Loading...
HomeMy WebLinkAboutAdden 07 CAG-17-082 , Adden #7-19 WillWashington State Department of Transportation Supplemental Agreement Organization and Address Number 7 Perteet,Inc. Original Agreement Number 505 Sth Ave.S.,#300 Seattle,WA 98104 CAG-17-082 Phone: 425-252-7700 Project Number Execution Date Completion Date May 1,2017 December 31,2019 Project Title New Maximum Amount Payable N.Park Avenue Extension-Preliminary Design $915,338.00 Description of Work This phase of the project will supplement previous phases to prepare 90%and final construction documents to construct improvements for the Park Avenue N extension between Logan Avenue N and the Southport development. The Local Agency of City of Renton desires to supplement the agreement entered in to with Perteet,Inc. and executed on May 1,2017 and identified as Agreement No. CAG-17-082 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: I Section 1, SCOPE OF WORK, is hereby changed to read: See attached exhibit A-7 II Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: December 31,2019 III Section V, PAYMENT, shall be amended as follows: Increase total contract amount from$626,721 to$915,338.00.See attached exhibit D7. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as d above, ple a sign in the Appropriate spaces below and return to this office for final action. Peter De Boldt „"„",,""ii By. By: � .��` O F if?, Denis La Mayor ...Ss,-.soo"""ii,,,,ot i,, r.. ., ,i 6,4eitz - , ATTEST: 6, / : ''I ',, 0�; Consultant Signature ./-, �i 1° i Jaso Se h c City,"4tk (D�te wY,, -a, '% �. .4: DOT Form 140-063 `"i1 OQ ''''it++++++``�� �q4`��� Revised 09/2005 4°4:14.0 SIP#o6`,,v,�`` 0 0 0 0 0 0 0 o o o o o = 0o 0o t ao 0 oo al ( ri uI 0 m m = • In .--' m CI) m m C 0 06 0 N O N lO In .-i ci 01 a .-i .-i 00 V N .-1 01 a) 1/ in VT VT VT VT 0 O 07 0 N 0 0 0 0N 0 o N: n ; ' al .- a Lu E W CV 00 v ocZ 00 Z CIN N Y Q 7 VT VT VT C co 00 0 Y —I C 1 i i i I I "5 al O E al * 0 Q * T Q * co v)• Yt in. VT VT VT VT 1/ cu Y .0 E CU 00 al C_ Q * a) Q * 0 N Ln CO VT VT LT VT VT LT .0 O O O O O O C 4 0 0 0 0 O • O N .-1 l0 01 7) N Y m N N t0 m E 00 In N N 001 a 1 L+ al .--' .--I m -0 0_ C Q CO ID n in. VT VT VT VT VT vi t O O O O O O 0 C O O O O O 0 cu l0 V1 l0 O O N al al O N I. I. O N C T v a, 0 .-' In O l0 0 Y I. O. Q v) N. v, a) 4- O V'1 m in. in VT VT VT VT 6 E .0 CO U x m 3 > '00 W E v 0 o v, aEi o o Q Q * 0 CO - C N N0 VT VT VT VT VT VT U T., N v al vO Z r0 CO C C • Q v w 00 E W �+-' c (0 a, 03 o `° a, Q CL * 41 (1/ -Co N 3t VT VT VT VT VT VT co < 0OJ O▪ O C `1 O O O O O O ''' 4-' Io fl- ✓ o W1 C N .-i O N O LAal al CL al .'-4 0) cY I. m to al o E tO C N a .--I a, 0_ a_ 4-,, U Tr CO .-I .-i IA , H `l e-I E E o a) 7, O O m 0.0 VT VT VT V? VT VT '- "- 0 L Y i v C Q 0 '0 -0 O. 0 3 7 O N L a) al al Y al V, V, 4_ Q Y C 0) 0 Y 10 C X C C a v 00 al , E 0 ✓ ° -cl, �' Y ,a v, U 0 0 Q 0_ ,Yi, al >, O N U of oa C01 C y y) a`l i. v 0.1 p 1D Q 0 O 0 a) C In Y O I. K 0 Y C l0 Y Z = v to Ci cl E E) m E CO 6 70 c al E " al N CU U) In ae`i Z LT To al o. Q o- a Cvf6 a 0- E 0_V V ywE t 0L Ll al al ri, * U V)O 0 0 0 LT. 2 1- * * * 0 * Exhibit A-7 Scope of Services Park Avenue N Extension — 60% to Construction Advertisement Design Phase January 8, 2018 City of Renton P E RTE E T 505 5TH AVENUE S, SUITE 300 t:v di'sgFti SEATTLE, WA 98104 800.615.9900 1206.436.0515 • PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 During the term of this Contract, Perteet Inc. (CONSULTANT) will perform professional services for the City of Renton (CITY), as detailed below: INTRODUCTION The project will construct improvements to extend Park Avenue N from the existing intersection with Logan Avenue N northward to connect to the Southport site now under construction. The purpose of the roadway extension is to provide a connection to the Southport development and relieve congestion on Lake Washington Boulevard. GENERAL SCOPE OF SERVICES This phase of the project will supplement previous phases to prepare 90% and final construction documents to construct improvements for the Park Avenue N extension between Logan Avenue N and the Southport development. Services not included in this scope of services are specifically excluded from the scope of the CONSULTANT's services. The CONSULTANT assumes no responsibility to perform any services not specifically listed in this scope of services. If agreed to in writing by the CITY and the CONSULTANT, the CONSULTANT shall provide Optional Services. Optional Services are not included as part of the Basic Scope of Services and shall be paid for by the Client in addition to payment for Basic Services, in accordance with the CONSULTANT's prevailing fee schedule as agreed to by the CITY and the CONSULTANT. At the CITY's request, the CONSULTANT may be asked to provide environmental support and/or construction management services. The CONSULTANT reserves the right to shift funds within the Contract between tasks, and between members of the CONSULTANT team during the prosecution of the work. 1 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 Currently only local agency funds will be used in the planning, design, and/or construction of the project. The CONSULTANT will use procedures outlined in the WSDOT Local Agency Guidelines (LAG Manual) during development of the project. Task 1 — Project Management Task 2 — Agency/Large Property Owner Coordination and Planning Task 3 — Not Applicable to this Phase Task 4 — Not applicable to this Phase Task 5 — Geotechnical Engineering Services Task 6 — Not Applicable to this Phase Task 7 — Final Plans, Specifications, and Estimate (90% and Final) Task 8 — Franchise Utilities Review and Coordination Task 9 — Final Stormwater Report Task 10 — Supplemental Survey and Basemapping Task 11 — Not Applicable to this Phase Task 12 — Assistance During Bidding Task 13 — Management Reserve OPTIONAL SERVICES The CONSULTANT may be asked by the CITY to provide Optional Services. Optional Services that may be performed include: • Assistance with preparation of environmental documentation and permits • Assistance with preparation of grant funding packages • Services during construction Providing Optional Services will require a supplement to this agreement. 2 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 TIME FOR COMPLETION All work under this Contract will be completed within twelve (12) months (365 calendar days) of notice to proceed. Task 1 — Project Management 1.1 Continuous Project Management The CONSULTANT will provide continuous project management administration (billing invoices, monthly progress reports, consultant coordination) throughout this phase of the project's duration (assume eight [8] months). 1.2 Budget and Schedule Oversight The CONSULTANT will monitor project budget and schedule. Schedule will be developed using MS Project 2016. Schedule will be updated on a monthly basis. 1.3 Work Plan The CONSULTANT will update the work plan developed during the previous phase of the project for this phase of the project, including communication plan, deliverables, quality control plan, and procedures for change management. 1.4 Project Coordination Meetings The CONSULTANT will attend weekly project coordination meetings with key CITY staff to discuss the project and report on progress. Attendance will consist of up to 3 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 two (2) CONSULTANT task leads, CONSULTANT project manager, CITY project manager, and other CITY staff as determined by the CITY's project manager to review project status and coordinate activities for current work tasks. Meetings will be held at Perteet's offices. The CONSULTANT will prepare and distribute meeting minutes. Assume twenty-four (24) meetings total. 1.5 Quality Assurance/Quality Control Program The CONSULTANT will conduct an internal quality assurance program prior to major submittals. Major submittals are defined as the 90% and final construction documents, along with the Utility Conflict Analysis Memorandum and Final Drainage Report. This task will supplement the continuous quality assurance program by conducting a detailed review of each major submittal for compliance with project criteria and consistency with the project goals. Deliverables: • Invoice and progress reports submitted monthly in hard copy via US Mail. Eight (8) prepared invoices will be submitted. • MS Project Gantt Schedule submitted every other month in hard copy with project invoices via US Mail. Four (4) schedule updates will be submitted. • Project work plan and change management procedures submitted via e-mail in PDF format. One (1) project work plan will be submitted. • Meeting agendas outlining likely discussion topics for each project coordination meeting, submitted via e-mail in MS Word format at least one (1) working day before each meeting. • Meeting minutes documenting each project coordination meeting, submitted via e-mail in MS Word format within three (3) working days of each meeting. 4 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 • Markups of major submittal quality control reviews in hard copy format with each major submittal. One (1) quality control review document will be submitted for each of the following: O 90% Construction Documents o Final Construction Documents o Utility Conflict Analysis Memorandum o Final Stormwater Report Task 2 - Agency/Large Property Owner Coordination and Planning This element of the work includes efforts to coordinate the project development with other agencies and adjoining large property owners. Known key entities include the City of Renton, the Boeing Company, Burlington Northern Santa Fe Railroad (BNSF), and SECO. USFW, USACOE, the Tribes, and the Department of Ecology will also have interest in the project, and the CONSULTANT encourages their involvement early in the project. 2.1 Agency/Large Property Owner Coordination and Planning Organize and attend up to six (6) two-hour coordination meetings with the agency/large property owner stakeholders. These meetings will to the maximum extent possible be joint meetings to share project status, issues, and areas of concern. Keeping these entities informed typically benefits the project with shorter approval cycles from the agencies and keeps the large property owners informed of project status. 5 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 Deliverables: • Attendance of up to two (2) CONSULTANT staff members for each coordination meeting, for a total of two (2) hours per staff member. Up to six (6) meetings are anticipated. • Meeting agenda for coordination meetings, submitted via e-mail in MS Word format at least two (2) days before each meeting. Up to six (6) coordination meeting agendas will be prepared. • Meeting minutes from coordination meetings, submitted via e-mail in MS Word format within three working days of the meeting. Up to six (6) coordination meeting minutes will be prepared. Task 3 — Public Involvement Program Not applicable to this Phase. Task 4 — Right-of-Way Acquisition Not applicable to this Phase. Task 5 — Geotechnical Engineering Services 5.5 Sanitary Sewer Extension under BNSF Railroad HWA will supplement the previously approved geotechnical engineering services effort to provide input to the proposed bored installation of a 24-inch casing under the BNSF Railroad into which a 12-inch diameter sanitary sewer will be installed. This effort includes the following anticipated items: 6 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 Explorations and Field Work • Revise Geotechnical Work Plan Memo: HWA will revise the Geotechnical Work Plan Memorandum to reflect the additional explorations consisting of drilling two 60-foot-deep geotechnical borings and installing 2-inch diameter ground water monitoring piezometers in each boring. The boring locations will be located within or as close as possible to the proposed jacking and receiving pits. This work plan will be submitted to the City for review and approval. The work plan will detail the type, location, and extent of proposed field explorations along with logistics necessary to perform the work such as traffic control plans and staging areas. The work plans will also be used for utility locating clearances and for permitting that may be necessary to access the exploration locations. The CITY will acquire and provide any required permits or right of entries at no cost to HWA. Locating borings in the Boeing area is anticipated to be challenging and will require HWA to coordinate with the Boeing Company. In addition to revising the Geotechnical Work Plan Memo, HWA will meet in the field with Boeing representatives to identify boring locations. • Conduct Additional Explorations: HWA original scope and budget included drilling six, 20-30-foot-deep borings in support of the roadway project. These borings where assumed to be drilled with limited access equipment. 4 actual borings locations were identified once the project condensed. Three of these borings are proposed within the Boeing right of way to support the roadway design. The cost to drill these borings is covered by the original scope and budget. HWA will conduct two (2) additional geotechnical borings to assess the subsurface soil conditions at the location of the proposed jacking and 7 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 receiving pits. One boring will be located within PSE property and one boring will be located within the triangular gore area on 757th Avenue Boeing access road. The boring conducted within the pavement areas accessing Boeing will be drilled during the day-time hours of 9AM to 3PM with appropriate traffic control measures. Each boring will be drilled to a depth of 60 feet below ground surface. Traffic control to consist of Arrow Board Mounted Attenuator Truck behind coned off work area for both coring and pavement patching by subcontractor. Flaggers may be utilized as needed (assume 1 day of flaggers). There will be separate mobilizations for each of these borings. A 2-inch ground water monitoring piezometer will be installed in each boring to monitor ground water fluctuations. A road grade flush-mounted steel monitoring well monument will be installed at the location of each monitoring well. Data logging transducers will be installed in the well to measure water levels over a period of one (1) year. Upon completion of design, the monitoring well will be decommissioned by the Contractor in accordance with the DOE requirements. As the addition of these two borings and associated wells will reduced the already approved roadway borings from six to three, a drilling credit of $4,000 has been assumed in calculation of the required budget supplement. Each geotechnical boring will be logged by an HWA geotechnical engineer or engineering geologist. Each boring conducted through the pavement will be patched with quick drying concrete upon completion of the boring. • Generate Boring Logs and Assign Laboratory Testing: HWA will prepare summary boring logs and perform laboratory testing to evaluate relevant physical properties at the location of the proposed jacking and receiving 8 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 pits. Laboratory testing would include moisture content, hydrometers, grain-size distribution, and Atterberg Limits. • Slug Testing and Data Reduction: HWA shall conduct a slug test at the location of each monitoring well. Slug test will consist of quickly adding fresh water to a ground water well, and monitoring the changes to hydraulic head continually, to determine the near-well hydraulic transmissivity. The slug test conducted within the pavement areas accessing Boeing will be performed during the day-time hours of 9AM to 3PM with appropriate traffic control measures. Traffic control will be limited to appropriate signage and closure of a limited coned off work area at the location of each monitoring well within PSE property and the triangular gore area on 757th Avenue Boeing access road. A team of two hydrogeologist/geotechnical engineer from HWA shall conduct the slug testing and data reduction. This data will be used to provide dewatering recommendations to prospective contractors. Additional Geotechnical Design Services: • Providing Temporary Shoring Recommendation: Based on the borings and the laboratory test results of selected samples, HWA will provide temporary shoring recommendations and lateral earth pressure diagrams for the jacking and receiving pits. • Generating Dewatering Recommendation: HWA will conduct theoretical hydraulic conductivity analyses. The results of slug testing in addition to hydraulic conductivity analyses will be used to developing dewatering recommendation at the location of jacking and receiving pits. • Providing Jack and Bore Recommendation: Based on the soils encountered along the alignment, HWA will determine the Site Class for seismic design. The design spectral acceleration parameters will then be 9 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc A PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 selected in accordance with the AASHTO Specifications for Road and Bridge. • HWA QA/QC: HWA will have all additional design calculations and recommendations reviewed by a senior principal prior to distribution to the design team or the City. • Update Draft Geotechnical Engineering Report: HWA will update the draft geotechnical engineering report with additional analyses and recommendations for the proposed sanitary sewer extension. This report will contain the results of the geotechnical engineering investigation, including description of surface and subsurface conditions; a site plan showing exploration locations and other pertinent features; summary boring logs; and laboratory test results. The report will provide geotechnical recommendations for each of the proposed improvements. ASSUMPTIONS • The geotechnical explorations proposed herein will not be used to assess site environmental conditions. However, visual or olfactory observations regarding potential contamination will be noted. Analysis, testing, storage, and handling of potentially contaminated soil and ground water (either sampled or spoils from drilling) are beyond this scope of services. If contaminated soils and/or ground water are encountered, the material will be properly contained on-site for disposal as mutually agreed upon without additional cost to HWA. • All drilling spoils and related debris from the Boeing right of way will be drummed on site and left on site for Boeing to dispose of per their protocol. All drilling spoils and related debris from the PSE right of way will be drummed on site and left on site for PSE to dispose of per their protocol. • HWA will be responsible for all post drilling clean up. 10 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 • HWA assumes no concrete pavement below the surface asphalt and assumes that coring will not be required prior to drilling the proposed borings. • No Phase 1 or Phase 2 Environmental Site Assessment will be completed by HWA. • All required rights of entry will be provided by the City at no cost to HWA. • All required street use permits will be provided by the City at no cost to HWA. • The borehole locations will be surveyed by others. • The monitoring wells installed as part of the field explorations will be maintained throughout design and abandoned by the contractor during construction. • No uniform police office will be required for traffic control implementation during the exploration program. • Traffic control will be limited to only 1 work day of two flagger crew to conduct the additional exploration. • The two deep borings (60-feet each) will be done on different days, requiring two mobilizations. Deliverables: • Inclusion into the project's Geotechnical Engineering Report of conditions that the Contractor can expect to encounter during installation of the 24-inch casing and 12-inch sanitary sewer. • Special Provisions to include in the Project Manual related to the ground and water conditions that the Contractor can expect to encounter during installation of the 24-inch casing and 12-inch sanitary sewer. 11 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 Task 6 — 30% Plans and Estimate Not applicable to this Phase. Task 7 — Final Plans, Specifications, and Estimate (90% and Final) The CONSULTANT will prepare 90% and final design construction documents based on the 60% design phase of the project. The proposed limits are illustrated in Figure 1. In addition, the CONSULTANT will prepare 90% and final design construction plans that would construct a new driveway entrance for Boeing from Logan Avenue N at the approximate location of N 7th Street as illustrated in Figure 2. The combination of these two locations will fit on two (2) "base sheets," utilizing 11" x 17" sheets at 1" = 40' scale. The CITY now anticipates that the Park Avenue N Extension north of the BNSF Railroad right-of-way will be designed and constructed by SECO, and therefore the CONSULTANT will not prepare construction plans north of the BNSF right-of-way. 12 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 ,,g ^4. m ,. ,.. ._I ...... X t fS C* r- — , ,i wir2 rmw.atIcar L, t ��a*e x "--�Ag � ^ls w' xmiM a �. `� n;I { .p..?4ilAtra4.-?..ii;ii....";::.;;;;49,104.1?* : 'I''',.., ' 4411,79,1:- , -.:E-4,i'' ;.,;„„,*, ..- mr 's , r�'a b tea �: ��3� . a svt a s �i / wx .... 4l Y� ,• .. d�,v 1 M SWniiORM CR ,� ` T': Figure 1. City Portion of Park Avenue N Extension. 13 H:WDivision.sWTRANSPOR.TAT�AFDESIGN.ENG FHebe North Park Ave ExtensionW300 Design Consultant Contract302 Consultant AgreementW302.3 Agreementb�302.3.7 Supplement 7FPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE NEXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 I. 1 +` : , « �` N� a z , �".� * `11 ��� ' tk mN� • '�" fry Es '` °"1 , �' - g i �la � 2. P�rw c .._ t � 3�.� � t �'" 'k�, . e+* --�w. .+ +...+.«- . +w ikww�e K ik, � ia .w+-.. '- _ _ yy, 2 t �f £F Ct � � SAE ::;:- '::';'1::'''':;:. ;:''.4.!,,:ti!' :''''''' '''''''."' ''.':is:s1.'..i'.'!.::: ::;':.H''.::,:0'''''',':':::':::i1::::::";:'.' ''''',:i.:';'':;4:4!1.;1',...,'!: d YR ke Figure 2. Boeing Driveway at N 7th Street and Logan Avenue N. At this time, a total of up to 37 plan sheets (based on two (2] base sheets) are assumed as necessary for the schematic plans. Specific 60% plan components are anticipated to consist of the following: 7.1 Cover Sheet (one [1] sheet, not to scale) 7.2 Legend and Abbreviation Sheet (one [1] sheet, not to scale) 7.3 Survey Control and Alignment Sheet (two [2] sheets, 1"=100' scale) 7.4 Typical Roadway Sections (two [2] sheets, not to scale) 14 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebe FNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 Agreement1 302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 7.5 Site Preparation, Erosion Control Plans, and Miscellaneous Details (two [2] sheets) The CONSULTANT will prepare plans identifying areas of removal and site preparation along with Best Management Practices (BMPs) for erosion control. Existing utility features will be shown in halftone (screened). One (1) sheet to document details for Temporary Sedimentation and Control is included. 7.6 Paving and Grading Plans and Miscellaneous Details (five [5] sheets, 1"=20' scale) The CONSULTANT will advance the 60% paving and grading plans to the 90% and final design level, including horizontal and vertical alignment information, paving limits, limits of cut/fill required, and earth retaining systems. Existing utility features will be shown in halftone (screened). One (1) sheet to document details for curb ramps is included. 7.6a Wall Plan, Profile and Details (one [1] sheet, 1"=20' scale [horizontal]) The CONSULTANT will advance the 60% modular block wall plan and profile, along with the related details to a 90% and then final design level. 7.7 Drainage Plans/Profiles and Miscellaneous Details (four [4] sheets, 1"=20' scale) The CONSULTANT will advance the 60% drainage plans and profiles to the 90% and final design level, including the proposed drainage conveyance system and water 15 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 quality facilities. Existing utility features will be shown in halftone (screened). Two (2) sheets to document details of anticipated water quality facilities are included. 7.8 Channelization and Signing and Details (three [3] sheets, 1"=20' scale) The CONSULTANT will advance the 60% channelization and signing plans to the 90% and final design level, including intersection channelization and sign tables documenting sign type, size and location. One (1) sheet to document details for channelization and signing is included. 7.9 Illumination Plans and Details (two [2] sheets, 1"=20' scale) The CONSULTANT will prepare plan sheets to the 90% and final design level for the illumination system along the corridor detailing luminaire pole and foundation locations and associated conduit systems. One (1) sheet to document details for luminaires, foundations, and associated conduit system is included. 7.10 Traffic Signal Plans (four [4] sheets, 1"=20' scale) The CONSULTANT will prepare signal plans to the 90% and final design level, including detailed pole and foundation information for the signal revision at Logan Avenue N and Park Avenue N. The CONSULTANT assumes that a new signal will be included for the intersection of 757 Drive and Park Avenue N. 7.11 Planting Plans and Details (three [3] sheets, 1"=20' scale) 16 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 The CONSULTANT will prepare planting plans to the 90% and final design level for proposed landscape improvements. Irrigation will not be included in the project. Drought tolerant planting materials will be utilized, with the anticipation that water trucks will be used on a limited basis through plant establishment. Planting plan sheets will include schedules, notes, and details. 7.12 BNSF Railroad Crossing and Details (three [3] sheets, 1"=20' scale) The CONSULTANT will develop plans to the 90% and final design level for the proposed roadway crossing at the BNSF railroad tracks, including up to three (3) detail sheets to illustrate crossing gates and other specific features required by BNSF. Construction of the elements will be done by BNSF. 7.13 Construction Staging Plans (four [4] sheets, 1"=40' scale) The CONSULTANT will prepare construction staging plans to the 90% and final design level to demonstrate possible traffic sequencing scenarios to maintain traffic in the corridor during construction. Construction project stages will be illustrated on 22" x 34" plan sheets at 1" = 40' scale. 7.14 Opinion of Cost The CONSULTANT will prepare an opinion of cost for the 90% and final contract plans, and will include allowances for acquisition of right-of-way. The opinion of cost will be based on unit prices, and incorporate contingencies to account for the level of completeness of plan preparation for each submittal, and to reflect past experience on similar projects within the region. When preparing each opinion of cost, the CONSULTANT will endeavor to keep the project within the projected 17 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 project construction cost of that was identified in the Design Report prepared by Perteet. If, as the project progresses, it is discovered that costs have increased, the CONSULTANT will make suggestions on how to bring the project back within budget. In providing opinions of probable construction cost, the CITY understands that the CONSULTANT has no control over the cost or availability of labor, equipment or materials, or over market conditions or the Contractor's method of pricing, and that the CONSULTANT's opinions of probable construction costs are made on the basis of the CONSULTANT's professional judgment and experience. The CONSULTANT makes no warranty, express or implied, that the bids or the negotiated cost of the work will not vary from the CONSULTANT's opinion of probable construction cost. 7.15 Project Manual The CONSULTANT will prepare a Project Manual for the project based on English units for the 90% and final submittals. These will include Special Provisions for the items of work that are not covered by the 2018 WSDOT/ APWA Standard Specifications, including any Renton General Requirements, as well as bid and contract forms. 7.16 Bid Package The CONSULTANT will prepare the bid-ready construction documents and deliver to Builder's Exchange of Washington. The CITY will reimburse Builder's Exchange for any costs associated with posting and maintaining the construction documents on the Builder's Exchange website. 18 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 Deliverables: • The CONSULTANT will submit plans, opinion of cost estimate, and Project Manual for the 90% level of design for review and comment by CITY staff. CITY staff will consolidate all comments at each review stage into one (1) package for response by the CONSULTANT. The CONSULTANT will prepare a proposed response to each comment received, and then conduct one (1) meeting with the CITY to reconcile any outstanding comments. • Five (5) copies of the 90% and Final plans (half size, 1" = 40' scale) and opinion of cost estimate submitted in hard copy form and delivered by US Mail. • Five (5) copies of the 90% and Final Project Manual submitted in hard copy form and delivered by US Mail. Task 8 — Franchise Utilities Review and Coordination 8.1 Final Utility Conflict Analysis Based on the 60% design, the CONSULTANT will prepare a one- to two-page (1-2 page) memorandum to document potential utility conflicts and the potential locations for franchise utilities to relocate. A plan identifying locations for potholing by the utilities of potential conflict locations will be developed and shared with the respective franchise utilities as part of Task 8.2. Deliverables: • One (1) draft Utility Conflict Analysis Memorandum for CITY review and comment submitted via e-mail in PDF format. • One (1) final Utility Conflict Analysis Memorandum submitted via e-mail in PDF format. 19 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 8.2 Franchise Utility Coordination Meetings The CONSULTANT will attend CITY-facilitated project utility coordination meetings at the CITY (up to two [2] are assumed for this phase of the project). Topics to be covered include anticipated project impacts and schedule, future utility infrastructure, potential conflicts and their resolution, and timeframes required for any anticipated utility relocations. Deliverables: • Meeting Agenda for coordination meetings, submitted via e-mail in MS Word format at least two (2) days before each meeting. The CONSULTANT will attend up to four (4) coordination meetings with two (2) CONSULTANT staff members per coordination meeting. • Meeting Minutes from coordination meetings, submitted via e-mail in PDF format within three (3) working days of the meeting. The CONSULTANT will prepare up to four (4) utility coordination meeting minutes. Task 9 — Final Stormwater Analysis and Report The CONSULANT will perform a final stormwater analysis of the project. The results of this work will be summarized in a Technical Information Report (TIR) conforming to CITY standards (based on the 2016 King County Surface Water Design Manual (KCSWDM), with Renton Amendments. 9.1 Offsite Analysis Not applicable to this Phase. 20 H:i+ Division.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 9.2 Threshold Analysis, Water Quality Treatment, Flow Control, and Conveyance Not applicable to this Phase. 9.3 Final Stormwater Technical Information Report (TIR) Prepare a Final Stormwater Technical Information Report (TIR) documenting the drainage analysis and design that updates the TIR prepared for the 60% design submittal. The TIR will address the Core Requirements and how each is being met, including any flow control and water quality facilities and flow control BMPs proposed for the project. The report will follow the King County TIR format and include the design information and calculations described in Task 9.2 of earlier phases of this project. Deliverables: • Five (5) copies of the final Stormwater TIR in hard copy form, delivered by US Mail (submitted with 100% design submittal). • Final Stormwater TIR submitted via e-mail in PDF format. Task 10 — Supplemental Survey and Basemapping The proposed work for supplemental surveying and basemapping services will be conducted by 1 Alliance Geomatics as a SUBCONSULTANT to the CONSULTANT (Perteet) and include the following tasks: 21 H:WDivision.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc PARK AVENUE N EXTENSION — FINAL DESIGN PHASE Agreement with Perteet Inc. January 8, 2018 The CONSULTANT will provide supplemental control surveys; ground based topographic and planimetric mapping completion surveys for potential North Southport Drive Rapid Ride stop locations within the area illustrated in Figure 3. Surveying will be sufficient to complete the preliminary and final design of RapidRide stops. , d / '„',,.-i:'.'',.. ,�^ ,y„ g a 34, ,t of: - ' Y'` ,y; ,,, € -`Y�' a¢,,4 '' ,,, µ,' ,i; � e t 4 4 t , .:A. r ' -';tir,,,,P--' ",„„ ".,,,.'''''',.. ,:,.,,,I,`,..- ,' ' '46 ,1 � fi . H °°.., A 1' S` `i' ' p,, fir,. r ." , `: ... .,.fk;/,,',,j,',R''i7 41,,:,,,..4.'*,.,te.-,4..,s,or,,7,/.,1.0 i4,4J,j,.''—,,,4',,0'„;'1 Fes; r l .,ii8 .r , ' . . ,` .ram„ ,- "b'/, 2o '' e' n -°1k \V IV -, , ,. - `: i s 4 ,�off " n '� " 4' '' 1, " . , It r .� +�... vk �' a °S'7.'\ At 4V.eit :�" ;i .�.� a6.'''",,'".r,.-‘.':-'4:f;, ',1;'ti$'PA4':;„''' -''''' .,---- \ -,- , ''? -''.'.- ''',. ''''' - - ' \0\;.),e;:':`,'"-.,'"‘ , :. ,:` Figure 3-Supplemental RapidRide Survey Area The CONSULTANT will procure utility locate services for sub-surface utility paint marking prior to field survey of the RapidRide survey area. Utilities will be located in horizontal plane only; the utility location service will not investigate the depth of existing utilities. Depths of existing utilities, if needed, will be conducted under Task 10.4 22 H:i+ Division.sWTRANSPOR.TATWDESIGN.ENGWHebeWNorth Park Ave ExtensionW300 Design Consultant ContractW302 Consultant AgreementW302.3 AgreementW302.3.7 Supplement 7WPark Ave N Ext Scope Final Design_1-8-19.doc