Loading...
HomeMy WebLinkAboutNOA_Notice_of_Application_DNS_Mailer_Barbee Mill Dock Bumpers_190313 OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  / OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: March 13, 2019 /  PROJECT NAME/NUMBER: PR18-000465 Barbee Mill Dock Bumpers / LUA19-000042   PROJECT LOCATION: 4151 Williams Ave N (0518500350/ 051850HYDR)   APPLICANT/PROJECT CONTACT PERSON: Evan Wehr, Ecco Design Inc./206 N 36th St, #201, Seattle, WA 98103   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2UxtlTu  PROJECT DESCRIPTION: The applicant is requesting Environmental (SEPA) Review and a Shoreline Substantial Development Permit for the installation of fifty (50) urethane foam bumpers on the Barbee Mill Community Organization dock located at 4151 Williams Ave N (Parcel #0518500350). Each bumper is approximately 4.5" x 30" in size and will be installed above the water in order to prevent injuries to dock users and damage to docking vessels. The proposed bumpers would be located along the perimeter of the dock within the DNR-owned parcel #051850HYDR. The subject DNR parcel is located in the Aquatic Shoreline Overlay District. The dock was constructed in 2010 under a separate Shoreline Substantial Development Permit and Environmental (SEPA) Review (LUA10-006). The upland portion of the site is zoned Residential 10 du/ac (R-10) and is designated Residential High Density in the Comprehensive Plan. The waterward portion of the site is located in the Lake Washington Reach C and is designated Shoreline High Intensity. The applicant submitted a Biological Assessment and Lake Study with the application.  DATE OF APPLICATION: March 7, 2019  NOTICE OF COMPLETE APPLICATION: March 13, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.   OPTIONAL DETERMINATION OF NON-SIGNIFICANCE (DNS): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS process to give notice that a DNS is likely to be issued. Comment periods for the project and the proposed DNS are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance (DNS). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Shoreline Substantial Development Permit  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit  REQUESTED STUDIES: Stream/Lake Study  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential High Density (RHD) on the City of Renton Comprehensive Land Use Map and Residential-10 (R-10) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-3-090 and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Alex Morganroth, Associate Planner CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on March 27, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Alex Morganroth, Associate Planner; Tel: (425) 430-7219; Email: amorganroth@rentonwa.gov  /