HomeMy WebLinkAboutAdden 03 CAG-17-149, Adden #3-19 Washington State �,,A. Department of Transportation Supplemental Agreement Organization and Address Number 3 KPG,PS, 3131 Elliott Avenue Suite 400 Seattle WA Original Agreement Number 98121 CAG-17-149 Phone: 253-627-0720 Project Number Execution Date Completion Date 10/24/2017 12/31/20 Project Title New Maximum Amount Payable Williams Ave S and Wells Ave S(Conversion) $1,206,957.18 + $88,084.00 =$1,295,042.18 Description of Work Design revisions to the intersections, approaches, and the affected appurtenances, as well as updating the current construction plans, quantities and cost estimate. The Local Agency of EiV of Renton desires to supplement the agreement entered in to with KPG. P.S, and executed on 10/24/2017 and identified as Agreement No. CAG-17-149 All provisions in the basic agreement remain in effect except as expressly modified by this supplement. The changes to the agreement are described as follows: Section 1, SCOPE OF WORK, is hereby changed to read: The General Scope of Work of the Original Agreement is supplemented to include the attached Exhibit A. I I Section IV, TIME FOR BEGINNING AND COMPLETION, is amended to change the number of calendar days for completion of the work to read: .Eemains unchanged - 12/31/20. III Section V, PAYMENT, shall be amended as follows: See attached Exhibits A&D. as set forth in the attached Exhibit A, and by this reference made a part of this supplement. If you concur with this supplement and agree to the changes as st e bove, plea sign in the isipp i'�tQ spaces below and return to this office for final action. ®��� E ,4L1111IIIltl�f� By: r e' KP(' By , 's Denis aw, May r SEAL S_ ATTEST• i' Consultant Signature -,� % o J son A. Seth, Ci ?06,1,erk ,��` .°\ ! ! ate rAci Q,E D`SEQ:Ns\�``• DOT Form 140-063 Revised 0912005 EXHIBIT A CITY OF RENTON WILLIAMS AVENUE S AND WELLS AVENUE S CONVERSION PROJECT SUPPLEMENT 3—INTERSECTION DESIGN REVISIONS CAG 17-149 SCOPE OF WORK FEBRUARY 28, 2019 A. PROJECT BACKGROUND/DESCRIPTION During the Final Design phase of the Williams Avenue S and Wells Avenue S Conversion Project, the City of Renton ("City") determined that the 11' wide approach lane widths (22" wide intersection throats) at the intersections of Wells Ave S—S 2"d St, S 3rd St and Williams Ave S-S 2nd St, S 3rd St are too narrow for larger vehicles making right turns. In an effort to accommodate larger vehicle turning radii, the City has elected to revise the lane approach widths to 11' wide approach lanes and 14' wide receiving lanes (25' wide intersection throats). The City has requested that KPG ("Consultant") enter into a supplemental agreement to re-design the intersections,approaches,and the affected appurtenances that will require revisions to the current plans, quantities, and estimates. B. ASSUMPTIONS The following assumptions were identified to provide direction with design: ❑ The project is estimated to add 2 months of design time to the current design schedule and the new 100% PS&E deliverable is anticipated in June 2019. ❑ Adjustments to storm structures, signal foundations, and lighting equipment may yield additional utility conflicts not previously identified. Additional potholing may be required. City of Renton Wells/Williams Conversion Project(CAG 17-149) SUPPLEMENT 3—DESIGN REVISIONS KPG Project Number: 16125 1 Feb,2019 C. KPG DELIVERABLES Deliverables prepared by the Consultant are identified at the end of each Work Element (WE). D. CITY OF RENTON PROVIDED ITEMS: The City of Renton will be responsible for the following: ❑ Submittal reviews, comments, and approvals(1 to 2 sets of comments per submittal) ❑ Meeting room arrangements E. SCOPE OF WORK WORK ELEMENT 25—MANAGEMENT/COORDINATION/ADMINISTRATION The Estimated project duration is 2 additional months. 25.1 The Consultant will provide continuous project management for the project duration (estimate additional 2 months). The Consultant will prepare monthly progress reports identifying work completed in the previous month, work in progress, upcoming work elements, and reporting of any delays, problems, or additional information needs. These reports will be submitted with the Consultant invoices. 25.2 The Consultant will conduct project team meetings (estimate 4 meetings total) with internal staff. 25.3 The Consultant will provide internal quality assurance/quality control (QA/QC) reviews of all major deliverables prior to submittal to the City. Work Element 25 Deliverables: ■ Monthly progress reports(2 months) WORK ELEMENT 26—UTILITY COORDINATION AND POTHOLING The Consultant will coordinate with private utilities affected by the proposed design revisions. Efforts included under this WE are as follows: 26.1 Update Utility Conflict Plan: An updated utility conflict plan will be submitted to all purveyors with utilities in the project limits to assess whether said utilities may be in conflict with the design revisions. City of Renton Wells/Williams Conversion Project(CAG 17-149) SUPPLEMENT 3—DESIGN REVISIONS KPG Project Number: 16125 2 Feb,2019 26.2 Potholing to identify potential utility conflicts will be completed as necessary for design (8 estimated). The locations of the potholes will be surveyed and added to the basemap. Work Element 26 Deliverables: ■ Utility Conflict Figure(11x17) ■ Updated basemap showing utility potholes and utility locations Work Element 26 Assumptions: ■ Any franchise utility expansion which is required to be incorporated into the project is not included. WORK ELEMENT 27—DESIGN REVISIONS(100%) The Consultant shall revise the 100% Design Plans, Quantities, and Estimates for review and approval by the City and will be reflected in the 100% design submittal (WE 18). All design plans and documents will be signed by a licensed professional engineer in the State of Washington. 27.1 Consultant will revise the Design Plans for review and approval by the City. The 100%submittal will include all design revisions and comments received from the 60% review. The estimated sheets to be revised are the following: u 1 Typical Sections u 2 Roadway Details ❑ 4 Site Preparation Plans and TESC Plans ❑ 4 Roadway Plans ❑ 4 Drainage Plan and Profiles ❑ 4 Concrete Panel Plan ❑ 4 Flowline and Sidewalk Layout Plan ❑ 4 Water Plans and Profiles ❑ 2 Sewer Plan and Profiles ❑ 9 Signalization, Illumination Plans and Details a 1 One Line Notes ❑ 5 Urban Design Plans and Details a 5 Landscape Plans and Details ❑ 5 Irrigation Plans and Details ❑ 6 Channelization and Signing Plans Total: 60 Sheets 27.2 Consultant will revise quantities and cost estimates in support of the 100% Design changes. City of Renton Wells/Williams Conversion Project(CAG 17-149) SUPPLEMENT 3—DESIGN REVISIONS KPG Project Number: 16125 3 Feb,2019 Work Element 27 Deliverables: • All revisions to the Plans, Quantities, and Estimates will be included in the 100% Deliverable in WE 18. ADDITIONAL SERVICES The City may require additional services of the Consultant. The scope of these services will be determined based on the unanticipated project needs or other considerations at the sole discretion of the City. These services will be authorized under a future contract supplement if necessary. At the time these services are required, the Consultant shall provide a detailed scope of work and an estimate of costs. The Consultant shall not proceed with the work until the City has authorized the work and issued a notice to proceed. City of Renton Wells/Williams Conversion Project(CAG 17-149) SUPPLEMENT 3—DESIGN REVISIONS KPG Project Number: 16125 4 Feb,2019 F 888 8 88 8 x 's a 3 N iffi e 0 a e _ ::: 1 aQ 1 I �R $-_, ' 11 VII! E gcii 1 8 . I ; ;' M 1 !JilliJI 4O M t 8 aF i N. .�' ..« O N P fli: I ! s awww. o. M, a � Es r m $$ y. g i a - o U ES ,. Ill W:. W O O 4 N 0 - s a` z S" u C U ii i'l 0 i Oe C ; � W : varb F is822, j 0.o l I f U hOU2.aLL ,.yy[ a O ; as w U p K-1 l a Q % t N N N g tV�l w E v a Y o T LL w LT r 8 8 88 888888 888 888 8 08 g W 1 `wBSN'� 'B�,fNEmmm�c'_ 8w ' �m < o N `N iYp $ ♦ o m m Q LL O w[V 1� -M-N M s �R� �$ m IH w H w H w w w H w w H w H w w w H w w H w w w w w H w H w H w w M M: aQ1 1 NE,4, .a. aNN N N & i y t c o CN 8 Uf F 8 I r - a M ifliHJi ! N ,g'1 1 ! - � N: F F ' M il1gIF' 8 w i x° w a N w 8 N m lV Q m °° Np 0�O N m lbw rym� N N I qo a .. u ai rA 8 i k t - N N N N m n O C 8. 1gt m e- rD m N N c0 Y O O p O S a3 4 w. k I 8 g €1 c o 4 N s oF,,ao;2ooia a mma �_ g 33 -F� o "-g UN_`m -aoo 9 _ i o O LL 33 43 w y 2 H U S m Q d U t I x N p $N g w E p 3' ffi m N v Um m y c 2 d m R g f f 5 <pZrg t@ U C O O Z F=W f F p U p a � � w U =f cTica7 w a ll a`Y o N w w w w LL S It $ $ e Oo II 1 I w t' flj ma T E o u 8'-. r y coa: u 1131Db "1-£ iK 6 c g v E g c U t�8 ° 5 its, 1^ W b a $ Ut aS Q «' 8cw sW k2 f a� pt 5 H y ., a cc 1-1 4 a. 1 P' ik L.,m` 4 » k k 8 8 c II N c i a` N s 2 p O v F 1 F U t f i O V N H 3 U m W a - c v f s E Q 7 2 o t u 2 co .' Q S .ita x'z2�a w W a O a X G w w February 21,2019 Keith Woolley City of Renton Public Works—5th Floor 1055 5 Grady Way Renton, WA 98057 Re: KPG Project Team Commitment—Houser Way/BNSF Complete Streets Dear Mr.Woolley: KPG is committing for the duration of the project the discipline leads listed below. These professionals will not be replaced without advance notification and subsequent authorization from the City. Employees Title Sessyle Asato QA/QC Manager Jason Fritzler Project Manager Olivia Paraschiv Engineering Lead Kirk Smith Stormwater Lead Ray Edralin Stormwater Engineer Jan Ciganik Signal/Illumination/ITS Lead Elizabeth Gibson Landscape/Irrigation Lead Phuong Nguyen Urban Design Lead Coreen Schmidt LA Hidemi Tsuru Signal/Lighting Engineer George Hilen Lighting Engineer Justin Wu Roadway Engineer Judy Johnson Landscape Tech Danielle Winklemann Admin Terri Simms Admin Michelle Torres Admin Vonnie Stockman CAD Tech Daniel Clark CM Lead Sincerely, Jason Fritzler, PM KPG Exhibit D W Department�State $ 310TransportationMePark Beading portatbn 310 Maple Park Avenue S.E. P.O.Box 47300 Olympia,WA 98504-7300 360-705-7000 TTY:1-800-833-6388 www.wsdotwa.gov April 19, 2018 KPG, P.S. 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 Subject: Acceptance FYE 2017 ICR—Risk Assessment Review Dear Ms. Suzy Rowe: Based on Washington State Department of Transportation's (WSDOT) Risk Assessment review of your Indirect Cost Rate (ICR), we have accepted your proposed FYE 2017 ICR of 146.70%. These rates are applicable to Washington Local Agency Contracts only.These rates may be subject to additional review if considered necessary by WSDOT. Your ICR must be updated on an annual basis. Costs billed to agreements/contracts will still be subject to audit of actual costs, based on the terms and conditions of the respective agreement/contract. This was not a cognizant review. Any other entity contracting with your firm is responsible for determining the acceptability of the ICR. If you have any questions,feel free to contact our office at(360) 705-7019 or via email consultantrates@wsdot.wa,gov. Regards; Janson, Erik �- — Apr 20 2018 8:02 AM cosign ERIK K. JONSON Manager, Consultant Services Office EKJ:kms Acceptance ICR Audit Office Review Exhibit D Project Name: Wells and Williams Ave Conversion Project Consultant: KPG,Inc. Consultant fee calculation worksheet Appendix 31.77 Rate Weight Value Degree of Risk The degree of risk for this project is: above average 25 0.32 8.00 Weight from 0.17 to 0.35,0.35 being riskiest Relative Difficulty of Work The difficulty of work for this project is: above average 20 0.32 6.40 Weight from 0.17 to 0.35,0.35 being most difficult Size of Job $ 600,000.00 <100,000=0.35 15 0.32 4.80 100,000-5,000,000 proportionate from 0.34 to 0.21 5,000,000 -10,000,000-proportionate from 0.21 to 0.17 Period of Performance >24 months=0.35 12 months 2-24 months proportionate from 0.17 to 0.35 15 0.25 3.75 <2 months=0.17 Assistance by the Agency The amount of assistance from the agency is: Few items provided 15 0.35 5.25 rate from 0.17 to 0.35,0.35 being few items provided Sub-Consulting 10 0.22 2.20 10%of cost >40%=0.35 0-40%proportionate from 0.17 to 0.35 0%=0.17 Total 30.40 Fraction,rounded to two digits 0.3