Loading...
HomeMy WebLinkAboutMiscDenis Law CITY OF Mayor Department of Community and Economic Development C.E. "Chip" Vincent, Administrator LUA # LUA NAME DATE MAIL RTD REASON COMMENTS A- 4.-,J D Renton City Hall 0 1055 South Grady Way 0 Renton, Washington 98057 0 rentonwa.gov Notice of intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2015 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. rr Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date.._ � � ..... Signature: Chair Signature: -4 -- - Signature: Signature.. Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010, Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am — 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date• . ,LZ117 Signature• % Chair Signature; Signature• r .6-r D rI Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. t The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date; Signature:.1 4W2 AII,, Chair signature:—C Signature:_ Signature:-1�4-4--. Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. r The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 AM. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases. (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region K office is open between 9:00 am — 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Menton Environmental Review Committee {ERQ Date;. __ Signature: r W2 Chair Signature: Signature: r Signature, ----._._------ f .......... r i r rt Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. in 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. 4 N The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. i Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Sate: Chain Signature, Signature: Signature: i Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, A1CP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. ti The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010, Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (CRC) t Date. q.17- -- Signature -.—,- Chair Signature. Signature:..�� � Signature: Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, A1CP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. k . 6 The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) r.2 Dater Signature: . Chair Signatures Signature: S ignature:� Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 4n or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would he integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a, SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community E[S. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date: .. '__...... Signature:.. :. .2 Chair , SignaturQ: � Signature: Signature: I. it •.°ol _. fI Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NE PA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NE PA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58, (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) A4VWLute: qLZ.117 Signature: Chair Signature. Signature: __.. Signature: _ ems^'[ Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. N. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057, Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region K office is open between 9:00 am - 5.00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Benton Environmental Review Committee (ERC) A4W�Ax:L-I-If=. - - Date: ... q/IzzI7 Slgnature: Chair Signature:... Signature:; � Signature: 9 f' Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U,S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue, An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD docu=nts the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying [officer City of Renton Environmental Review Committee (ERC) S Date: .. .. Signature: Chair 1 Signature - - Signature, Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERQ Date:..... . Signature: Chair Signature:.... Signature: e 1P r if,rr n ; Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. 1 it The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am — 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. &awl' 4t Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement [EIS] planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. At Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date:...... ______ Signature; 'A 4 W 2 Chair Signature:— 2L Signature: Signature: e .rr rt Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Munroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 20111 conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. 4 The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057, Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. RAponsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) ,p Date: ..g1147� Signature: `� Chair Signature: Signature: Signature: (�i)•uf a .„� Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, A1CP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) A4v,-,?-2oxo-� -.- Date:— _ Signature: Char Signature: Signature: Signature: r p r a Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 20111 conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. n. 4A The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division, 10 5 5 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. V* Responsible entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date: Signature: V,:�t 2 Alx-o-r� . ........ .. Chair y Signature: �� Li 4 fd� Signature: Signature:_ J�r ..,.11 .. Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study ,Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. �I Responsible Entity Certifying Officer City ©F Renton Environmental Review Committee (ERC) Date: 17 _ Signature; Chair " Signature: Signature: __ Signature: 1�-ai P r D rI Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset "Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. v, L0 The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 F.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date; Iz Signature: 4W2 ............. Chair - i Signature: . Signature. I�� Signature:. _944A_ _ Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 on or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. n 1 Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date: � 4�LZII Signature: .. Chair ` Signature: Signature: Signature: Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would he a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 F.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Bate: /ZZ117 Signature: Chair Signature:..... Signature: 1/ Signature: __ __ � �j.. .. r Notice of Intent to Request Release of Funds Date of Notice; April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. E The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9.00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying [Officer City of Renton Environmental Review Committee (ERC) Date: q117117 Signature: -Jj Chair Signature: Signature: Signature: r Notice of of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development: Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. 0 The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5.00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057, Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept_ of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5.00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC} Date: __ Signature; —�J4 Chair " Signature;.... --------------- Signature; Signature: ti Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities, a new parr/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. 2 Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERQ A4Date. —, ,.��. _ Signature: Chair Signature•... Signature-0 Signature: Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057, Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Denton Environmental Review Committee (ERC) ��- 4 1����� - Signature Chair Signature - signature: 4 E1(sf � , ri,r Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mined -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the HIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 HIS Study Area. Compared to 2011 plans, there would he a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010, Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date: Signature- Chair i Signature; Signature:- r Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011, In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Denton Environmental Review Committee (ERR Date: q Signature; Chair ` Si�nat►�re: y Signature: 5 ignature: - Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban. Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLQ would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. 0' Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date: . Signature.. 1 2 Chair Signature: Signature: Signature �f rtva . r i Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the HIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 HIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Off icer City of Renton Environmental Review Committee (ERC) Date: q 14Si afore: Chair . Signature: Signature: Signature:-__-- Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am — 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (RRC) Date:. q/1ZI17 Signature Chair Signature. Signature: Signature: Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division, 1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton EnvironrnenLal Review Committee (ERC) Date: e� l Signature: Chair i Signature: Signature: Signature: 100 Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C.1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLQ would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. Responsible Entity Certifying Officer City of Renton Environmental Review Committee (ERC) Date-, Signature,.—<,84 . . .. ................ Chair t.« Signature: Signature: Signature: Notice of Intent to Request Release of Funds Date of Notice: April 21, 2017 Name of Responsible Entity: City of Renton, Washington Address: 1055 S. Grady Way, Renton, WA 98057 Contact and Telephone: Matthew Herrera, AICP, Senior Planner City of Renton Department of Community and Economic Development Planning Division (425) 430-6593 On or about May 9, 2017 the City of Renton will authorize the Renton Housing Authority (RHA) to submit a request to the Department of Housing and Urban Development (HUD) for the release of funding for projects assisted under section 9 of the U.S. Housing Act of 1937 (42 U.S.C. 1437x) to undertake redevelopment of RHA's Sunset Terrace public housing community and additional properties owned or purchased by RHA for housing and associated services. Locations: The Sunset Terrace property is generally located at the intersection of Sunset Boulevard and Harrington Avenue. An Environmental Impact Statement (EIS) planned action study area was defined and bounded approximately by NE 21st Street on the north, Monroe Avenue NE on the east, NE 7th Street on the south, and Edmonds Avenue NE. Within the EIS study area, a master plan redevelopment of Sunset Terrace was evaluated, as well as replacement housing sites, and private development in the neighborhood. Description: Since 2011, conceptual plans have proposed redevelopment of Sunset Terrace and adjacent properties with mixed -income, mixed -use residential and commercial space and public amenities. The redevelopment would include a 1-to-1 unit replacement for all 100 existing public housing units either on -site at Sunset Terrace or off -site at locations within the EIS study area. The project will require relocation of all existing residents and RHA has developed a relocation plan as part of the demolition and disposition permits granted by the US Department of Housing and Urban Development. Public amenities would be integrated with the development and could include a community gathering space; civic facilities; a new park/open space; retail shopping and commercial space; and green infrastructure. Conceptual master plans were updated in 2014 and 2016 and reevaluations under NEPA and SEPA were conducted and revised Records of Decision noticed. As planned, the Sunset Terrace property and associated properties owned or purchased by RHA or by other public or private developers (e.g. Colpitts Development Company, LLC) would be developed with up to 722 total units on the Sunset Terrace property including nearby land swap/housing replacement sites. In 2016, the City and RHA proposed the addition of replacement housing for the Sunset Terrace redevelopment on five parcels located abutting the Master Plan area and evaluated in the 2011 EIS Study Area. Compared to 2011 plans, there would be a redistribution of Master Plan dwelling units within the Master Plan area and the Renton Sunset neighborhood. The proposed changes would redistribute dwelling units, but there would be no net increase in the total number of housing units in the Master Plan area or in the Sunset Area neighborhood. The activities proposed comprise a project for which the City of Renton initiated and prepared a SEPA/NEPA EIS. A public EIS scoping process on the project occurred from August 13 to October 18, 2010. The City of Renton issued a Draft EIS on December 17, 2010. Following a formal comment period which ended on January 31, 2011, the City issued a Final EIS on April 1, 2011. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. An Environmental Review Record (ERR) that documents the environmental determinations for this project is on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. The public may review and obtain copies of the ERR at this location Monday through Friday between 8:00 A.M. and 5:00 P.M. Record of Decision In 2011, the City provided a notice of its Record of Decision (ROD) for the Renton Sunset Area Community EIS. The ROD documents the City's consideration and conclusions with respect to environmental impacts and mitigation measures for various elements of the environment, as required by NEPA. The ROD does not constitute approval of development of the proposal. The ROD is also considered part of the ERR. In 2014 and 2016, the City issued reevaluations and published a Revised Record of Decision. Copies of the ROD as revised are on file at the City of Renton, Department of Community and Economic Development, Planning Division,1055 S. Grady Way, Renton, WA 98057. Public Comments Any individual, group, or agency may submit comments on the ERR to the City of Renton Department of Community and Economic Development. All comments received by May 8, 2017 will be considered by the City of Renton prior to authorizing submission of a request for release of funds. Copies of the ERR are available upon request by contacting Matthew Herrera, Senior Planner, at the contact information provided above. Release of Funds The City of Renton certifies to HUD that the Renton Environmental Review Committee chair, as designated by the Chief Executive Officer to function as the NEPA Responsible Entity (RE), consents to accept the jurisdiction of the Federal Courts if an action is brought to enforce responsibilities in relation to the environmental review process and that these responsibilities have been satisfied. HUD's approval of the certification satisfies its responsibilities under NEPA and related laws and authorities, and allows the Renton Housing Authority to use Program funds. Objections to Release of Funds HUD will accept objections to its release of funds and the City of Renton's certification for a period of fifteen (15) days following the anticipated submission date or its actual receipt of the request (whichever is later) only if they are on one of the following bases: (a) the certification was not executed by the Certifying Officer of the City of Renton; (b) the City of Renton has omitted a step or failed to make a decision or finding required by HUD regulations at 24 CFR Part 58; (c) the grant recipient has committed funds or incurred costs not authorized by 24 CFR Part 58 before approval of a release of funds by HUD; or (d) another Federal agency acting pursuant to 40 CFR Part 1504 has submitted a written finding that the project is unsatisfactory from the standpoint of environmental quality. Objections must be prepared and submitted in accordance with the required procedures (24 CFR Part 58) and shall be addressed to the Cherie Shanks, General Engineer, Office of Public Housing, U.S. Dept. of Housing and Urban Development, 909 First Ave., Suite 360, Seattle, WA 98104-1000. The Seattle Region X office is open between 9:00 am - 5:00 pm. Potential objectors should contact HUD to verify the actual last day of the objection period. R6ponslble Entity certifying Officer City of Renton Environmental Review Committee (ERQ Date: q117117_. Signature: I-,AV±2 Chair Signature— Signature- Signature:— City of Renton ® Community & Economic Development b 1055 South Grady Way Renton WA 98057-3232 Edie Mae Lawyer & Gene Gannon 201 Union Ave SE, Space #20 Renton, WA98059 ediemae100@+nsn.com al7;.i:.e 2_1)3 Erix ar �1: V_Fri, E F A d A ' D _ "-. S r -, . _ 2 � �•� �q +�. �.+.y�}- J is . u 0 ,,.4 City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 v<� Linda Jean Perchyk 2712 NE 9th St Renton, WA98056 k,4 7 X-j -- 7JI 3 City of Renton Community & Economic Development 'R 1055 South Grady Way Renton WA 98057-3232 David & Shannon Rollo Green ."___-2213 N E 9th Si .... -------------- Renton, WA98056 shan9800@yahoo.com OCT- 0 ^'rt isl ,^ I'• D'.�. _. ..: ? __ f4 M City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 4 Sandel DeMastus 1137 Harrington Ave NF Renton98056 Anget5andet@aol.com N 7 '11�. i --, City of Renton 5RCommunity & Economic Development 1055 South Grady Way Renton WA 98057-3232 Theresa Elmer 3201A NE 13th St Renton, WA99056 tenacious—tic@msn.com x i H 10 i 6 0 0 31 4 Z S 0 T D F'L'i C J N As Ww D S e5 ZI City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 LeKetCrila Jones 1058 Glennwood Ave NE Renton, WA98056 leketchiajones@awinxom F T I "� S '- ! -; -- -- q 1 7, T IN 7' A D -D F F 5 S j N A 3 T ON :: 01 W A R F) City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 V�4 Brittney Cherry 2629 Sunset Ln NE Renton, WA98056 brittcherry@hotmail.Cem AS ti - U NTO T DI VOA D City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 An&za-56fort 2012 Dayton Ave NE Renton, WA98056 akbufart@yahoo.com 4 7 T a 0 7-- 0 City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Thomas DeJonete 2828 NE 3rd St Renton, WA98056 N I x I F 980 DEE la3G 0 0 e 4 r' 2, 4 / 17 3 'NA;2pl: TO OPV;A.FFD 0. '_- City of Renton Community& Economic Development 1055 South Grady Way Renton WA 98057-3232 Harrison Liu 3 100 NE 16th St Renton, WA98056 4 T 1 C A D D R S S N AFI - E 7 0 Y CD + 14 TO City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Jesus & Maricela De Dios 2615 NE 9" St Renton, WA 98056 101 6 1 2 4 7 '�A 7 CZ � 0 5 H- to7, F F- IM" City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Joshua & BrIdgette Marshall 454 M6fore Ave- NE-#l.G4: Renton, WA99056 C Z' 0 0 OA 4.1 27 5; - - �' - E. - ': 71 '4' -1. 5,27. City of Renton Community & Economic Development ;IOR 1055 South Grady Way Renton WA 98057-3232 Donald Wright 1177 Harrington Ave NE #207 Renton, WA93056 T 7 0 P ', i A D City of Renton % Community& Economic Development IWO 1055 South Grady Way Renton WA 98057-3232 Delwari Tyndale 2630 Sunset Ln NE HD Renton, WA98056 xtrenie493@yahc)o.corn N I x E e a E 1036 jN 6- 0 OP NA F -A IT VI �4 LD Vi Zug / \\\ lk /� C L V1. i .4 u ft LU Ln M 00 _ U5 @ Lp . 4 - 0 4v City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Scott Weiss 1144 Harrington Ave Renton, WA98056 J N A B 7- T 0 OF KAP! D a 3 0 0 4 ! n - J �-: 7 B C 9 S 5 7 3 3 5 6 9 15 Z 2 JF~, 7 'P City of Renton Community& Economic Development 1055 South Grady Way Renton WA 98057-3232 Linda Perrine 1157 Glennwood Ave NE Renton, WA98056 1perrine@wkg.cum P I L 'NA�� E TO -OPWARD City of Renton Community & Economic Development ; WO 1055 South Grady Way R Renton WA 98057-3232 City of Newcastle Attn: Steve Roberge Director of Community Development 13020 Newcastle Way Newcastle, WA 98059 N f B C' T S Li I..i _.NI AD, 0 R S S C- T/)-< V ) City of Renton Community& Economic Development 1055 South Grady Way Renton WA 98057-3232 Dawn Johnson 1131 Lake Washing Blvd N Renton, WA98056 dawn@ data cen tricsolutions. us 710 F.0;7iq-'O-­ - City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Carl Stixrood 814 E Pike St Seattle, WA98102 carls@huitt-zollars.ccjm A F T! 7C L N' :1 w A R City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Catherine A. O'Day 861 Edmonds Ave NE Renton, WA98056 cjoday@msn.com ' City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 KC Dev. & Environmental Serv. Attn: SEPA Section 900 Oakesdale Ave. SW Renton, WA 98055-1219 City of Renton Community & Economic Development 1055 South Grady Way 25 APB, " ..', Renton WA 98057-3232 P3•I 6 L Dave Halfon �8@q Kirk, mTXv NE Renton, WA98056 wolf5756@comcast.net \s ATTE��F—r, City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Davonne Carter _--901 SunYset-Blvd-N Renton, WA98056 N z x I City of Renton Community & Economic Development Iwo 1055 South Grady Way Renton WA 98057-3232 John Barker 1428 Kirkland Ave EVE Renton, WA98055 johnbarker_net@hotmaii.com AS ADDRESSED City of Renton % Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Dorothy Somers 697 Kirkland Ave NE Renton, WA980S6 -0 E A, M. 7 T- T-I K -1 N 0 7 City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Advisory Council on Historic Preservation (federal) 1100 Pennsylvania Avenue NW Suite 803 Old post office Building Washington DC 20004 7 Y 5 7 k'a Ezz R F N j�,S cle Op WAR Z, City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Puget Sound Energy Municipal Liaison Manager Joe Jainga PO Box 90868, MS. XRD-OIW Bellevue, WA 98009-0868 N 7 X I E 9SO DE 1036 JNABLEE "FO POFWA.;ZD !A �C. 9E057323255 City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Sid Rodabough 376 Temple Meadow Ln Rirhlnnrl ulnoo�rc 43z? i ;-4';=, 3_0 6A1_ErRBQF , 1� _ s f\14. H L, .+! Fti N 7 IX.i� gh�Z CAE �0a6 PJ0E14.L=`rr�7;' R.ETJRN TO SENDER :t i`F. ..sis sos NO Suslii STREET l4:ethc7?P.aG 1 F?46t :. x * sr�ra_1 �1 4Po 7.t _' !I tl ;3e .3;#i' 3l�11�9y1ai#,iy€.i� €R'ssaa'slt 0 r ] 3 � 3� ii'Is i13 k' i ! 4 City of Renton qk Community & Economic Development ;R IWO 1055 South Grady Way Renton WA 98057-3232 David Liu 1634 Monroe Ave NE Renton, WA98056 4iudavid@q•corn N I X 1 980 of i P'aTUF14 TO 5 = N D F U., AS�E 'TO PORWAFD os L- A -a , 9C: 98057323255 *2189- 0549 —26-17 :w is r:::'iyL•:::€-yyf'-�!�'-�I�'S7°���r�'� 4s1 € ?Zt €€€!ji€iai€t a�3.€s r!k€i 4ff ;�€€ sal €`s €s?:l'> • �i ;€i�j �' '1r1,€ � �� ti i£ i � li .� s City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 Johnny Contrords ----639-Ferndale-Pi-NE~-------------- — Renton, WA98055 CM NIXIH 980 _ ;. 0005/a1,} Tj R N TO SENDER NOT DELIVERASLE AS ADDRESSED UNABLE TO PORWARID ,:•'.i:c; r•y ,! :r i' i$$I ?:�+3 31111, i t s¢il ;f a.ta fi4 i 1 IiItE" 5 :iia �f :�- �� z i iii i sip l .�� t City of Renton Community & Economic Development 1055 South Grady Way Renton WA 98057-3232 EOC Haywood 4008 Lake Washington Blvd N, #3 Menton, WA99056 eric.w.haywOod@boeirkgXoM R E T; R IN E- J City of Renton Communitv & Economic Development 1055 Souh Grady Way Rento;iWA98057-323, �, ?�) 0 ngton DC 20460 0003 98OS7323:2255 2 7 9 ? - 0 2 a S e - 12