HomeMy WebLinkAboutMiscFri The Riley Group Inc. MAY GEOTECHNICA.L ENGINEERING REPORT Regional Veteran's Center 403 South 2nd Street Renton, WA 98055 Project No. 2008-034 Prepared By: The Riley Group, Inc. 17522 Bothell Way NE Bothell, WA 98011 Prepared for: Mr. Len Brannen Mr. Rick Friedhoff Shelter Resources, Inc. Compass Center 1200 112th Ave. NE, C-163 77 South Washington St. Bellevue, WA 98004 Seattle, WA98104 March 4, 2008 serving the Pacific Northwest Main Office: 17522 Bothell Way NE, Bothell, WA 98011 Tel (425) 415-0551 . Fax (425) 415-0311 W1 The Riley Group Inc. March 4, 2008 Mr. Len Brannen Shelter Resources, Inc. 1200 112'[' Avenue NE, C-163 Bellevue, WA 98004 Mr. Rick Friedhoff Compass Center 77 South Washington Street Seattle, WA 99104 Subject: Geotechnical Engineering Report Regional Veteran's Center 403 South 2"d Street Renton, WA 98055 Project No. 2008-034 Dear Mr. Brannen and Mr. Friedhoff: As requested, The Riley Group, Inc. (Riley) has performed a geotechnicai engineering study for the above referenced subject site. Riley understands that the client is planning to demolish the existing buildings and build a four-story mixed use Regional Veteran's Center with associated parking and utilities. The attached report presents our findings and recommendations for the geotechnical anticipated aspects for the project design and construction. Our field exploration indicates that the site is generally underlain by 7 to 20 feet of loose silty SAND with soft silt layer overlying medium dense to dense SAND with trace gravel to sandy GRAVEL. Groundwater seepage was encountered at depth of 13.0 feet below ground surface during our field exploration. Based on the subsurface soil condition, the site that is underlain by loose sand has a potential of liquefaction during earthquake event. If the proposed building is directly supported on spread footing foundation bearing on the loose soil, it will experience excessive settlements during earthquake event. Therefore, we recommend supporting the proposed building and floor slab on pile foundation to transfer the structure load to the competent native soil below loose layer. The pavement can be supported on 12 inches of structural fill after overexcavation. Serving the Pacific Northwest Main Office: 17522 Bothell Way NE, Bothell, WA 98011 Tel (425) 415-0551 9 Fax (425) 415-0311 Geotechnical Engineering Report Regional Veteran's Center, Renton, WA March 4, 2008 Project 92008-034 This report provides recommendations for geotechnical aspects of the project. These recommendations should be incorporated into project design and construction. We trust the information presented is sufficient for your current needs. If you have any questions or require additional information, please call. Sincerely yours, THE RILEY GROUP, INC. LIN C 41353 sIatvat.. ON 31*1 ' �XPI7�S SEPT, Chien -Lin (Johnny) Chen, P.E. Project Engineer JC/RW Ricky R. Wang, Ph.D., P.E. Principal Engineer The Riley Group, Inc. TABLE OF CONTENTS 1.0 PROJECT DESCRIPTION..................................................................................... I 2.0 SCOPE OF WORK................................................................................................... I 3.0 SITE CONDITIONS................................................................................................. I 3.1 SURFACE.....................................................................................................................1 3.2 SOILS.......................................................................................................................... 2 3.3 GROUNDWATER.......................................................................................................... 2 3.4 SEISMIC CONSIDERATIONS.......................................................................................... 2 4.0 DISCUSSION AND RECOMMENDATIONS....................................................... 3 4.1 GENERAL.................................................................................................................... 3 4.2 SITE PREPARATION AND GRADING.............................................................................. 3 4.3 FOUNDATIONS.............................................................................................................4 4.4 SLAB -ON -GRADE CONSTRUCTION ........................ --.................................................. 6 4.5 DRAINAGE...................................................................................................................6 4.6 UTILITIES.................................................................................................................... 7 4.7 PAVEMENTS................................................................................................................ 7 5.0 ADDITIONAL SERVICES...................................................................................... 8 6.0 LIMITATIONS......................................................................................................... 8 LIST OF FIGURES FigureI....................................................................:............................................... Site Vicinity Map Figure 2.............................................................................................. Geotechnical Exploration Plan LIST OF APPENDICES Appendix A ...... --............................................................. Field Exploration and Laboratory Testing Appendix B...................................................................................................... Liquefaction Analysis The Riley Group, Inc. Geotechnical Engineering Report 1 March 4, 2008 Regional Veteran's Center, Renton, WA Project #2008-034 1.0 PROJECT DESCRIPTION The project site is located at 403 South 2°d Street in Renton, Washington, shown in the project vicinity map (Figure 1). The site is currently occupied by a church.lauiIding and two buildings. The site is essentially asphalt paved around the buildings. Riley understands that the client intends to demolish the existing buildings and construct a mixed use building for Regional Veteran's Center (approximately 65,000 square feet) with associated parking and utilities. Riley's understanding of the project is based on the pre - application site plans prepared by Baylis Architects, Inc, dated December 20, 2007. Based on the plans, the proposed building will be a four-story structure supported on perimeter bearing walls and a series of isolated columns. We anticipate that the building loads will be from 6 to 8 kips per linear foot for perimeter walls, and up to 250 kips for interior isolated columns. The recommendations in the following sections of this report are based upon our understanding of the above design features. If actual features vary or changes are made, we should review them in order to modify our recommendations as required. In addition, Riley requests to review final design drawings and specifications to verify that our project understanding is correct and that our recommendations have been properly interpreted and incorporated into project design and construction. 2.0 SCOPE OF WORK On February 5, 2008, Riley drilled a total of three test borings to a maximum depth of 31.5 feet below ground surface (bgs). Test borings were drilled with truck -mounted, hollow - stem auger drill rigs. Test borings were drilled within the proposed building footprint and parking area. The approximate test boring locations are shown on Figure 2. Using the information obtained from our subsurface exploration, we performed analyses to develop geotechnical recommendations for project design and construction on the following: ➢ Soil and groundwater conditions ➢ Seismic considerations ➢ Site preparation and grading ➢ Structural fill recommendations ➢ Foundation support 3.0 SITE CONDITIONS 3.1 Surface ➢ Slab -on -grade support ➢ Drainage ➢ Utilities ➢ Pavements The site includes three parcels of land approximately 27,770 square feet. The site is bounded by South 2nd Street to the north, Morris Avenue South to the east, an office building and utility easement to the south, and Whitworth Avenue South to the west. The Riley Group, Inc. Geotechnical Engineering Report 2 March 4, 2008 Regional Veteran's Center Renton, WA Project #2008-034 The site is currently occupied by a two-story brick building (Renton Lutheran Church) in the west portion of the site. A one-story building for church classroom and a single-family residence occupy in the east portion of the site. The rest of the areas are asphalt -paved parking lots and driveways. The site is relatively flat with an overall elevation less than two feet across the site. 3.2 Soils The soils encountered in the test borings are relatively consistent across the site. The soil profile includes 7 to 20 feet of loose silty SAND with soft silt layer overlying medium dense to dense SAND with trace gravel to sandy GRAVEL. The Geologic Map of King County, Washington, by V.E Livingston Jr, (1970) indicated that the native site soils were mapped as alluvium deposit (Qa). The soils include mostly unconsolidated silt, sand, and gravel valley fill with some clay and local artificial fill and peat layers. This description is generally consistent with our findings during field exploration except peat was not encountered. More detailed descriptions of the subsurface conditions encountered are presented on the Test Boring Logs, Figures A-2 through A-7 in Appendix A. Sieve analysis was performed on selected soil samples. Grain size distribution curves are included in Figures A-8 and A- 9. 