WATER PLAN GENERAL NOTES Standard Plan Nm 300
1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CRY OF RENTON PUBLIC WORKS
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSDOT J APWA STANDARD SPECIFICATIONS, LATEST EDITION AS
AMENDED BY THE CTTY OF RENTON. A SET OF CITY APPROVED PLANS SHALL BE KEPT AT THE SOB SETS WHENEVER CONSTRUCTION
15 IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE ODNTRACTOR
AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION.
2. ALL EXISTING UlI:LITIESSHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL
CALL 1-800-424-5555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION.
3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMEN75 SHALL BE NEW AND UNDAMAGED, AND
"CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN WRITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY
MATERIALS ON -SITE.
4. AiL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINED )DUCTILE IRON PIPE, THICKNESS CLASS52 PER AWWA C 151AND C
104. PIPE JOINTS SHALL BE PUSH -ON OR MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS250AS
PER ANSI/AWWA C110/A21.104M ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH B-MIL BLACK, TURF TYPE,
POLYETHYLENE PLASTIC PER AWWA C105 STANDARDS.
5. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES FOR PIPE DIAMETER OF CINCH OR LESS
AND 48 INCHES FOR PIPE DIAMETER OF 12-INCH AND LARGER. MAXI MUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES.
ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILITY CONFLICTS OCCUR,
THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER
PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALL TRENCH
BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST
METHOD {(MDD) IN ROADWAYS ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND85 PERCENT MDR IN UNPAVED
AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MDT].
6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PLACE IN ACCORDANCE WITH CFFY OF
RENTON STANDARD DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, FITTINGS
AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAYBE REQUIRED ON ALL MECHANICALJOINTS IN ADDITION TO
CONCRETE BLOCKING.
7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR TO BEING FLUSHED,
DISINFECTED, AND TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE
SUPERVISION OF A CITY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND REMOVE PLUGS,
CORPORATION STOPS, BLOW -OFF ASSEMBLIES, AND THRUST RESTRAINT / BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO
CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW WET -TAP VALVE TO AN E KunNG MAIN UNTIE
THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINF€CTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITY TESTING.
8. NEW WATER MAINS INCLUDING SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF 150 PSI ABOVE WORKING
PRESSURE WITH A MINIMUM OF Z25 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING
THE ENTIRE TEST PERIOD. UPON SATESFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED,
AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BY THE PUBLIC WORKS INSPECTOR.
9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING
DAYS PRIOR TO MAKING CONNECTIONS TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL EKPOSE THE EX{ISTINGi WATER
MAIN AND FTT7ING5 AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR
THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND
ALL MATERIALS "UIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE JEX STING WATER SYSTEM. THE
CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION.
STD. PLAN — 300.0
+ dR
+ DEPARTMENTNT PUBLIC WORKSWATER PLAN GENERAL NOTES
MARCH 2010
ASBUILT WATER NOTES AND DETAILS
FOR
ALL UlM AT TIFFANY PARK
PTN OF THE W1/2 & SE1/4 OF THE SE1/4 AND PTN OF THE NE1/4, OF THE SW1/4 OF SEC. 21,
TWP. 23 N., RGE 5 EAST, W. M. CITY OF RENTON KING COUNTY STATE OF WASHINGTON
FIRE HYDRANT SHALL BE COREY-TYPE EQUAL TO IOWA F-5110 OR
COMPRESSION TYPE SUCH AS CLOW MEDALLION; M & H 921�, MUELLER
SUPER CENTURION 200, AND WATEROUS PACER MTH 6" MECHANICAL
JOINT INLET WITH LUGS. 5-1/4" MAIN VALVE OPENING. TWO 2,-1/2"
HOSE CONNECTIONS NATIONAL STANDARD THREADS. 4" PUMPER
CONNECTION CITY OF SEATTI,E THREADS WIT#i A STORZ ADAPTOR,
4.875" SEATTLE THREAD X 5" S70RZ, ATTACHED WITH 1/8" STAINLESS
STEEL CABLE_ 1-1/4" PENTAGON OPERATING NUT. FIRE HYDRANT TO
BE PAINTED WITH TWO COATS OF PAINT. KELLY-MOORE/PRESERVATIIIE
PAINT No. 5780-563 DTM ACRYLIC GLOSS. SAFETY YELLOW DR
APPROVED Ei�UAI_- PUMPER CONNECTION TO FACE ROADWAY OR AS
DIRECTI`D BY RENTON FIRE DEPARTMENT. FIRE HYDRANT EXTENSION TO
BE USED IF REQUIRED.
MIN, 1S" TO 20" BEHIND BACK OF
CURB OR 12" BEHIND BACK OF
3' SIDEWALK THAT IS ADJACENT TO
CURB
x 5" STOR7
\�y 5'x5'x8" THICK CONCRETE PAD AROUND
HYDRANT. FINISH TO MATCH SIDEWALK.
EXPANSION JOINT AT
1., BAOIf OF SIDEWALK
—CJDORNPLANTING STRIP K
CONGRET>r �
THRUST 81.00K
16" x S` x 4" MININUM
CONCRETE BEARING
BLOCK UNDER HYDRANT
36" MIN
COVER
/--- TWO—PIECE CAST IRON VALVE BOX WITH LUG
TYPE COVER. EQUAL TO OLYMPIC FOUNDRY CO.
STANDARD 8" TOP SECTION WITH REGULAR BASE
SECTION LENGTH TO FIT. VALVE NUT EXTENSION
A$ REQUIRED_
RAISED PAvEmEN7 MARKER TYPE 88-A
STIMSONITE TWO-WAY BLUE REFLECTIVE
CONCRETE BLOCKING
1 MAIN LINE TEE. WITH 5" FLANGE SIDE OUTLET.
6" GATE VALVE (FL X W) AWWA C-509. RESILIENT SEAT
& DUCTILE IRON PIPE, CLASS 52 CEMENT LINED, LENGTH TO FIT
2-3/4" COR-TEN STEEL TIE RODS.
1/2 YARD OF 1-1/4" WASHED DRAIN ROCK
V ABOVE BOOT FLANGE. PLACE 8 MIL
POLYETHYLENE FILM AROUND TOP AND SIDES OF
GRAVEL.
FIRE HYDRANT ASSEMBLY
LEVEL ALL GREfUND
MIN 3' RADIUS
b" CONCRETE PAD
ONE MAN ROCK -
1
LEVEL ALL GROUND
MIN 3RADIUS
0
6" CONCRETE PAD
CUT FILL
HYDRANT LOCATION IN CUT OFF FILL
AN$ PUBLIC WORKS FIRE HYDRANT ASSEMBLY PLAN — 310.1
+ =�� + DEPARTMENT
MARCH 2010
2 REVISED PER CITY COMMENT BK 1/20/1
1 ASBUILT BK 11/2/11
NO. REVISION BY DATE
SURVEYED:
BCE
DESIGNED:
BJT
BJT DRAWN:
RAG
BJT —CHECKED-
RAG
APPROVED:
APPR
BJT
SCALE:
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
2" BEEHIVE STRA
CUT DPENING AS REQUIRED,
AFTER INSTALLATION, GROUT
AROUND PIPE.
18"
INSTALL-
1 - 2"Xl" REDUCER
2 - 2" 90' BENDS AS
SMANG JOINT
NOTE:
2" OPEN PATTERN, RETURN BEND - 180"
2" GALVANIZED IRON PIPE FIELD
LDCATE
6"
1" CLOSE NIPPLE
1" UNION
t" NIPPLE 7
17 60" PLASTIC METER BOX EQUAL TO MID STATES
PLASTIC, BCF SERIES 1730-18 WITH 2" THICK DUCTILE
IRON DIAMOND PLATE. 15"x31" MSCBC 173OR
o
0 ° O 4v.pd
12" MIN.
1" GALVANIZED IRON
PIPE TO FIT
t go, ELBOW
1" TYPE "K" SOFT COPPER TUBING
1" COMBINATION AIR RELEASE & VACUUM VALVE,
SCREWED. APCO NO, 143C OR EQUAL -
WASHED GRAVEL, PASSING 1-1/2" AND RETAINED ON
1/47 MESH FOR DRAIN
AIR ANO VACUUM RELEASE VALVE ASSEMBLY SHALL BE
INSTALLED AT HIGHEST POINT OF LINE. IF HIGH POINT FALLS
IN A LOCATION WHERE ASSEMBLY CANNOT BE INSTALLED,
PROVIDE ADDITIONAL DEPTH OF LINE TO CREATE A HI:GH
POINT AT A LOCATION WHERE ASSEMBLY CAN BE INSTALLED.
LOCATE ARE —VACUUM METER BOX OUTSIDE OF TRAFFIC
AREAS, IN PLANTING STRIPS, BEHIND CURB OR SIDEWALK.
t" BRONZE GATE VALVE, SCREW EQUAL
TO RED -WHITE VALVE CORP. FIG N0.280
COUPLING COPPER 70 MALE IRON.
PIPE -FORD C28-44 OR EQUAL
2" RESILIENT SEAT OATS VALVE
WITH THREADED ENDS
2" BRASS NIPPLE -- 6" LONG
(MIPT X MIPT)
2" iRON PIPE THREAD CORPORATION STOP WITH
90' BEND FOR COPPER. FORD TYPE F1000 PACK
AUNT CTS.
DOUDLE STRAP SERVICE CLAMP WITH
2" IPS TAP TO FIT, EQUAL TO MEULLER CO.
2"x1" BRASS BUSHING
PUBLIC WORKS 1" AIR & VACUUM RELEASE STD. PLAN — 340.3
+ + DEPARTMENT ASSEMBLY
MARCH 2010
VERTICAL: NAVD 1983
HORIZONTAL: NAD 1983/1991
DATUM
Cl01
TY OF
RENTON
Plonning/Building/Public Works Dept.
CITY OF RENTON
E�)EPAF917MENT OF= PUBLIC WORKS
APPROVED BY
APPROVED BY
APPROVED BY
APPROVED BY
Moir 0! 0'.
'411423
SIONA L
3-1-/2-0/2-01
2
(/l
0LLJ
U
I—
Z >
O
N
Z LLI
c/1
J
a J
LLJ
z
x
Z
LLJ
N
<
Lj
J Z
Q
I�
O
N
N
N
00
U
Z
00
N
ILO
r-
00
>
w
Z
CN
Q
I
I
w
L,J
In
In
Z
3 Z
Ln
~
N
In
N
Lr)
Z —
W
N
00
Z
LLJ
N
N
J a-
N
1 °
J 2
Q L7
Z
DATE = W
DATE V� A
71
DATE b� 5 N
0 CO
DATE
WATER NOTES AND DETAILS D 1 /20/2018
ASBUILT — ALLURA AT TIFFANY PARK FIELDBOOK
PAGE:
MAINVUE WA, LLC DRAWING N0:
1110112TH AVE NE, SUITE 202
BELLEVUE, WA 98004 SHEET w� OF: wf