Loading...
HomeMy WebLinkAboutMFP19001108.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Franchise Permit: MFP19001108 IVR Number: 19001108 Permit Informaon Permit Name:Puget Sound Energy Gas Permits Address/Locaon :03/01/2019Application Date:7231502370Parcel Number:709 S 3RD ST Permit Type:03/13/2019Issue Date:Franchise Permit Work Class:03/12/2020Expiration Date:Minor Utility Job Number:109120598Franchise Type:Natural Gas Description:Potholing utilities for future work. 709 S 3rd ST, 811 S 3rd ST, and 201 Williams Ave S. Restoration per City of Renton standards. APPROVED WITH COMMENTS OR REDLINES Contacts Name Address PhoneTypeBilling Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Applicant Stuart Bennett Infrasource Services LLC 14103 Stewart Rd Sumner, WA 98490 B: (303) 419-8755 H: (425) 677-5197 C: (713) 985-6489 Contractor Business License Number: 36742Construction Contractor: INFRASL871C2 CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Marita Bond Puget Sound Energy Billing 6905 S 228 St Kent, WA 98032 B: (253) 395-6346Specialized Billing X General Condions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. This permit and plans must be posted at the job site at all times. I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Call 425.430.7203 or go to: www.MyBuildingPermit.com one working day in advance to schedule an inspections and for ANY work in the Right of Way. Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation. In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 206.510.0575) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 | Published: 3/30/2017 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 3/30/2017 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $360.50. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: տ New Construction տ Repair/Relocate տ Underground տ Overhead տ Sidewalk տ Street տ Open Trench տ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $75/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Puget Sound Energy - Gas - MARITA BOND 109120598 Marita Bond (253) 395-6346 marita.bond@pse.com WELLS & WILLIAMS AVE N POTHOLING POTHOLING FOR EXISTING UTILITIES FOR FUTURE WORK. PLEASE SEE ATTACHED. 3: 2'X2' & 1:4'X4' asphalt cutS anticipated. PSE/Infrasource (253) 395-6346 INFRASL871C2 BL.036742 3-1-19Marita G. Bond Digitally signed by Marita G. Bond DN: cn=Marita G. Bond, o=Municipal Relations, ou=Street Use Permitting, email=marita.bond@pse.com, c=US Date: 2019.03.01 16:45:36 -08'00' RESTORATION PER CITY OF RENTON STANDARDS Scott Warlick 3/6/2019 MFP19001108 Holly Powers 3/13/2019 CITY OF RENTON TRAFFIC CONTROL PLAN PROJECT NAME: PERMIT# CONSTRUCTION COMPANY: PHONE#: CONTACT NAME: PHONE#: ADDRESS: CELL#: E-MAIL ADDRESS: FAX#: PROJECT LOCATION: N/E/S/W OF: WORK TIME: APPROVED BY: WORK DATE: APPROVAL DATE: OFFICE COPY T- CONTRACTOR DEV. SERVICE, INSPECTION P. MILLER DEV. SERVICE, PLAN REVIEW B. BANNWARTH POLICE CHARLES KARLEWICZ FIRE FIRE MARSHALL FS #13 Permit Holder agrees to all the following: •Comply with all traffic regulations of the City of Renton and the State of Washington. •Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. •Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. •Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 through 47.36.220, 9A.36.050 Reckless Endangerment, and other applicable State and City codes. •Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. •The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. •In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. •Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. •By my