3.3 Groundwater Groundwater seepage was encountered at 13.0 feet bgs in the test borings during our field exploration. The groundwater table seems to be the static water level in the area. Based on the soil color change, the season -high groundwater Ievel may be up to 5 feet bgs during the wet season. Fluctuations in groundwater level should be expected on a seasonal and annual basis. The level will be highest during the extended periods of heavy seepage in the wet winter months. Given the time that the field exploration was performed, Riley believes that the groundwater should be below the season -high level. 3.4 Seismic Considerations Based on the 2003 International Building Code (IBC), the site soil is Class E (Table 1615.1.1). The earthquake spectral response acceleration at short periods (SS) is 133% g and at 1-second period (SI) is 46% g. Riley reviewed the Seismic Hazard Areas Map prepared by Technical Services, City of Renton dated January 22, 2008. The review indicates that the project site is mapped as a potential seismic hazard area. Liquefaction Liquefaction is a phenomenon where there is a reduction or complete loss of soil strength due to an increase in water pressure induced by vibrations from a seismic event. The Riley Group, Inc. Geotechn.ical Engineering Report 3 March 4, 2008 Regional Veteran's Center, Renton, WA Project #2008-034 Liquefaction mainly affects geologically recent deposits of fine-grained sands that are below the groundwater table. Soils of this nature derive their strength from intergranular friction. The generated water pressure or pore pressure essentially separates the soil grains and eliminates this intergranular friction, thus reducing or eliminating the soil's strength. For liquefaction analysis, soil information obtained from the test borings B-3 was used. Groundwater level was assumed to be 5 feet bgs. Analysis indicated the loose layer intercepted between 5 and 20 feet bgs may liquefy under severe earthquake ground motions (Magnitude 7 and horizontal acceleration 0.25g) or moderate ground shaking of significant duration. The total ground settlement of up to 5.0 inches is possible upon dissipation of excess pore pressures generated during a seismic event. The resulting differential settlement may be up to 3.5 inches. The analysis was attached in Appendix B. 4.0 DISCUSSION AND RECOMMENDATIONS 4.1 General Based on our study, the major geotechnical concern for the development is that the site has a potential of liquefaction during an earthquake event. if the building foundation is directly supported on spread footing foundation bearing on loose soil, it will subject to a significant amount of settlement during an earthquake. To avoid the excessive settlement, the general practice in the area is to support the building on pile foundations to transfer the structural load to competent soil below the liquefaction zone. The building slab can be similarly supported on pile foundation. The pavement section can be supported on structural fill after overexcavation Detailed recommendations regarding the above issues and other geotechnical design considerations are provided in the following sections. These recommendations should be incorporated into the final design drawings and construction specifications. 4.2 Site Preparation and Grading To prepare the site for construction, the existing buildings and pavement within the proposed development area should be demolished and stripped. Surface stripping depths of up to 6 inches should be expected to remove the asphalt surface. All remnants related to previous site construction should also be cleared and removed from the site. Once stripping, clearing and other preparing operations are complete, cuts and fills can be made to establish desired building grades. The native soil has a high percentage of fines and is characteristically moisture sensitive. Riley recommends that all site grading and earthwork activities be performed in dry weather conditions. The owner/contractor should be prepared to deal with soft ground problems if the earthwork occurs during periods of precipitation, particularly if construction occurs during the wet winter season. The Riley Group, Inc. Geotechnical Engineering Report 4 March 4, 2008 Regional Veteran's Center, Renton, WA Project #2008-034 Based on our experience in the Pacific Northwest, a combination of 18 inches of crushed rock over a geotextile fabric such as Mirafi 50OX on native soil subgrade should be sufficient to establish a stable grade for construction equipment if the construction occurs during periods of precipitation or in the wet season. The native soil has a high percentage of fines and will not be suitable for being used as structural fill. We recommend importing a material that meets the grading requirements listed in Table 1. Table 1. Structural Fill U.S. Sieve Size Percent Passing 3 inches 100 percent No. 4 sieve 0 to 75 percent No. 200 sieve 0 to 5 percent *Based on minus 3/4 inch fraction. Prior to use, Riley should examine and test all materials imported to the site for use as structural fill. Structural fill materials should be placed in uniform loose layers not exceeding 12 inches and compacted to a minimum of 95 percent of the soil's maximum density, as determined by ASTM Test Designation D-1557 (Modified Proctor) until the desired finished grade is met. The moisture content of the soil at the time of compaction should be within about two percent of its optimum, as determined by this ASTM method. 4.3 Foundations As discussed above, the major geotechnical concern with this project is loose soil underlying the site. If the foundation is directly supported on the existing ground surface, the building will subject liquefaction settlement. To avoid excessive building settlement, we recommend supporting the building using piles to transfer building loads to the competent native soil. Driven Piles The proposed building can be supported on drivel timber pile foundations. Based on our experience, Riley recommends that &- to 10-inch diameter timber piles be used. The minimum pile embedment depth is 10 feet into the competent native soil (dense sandy gravel) below the loose soil layer. For structural design and pile layout, the pile capacities listed in Table 2 should be used. The Riley Group, Inc. Geoteehnical Engineering Report 5 March 4, 2008 Regional Veteran's Center, Renton, WA Project 92008-034 Table 2: Pile Axial Compression Loads (tons) Pipe Diameter Compression Load Uplift Load Lateral Load* 8" 25 T 5 2.5 10" 35 12.5 3.5 *Assume one inch deflection on top of pile. Riley expects that the pile capacities can be reached at 25 to 30 feet bgs. However, the actual pile termination depth should be determined in the field based on pile driving conditions. A pile load test is recommended to verify the design pile capacities. Full single pile capacities can be used, provided that pile spacing is at least three pile diameters. For closer spacing, there will be a slight reduction in the allowable single pile capacity due to group effects. The amount of this reduction will depend on the number of piles in the group and their spacing. We can provide this information, if required. The lateral load capacity assumes 1-inch deflection on the top of the pile. Following the successful installation of the driven piles, you should expect maximum total and differential post -construction settlements of/4-inch to'/2-inch. Augercast Pile As an alternative, the proposed building can be supported on augereast pile foundations. Augercast piles are constructed using a hollow stem auger advanced in the ground to a predetermined tip elevation. When the bearing depth is reached, cement grout is injected under pressure through the stem of the auger, and the auger is slowly extracted froze the ground. Reinforcing steel, as required, is then set into the completed grout column. Table 3 Iists recommended allowable axial and lateral capacities for the most common 12 and 18- inch diameter auger cast pile used in the area. The soil profile was rased on the soil information obtained from test borings B-1 and B-3. Riley recommends that the minimums pile depth be 25 feet bgs. The augercast piles can be designed and constructed using the following pile capacities detailed in Table 3. Table 3, Augercast Pile Design Capacities (tons) Pile Diameter 129' Compression Load 40 Uplift Load 15 Lateral Load* 4 18" 60 25 5 *Assume one inch deflection on top of pile. Full single pile capacities can be used, provided that pile spacing is at least three pile diameters. For closer spacing, there will be a slight reduction in the allowable single pile capacity due to group effects. The amount of