trout, herring, shellfish, other
b. List any threatened or endangered species known to be on or near the site.
There are no known threatened or endangered animal species on or near the site.
C. Is the site part of a migration route? If so, explain
Not to PSE's knowledge.
d. Proposed measures to preserve or enhance wildlife, if any:
No measures are proposed.
6. ENERGY AND NATURAL. RESOURCES
a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the
completed project's energy needs? Describe whether it will be used for heating,
manufacturing, etc.
WRenton Pres Park mobile sub SEPA checklist.doc 6
The proposed project is temporary in nature and in support of the re -construction of
an existing electrical substation facility. There will be no need for any other energy
supply at this site.
b. Would your project affect the potential use of solar energy by adjacent properties? If so,
generally describe.
No.
C. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
None proposed.
7. ENVIRONMENTAL HEALTH
a. Are there any environmental health hazards, including exposure to toxic chemicals, risk
of fire and explosion, spill, or hazardous waste, that could occur as a result of this
proposal? If so, describe.
No
1) Describe special emergency services that might be required.
No special emergency services will be required.
2) Proposed measures to reduce or control environmental health hazards, if any:
None proposed.
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
Existing noises will not effect the proposed project.
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hours noise would come from the site.
Potential short-term noise associated with project set up will be mitigated through
normal construction hours of operation. There will be no long-term related noise
issues associated with this proposed project.
3) Proposed measures to reduce or control noise impacts, if any:
Potential short-term set up related noise will be mitigated through allowable
construction hours of operation.
8. LAND AND SHORELINE USE
a. What is the current use of the site and adjacent properties?
NARenton Pres Park mobile sub SEPA checklist.doc 7
The parcel is zoned residential R-10 and is a church. The property to the south is
zoned R-10 and is a school. The property to the west is zoned Residential and is a
park. The property to the north is zoned residential and is single family residential.
b_ Has the site been used for agriculture? If so, describe.
No.
C. Describe any structures on the site.
There are no "structures" on site. The electrical equipment is free-standing, trailer -
mounted and outdoor -rated facilities,
d. Will any structures be demolished? If so, what?
No
e. What is the current zoning classification of the site?
Residential R-10
f. What is the current comprehensive plan designation of the site?
Residential Moderate Density
g. If applicable, what is the current shoreline master program designation of the site?
Not Applicable
h. Has any part of the site been classified as an "environmentally sensitive" area? If so,
specify.
No
i. Approximately how many people would reside or work in the completed project?
There will be no permanent residents or workers associated with this project.
j. Approximately how many people would the completed project displace?
None.
k. Proposed measures to avoid or reduce displacement impacts, if any:
No measures are proposed.
I_ Proposed measures to ensure the proposal is compatible with existing and projected land
uses and plans, if any:
No measures are proposed.
9. HOUSING
a. Approximately how many units would be provided, if any? Indicate whether high, middle,
or low-income housing.
NARenton Pres Park mobile sub SEPA checklist.doc 8
Not Applicable.
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
Not Applicable.
C. Proposed measures to reduce or control housing impacts, if any:
Not Applicable.
10. AESTHETICS
a. What is the tallest height of any proposed structure(s), not including antennas; what is the
principal exterior building material(s) proposed.
The tallest "structure" on -site will be the trailer -mounted substation and it will be
approximately 20 feet in height.
b. What views in the immediate vicinity would be altered or obstructed?
No views will be obstructed or altered.
C. Proposed measures to reduce or control aesthetic impacts, if any:
None proposed.
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
There will be no light or glare as a result of this proposed project.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
I►M
C. What existing off -site sources of light or glare may affect your proposal?
There will be no off -site sources of light or glare that will affect the proposed
project.
d. Proposed measures to reduce or control light and glare impacts, if any:
No measures are proposed.
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate vicinity?
There is a park to the west of the site.
b. Would the proposed project displace any existing recreational uses? If so, describe.
No.
WRenton Pres Park mobile sub SEPA checklist.doc 9
C. Proposed measures to reduce or control impacts on recreation, including recreation
opportunities to be provided by the project or applicant, if any:
No measures proposed.
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national state, or local
preservation registers known to be on or next to the site? If so, generally describe.
There are no known historic or cultural resources on this site.
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or
cultural importance known to be on or next to the site.
There are no known landmarks on or next to the site.
C. Proposed measures to reduce or control impacts, if any:
No measures are proposed.
14. TRANSPORTATION
a. Identify public streets and highways serving the site, and describe proposed access to the
existing street system. Show on site plans, if any.
The site is located at 850 union Ave NE, Renton, WA
b. Is site currently served by public transit? If not, what is the approximate distance to the
nearest transit stop?
PSE believes that Metro operates a bus service route along Union Ave NE.
C. How many parking spaces would the completed project have? How many would the
project eliminate?
There are no parking spaces created, eliminated or needed for this proposed
project.
d. Will the proposal require any new roads or streets, or improvements to existing roads or
streets, not including driveways? If so, generally describe (indicate whether public or
private?
No.
e_ Will the project use (or occur in the immediate vicinity of) water, rail, or air transportation?
If so, generally describe.
No.
WRenton Pres Park mobile sub SEPA checklist.doc 10
How many vehicular trips per day would be generated by the completed project? If
known, indicate when peak volumes would occur.
The project will create approximately one vehicular trip per week.
g. Proposed measures to reduce or control transportation impacts, if any:
No measures are proposed.
15. PUBLIC SERVICES
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, health care, schools, other)? If so, generally describe.
No.
b. Proposed measures to reduce or control direct impacts on public services, if any.
