HomeMy WebLinkAboutMFP19000010.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Franchise Permit: MFP19000010
IVR Number: 19000010
Permit Informaon
Permit Name:BLANKET PERMIT - PSE (Bare Poles)
Address/Locaon :01/02/2019Application Date:Parcel Number:VARIOUS LOCATIONS IN RENTON CITY LIMITS
Permit Type:01/02/2019Issue Date:Franchise
Permit Work Class:01/02/2020Expiration Date:Major Utility
Job Number:Blanket Permit Franchise Type:Electric
Inspector:Brad Stocco 425-282-2373
Description:2019 PERMIT TO REMOVE BARE POLES ONLY. SOME TRANSFER WORK IF NECESSARY TO REMOVE POLES.
TRAFFIC CONTROL PLAN REQUIRED. WORK UNDER THIS PERMIT MUST BE CALLED IN AT JOB START (425) 430
7203.
Contacts
Name Address PhoneTypeBilling
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Applicant
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Marita Bond
Puget Sound Energy Billing
6905 S 228 St
Kent, WA 98032
B: (253) 395-6346Specialized
Billing
X
General Condions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
This permit and plans must be posted at the job site at all times.
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES