HomeMy WebLinkAboutCM_Construction_Mitigation_190225_v1.pdfConstruction Mitigation Description
Barbee Mill Bumpers
Construction Dates: The date of construction will depend on when the necessary
government approvals for the bumpers are issued. Installation of the bumpers will only
take three days to complete.
Hours and Days of Operation: The work will take place during the City of Renton’s
typical hours of construction which are 7:00 am through 10:00 pm Monday through
Friday and 9:00 am through 10:00 pm Saturday and Sunday.
Proposed Hauling/Transportation Routes: The materials will be brought to the site by
barge.
Measures to be implemented to minimize dust, traffic and transportation impacts,
erosion, mud, noise, and other noxious characteristics: Work will take place only
during allowed hours of operation. No impact to traffic as work will be completed from a
barge. Erosion will not be caused by the installation of the bumpers. Noise levels from
installation are low.
Special Hours Proposed for Construction: No special hours are proposed for
construction.
Preliminary Traffic Control Plan: Traffic control is not necessary for the project.