No measures are proposed.
16. UTILITIES
a_ Circle utilities currently available at the site: electricity, natural gas, water, refuse service,
telephone, sanitary sewer, septic system, other.
All facilities are available at the site
b. Describe the utilities that are proposed for the project, the utility providing the service, and
the general construction activities on the site or in the immediate vicinity which might be
needed.
This project is in support of the re -construction of an existing electric substation
providing electric facilities for PSE customers in the immediate vicinity. No other
utilities will be affected by this proposed project.
C. SIGNATURE
I, the undersigned, state that to the best of my knowledge the above information is true and
complete. It is understood that the lead agency may withdraw any declaration of non -significance
that it might issue in reliance upon this checklist should there be any willful misrepresentation or
willful lack of full disclosure on my part.
Proponent: o4A
Name Printed: 4,11 Aeeo _s,
Date: _ s - / Z'ro i~
N:1Renton Pres Park mobile sub SEPA checklist.doc 11
Printed: 09-01-2006
Payment Made:
` 1TY OF RENTON
1055 S. Grady Way
Renton, WA 98055
Land Use Actions
RECEIPT
Permit#: LUA06-115
09/01/2006 02:31 PM
Total Payment: 100.00
Current Payment Made to the Following Items:
Receipt Number: R0604424
Payee: PUGET SOUND ENERGY
Trans Account Code Description Amount
--------------------------------------------------------- ----------------
5021 000.345.81.00.0018 Temp Use or Fence Review 100.00
Payments made for this receipt
Trans Method Description Amount
Payment Check 00586345 100.00
Account Balances
Trans
Account Code
Description
Balance Due
------
3021
-------------------
303.000.00.345.85
------------------------------
Park Mitigation Fee
---------------
.00
5006
000.345.81.00.0002
Annexation Fees
.00
5007
000.345.81.00.0003
Appeals/Waivers
.00
5008
000,345.81.00.0004
Binding Site/Short Plat
.00
5009
000.345.81.00.0006
Conditional Use Fees
.00
5010
000.345.81.00.0007
Environmental Review
.00
5011
000.345.81.00.0008
Prelim/Tentative Plat
.00
5012
000.345.81.00.0009
Final Plat
.00
5013
000.345.81.00.0010
PUD
.00
5014
000.345.81.00.0011
Grading & Filling Fees
.00
5015
000.345.81.00.0012
Lot Line Adjustment
.00
5016
000.345.81.00.0013
Mobile Home Parks
.00
5017
000.345.81.00,0014
Rezone
.00
5018
000.345.81.00.0015
Routine Vegetation Mgmt
.00
5019
000.345.81.00.0016
Shoreline Subst Dev
.00
5020
000.345.81.00.0017
Site Plan Approval
.00
5021
000.345.81.00.0018
Temp Use or Fence Review
.00
5022
000.345.81.00.0019
Variance Fees
.00
5024
000.345,81,00.0024
Conditional Approval Fee
.00
5036
000.345.81.00.0005
Comprehensive Plan Amend
.00
5909
000.341.60.00.0024
Booklets/EIS/Cop.ies
.00
5941
000.341.50.00.0000
Maps (Taxable)
.00
5954
604.237.00.00.0000
Special Deposits
.00
5955
000.05.519.90.42.1
Postage
.00
5998
000.231.70.00.0000
Tax
.00
Remaining Balance Due: $0.00
z
O
F
U
V)
Ld
C]
LL, \
F
a
d
w
z
0
F
0-
C.)
V)
Ld
w\
a
a
Ld
z
0
CL
LLl
C)
LL \
F
Q
0
Ld
Z
O
1—
U
V)
W
w\
F-
' a
a
u�
w
v
CED
�r-
L�
cv
m
Co
Co
0
a
L
CURB
LABOR CHARGE DESCRIPTIONS
`
TRANSMISSION CONSTRUCTIONCo
z
0
TRANSMISSION REMOVAL
PLAN SCALE
wCo
TRANSMISSION EXPENSE
Imo-
(A$.-*
Ow
Ott)
CURRENT REVISION DESCRIPTION:
v-
1="
�o
ORIGINAL ISSUE
8 7 6 5 4
ORDER NUMBER
TEMPORARY
MOBILE
JOINT FACILITIES PRIOR LINE NAME:
ARRANGEMENTS — OTHER UTIL• SURVEYOR/DATE:
J.F.N. NO. EASEMENT: PERMIT & FRAN.:
ENG: DISTRICT OPER: CENTRAL KING T 23 R 5E Sect 10
REGION: CENTRAL KING PSE Map
ENG: COUNTY: KING COUNTY 2305E 038
ENG' MAPPED: TSG Map 07E
E
r
0
A
'--�`
r"UUt I JUUIVt1 tlVtl'(U T MUD 1 L,t JUD
CITY OF RENTON TEMPORARY
USE PERMIT
APPROVAL
DATE (M/D/Y)
DRAWN BY
DAVE CHERVE;NAK
07 / 31 / 06
CADD/DRAFT
PUGET
SOUND
ENERGYDEPARTMENT
MAJOR PROJECTS
TN
oRa,wiNc No
S K -0 3 7 9
REV NO
O
ENGINEER
GERRY BAKER
CHKD/APRVD
/ /
SHEET
FOREMAN
LOG OUT
3
/
/
/ SCALE: PROF: V:20 H:200 CLASS: MICROFILMED: IFILE N0: p_97
PLAN: 1:20
i CaDD No: SK037901 v0. dgn SCANNED -oDE: TLN-0045 J
2 r_ �