signature herein, I acknowledge all the above requirements. PRINT NAME: DATE: SIGNATURE: Reset FormPrint Form 109120598 PSE/Infrasource GLENN HELTON (425) 559-4647 6905 S 228th St, Kent 98032 GLENN.HELTON@PSE.COM WELLS & WILLIAMS AVE N TBD TBD Marita Bond 3-1-19 Marita G. Bond Digitally signed by Marita G. Bond DN: cn=Marita G. Bond, o=Municipal Relations, ou=Street Use Permitting, email=marita.bond@pse.com, c=US Date: 2019.03.01 16:45:49 -08'00' MFP19001108 Scott Warlick 3/6/2019Monday - Friday 8:30am - 3:00pm SKETCH I -- NORTH -- I NOTES: •Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by sketch or reference to WSDOT. •The plan must be submitted to the City’s PW/Transportation Division for review and/or approval at least three working days prior to work. •Approved Temporary Traffic Control Plan must be at the work site during work hours. •Contractor or entity must call Renton School District (425-204-4455) or any public/private agency to be affected by a temporary lane or road closure. •Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded. •Total road closure lasting more than 24 hours is subject to the approval by the City Council. •Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. In the case of Temporary No Parking Zones, all the following apply in addition to previous: •Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. •Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block 72 hours in advance of effective date and time. •The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. •Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). Job #: Date:Address: Jurisdiction:City / Zip: Right of Way Permit?Customer: Est. Start Date:PM / Insp: Est. Duration: Open Trench Trenchless & & & & Fuel Line Length: Mtr Loc:Fuel Line Diameter: Williams Ave S 4' X 4'Asphalt2' 'N S of CL S 2nd St 5' 'E W of CL Williams Ave S 2' X 2'9' 'N S of CL 2' X 2' S 3rd St 'E W of CL75' 2' X 2'Asphalt PLAT MAP: 1-2 days 9' 'N S of CL Pothole gas main in 3 different locations and power in 1 location to get depth to give to city for their project. There's supposed to be a 6" and 4" conduit in trench for power. Need depth of both. Notification for potholes is 11490752 S 3rd St 68' 'E W of CL Wells Ave S 20' 'N S of CL S 2nd St 'E W of CL Williams Ave S Asphalt15' Glenn Helton 709 S 3rd St, 811 S 3rd St & 201 Williams Ave S Renton 98057 Construction Method (425) 559-4647 City of Renton Asphalt 109120598 2/20/18 Renton 03/25/18 PRE-INSPECTION REPORT WORK DESCRIPTION: CUST PHONE NUMBER Work Location PHONE NUMBER Size of Cut Surface Type SPEED LIMIT MPH Service Information Diameter Meter EFV N 709 S 3rd St Ex. PSE Power Ex. 2" PE MN in 6" Casing FLAGGERS # OFFICERS # TROLLY LINES TRAFFIC SIGNAL BUS STOP # ARTERIAL METER HOODS # NO PARKS # Commercial Residential Multi-Family New Constr. Stub Extension Cut & Cap Altered Commercial Altered Residential Replacement Service Main Maintenance Service Maintenance Valve Maintenance Leak Repair CP Work Pothole Extension Compete Serv 5/8" 11/8" 11/4" 2" 250 425 630 1000 1800 2600 10,000 Bollards 2.5" # Bollards 4" # FUEL LINE PERMIT NEEDED Template Bar YES NO Quarter-Sec-Town-Range CL's S 3rd St Williams Ave S Ex. 2" PE MN in 6" Casing CL's S 3rd St Wells Ave S CL's S 2nd St Williams Ave Ex. 12" STW HP MN 811 S 3rd St 201 Williams Ave S PH G1 PH G2 PH G3 PH P1 G1 P1 G3 G2 RESTORATION PER CITY OF RENTON STANDARDS MFP19001108 BUSSTOPBUSSTOPRIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1ONE WAYONE WAY100'100'ROADWORKAHEADW20-1W4-2LROADWORKAHEADW20-1 S 3RD ST (SR-900)BURNETT AVE SWILLIAMS AVE SBURNETT AVE SWILLIAMS