Loading...
HomeMy WebLinkAboutMFP19000851.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19000851 IVR Number: 19000851 Permit Informaon Permit Name:Puget Sound Energy - Electric Address/Locaon :02/20/2019Application Date:2923059026Parcel Number:10801 SE 170TH ST Permit Type:03/06/2019Issue Date:Franchise Permit Work Class:03/05/2020Expiration Date:Minor Utility Job Number:105090892Franchise Type:Electric Description:Connect 2 runs of UG service at V01. Trench 36' south across road way and continue 60' west to property and install 2 runs of UG 4/0 TPX. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Applicant Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner ANISH KUMAR PUGET SOUND ENERGY - ELECTRIC 6905 S 228th St Kent, WA 98032 B: (253) 208-2183Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Electric 105090892 MARITA BOND (253) 395-6346 marita.bond@pse.com 10801 SE 170TH ST NEW SERVICE - POTELCO TO CONNECT 2 RUNS OF CUSTOMER INSTALL UG SERVICE @ V01 (316730-166335) CUSTOMER/CUSTOMER CONTRACTOR TO DIG 4'x4' work pit at V01 (CUSTOMER REPSONSIBLE FOR RESTOARTION). Trench 36' south across road way & continue 60' west to property line and install 2 runs of customer owned UG 4/0 tpx. Please see attached. 100' Potelco Inc.(253) 395-6346 BL005109 Poteli*227PL 2-20-19 MFP19000851 RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 2/21/2019 Holly Powers 3/6/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: • Comply with all traffic regulations of the City of Renton and the State of Washington. • Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. • Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. • Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. • Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. • The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. • In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. • Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. • By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 105090892 PSE/Potelco Inc. FABIAN GOMEZ (206) 573-0031 6905 S 228th St, Kent, WA 98032 FABIAN GOMEZ 10801 SE 170TH ST TBD TBD MARITA BOND 2-20-19 MFP19000851 Scott Warlick 2/21/2019Monday - Friday 8:00AM - 3:30PM SKETCH I -- NORTH -- I NOTES: • Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. • The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. • Approved Temporary Traffic Control Plan must be at the work site during work hours. • Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. • Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. • Total road closure lasting more than 24 hours is subject to the approval by the City Council. • Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: • Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. • Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. • The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. • Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). 10922 10934 10928 10918 10914 16921 16826 16839 10732 17011 17015 10824 10801 17014 17019 16922 16927 10920 1082510821 10819 10931 10926 10835 10817 316730-166313 75 kVA 120/240V (B)316730-166335 75 kVA 120/240V (B) 316722-166303 316724-166297 37.5 kVA 120/240V (B) 316737-166297 X8824 X8824 X8824 DRAIN FIELD DW 5' SIDEWALK 8' PLANTER PROPOSED DUPLEX DW SIDEWALK 316746-166298 15 kVA 120/240V (B) ROW 36' SE 170TH ST 108TH AVE SE316745-166355 25 kVA 120/240V (B) ROL 15 BØ53595 BØ53599 JOB SITE JOB SITE JOB SITE SITE PLAN POWER GENERAL NOTES - MULTIFAMILY PROJECT N Vicinity Map 47.450475, -122.196074 Owner / Developer Contact Info officeATTN: JDL PROPERTIES LLC 705 214TH AVE SE SAMMAMISH WA 98074 JEREMY BENEZRA 206-465-9678 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE 11. 7. 6. 5. 4. 3. 2. 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point. Inclement weather conditions may cause delays in construction times and dates. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. 8. ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE ROL-15 10/2018 269 278 268 -3.51 - 2.69 279.51 2.68 GAS PHONE CABLE TV N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Perm. Service Relocation Removal Temporary Job Order Distribution HP Svc/MSA Phone INTOLIGHT Contact Information: N/A N/A UNDERGROUND CIRCUIT MAP SCALE: 6" = 1 MILE 9. 10. E-Mail: Cell Phone: Project Manager Contact Information: Manager:FABIAN GOMEZ 206-573-0031 FABIAN.GOMEZ@PSE.COM PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" SCALE: 1" = 50'105090892THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP FABIAN GOMEZ 206-573-0031 12/3/18 TIN NGUYEN 253-244-4303 12/3/18 N/A N/A N/A TIN NGUYEN 253-244-4303 12/3/18 REQUIRED RENTON JDL DUPLEX UG SVC TO DUPLEX W/ HH INST. 10807 SE 170TH ST, RENTON WA 98055 N/A N/A N/A 105090892 AS NOTED 1/2 KING N/A N/A CSPSKEIN SE29-23N-05E N/A N/A 2305E116 2305E136 2305E116 ROL-15 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A Service Stubs 105090892 N/A N/A 506404675 N/A SITE SPECIFIC NOTES V01 (316730-166335): -EXISTING VAULT & TRANSFORMER TO REMAIN -REMOVE EXISTING 6-POS CONNECTOR LUGS -INSTALL (3) 8-POS CONNECTOR LUGS HH1: -INSTALL 13" X 24" 4-POS HANDHOLE STD 6050.2000 (HH14350) -INSTALL (3) #10-350 4-POS CONN. BAR (MID 7651005) -CONNECT 2-RUN OF CUSTOMER OWNED 4/0 UG TPX M01: -INSTALL 200A METER M02: -INSTALL 200A METER SPAN SPECIFIC NOTES V01-HH1: -CUSTOMER TO TRENCH & INSTALL 1-3" SCH'L 80 CONDUIT, ±100' -PSE TO INSTALL 1 RUN OF 350KCMIL UG TPX, ±110' V01-M01: -CUSTOMER OWNED, INSTALL & MAINTAINED CONDUIT AND 4/0 CABLE, ±80' V01-M02: -CUSTOMER OWNED, INSTALL & MAINTAINED CONDUIT AND 4/0 CABLE, ±40' CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH FOR CROSSINGS ARE ALLOWED ONLY IF LOCAL MUNICIPALITY PERMITS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. -PROVIDE A 4' X 4' WORK PIT & 1 YARD OF SAND AT V01. -PROVIDE A 4' X 4' WORK PIT & 1 YARD OF SAND AT HH1. TRENCHING & CONDUIT. -INSTALL 100' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM V01 TO HH1. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY MULE TAPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . Communications Electric Service Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 2400 SQ. 320AMPS GAS 12 KW 80A 1.3% 1.5% CIRCUIT FEET ADDED: 0' SCHEDULE: 27 00 1"2" 00 50'100' MFP19000851 -PSE TO INSTALL 1 RUN OF 350 KCMIL UG PTX, ±110' -CUSTOMER OWNED, INSTALLED & MAINTAINED 4/0 UG CABLE -CUSTOMER TO PROVIDE 4'X4' WORK PIT & 1 YARD OF SAND -CUSTOMER TO PROVIDE 4'X4' WORK PIT ±40 ±60 316730-166335 75KVA 120/240V -CUSTOMER TO TRENCH & INSTALL 1-3" SCH'L 80 CONDUIT, ±100' -CUSTOMER OWNED, INSTALLED & MAINTAINED 3" SCH'L 40 CONDUIT -CUSTOMER TO PROVIDE 4'X4' WORK PIT & 1 YARD OF SAND -CUSTOMER TO PROVIDE 4'X4' WORK PIT ±40 ±60 90° R=48" 316730-166335 75KVA 120/240V SCALE: NONE CABLE DIAGRAM 105090892UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A REQUIRED RENTON JDL DUPLEX UG SVC TO DUPLEX W/ HH INST. 10807 SE 170TH ST, RENTON WA 98055 N/A N/A N/A 105090892 AS NOTED 2/2 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A PSE 1324 POLYETHELYNE HANDHOLE PLAN VIEW 2" APPROX24" APPROX13"ELECTRIC 4' - 0" PENTABOLTLOCK COVER 5' - 0" 15” SIDE VIEW 4" X 4" KNOCKOUT (2 PLACES) APPROX 23"APPROX 32"17" CONDUITS ENTER FROM BENEATH AT ONE END OF HANDHOLE SINGLE PHASE SECONDARY HANDHOLE EXCAVATION DETAIL Not to scale METER DETAIL @ M01 & M02 32" Typical 24" Min 24"-36" 4'Top View Electric & Joint Utility Work Pit Dimensions 36"Min Drainage Pipe 12" Minimum Clearance from Gas Service Lines Conduit Depth 24" to 36" Max Regulator Gas Meter Assembly 48" 4'8" Service (Permanent Detail:) Not to Scale ConduitEndsClosed 4'8" 24" Min 36" Typical 3' To Trench Property Line Conduit Stakes Customer Provided 3" Schedule 40 Grey PVC Power Cable Conduit Customer Provided Gas Service Line Conduit 3" Conduit Service Riser Customer Provided Elec. Mtr Base Elec Mtr utility provided Gas Meter Relief Vent Building Wall Elec. Mtr Vent Utility Provided Seal 24"-36" SCALE: NONE CONDUIT DIAGRAM FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 CROSS SECTIONAL VIEW OF 108TH AVE SE - FACING NORTHE 22'22'8' 87.5' RIGHT OF WAY 8'5'16.75'3.5'1'1' 44.75'44.75' 5.75' CROSS SECTIONAL VIEW OF SE 170TH ST - FACING WESTB 5'12'12' 36' RIGHT OF WAY 5'8'1'1' MFP19000851 11111515 13131313151516111611SE 170TH ST109TH PL SE108TH AVE SE108TH AVE SESE 170TH ST#10807VO1STOP FLAGGER STOP FLAGGERSTOPFLAGGERW20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEADX'350'X'ROADWORKAHEADW20-1350'ROADWORKAHEADW20-1100'FROM TO TOW AWAY AREA PHONE 888-9999 INFRASOURCE LLC 000 0000000 NO PARKING NO-PARK W20-7AROAD WORK AHEAD W20-1BE PREPARED TO STOP W3-4100'100' 10 0 'W20-7AROAD WORK AHEAD W20-1BE PREPARED TOSTOP W3-4100'100'100'SIDEWALKCLOSEDR9-9SIDEWALK CLOSED R9-9R9-11SIDEWALKCLOSEDAHEADR9-11SIDEWALK CLOSED AHEAD RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSURENPSEPUGETSOUNDENERGYJOB#10509089210807, SE 170th St, Renton, WA24th January, 2019prachi.joshi@pse.com425-424-7806SHEET 1 of 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--84028" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWMFP19000851 11111515 13131313151516111611SE 170TH ST109TH PL SE108TH AVE SE108TH AVE SESE 170TH ST#10807STOP FLAGGER STOP FLAGGERSTOPFLAGGERW20-7AROADWORKAHEADW20-1 W20-4ONE LANEROADAHEAD350'X'ROADWORKAHEADW20-1350'ROADWORKAHEADW20-1100'W20-7AROAD WORK AHEAD W20-1BE PREPAR E D TO STOP W3-4100'100' 10 0 'W20-7AROAD WORK AHEAD W20-1BE PREPAREDTOSTOP W3-4100'100'100'RESIDENT(S) WILL BE INFORMEDOF POSSIBLE TEMPORARYDRIVEWAY CLOSUREHH110_X_20-PLAT EX'FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK NPSEPUGETSOUNDENERGYJOB#10509089210807, SE 170th St, Renton, WA24th January, 2019prachi.joshi@pse.com425-424-7806SHEET 2 of 2Puget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. 008997Card Exp. 08/13/2019gregory.harwood@pse.com(425)424-6425TEMPORARY TRAFFIC CONTROL PLANCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--84028" TRAFFIC CONELEGENDTRAFFIC FLOWSIGN LOCATIONFLAGGERSTOPVAULTVaultWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.MFP19000851