this reduction will depend on the number of The Riley Group, Inc. Geotechnical Engineering Report b March 4, 2008 Regional Veteran's Center, Renton, WA Project #2008-034 piles in the grouping and their spacing. We can provide this information, if required. The lateral load capacity assumes 1-inch deflection on the top of the pile, The pressure used to inject the grout and construct the pile column will compress the soils immediately adjacent to the pile. As a result, the amount of grout needed to form the pile will be greater than the computed grout volume. For estimating purposes, a volume increase of 25 percent should be used. Also, the installation sequence should be such that piles are constructed at a minimum spacing of five diameters. Once the grout has achieved its initial set, usually in 24 hours, installation between these locations can be completed. The auger should be extracted slowly and uniformly below a sufficient and consistent head of grout. If the auger is extracted too quickly, the pile may neck down and soil may collapse into the pile, reducing its structural integrity. At an accessible and easily read location along the inject line, the piling contractor should install a pressure gauge to monitor the grout pressure during construction. The amount of grout used in forming the pile should also be determined. This can be accomplished by calibrating the grout pump and determining the volume of grout pumped per piston stroke. 4.4 Slab -on -Grade Construction The floor slab should be supported on pile foundation. With site preparation completed as described in the Site Preparation and Grading section, suitable support for slab -on -grade construction should be provided. Immediately below the floor slab, we recommend placing a 4-inch thick capillary break layer of clean, free -draining sand or gravel that has less than 5 percent passing the No. 200 sieve. This material will reduce the potential for upward capillary movement of water through the underlying soil and subsequent wetting of the floor slab. Where moisture by vapor transmission is undesirable, an S to 10-mil thick plastic membrane should be placed on a 4-inch thick layer of clean gravel. The membrane should be covered with 1 to 2 inches of clean, moist sand to guard against damage during construction and to aid in curing of the concrete. 4.5 Drainage Surface Final exterior grades should promote free and positive drainage away from building. Water must not pond or collect adjacent to foundations or within the immediate building area. We recommend providing a minimum drainage gradient of 3% for a minimum distance of 10 feet from the building perimeter, except in paved locations. In paved locations, a minimum gradient of 1% should be provided unless provisions are included for collection and disposal of surface water adjacent to the structure. The Riley Group, Inc. Geotechnical Engineering Report 7 March 4, 2008 Regional Veteran's Center, Renton, WA Project #2008-034 4.6 Utilities Utility pipes should be bedded and backfilled in accordance with American Public Works Association (APWA) specifications. For site utilities located within the City of Renton right-of-ways, bedding and backfill should be completed in accordance with City of Renton specifications. The trench backfill should be placed and compacted as structural fill, as described in the Site Preparation and Grading section. Since Iiquefiable soil is underlying the proposed utilities, the utilities will experience settlement during seismic events. Riley recommends that flexible joints should be used to avoid damages due to settlements. Where utilities occur below unimproved areas, the degree of compaction can be reduced to a minimum of 90 percent of the soil's maximum density as determined by the referenced ASTM standard. As noted, excavated soils are not suitable to be used as backfill. The backfill material should satisfy the structural fill requirements listed in the Site Preparation and Grading section. 4.7 Pavements Pavement subgrades should be prepared as described in the Site Preparation and Grading section of this report and as discussed below, The subgrade should consist of 12 inches of structural fill over native soil. Typically, a geotextile fabric such as Amoco 2002 or equivalent should be placed on the SUbgrade. Regardless of the relative compaction achieved, the subgrade must be firm and relatively unyielding before paving. This condition should be verified by proof -rolling with heavy construction equipment or hand probe by inspector. With the pavement subgrade prepared as described above, we recommend that the general parking area be paved with flexible pavement surface. The following pavement sections are recommended: ➢ For heavy truck traffic areas: 3.5 inches of asphalt concrete (AC) over 8 inches of crushed rock base (CRB) over 12 inches of structural fill; and ➢ For general parking areas: 2.5 inches of AC over 6 inches of CRB over 12 inches of structural fill. The asphalt paving materials used should conform to the Washington State Department of Transportation (WSDOT) specifications for Class B asphalt concrete and CRB surfacing. Long-term pavement performance will depend on surface drainage. A poorly -drained pavement section will be subject to premature failure as a result of surface water infiltrating into the subgrade soils and reducing their supporting capability. For optimum pavement performance, surface drainage gradients of no less than two percent are recommended. Also, some degree of longitudinal and transverse cracking of The Riley Group, Inc. Geotechnical Engineering Report & March 4, 2008 Regional Veteran's Center, Renton, WA Project #2008-034 the pavement surface should be expected over time. Regular maintenance should be planned to seal cracks when they occur. 5.0 ADDITIONAL SERVICES Riley is available to provide further geotechnical consultation as the project design develops. We should review the final design and specifications in order to verify that earthwork and foundation recommendations have been properly interpreted and incorporated into project design and construction. Riley is also available to provide geotechnical engineering and monitoring services during construction. The integrity of the earthwork and construction depends on proper site preparation and procedures. In addition, engineering decisions may have to be made in the field in the event that variations in subsurface conditions become apparent. Construction monitoring services are not part of this scope of work. If these services are desired, please let us know and we will prepare a cost proposal. 6.0 LIMITATIONS This report is the property of The Riley Group, Inc., Shelter Resources, Inc., Compass Center, and their designated agents, and was prepared in accordance with generally accepted geotechnical engineering practices. This report is intended for specific application to the Regional Veteran's Center at 403 South 2`id Street in Renton, Washington, and for the exclusive use of Shelter Resources, Inc., Compass Center, and their authorized representatives. No other warranty, expressed or implied, is made. The analyses and recommendations presented in this report are based upon data obtained from the test borings drilled on -site. Variations in soil conditions can occur, the nature and extent of which may not become evident until construction. If variations appear evident, The Riley Group, Inc. should be requested to reevaluate the recommendations in this report prior to proceeding with construction. The Riley Group, Inc. The Riley Group, Inc. 17522 BOTHELL WAY NE BOTHELL, WASHINGTON 98011 Regional Veteran's Center I Site Vicinity Map I Figure I i Site Address: 403 South 2nd Street, Renton, Washington is cmae +•1i'"°"' N !6f as Al Al ►A91W 15 /IWOl SET Yf9M T V M m •ay I ,7 � 5 n! 1a21' ♦♦ •. PfA ' A• • at IM lUFG mw '. M ale 'd0 - 94 +' I r[ v U. I �• 0.1E � P fa s ', pp 111 at B-1 Fr 144 • SE1.A x.4 P/A . N j ✓I Y�E M1tMCI �1®�1M 1 i All M & M PM + Af r� 4 b rF. ]T.P b QPf P�II 51�1 ,J'II I I— 34S IIt14Y- } i ra; an.PIA r .� �I�S'` � r. ;�• •.� t pa eu A a[IOPw�FIE SA FIA a• •a' a• 2 a> IDEb 6• g_3 a, U. 36A 1'1 2 >� 5BA - au 0 - i as >A „� 1 woav A1A16 Y m P/A � 9g� '� � ae Feria r we xxu a, Q F -p/A Aft Stl a; l [ 1 1aP1 / FiRIW S 162 '^ Y 4m m• a. _ �. _ ...^ ti!' of v. xS tom- MOD •- IawOa „ dh c�rflPpa w P AW an ,� ar _ -. ` m - pp rryP U-L, i q lS Ei[ v ppEl >t i ¢ A s Ra IEIAWIa 96[ R w" OP IIIRLE M : ' = I I11A� r �. N, elvvge v:r Ivv FFne cAP .' , > ` •, M fi ils naffs' s mm ram[ • 5 ir.t �q r d IPUT_ 6i Sarf d�O.W '..iO�5 5 off a TWE 1 as a•• llby etwiS a, m 4 m m � �,•, aL xsaaam m4a ar a• K•WD Div �v p mtl a:T N � APFADMIX AFI�iVEV6 �rtQr ~. wl' S at M"1s1 'to >•A T 1 Alm P/A •f y1t ell �jf d 1nF.4a N F16$1[MIL N rolro N �r w/ S aa.14 •ir 40./ � �4 Y I Reference:{ Figure modified from Topographic Survey prepared by Core Design, Inc. dated September 2007, 1 `� Geotechnical test boring location drilled by The Riley Group, Inc. on February 5, 2008. B-9 DRAWING NOT TO SCALE Regional Veteran's Center The Riley Group, Inc. 17522 BOTHELL WAY NE Geotechnical Exploration Plan Figure 2 BOTMLL, WASHlNGTON 98011 Site Address: 403 South 2nd Street, Renton, Washington Geotechnical Engineering Report March 4, 2008 Regional Veteran's Center, Renton, WA Project 92008-034 APPENDIX A FIELD EXPLORATION AN]) LABORATORY TESTING Regional Veteran's Center 403 South 2nd Street Renton, WA 98055 On February 5, 2008, we performed our field exploration using truck -mounted drill rigs. We explored subsurface soil conditions at the site by advancing three test borings to a maximum depth of 31.5 feet below existing grade. The test boring locations are shown on Figure 2. The test boring locations were approximately determined by measurements from existing property lines and streets. The Test Boring Logs are presented on Figures A-2 through A-7. A geologist/engineer from our office conducted the field exploration and classified the soil conditions encountered, maintained a log of each test boring, obtained representative soil samples, and observed pertinent site features. All soil samples were visually classified in accordance with the Unified Soil Classification System (USCS) described on Figure A-1. Representative soil samples obtained from the test borings were placed in closed containers and taken to our laboratory for further examination and testing. The moisture content of a typical sample was measured and is reported on the Test Boring Logs. Grain size analyses were performed on selected samples, the results of which are shown on Figure A-8 and A-9. The Riley Group, Inc. MAJOR DIVISIONS LETTER TYPICAL DESCRIPTION SYMBOL —Weill-graded CLEAN gravels, gravel -sand i mix ures, e ❑ s L GRAVELS o More than 50% GRAVELS or no fines. G P Poorly -graded gravels, gravel -sand mixtures, W <5% fines little or no fines. Z cc of coarse CaM Silty gravels, gravel -sand -silt mixtures, Q a) fraction is larger GRAVELS non- lasticfines. GC Clayey gravels, gravel -sand -clay mixtures, O� CO .Q) than No. 4 sieve with fines _ plastic fines. SANDS CLEAN SIIV Well -graded sands, gravelly sands, little or no W E C%jU) U) C' Z More than 50o/u SANDS fines. SP Poorly -graded sands or gravelly sands, little or 0 of coarse �5%fines no fines. U E; fraction is SANDS SM Silty sands, sand -silt mixtures, non -plastic fines. L_ a � smaller than No. 4 sieve with fines S C Clayey sands, sand -clay mixtures, plastic fines. y y y M L Inorganic silts, roc our, clayey silts withs ight ❑ L4 •L SILTS AND CLAYS plasticity. CL Inorganic clays a ow o medium plasticity, can clay). W CD 16 CD Liquid limits Z — fl) J � o "' less than 50% OL Organic silts and organic clays of low plasticity. 0 5 CD r_ z ca MH Inorganic silts, elastic. W .� Z SILTS AND CLAYS z L a? Liquid limits greater CH Inorganic clays of high plasticity, (fat clays). W 70 E than 50% OH Organic clays of high plasticity. HIGHLY ORGANIC SOILS PT Peat. DEFINITION OF TERMS.AND SYMBOLS O Density SOT (Blows/Foot)_ Very loose 0-4 I 2„ Outside diameter split spoon W sampler ❑ Z > � Loose 4-10 Medium dense 10-30 2.4" Inside diameter ring sampler or < Dense 30-50 Shelby tube 07 0 Very dense >50 Y Tr Water level (date) Torvane reading, tsf Consistency SPT (Blows/Foot) L Very soft 0-2 pp Penetrometer reading, tsf o Soft 2-4 DID Dry density, pcf J Q Medium stiff 4-8 LL Liquid limit, percent C) Stiff 8-15 Pi Plasticity index Very stiff 15-30 N Standard penetration, blows per foot Hard >30 The Riley Group, Inc. Regional Veteran's Center Unified Soil Classification System Figure A-1 17522 BOTHELL WAY NE BOTHELL, WASHINGTON 9901 Site Address: 403 South 2nd Street, Renton, Washington Boring No. B-1 Logged by: PL Date: 2/5/08 Approximate Elev.: NIA Consistency/ a (N) Moisture Soil Description Relative Depth E Blows Content Density (feet) cn /ft N Surface: Asphalt -- 3". Brown SAND, damp, loose, (Fill). Loose - 5 � 5 19.7 -- Brown SAND with 1" silt lens (I V-2" to 1 V-3"), damp to Medium Dense 0 moist, medium dense, (SP). 14 17.7 (2i5108) Gray SAND (SM) till 16'-1", 15 transitioning to sandy GRAVEL Medium Dense-- I 28 24.6 to GRAVEL with little sand, wet, medium dense, (GP). 20 25 9.6 (Continued) 191 The Riley Group, Ine. Regional Veteran's Center Test Boring Log B-1 Figure A-2 17522 BOTHELL WAY NE SOTHELL, WASHINGTON 98011 Site Address: 403 Sou#h 2nd Street, Renton, Washington Boring No. B-'I (cont.) Logged by: PL Date: 2/5/08 Approximate Elev.: NIA Soil Description Consistency/ Relative Density Depth (feet) E rn (N) Blows /ft Moisture Content (°Io) (continued) 25 44 10.7 Gray SAND till 26'.8" (SP), transitioning to sandy __ Dense GRAVEL with some silt, moist to wet, dense, (GM). 30 Terminated at 30.0' due to excessive heave. 1.8' heave encountered at 20.0'. Groundwater seepage - encountered at 13.0'. r� The Daley Group, Inc, Regional Veteran's Center Test Boring Log B--1 Figure A-3 17522 BOTHELL WAY NE BOTHELL, WASHINGTQN 98011 Site Address: 403 South 2nd Street, Renton, Washington Boring No. B-2 Logged by: PL Date: 2/5108 Approximate Elev.: NIA Consistency/ Q (N) Moisture Soil Description Relative Depth E Blows Content Density (feet) w /ft (%} Surface: Asphalt -- 3". Grayish brown SILT with some sand, low plasticity, damp to Soft 3 30.9 moist, soft, (ML). Brawn SAND with little gravel Medium Dense 10 12 10.9 to 1l'-2", damp, medium dense, (SP). V (2/5/03) 15 Brown sandy GRAVEL, trace Dense I 36 10.5 silt, moist to wet, medium dense to dense, (GP). Medium Dense -- 20 Z 28 18.9 (continued) �'� The Riley Group, Inc. Regional Veteran's Center 17522 BOTHELL WAY NE Test Boring Log B-2 Figure A--4 BOTHELL, WASHINGTON 9801 l Site Address: 403 South 2nd Street, Renton, Washington Boring No. B-2 (cont.) Logged by: PL Date: 215108 Approximate Elev.: NIA Consistency/ (N) Moisture Soil Description Relative Depth E Blows Content Density (feet) /ft (°/Q) (continued) - 25 Brown SAND (SP) till 25'-10", transitioning to sandy Dense 30 9.9 GRAVEL, moist to wet, dense, (GP). 30 Brown SAND (SP) till 31', transitioning to GRAVEL, Dense T 47 7.2 moist to wet, dense, (GP). 1. Terminated at 31.5'. Groundwater seepage encountered at 13.0'. r� The Riley Group, Inc. Regional Veteran's Center Teat Boring Log B-2 Figure A-5 17522 BOTHELL WAY NE BOTHELL, WASH1NCsTON 98011 Site Address: 403 South 2nd Street, Renton, Washington Boring No. B-3 Logged by: PL Date: 215/08 Approximate Elev.: NIA Consistency/ a (N) Moisture Soil Description Relative Depth E Blows Content Density (feet) ' /ft (%) Surface: Asphalt - 2" Grayish brown silty SAND, Loose damp to moist, loose, (SM). 5 T I I 5 3 24.5 36.5 -- Brownish gray SILT with some - Soft fine sand, low plasticity, damp 10 to moist, soft, (ML). (216/O8) I7 22.6 Brown silty SAND to SAND 15 with little gravel and silt, damp Loose I g 19.6 to wet, loose, (SM). —L 20 I 6 2g 13.4 11.3 Brown sandy GRAVEL, damp, Medium Dense medium dense, (GP). (continued) r The Riley Group, Inc. Regional Veteran's Center Test Boring Log B-3 Figure A-6 17522 BOTHELL WAY NE BOTHELI., WASHINGTON 9$0I Site Address; 403 South 2nd Street, Renton, Washington Boring No. B-3 (cont.) Logged by. PL Date: 2/5/08 Approximate Elev.: N/A Consistency/ n (N) Moisture Soil Description Relative Depth E Blows Content Density (feet) cn /ft (°Io) (continued) 25 Brown sandy GRAVEL, damp to moist, dense, (GP). Dense 35 15.1 - 30 Terminated at 30.0' due to excessive heave - 3.0'. _ Groundwater seepage encountered at 13.0'. The Riley Group, Inc. Regional Veteran's Center Test Boring Lag B-3 Figure A-7 17522 BOTHELL WAY NE, BQTHELL, WASi-IINGTON 98011 Site Address: 403 South 2nd Street, Renton, Washington THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 GRAIN SIZE ANALYSIS ASTM D 421, D 22i7, D 1140, C 117, D 422, C 136 PROJECT TITLE Regional Veteran's Center PROJECT NO. 2008-034 TECHIDATE PLL 2/27109 WATER CONTENT (Delivered_ Moisture) Wt Wet Soil & Tare (gm) (wl) 423A0 WtDry Soil & Tare (gm) (w2) 314.30 Weight of`I'are (gin) (w3) 15.00 Weight of Water (gm) (w4=w1-w2) 109.10 Weight of Dry Soil (gin) (w5=w2-w3) 299,30 Moisture Content M) (w4/w5)*1001 36.45 % COBBLES C GRAVEL %FGRAVEL C SAND 0/6 M SAND F SAND FINES % TOTAL D10 (mm) D30 (mm) D60 (mm) Cu Cc 0.00 12.0" 3.0" 2.5" 2.01, 1.5 ° 1.0" 0.75" 0.50' 0.375" #4 910 #20 #40 #60 0.00 0.00 0.30 2.41 17.04 80.25 100.00 N/A 0.0018 0.017 N/A N/A #l00 #200 PAN 100 90 so P 70 A 60 S 50 S 40 1 30 N 20 G 10 0 PHONE: (425) 415-0551 FAX; (425) 415-0311 SAMPLE ID/TYPE B-3 S-2 SAMPLE DEPTH 7.5'-9.0' Weight Of Sample (gm) Tare Weight (gm) (w6) Total Dry Weight (gm) SIEVE ANALYSIS Cu olative Wt Ret t-Tare (%Retained) % PASS �-T.rP rrwt ms 1100-%mtl 15.00 0.00 0.00 100.00 15.00 0.00 0.00 100.00 15.00 0.00 0.00 100.00 15 A0 0.00 0.00 100.00 15.00 0.00 0.00 100.00 15.00 0.00 0,00 100.00 15.90 0.90 0.30 99.70 23.10 8,10 2.71 97.29 45.60 30.60 10.22 89.78 74.10 59.10 19.75 80.25 314.30 299.30 100.00 0.00 1000 100 10 1 Grain size in millimeters DESCRIPTION SILT with some F sand USCS ML The Riley Group, Inc. 0.1 Descriptive Terms trace 0 to 5% Little 5 to 12% some 12 to 30% and 30 to 50% 314.30 15.00 299.30 ;obbles :oarse gravel ;oarse gravel coarse gravel .parse gravel ;oarse gravel Fare gravel Fine gravel Fme gravel :oorse sand medium sand medium sand fine sand Fine sand flee sand r'ures silt/clay 0.01 0.001 FIGURE A-8 THE RILEY GROUP, INC. 17522 Bothell Way NE Bothell, WA 98011 PHONE: (425) 415-0551 FAX: (425) 415-0311 GRAIN SIZE ANALYSIS ASTM D 421, D 2217, D 1140, C 117, D 422, C 136 PROJECT TITLE Regional Veteran's Center SAMPLE ID/TYPE B 3 S3 PROJECT NO. 2009-034 SAMPLE DEPTH IMP-14.0' TECH/DATE PLL 2127108 WATER CONTENT (Delivered Moisture Total Weight Of Sample Used Fo Sieve Corrected For H roscopicMoiskre Wk Wet Soil Fc Tare (gm) (w1) 318.10 Weight Of Sample (gm) 262.11 Wt Dry Soil & Tare (gm} (w2) 262.50 Tare Weight (gin) 16.00 Weight of Tare (gm) (w3) 16.00 (w6) Total pil Weight (m) 246.50 Weight of Water (gm) (w4=w1-w2) 55.60 SIEVE ANALYSIS Weight of pry Soil (gm) (w5=v2-w3) 246.50 Cumulative Moisture Content % (w4lw5)*1001 22,56 WtRet t-Tare (°loRetained) %PASS $- are (lau2o o.*LOOS 100-%Yet COBBLES 0.00 12.0" 16.00 0.00 D.00 100.00 cobbles C GRAVEL 0.00 3.0" 16.00 0.00 0.00 100,00 coarse gravel % F GRAVEL 1.38 2.5" "arse gravel % C SAND 1.58 2.0" coarse gravel 16.oQ 0.D0 Q.Do 1aQ.00 Riley Group, Inc. Georechnical Engineering Report Regional Veteran's Center, Renton, WA APPENDIX B LIQUEFACTION ANALYSIS Regional Veteran's Center 403 South 2"d Street Renton, WA 98055 The Riley Group, Inc. March 4, 2008 Project #2008-034 LIQUEFACTION ANALYSIS Regional Veteran's Center Hale No.=B-3 Water Depfh=5 ft Shear Stress Ratio Factor of Safety Settlement (M0 1 0 1 5 0 (in.) 10 —5 —10 — 15 -- 20 — 25 E m — fs1=1.0 — 30 CRR — CSR fs4L— — Shaded Zone has Liquefaction Potential a N _ i L] a — 35 a 4 Saturated Unsaturat. Soil Description Magnitude=7 Acceleration=0.25g Raw Unit Fines SPT Weight % 5 120 20 7 115 30 W-IMU` &I 6 115 12 23 125 10 35 125 10 CivilTech Corporation 2008-034 Plate B-1 t • CORE D1=SfGN r K i Id PRELIMINARY STORM DRAINAGE REPORT FOR REGIONAL VETERAN'S COMPLEX Project Manager: Prepared by: Date: Core No.: RENTON, WASHINGTON (PRE, -APP07-113) David E. Cayton, P.E. Jason A. Toba, E.I.T. April 2008 07137 �aEs6-12--p Core Design,lnc. 14711 N.E.29thPlace, Suite 107 Bellevue, Washington 98007 425.885.7877 Fox425.885.7963 www.coredesigninc.com ENGINEERING - PLANNING SURVEYING REGIONAL VETERAN'S COMPLEX TABLE OF CONTENTS 1. Project Overview 2. Surface Water Drainage 3.Off-Site Analysis 1. PROJECT OVERVIEW The proposed mixed -use development is named "Regional Veteran's Complex" and will consist of a 4-story mixed -use building located on the south side of South Second Street and between Whitworth Avenue South and Morris Avenue South. The 0.68 acre site is currently developed and is located in the northwest quarter of Section 18, Township 23, Range 5 in Renton Washington. The site is within the Urban Center — Downtown (UC- D) Comprehensive Plan designation and is implemented by the Center Downtown Zoning (CD) to provide high -density residential and mixed -use commercial centers serving a regional market as well as adjacent residences. The existing ground coverage over the site is mostly pavement with some grassy landscaped areas and is relatively flat. No wetlands are located on or within the vicinity of the site. Pre -application comments from the City of Renton are attached in the Appendix of this report. Per the pre -application comments received from the City of Renton, the 1990 King County Surface Water Manual (KCSWM) was adhered to in the design of the onsite stormwater facilities. The Regional Veteran's Complex project is exempt from detention and water quality requirements. 2. SURFACE WATER DRAINAGE As discussed at the pre -application meeting, no detention will be required for the proposed project. Core Requirement #3 Flow Control of the 1990 King County Surface Water Design Manual (1990 KCSWDM) states that on -site peak runoff control will not be required if the project proposes to construct 5,000 square feet, or less, of new impervious surface. The existing site is practically 100% impervious and will remain that way in the developed condition. This project proposes to construction 4,392 square feet of new impervious surface, and is therefore, exempt from the on -site peak runoff control requirement This project will reduce the amount of pollution generating impervious surface (pgis) from 21,714 square feet to 6,739 square feet due to the increased roof size of the proposed building. KCSDWM Section l .2.3 does not require project runoff to be treated prior to discharge for areas smaller than 5,000 square feet of new impervious surfaces. Therefore, no water quality treatment is required. 3.OFF-SITE ANALYSIS 3. OFF -SITE ANALYSIS Upstream Tributary Area The existing topography of the site is higher than the surrounding areas. All offsite flow is collected by a series of catch basins along the adjacent roadways; therefore, no upstream areas contribute runoff to this property. See below for a detailed narrative of the dovsnstream system. Downstream Analysis On April 17, 2008 a site visit was conducted. The purpose of this site visit was to determine the surface water flow characteristics of this site and assess the locations of surface water running off of this property. The weather was cool with overcast skies and the temperature was around 60 degrees. There were no signs of substantial precipitation noticed at the site. The site is bordered by South Second Avenue to the north, Morris Avenue South to the east, Whitworth Avenue South to the west, and existing buildings to the south. The existing topography of the existing Parcel A slopes towards the south and east into two existing catch basins, which then conveys water offsite to a nearby catch basin. The existing topography of Parcel C slopes towards an existing catch basin located in the northwestern corner of the parcel and also discharges to a nearby catch basin. During rainfall events, all runoff from the site is captured by these three existing catch basins and conveyed offsite. The downstream investigation began along the southwestern boundary of the site on Whitworth Avenue South. There are two catch basins located in Whitworth Avenue South. Our connection into the existing system will be into the larger, bricked -up catch basin (See Photo 43). To the north of this catch basin is a Type 1 catch basin. The lid of this Type 1 catch basin was lifted to verify that offsite street runoff was discharge from the Type I into the bricked -up catch basin. The bricked -up catch basin, which had a "sewer" lid on it, had one outlet and three inlet pipes. The pipes to the north and south were 6" concrete pipe and the pipes to the northwest and southeast were 12" concrete pipe. Following the pipe to the southwest a distance of 155', a Type I catch basin (See Photo #2) was found with a crack in the existing 12" concrete pipe. From the orientation of the connection of the pipe, it was assumed that flow travels from southeast to northwest. To confirm this, the pipe was followed 100' to the southwest where a Type I catch basin (See Photo #1) was found with only an outlet pipe, which was also a 12" concrete pipe. Starting back at the bricked -up catch basin along Whitworth Avenue South it was hard to determine exactly where the 12" concrete pipe discharged to. Standing over the manhole and lining up with the outlet pipe it appeared as if the outlet pipe ran straight through the adjacent building. Walking along the backside of the adjacent building, a Type I catch basin was found with no 12" inlet or outlet pipe. A small 4" pipe was found which appeared to be a footing drain. It was the only pipe entering this catch basin. Approximately 330' northwest of the bricked -up catch basin along Whitworth Avenue South was another manhole located on Shattuck Avenue South with a "sewer" lid on it. Opening this manhole revealed a 12" concrete pipe entering from the southeast and discharging to the northwest. 80' to the northwest was a Type II manhole, which only had a pipe flowing to the north and south. Walking 550' west on the north and south side of South Second Avenue, there was no outlet pipe for this 12" pipe found. The City of Renton's Storm — Surface Water Plans confirms that this pipe just ends with no outfall (See Appendix). At the current time we are still coordinating efforts with the City of Renton's Surface -- Water Division to determine the discharge location of this pipe. APPENDIX • City of Renton Storm — Surface Water Map (1 page) • Down Stream Map (1 page) • Site Photos (1 page) • City of Renton Pre -application Comments �'APROJECT SITE 1 ' , 31 r. 71. t�JFs ' r, ji rr 17, oli � � j •/I ��'"'� .�r R� f .���' [E1��i�"r� . ... : �f. � `�•r-. _.-....� y*E !je �.�y •ram_,.-,r.y �... G 16 6-1 41 t..'. ... '\ y f 1`4�_J'-' �sycw.,.r.. .::r o_... :� •{".' ,—r-,,,..v :.i,u. i- _L. ,...s..:!r...a--�.r ! L i.�f.-f ��v ls:,-t�� ii� �ixs� •i-✓i-i ![6 _ _._ �_;cc_�_- �q �— i � .�_.�.. r ! � �.'. .>,..�a.._r�.... w..•-ti.. :��.t.xisY #-' lhE'�,�a�er � �� tt �" ..__.x� ( : ' ZF41 l4 f'ile.rb-;r. j .. J_,� _... _.. ._ —_ __ { _— ,• `,a ..__. _ � 1�6;Hb • 16.fTa—#'i y1,fG-!L• ,. fA. .H .+i,���=_:��r�.y.._ WSFIt"_"�"_—�....4_ ll.rr:-1r ».v..R,.._ eg,----��.�..,,..�-".. �.r.�:r�•��� iI 3r 1,1 .:'"", �C � /RJ57D � /C—[�1�—�- �Ir,�J'�•�` � �,JTI �fiJil�".��e�'t...,":. 57J���'' ��.i �. F.� ..,� �.� :.=3"��i•�. ..�,k_. �.,::l�r� ,� C� J SV�Hr�T7 '- - -'- ! ���Mir� ��MIf� ....wr.a—,.. .. .-. ... �... � --.--.. .L.. __.... ` �•�y i .. .� s � . - — A � '�} fi,`'��'µ � ��ii ,� 'roc J= �� � ifJ e. .--.. . " v ��r' ``mow - ._. x bJGr-•$ 3 -17f 16041 16,F7- !y 16 G7-1 11114 CITYOFRENTON STORM- SURFACE WATER MAP Nor TO scALc' REGIONAL VETERANS COMPLEX CORENO.07137 3JOI F 12 CONC. PIPE -S--.--2--n. d Nl' PIPE r —3 JL- 116,4675 6,F6-14 ­Jf 1 OL 12 BS, riviol ! C NC APE 3rs.+-. tiYI 24 97, t. 4�, h- J %!L— W-C 16 7-e �ym 7 51; -Tv i6 6. ISA7-e J47 u 16,r I I6jG7- 114' DOWN STREAM MAP R-rGlolvAt. vETERAWS COMPLEX CORENO. 07137 NOT 70 SCALE a.IL Photo # 1 — Looking Northwest I Photo f# 2 — Looking North Photo 43 -- Looking South DATE: TO: FROM: SUBJECT: I a I R-WIMINIA 10 1 DW I I M E M O R A N D U M 01/08/08 Elizabeth Higgins, Senior Planner David Pargas, Assistant Fire Marshal PRE-APP07-113 Regional Veterans Center — Mixed Use Review of the plans and material submitted regarding the Regional Veterans Center mixed use has disclosed that the following Fire Code requirements shall need to be met for this project. The Fire Code requirements are as follows: 1. FIRE FLOW: The minimum fire flow requirement for this project shall bd 2500 ..s ' gallons per minute. Fire flow shall be determined as in accordance to Renton Fire Department Standards. and as in accordance with Table B, Appendix B of the 2006 international Fire Code. A water availability certificate shall need to be provided 2. # Of REQUIRED HYDRANTS: The number of hydrants for this project is based on the size of the building and the minimum required fire flow. Based on these two issues, a minimum of 3 hydrants shall be required. One of the 3 hydrants shall be dedicated to serving the Fire Department Connection and is to be within 50 feet of the FDC. The number of hydrants is also subject to meeting installation spacing requirements that are in accordance with sound engineering practices. 3. HYDRANTS: Hydrants main port shall be equipped with a 5 inch Storz fitting 4. HYDRANT SPACING: Commercial Structure. A) Spacing for commercial projects shall be no greater than 300 feet apart. B) Hydrants shall, be no greater than 250 feet to the front of any structure. C) Primary Hydrants shall not be greater than 150 feet to the structure. 5. LADDER & FIRE APPARATUS ACCESS: A) Review of this project discloses that there is substantial access on three (3) sides of this project. This meets the required Fire Apparatus and Ladder access standards for this type of structure. B) Fire Apparatus having an access width of 20 to 26 feet wide shall require Fire Lane signage. Contact the Fire Marshal's office for specific Fire Lane signage requirements. This does not appear to be an issue with this project. i:icity memos107 pre app memoslpre-app07-113 regional vetrans center mixed use.doc Addressee Name Page 2 of 2 Date of Memo Here 6. FIRE SPRMLER SYSTEM: A National Fire Protection Association Standard 13 fire sprinkler system shall be required for this building as well as for the covered parking. 7. STANDPIPE SYSTEM: A Class I Standpipe System shall be required for this structure. S. FIRE ALARM SYSTEM: A total coverage fire alarm system shall be required for this structure. Some of the residential twits may be required to meet American Disabilities Act requirements, The installation of the Fire Alarm system shall be required to meet National Fire Protection Association Standard 72, 9. FIRE MITIGATION FEES: Fire mitigation fees for the commercial portion of the project shall be at .52 cents per square foot. Credit shall be given equal to the amount of square footage of the church that is being removed. Fire Mitigation fees for the residential units shall be at $388.00 per unit. Any questions or concerns regarding Fire pre -application review comments may be directed to Fire Marshal Dave Pargas at 425-430-7023 iAcity memos107 pre app menios\pre-app07-113 regional vetrans center mixed use.doc PLANNING/BUILDING/ ♦ PUBLIC WORKS DEPARTMENT "TrrV M E M O R A N D U M DATE: January 10, 2008 TO: Elizabeth Higgins FROM; Mike Doison; SUBJECT: Regional Veteran's Center Mixed Use Building — 205 Morris Ave S. Pre-app 07-113 NOTE ON PRELIMINARY REVIEW COMMENTS CONTAINMI IN THIS REPORT: The following comments on development and permitting issues are based on the pre -application submittals made to the City of Renton by the applicant. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision masters (e.g. Hearing Examiner, Boards of Adjustment, Board of Public works and City Council). Review comments may also need to be revised based on site planning and other design changes required by the City or made: by the applicant. We have reviewed the information provided in the preliminary application for this proposed plat. The following are comments concerning utility and transportation issues with regard to the potential subdivision of the subject property. WATER 1. There is a 4, 8-inch and 12-inch waterlines along the frontage of the proposed site. 2. The modeled fire flow available at the site is approximately between 3000-5000 gpm. Static pressure is approximately 72 psi. 3. Fire flow requirements will dictate the sizing and layout for new watermains to serve the site. New watermains may be required to be looped around the building or complex of buildings, in accordance with the required fire flow. 4. The proposed project is located within the 196-water pressure zone. 5. The site is not within the Aquifer Protection Area. 6. If fire sprinkler systems are necessary, then a separate fire sprinkler permit will be required. 7. Any existing sub -standard hydrants will need to be replaced and/or retrofitted with a quick disconnect Storz fittings. 8. A Water System Development Charge are based on new water meters required to serve the new site development, The site would be credited with existing water meters. This fee is due at time of issuance of a construction permit. SANITARY SEWER 1. There is an existing 8-inch sewer main in Morris Ave Sand South 2na Street. 2. The Sanitary Sewer System Development Charges will be determined with the Utility plan review. I:IPlan ReviewlPlan Review 20071Veterens Center Mixed Use Pre App.doc Addressee Name Page 2 of 2 Date ofMerno Here SURFACE WATER 1. This site drains to the Black River; sub -basin to Lake Washington, 2. A drainage analysis and design is required to comply with the requirements and standards of the 19M. King County Surface Water design manual. 3. The Surface Water System Development Charge is SOA05 per square foot of new impervious surface. This fee is due at the time the utility construction permit is issued STREET Il11"ROVEMENTS 1. Fully improved right of way currently exists at the site. The site is surrounded with sidewalk, curb, gutter and street lighting. A traffic study may be required if the proposed new development exceeds the traffic impact thresholds as outlined in the attached guidelines. 2. Transportation Mitigation fees are $75 per additional generated trip/day generated, These fees shall be assessed -for new multi -family units at a rate of 6.63 trips/day. 3. All wire utilities shall be installed underground per the City of Renton Under -grounding Ordinance. If three or more poles are required to be moved by the development design, all existing overhead utilities shall be placed underground, GENERAL COMMENTS 1. Permit application will required separate plan submittals for all proposed public utilities, drainage and street improvements. Plans are required to be prepared by a licensed Civil Engineer according to City of Renton drafting standards. 2. Permit application must also include an estimated cost of construction for water, sewer and roadway/drainage improvements, The cost estimate will be used to calculate the fee(s) due for review and inspection of the utility improvements. Separate permits for water meters, and side sewers are required. And a separate utility permit to cut and cap existing utilities to existing structures on site will be required as part of the demolition permit. 1APlan Revlew\Plan Review 2007Wcterens Center Mixed Use Pre App,dao CITY OF RENTON Planning/Building/Public Works MEMORANDUM DATE: January 10, 2008 TO: Pre -Application File No, 07-113 FROM: Elizabeth Higgins, Senior Planner x 7382 SUBJECT: Regional Veteran's Center Mixed Use Development General: We have completed a preliminary review of the pre -application for the above - referenced development proposal. The following comments on development and permitting issues are based on the pre -application submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The applicant is cautioned that information contained in this summary may be subject to modification and/or concurrence by official decision -makers (e.g,, Hearing Examiner, Zoning Administrator, Planning/Building/Public Works Administrator, and City Council), Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. The applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development Regulations are available for purchase for $50, plus tax, from the Finance Division on the first floor of City Hall, Development Regulations are also available for review at no charge in the office of the City Clerk on the 7�' floor, at Development Services on the 6th :door and at the Renton Library. Project Proposal: The proposal is to construct a 4-story mixed -use building on 3 abutting parcels in downtown Renton (7841800045, 7841800080, and 7841800075). The combined area is approximately 29,772 square feet (0.68 acre). The site fronts on S 2nd St, between Whitworth and Morris Avenues NE, across from Renton High School and the IKEA Performing Arts Center. The project would include 57 apartment residential units on three floors above 8,000 square feet of commercial space. Parking would be outside of the building, both covered, but not enclosed on the site and surface parking on the abutting public utility right-of-way. The apartments would consist of studio, 2-bedroom, and 3-bedroom units. The building would contain a total of 38 studio, 9 two bedroom, and 11 three bedroom units. Recreational space would include a youth and children's recreational room and an outdoor community terrace and play area on the second floor, a smoking lounge and shared outdoor deck on the third floor, and a recreational room and shared outdoor deck on the third floor. Commercial uses on the ground floor are subject to the use table for the Center Downtown, RMC 4-2-070L (included herewith). A portion of the building would be used for continuing Lutheran Church ministry, Current Use: The property is currently the site of the Renton Lutheran Church, a multi -story brick structure built in 1946; 2 single -story wood frame buildings constructed in 1924 and Pm07-113 Regional Veteran's Center (CD, mixed-use).doc 1930 and used as classrooms or office by the church; and associated surface parking. All structures would be removed from the site prior to construction. Comprehensive Plan: The site is within the Urban Center —Downtown (UC-D) Comprehensive Plan designation. The UC-D is expected to redevelop as a destination shopping area providing neighborhood, citywide, and sub -regional services and mixed -use residential development. UC-D residential development is expected to support urban scale multi -family projects at high densities, consistent with Urban Center policies. Projects in the UC-D area expected to incorporate mixed -uses including retail, office, residential, and service uses that support transit and further the synergism of public and private sector activities. In the surrounding neighborhoods, infill urban scale townhouse and multi -family residential developments are anticipated. Zoning: The UC-D is implemented by the Center Downtown Zoning (CD). The intent of the CD zone is to provide high -density residential and mixed -use commercial centers serving a regional market as well as adjacent residences. In addition, the site is located within the Urban Design Overlay District (see below). Development. Standards: The proposal's compliance with the CD zone development standards and the parking regulations is addressed below; Lot Size, Width and Depth; There are no standards for lot size, width, or depth in the CD zone. Lot Coverage — For properties located outside the Downtown Core Area, as is this site, the standards regarding maximum lot coverage for buildings are applicable. The maximum coverage is 65 percent of the total property area or 75 percent when parking is within a garage or within the building (structured parking). The parking is proposed to be surface parking; a portion covered by the 2r'd floor terrace and other upper story building areas, but not enclosed in a parking garage ("open on three sides"). Therefore the maximum site coverage by the building is 65 percent. It appears the proposed project would cover about 60 percent of the site with the building, The site data must include the lot coverage calculations. Density — The permitted density range in the CD zone is a minimum of 25 dwelling units per acre to a maximum of 100 dwelling units per acre (du/ae). Net density is calculated after sensitive areas, access easements, and areas to be dedicated to public right-of-way are deducted from the gross area of the site. It does not appear that there are sensitive areas, access easements, or public rights -of -way to be deducted from the gross area of the property. The proposal for 44 units on the 29,772 square foot site arrives at a net density of 64.3 8 du/a, which is within the permitted density range for the CD zone. Setbacks: In the CD (outside of the Downtown Core) the minimum front setback is 10 feet for the first 25 feet of building height. For that portion of the building greater than 25 feet in height; the minimum ,setback is 15 feet. It appears that the proposed setback is 5 feet. For side yards along a street, the minimum setback is 15 feet for the first 25 feet of building height. There is no side yard requirement for portions of a building greater than 25 feet in height. These setbacks would be required on the east and west sides of the building (Morris and Whitworth). Pre07-113 Regional Veteran's Center (CD, mixed-use),doc There is no rear yard setback requirement. Land s_ca in -- There is a minimum landscaping requirement in the CD of 10 along street frontages. Height — The CD zone allows a maximum building height of 95 feet. The proposed structure would be a 4-story building with a maximum height of less than 60 feet, which is less than the maximum height permitted. Building elevations and detailed descriptions of elements and building materials are required with the site plan review submittal. Screening — Screening must be provided for all surface -mounted and roof top utility and mechanical equipment. In addition, garbage dumpsters and recyclable areas must be screened pursuant to RMC section. 4-4-090.C.7. Approval of the proposed locations of dumpster areas by Rainier Waste Management is recommended prior to the submittal of the formal land use application. The site plan application will need to include elevations and details for the proposed methods of screening. Refuse/Recyclable Areas — For multi -family developments a minimum of 1 1/2 square feet per dwelling unit is required for recyclable deposit areas and a minimum of 3 square feet per dwelling unit is required for refuse deposit areas. For retail developments a minimum of 5 square feet per every 1,000 square feet of building gross floor area shall be provided for recyclable deposit areas and a minimum of 10 square feet per 1,000 square feet of building gross floor area shall be provided for refuse deposit areas with a total minimum area of 100 square feet. Calculations must be provided with the application. Access/Parking.—It appears that the applicant proposes to gain access to the parking garage from both Whitworth and Morris. Minimum parking ratios are provided in RMC 44 080.F.10 based on the proposed land use. The following parking ratios apply to attached residential developments: , 1;8 stall per 3 bedroom dwelling unit F l • 1.6 stall per 2 bedroom dwelling unit • 1.2 stall per studio or 1 bedroom dwelling unit The parking ratios for retail developments outside the downtown core: • 0.4 space per 100 square feet of net floor area. Calculations demonstrating that the parking requirements would be met on site must be submitted with the application. Off site (on street) parking is not applicable to meeting these requirements. In addition, the City's parking regulations provide specific requirements for accessible parking spaces. Surface parking spaces must comply with the minimum dimensions for standards and compact stalls, with a maximum of 50 percent compact allowed). Deskk — The site is subject to the Urban Center Overlay District Regulations RMC 4-3- 100. These regulations contain both standards and guidelines that affect site planning and architecture including building and parking siting, design and materials, modulation, common open space, access and parking. Several standards are directly applicable to this project and should be considered thoroughly before a detailed design Pre07-I 13 Regional Veteran's Center (CD, mixed-use),doo is fmalized. Within the regulations, the intent of each element must be met and clearly demonstrated by the project. The "Minimum Standards" for Design District `A' are required. "Guidelines" for District `A' are suggestions of how the intent may be met, but are not required outright. Sensitive Areas: Based on the City's Critical Areas Maps, the site is located in a Seismic Hazard Area. The seismic hazard is related to potential liquefaction of soils during an earthquake event. A geotechnical analysis for the site is required. The analysis needs to assess soil conditions and detail construction measures to assure building stability..