Loading...
HomeMy WebLinkAboutMiscof ; ti v CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT (425)430-7266 CONSTRUCTION PERMIT APPLICATION PER ORDINANCE NO.4345 1. Fill out Public Works Construction Permit Application form and Public Works Construction Permit Cost Breakdown form. it is required that you provide your best estimate on the cost of proposed improvements to water, wastewater, stormwater, and transportation facilities, both on -site and off -site. 2. Pay the inspection/approval fee, as determined on the attached Construction Permit Cost Breakdown form, at the 6th floor Customer Service Counter of Renton City Hall. You may tail (425) 430-7266 before hand to verify the fee. You will be given a receipt for the payment. 3. Deliver a copy of the inspection/approval fee receipt to the 6th floor Customer Service Counter of Renton City Hall along with your sets of utility plans. 4. Later at permit issuance, a 3% Technology Surcharge Fee will be added to all permit fees. This fee will NOT be collected at the time of plan submittal. H 10ED1Data\Forms-Template%%Setf-Help }landoWSTHblic WorkslConstruction Permt Application doe Revision Date. March 28, 201d CITY OF RENTON PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT PUBLIC WORKS CONSTRUCTION PERMIT APPLICATION ❑ New Building ❑ Addition to Existing Tenant Improvement Project Address: Work Description: King County Tax Assessor Number: Legal Description: Square Footage of Entire site Impervious Area Property Owner: Address: City/State/Zip: Phone/Fax: Applicant: Address: City/State/Zip: Phone/Fax: When applying for redevelopment, credit Water meter size: Account No: Information provided by Utility Billing (425) 430-6852 This application does not constitute a permit to work. Work is not to commence until a construction permit is issued. I certify that the information on this application is accurate to the best of my knowledge and I will be responsible for any additional fees resulting from a different valuation. Signatures Print Name FJ:\CEDMata\Forms--I'eniplates\Self-Help Handouts\Puhllc Wnria\Constniction Permit Application_doc Jtcvision Dale: March 28, 2014 A PUBLIC WORKS CONSTRUCTION PERMIT INSPECTION/APPROVAL FEE CALCULATION WORKSHEET 50% INSPECTION/APPROVAL FEES PER ORDINANCE NO.4345 PROJECT NAME: 1. Estimate the total cost of offsite and onsite improvements for water lines, sewer lines, Stormwater facilities, and roadway improvements for your project. Enter estimated costs in items (A) through (D) below. (A) � $ (B)-Saw4w--- $ (C) Stormwater $ (Includes On -Site Pavement) (D) Roadway $ (Street, sidewalks, street lighting, etc.) (E) Total Improvements $ (A) + (B) + (C) + (D) = (E 2. Calculate 50% inspection/approval fee for total improvements, as follows: (F) 3% of First $150,000 of (E) $ (G) 2.5% of over $150,000 but $ less than $300,000 of (E) (H) 2% of over $300,000 of (E) $ (1) Total 50% Inspection/Approval $ Fee: (F) + (G) + (H) = (I) 3. Breakdown of 50% Inspection/Approval Fees is performed as follows: (J) 50% Water Fee $ ((A) \ (E)) x (1) _ (J) (K) 50% Sewer Fee $ ((B) \ (E)) x (1) _ (K) (L) 50% Stormwater Fee $ ((C) \ (E)) x (1) = (L) (M) 50% Roadway Fee: $ ((D) \ (E)) x (I) = (M) 4. Check: Make sure (J) + (K) + (L) + (M) = (1) }[',ICED%Dat,t%Purms-Tzmplates,Sell-Help HandOLIN\Pnblic Works\Construction Permit Apphcilion.duc Revision Date: March 28, 2014 SAMPLE CALCULATION PUBLIC WORKS CONSTRUCTION PERMIT INSPECTION/APPROVAL FEE CALCULATION WORKSHEET 50% INSPECTION/APPROVAL FEES PER ORDINANCE NO.4345 PROJECT NAME: XYZ Apartments 1. Estimate the total cost of offsite and onsite improvements for water lines, sewer lines, stormwater facilities, and roadway improvements for your project. Enter estimated costs in items (A) through (D) below. (A) Water $ 45,000 (B) sewer $ 20,000 (C) 5tormwater $108,000 (Includes On -Site Pavement) (D) Roadway $ 62,000 (Street, sidewalks, street lighting, etc.) (E) Total Improvements $235,000 ($45,000) + ($20,000) + ($108,000) + ($62,000) = ($235,000) 2. Calculate 50% inspection/approval fee for total improvements, as follows: (F) 3% of First $100,000 of (E) $ 3,000 .03 x $100,000 = $3,000 (G) 2.5% of over $100,000 but $ 2,500 less than $200,000 of (E) .025 x $100,000 = $2,500 (H) 2% of over $200,000 of (E) $ 700 .2 x ($235,000 - $200,000) = $525 (1) Total 50% Inspection/Approval $ 6,200 Fee: ($2,500) + ($2,000) + ($525) = ($5,025) 3. Breakdown of 50% Inspection/Approval Fees is performed as follows: 0) 50% Water Fee $ 1,187.23 (($45,000) \ ($235,000)) x ($6,200) = ($962,23) (K) 50% Sewer Fee $ 527.66 (($20,000) \ ($235,000)) x ($6,200) � ($427.66) (L) 50% 5tormwater Fee $ 2,849.36 (($108000) \ ($235,000)) x ($6,200) = ($2,309.36) (M) 50% Roadway Fee: $ 1,635.75 (($62,000) \ ($235,000)) x ($6,200) = ($1,325.75) 4. Check: ($1,187.23) + ($527.66) + ($2,849.36) + ($1,635.75) = $6,200.00 OK I H:10ED\DatalForms-TemplateslSelt=Help Handovts\Puhlic Work%Tonstruction PermitApphcation.doc Revision Date: March 28, 2014