AVE S709111112121212ONE WAYONE WAY1111RRRR18ONE WAY ONE WAYHOUSER WAY S WELLS AVE S 1012ONE WAY 1010S 3RD ST (SR-900)WELLS AVE SFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKM6-2BL100'W4-2LRIGHT LANECLOSEDAHEADW20-5R100'100'ROADWORKAHEADW20-1NPSEPUGETSOUNDENERGYJOB#109120598709 S 3rd St, Renton, WA, USAFebruary 26, 2019ina.ustemchuk@pse.com(425)398-6063SHEET 1 of 4Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 9' SCL of S 3rd St & 75' WCL ofWilliams Ave S.WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--8400'6030MFP19001108 BUSSTOPBUSSTOPONE WAYONE WAY100'100'S 3RD ST (SR-900)BURNETT AVE SWILLIAMS AVE SBURNETT AVE SWILLIAMS AVE S111112121212ONE WAYONE WAY1111RRRR1818ONE WAY ONE WAYHOUSER WAY S WELLS AVE S 1012ONE WAY 1010ONE WAYS 3RD ST (SR-900)S 3RD ST (SR-900)WELLS AVE SRIGHT LANECLOSEDAHEADW20-5R100'100'100'ROADWORKAHEADW20-1100'W4-2LROADWORKAHEADW20-1FROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000 NO PARKINGNO-PARKM6-2BL100'W4-2LRIGHT LANECLOSEDAHEADW20-5R100'100'ROADWORKAHEADW20-1NPSEPUGETSOUNDENERGYJOB#109120598811 S 3rd St, Renton, WA, USAFebruary 26, 2019ina.ustemchuk@pse.com(425)398-6063SHEET 2 of 4Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 9' SCL of S 3rd St & 68' WCL ofWells Ave S.WORK PIT28" TRAFFIC CONETRAFFIC FLOWSIGN LOCATIONLEGENDCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWCHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--8400'6030MFP19001108 11 11 11 S 2ND ST (SR-900)191111 1111 1010US BANKWILLIAMS AVE S1111 S 2ND ST (SR-900)BURNETT AVE S WELLS AVE S 121212ONE WAY10ONE WAY11 11 11 11 ALLEYB R O N S O N W A Y NMAIN AVE SONE WAY1010POLICEUPO ONE WAYONE WAYONE WAYONE WAYBL2LLROAD WORK AHEAD W20-1100'100'100'W4-2RLEFT TWO LANES CLOSEDAHEAD W20-5LROAD WORK AHEADW20-1W4-2RLEFT TWO LANES CLOSED AHEADW20-5L100'100'100'ONE WAY1010ROADWORKAHEADW20-1100'100'100'W4-2RLEFT LANECLOSEDAHEADW20-5LW20-7ABEPREPAREDTOSTOPW3-4100'100'W20-7ABE PREPARED TOSTOP W3-4100'100'W20-7ABE PREPARED TO STOPW3-4100'100'W20-7AROADWORKAHEADW20-1 BEPREPAREDTOSTOPW3-4100'100'100'FROMTOTOW AWAY AREAPHONE 88 8-9 999 INFR ASO URCE L LC 00 0 00 000 00 NO PARKING NO-PARK PLACE SIGNS ONALL SIDES OFWORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 00 00 00 0 NO PARKINGNO-PARK FROMTOTOW AWAY AREAPHONE 88 8-9999 INFRASOURCE LLC 00 0 00 000 00 NO PARKINGNO-PARK CROSSWALKCLOSEDR9-3DETOURM4-9bCROSSWALKCLOSEDR9-3DETOURM4-9b ARRW-BRD ARRW-BRD ARRW-BRD NPSEPUGETSOUNDENERGYJOB#109120598811 S 3rd St, Renton, WA, USAFebruary 26, 2019ina.ustemchuk@pse.com(425)398-6063SHEET 3 of 4Puget Sound EnergyTraffic Control Supervisor:Ina UstemchukCard No. 010768Card Exp.06/30/2021ina.ustemchuk@pse.com(425)398-6063TEMPORARY TRAFFIC CONTROL PLANNotes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 11' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place between 9 a.m. and 4 p.munless otherwise specified. All work for arterialsand major roadways will be from 9 a.m. to 3 p.m.8. Work area will be 2' SCL of S 2nd St & 5' ECL ofWilliams Ave S; 20' SCL of S 2nd St & 15' ECL ofWilliams Ave S.CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT80604055 +60/6545/5535/403025SIGN SPACING"X"800500'350'200'100'MINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--8400'603028" TRAFFIC CONELEGENDWORK PITTRAFFIC FLOWSIGN LOCATIONFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPCHEVRONARROW BOARDWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYROWROWMFP19001108 NPSEPUGETSOUNDENERGYJOB#109120598811 S 3rd St, Renton, WA, USAFebruary 26, 2019ina.ustemchuk@pse.com(425)398-6063SHEET 4 of 4WSDOT NOTES & TABLES””–MFP19001108