__._..... . In addition to the geotechnical analysis, the applicant may be required to submit an archeological resource survey of the site due to the poten.tial.of archeological resources present on site. This report will not be required at the time of formal land use application, however it may be required at a later time based on comments the City receives from the State Office of Archeology and Historic Preservation. In order to complete this report, the applicant will be required to hire a state approved archeologist to conduct the site investigation and prepare a report to the State Office of Archeology and Historic Preservation. Environmental Review: The proposed project would be subject to Environmental CEP. ) Review as the proposal would result in the construction of more than 4 dwelling units and "is not Categorically Exempt per WAC 197-11-800. Permit Requirements: Religious institutions in the CD are subject to a Hearing Examiner Conditional Use Permit, Conditional Use Permits are also required when an existing religious institution expands its use on a site (St Matthew's Lutheran Church Expansion, LUA00-056; Living Hope Church Expansion, LUA06-157, etc.). The proposal would require Site Plan approval, a Hearing Examiner Conditional Use Permit, and Environmental ($EPA) Review. In addition to the required land use pennits, separate construction, building and sign permits would be required. The review of these permits may occur concurrently with the review of the land use permits, but cannot be issued prior to the completion of any appeal periods. Impact Mitigation Fees: In addition to the applicable building and construction fees, the following mitigation fees would be required prior to the issuance of building permits. t A Transportation Mitigation Fee based on $75.00 per new daily trip attributed to the development; w A Parks Mitigation Fee based on $354.51 per new multi -family unit; and, ♦ A Fire Mitigation Fee based on $388.00 per multi -family unit. A handout listing all of the City's Development related fees in attached for your review. cc: Jennifer Henning Pre07-113 Regional Veteran's Center (CD, mixed-use).doc .'PLAI�C�BUILDIN(31.PUBLIC.,W6it"- -Y- ael'Dotsdli' t Services]bev0op1Aen1D i . 1" 6th F 00t (425)A3 south Grady" 'Way-, )FAXi (425)- qZeiLWrL,: to 7 }.:;'jjEKTO1qFIRE bVAR fi per` �C&ey lilt] Thii as _ di Fire' , 4viiv."�. c fied, pje . 6 l iner5 0 05-. LN c4or r 4Y N24 I2eiitO-ici 1055 South w FAXf (425)-bG-7Ri'-'.'.% 5, as 5 I 171 oar :(4 1055 SO" U"tfi Grady Way Rent6:,-r -WWW.re to .............................. "-OC. "iA" eVel Ph, e f,Se vices Davis on a 0. 4ity,E3alt 6tir Ido '9 05 ..... 'i& t -W us: its 8 � on;z W. i um ln' 14 GV P"U'BU" C'1W c to p tut; vfces Ili .5 Ir ." -7,%Afon ty. 142 1ik55 South adp Way.-FAM, 25" 1ww.m:ren V DEVELOPMENT SERVICES DIVISION WAIVER OF SUBMITTAL REQUIREMENTS FOR LAND USE APPLICATIONS �`,t4[ �. Wv'St"CC�hvv . $r .. ...... ..��j,++,yjfr" ?P: .IX•YQ:�':L. .% ,+N'•`-'6^h v'C'��':• � �: : : �'.}y,•- :"t^ti"�- � - :: J:�: i�.-:"i=::". j.:l-,'-v4;.:'lk-.v "'Y'I.'�F:. \t.FAti � '- �i%�'�' 4'�v`�' '- Y H A^� •%-::f .:. y:�:'i]'�.?�'•f"4.x': Parking, Lok Coverage & Landscaping Analysis 4 _ } :S,%�,.�yytpryryp4 - .: Y: aL �!..'..ht^':,r :.:✓ " a•�iviii g r 52-:rra'''=i:. •:: -:x ..... .. ............. : nc;.,'M:s:-0w}xca:�6r}4i'a}76 :.3.?�:?ik���."�i.•u.':. .... .. }�yY - Y?' :: "^C_dr:.::µ`4{"Yoici}."?!-`: *hh :�f r :'¢::.-.'Y�.•Q:. } �'" ,�, �tt4''o-;�: '- r i`-'- , Plat {Name Reservation 4 ,. w� .-�:�C(i: '. yv � v -w vy -:t }::-% :Y-%:w.. %� v c $�p-� :. ... '°'�: �,,i's'i i'�, yG rt:'${ "'l'i... <x \:h. :'1[Q\; : o+¢v-h• p. v <. k `-0a-fi. ir)TT%Y::ry."<qr.•- ''�`"#}��: Preapplicabon Meeting Summary 4 }` � 1Pw..�'i ♦p - : }�1y� q. may,., i :}:C: n:ik�:?iJ::'�: ,� W-..{.(::✓F ::::i?'A`:C:: �: .q� Rehabilitation Plan 4 �'}� y :ti%"-�':�+k)N`=•, w '2-�• .W h: 7 -.x::r..,sr: •;-. '� •r:iia.... _•„•2;:'^ �?"5.�`�¢h�:"''k-��a�-:<-:�-�-.e-r},6:x ":.iv.-!:.?�::. `4},::� }_Y-1jCn:i{:v=?Y-. +,y :".Y`3$Kq'iY�'Y,':).� ..F.... �: Y. *: ?-:t phi'.`:-?}^:.-:}• '^%h'�:4 {3:::M:h: � y ^.2 ] 3 r.�„ � '.'m:.- o:a.. n�...-. This requirement may be waived by: ,. I. Property Services Section PROJECT NAME: 2. Public Works Plan Review Section ll� 3. Building Section DATE: V d d 4. Development Planning Section Q:1WEBTWIDEVSERV1FormsTlanninglwafverofsubmitialregs_9-06.xls 09106 r � �. y' �s - 1 i'q T j 'Lh--=' '� i � e 5. � :{r'}7 Y� r�c�•+:, r � 6. 0F[G[HAL !F `' � ORDINANCE NO. r A_6 Ln AN CRDINANCS OP THE CITY OF RENTON, WASHING'lt7N, VACATING A 0RTAIN ALLEY IN BLACK 2, SMITHERS-679 ADDITION, RENTON, KINC COUNTY, WA,SAINOWN WHEREAS a proper petition for vacating a certain alley as herein more 'particularly described was duly filed with the City Clerk on or about April 10, 1968, and said petition has been signed by the owners of more than two-thirds of the property abutting upon such alley sought to be vacated, AND WHEREAS the City Council by Resolution No. 1542 approved on May 6, 1968, and after due investigation did eix and determine the 3rd day of June, 1969 at the hour of 8 pm, in the City Council Chambers of the City of Renton to be the time and place for public'hearingthereon; and directed the Clerk to give notice of such hearing in the manner provided by law and such notice has been duly given and published and all persona having been heard Appearing in favor of or in opposition thereto; AND WHEREAS the Planning Commission having duly considered said petition and said vacation as hereinafter more particularly described being Found to be in the public interest and for the public benefit and no injury or damage to any person or properties will result therefrom, AND WHEREAS the City Council caused to have made an appraisal of the properties sought to be vacated as provided for in City of Renton Ordinance No. 2349;, NOW TH=FORE, BE IT 09DAINED BY TEE MAYOR AND TH8 CITY COUNCIL OF THE CITY OF RENIDN, AS FOLLOWS: SECTION I: The following described alley, to -wits Alley in Block 2, 5mithers 6th Addition, according to pl8t recorded in volume 26 of plate, page 47, records of King County, Washington BE AND THE SAME IS HEREBY VACATED, subject to payment unto the City by the abutting Owners thereof, or tteir assignees, of the total sum of $1312,SJ (One thouaaa& three hundred and twelve dollars and fifty cents) which sum does not exceed one half of the appraised value of the area so vacated. SECTION II: This Ordinance shall be in full force and effect from and after its passage, approval and legal publication as provided by law. A certified copy of this Ordinance shall be filed with the King County Auditor's Office. PASSEL) by the City Council this,day of G APPROVED by the Mayor, thisL%)4�rday of t Approved as to form: Dons Gerard M,Shellan. City Attorney, Date of 'Publication, 19v, � r i -A��..�, T 425 �/la�Zdd� 10801 Main Street Bellevue, WA 96004 4540566 F 425 453 6013 www. hoylisarchiiects,com .Fvok^ \JJA�vLev . I- .tire . , . . . . . . . . , . . . . . . . . , . . . . , . G�r� - i roc k �►.�,. z5�� � fd S� o �cvo�� �A.6I e-, , . �fwlt4n •• �J • ����r`R�7' S .'�'-2si �.tswuJ� - .� Z� G�P��� . ��. . 1i 44 �� l4 v. td - I�LQ�-CG�-S �rD Sr`Zr V . v7 'LA ! Vtj f w� w4u v. 1' - - S. 1(� l . G4,.t A-tA "� • , . 'Ft> e- EISIT-1 10801 Main Streel Bellevue, WA 98004 4540566 F 425 453 8013 wvvw.bayliscrohitects.com tn,acct-eS s (1� �.. �a�- . . . 1 . l . . . . . . r . �}Ss.�,r�n.�� � c c � s S �`�`� �- . r7vv i s � - � v� �t .wA✓� �-e 1 S S�SAern , , . . . . , . . . .V-' cam.- . . . . . . . . . . . . . , . . . . . . .........,............. vr.,r-c-� . . . . , , . . . , . . . . . . . . . , rj b a T 425 10801 Main 5treei Bellevue, WA 98004 4540566 F 425 453 8013 www,bayllsorchilecls.com . ;.1` . . �.�� . . . . . . . . . . . l. It . . . . . . . . . . . . . . . . . . . . . . . . I,,(�ti�4 .t".iPG�i� . G•.�t`T .'�o�. a�� �� .yam[,. LA r • �1Ii'm' S�~rh\ , �'' , a�'d�4 , �+��_ �L��;rL� . O�`,ri� �r2�.+t�l{" .1t44•G .. . , , . . . . . . . , . . . , . . . . . . 9� .�>��rl.� ,����a.44. ��t-C.G.• ��-� �. lS .1i.�1�\ �CL',CS? ���1Y� .. . . p [.. p. . ,��i�V` �r� 1�'fY��r� 'Y • V>ti"�7.f • �Jk'�:h�Y' ���1 'O � `� y� . V � J � C a v4 G�l'u"1 G1.�AA�IT 4 rCGi.- �"lT . G,ovr . . , . . . . . . , . . . . . 24 'I,— . 4 T 425 VI j�aos 10801 Main Street Beilevoe, WA P8004 4540566 F 425 453 6013 www.bcyliscrcbilects.com -� � •fin (�{ . S-e �,�- • cat � .� �.. . of o �e. s . � � �•�I� . e,�rc�.•, . �p+�w� � . . . �-C�-�'+� il�G v`•? •�r� � .6 C..�. .1 �7 �3;-� �M'p'�' •4�4� q,'��'�'�+�� dv�. , d VLQ. • PtL `� • 6 ✓L v vu-k [ l W r+.1 �{ dLs 01.2� . 1va v` , Y \x, . �,w �C•• r-t7�l:�2.w�cr- w.'.�s t. AbA. . . , . , . . . . . . . . . . . .— . �t off•- G�. G��-••t . cv�. J����..���•, d� • ��i�I,��o,rT�hk� . . . , . . . , . . , , , . . . . . . , Pw r...vv. a Gl2•s ��o� -e �� -e-!N4 d +�v� • �D w� c` c.�' Y�C 5 j���� a�rF� � -+� c.�" 6tG Gam. S� e. � . . . . . . . . . . ` . {, , w�11 . � rvj4-e . , . . . . . . . . . . . . . . . . . . . Zak . T 425 i0B01 Main Street Bellevue, WA 48004 4540566 F 425 453 8013 www,bayltsc rchileci s. co m V : �•r +i 1�-� . �5..� , �-�,� ►,...,fin.@.. w-'�,,.%s. �*! . �-c�' lal•,G'�. :�,-�,r„�.. �- �,�es . . ` �. �rnjk s .) /1j o- . . -. .. �e o.r1 rti e a . . . . . . . . . . . . . . 4� ram... . . J . . . ��7�,�o•c..�.. ..ut�t .Jv�-o-t.�' .wt`�. `ou��. -["-au.�e... ��vdu,��� s�-�.. , , L 5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . t/I 10801 Maio Street Bellevue, WA 98004 T 425 454 0566 F 425 453 8013 wvvw.baylisa rchitects.co m