Loading...
HomeMy WebLinkAboutMFP19000011.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19000011 IVR Number: 19000011 Permit Informaon Permit Name:PSE CORROSION CONTROL - BLANKET PERMIT Address/Locaon :01/02/2019Application Date:Parcel Number:VARIOUS LOCATIONS IN RENTON Permit Type:01/02/2019Issue Date:Franchise Permit Work Class:01/02/2020Expiration Date:Major Utility Job Number:Blanket Permit Franchise Type:Natural Gas Description:2019 ROUTINE GAS COROSION CONTROL TESTING AND MAINTENANCE OF NATURAL GAS PIPELINE . TRAFFIC CONTROL PLAN REQUIRED. WORK UNDER THIS PERMIT MUST BE CALLED IN AT JOB START (425) 430 7203. Contacts Name Address PhoneTypeBilling Betty Frank PSE-Corrosion Control 6500 Ursula Pl S Seattle, WA 98108 B: (206) 716-2641ApplicantX Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Contact General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES