Loading...
HomeMy WebLinkAboutMFP19000015.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19000015 IVR Number: 19000015 Permit Informaon Permit Name:Blanket Permit - PSE - Intolight Address/Locaon :01/02/2019Application Date:Parcel Number:Various locations in Renton City Limits Permit Type:01/02/2019Issue Date:Franchise Permit Work Class:01/02/2020Expiration Date:Major Utility Job Number:#596000974Franchise Type:Electric Inspector:Brad Stocco 425-282-2373 Description:2019 Blanket Permit for Puget Sound Energy Intolight to Repair and Replace Street Lights as required by the City or Customers. Good Traffic Control is required at all job sites. For simple arm/head street light installations on PSE wood distribution poles (requested by the City), they shall be covered under this blanket permit. ALL WORK MUST BE CALLED IN THE DAY PRIOR TO WORK TO INSPECTION LINE (425) 430 7203. Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Jennilee Messenger PSE / INTOLIGHT 3380 146th Pl SE, #310 Bellevue, WA 98007 B: (425) 603-5903Contact PAUL KINBERG PSE / INTOLIGHT B: (206) 604-3346Contact Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES