HomeMy WebLinkAboutISSUED - L2ST SEG A COnstruction permit U16006840DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Construction Permit: U16006840
IVR Number: 16006840
Permit Information
Permit Name: Lake to Sound Trail Segment A
Address/Location:12/29/2016Application Date:1323049080Parcel Number:
Permit Type:12/10/2018Issue Date:Engineering
Permit Work Class:12/10/2019Expiration Date:Construction
Inspector: Pat Miller 206-794-6162 Plan Reviewer: Rohini Nair 425-430-7298
Description: Construction permit for Lake to Sound Trail segment A. Trail length approximately 1.2 miles. PW plan number 3938.
Following are the conditions of permit approval
•CONTRACTOR INFORMATION SHOULD BE PROVIDED TO CITY OF RENTON PRIOR TO START OF
CONSTRUCTION.
•PRECONSTRUCTION MEETING WITH THE CITY IS REQUIRED AFTER CONTRACTOR SELECTION AND PRIOR
TO START OF CONSTRUCTION
•APPROVED TRAFFIC ONTROL PLAN SHOULD BE OBTAINED BY THE PROJECT PRIOR TO START OF WORK
IN THE CITY OF RENTON RIGHT OF WAY.
•ANY EASEMENT AND/OR AGREEMENT NOT COVERED BY THE INTERLOCAL AGREEMENT SHOULD BE
OBTAINED BY KING COUNTY PRIOR TO START OF CONSTRUCTION.
Contacts
Name Address PhoneTypeBilling
Jason Rich
King County Parks; ATTN: Jason Rich
201 S Jackson St, Rm 700
Seattle, WA 98104-3855
ApplicantX
City of Tukwila 2140 SW 43rd StreetOwner
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton codes and ordinances.
Ÿ
Call (425) 430-7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES