Loading...
HomeMy WebLinkAboutCO 4 - CAG-18-237, CO #4-19 CITY OF RENTON Community Services Department CONTRACT CHANGE ORDER AGREEMENT 326.1019 CONTRACT: City of Renton CAG-18-237 CONTRACTOR: All Play Systems,LLC. CHANGE ORDER: No.4 SUMMARY OF PROPOSED CHANGE: Reason/Justification: ......... Change in the scope of work: 1.)Change Spin-Max-Tower to Spin N Stand,2.)change from 180 to 203 cy.of EWF material,and 3.)Change in drainage work to existing inlet. DESCRIPTION: Item Qty. Description Unit Price , Amount No. w/WSSI ......_ . 1 1 Deduct-Change Spin-Max Tower to Stand N Spin $ (2,153.36) $ (2,368.70) 2 1 Add i Change from 180 cy.To 203 cy.IMF material $ 1, $ 2,000.11818.28...._. 3 1 Deduct,Change drainage work to exist.drain inlet. $ (2 634.00) $ (2,897.40) ., Total this Change Order: $ (3,265.99) ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT(WI WSST) AMOUNT THIS ORDER(W/WSST) TOTAL AFTER CHANGE $ 152,282.69 1 $ 181,719.79 $ (3,265.99) $ 178,453.80 1 Additional Calendar Days: Extension of Time 30 Calendar Days,Completion Date is April 30,2019. The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. SIGNATURES: -,,'7%t. . /... Contractor: Date: Project Manager* Date 5/27/e2Of? Approved By: / /.4e, ,..II I P if Date:j/ S)//? (CC`mr,nily.f.,ervire5 Administ,atur) • Alan Wyatt From: Jeff Hansen <jeff@allplaysystems.com> Sent: Monday, March 25, 2019 4:47 PM To: Alan Wyatt Cc: 'Becky Spiker' Subject: Teasdale Park final invoice Attachments: City of Renton - Teasdale Park final .pdf; Teasdale Park change orders.pdf Alan, Please see the itemized quotation and separate change order itemization for Teasdale Park. Becky will send you an invoice for the new total of$178,453.80 less 5% retainage. Let me know if you have any questions or need further clarification.Thank you Original Contract $152,282.69 Change order 10.00 Change order 2 $29,437.10 Total contract $181,719.79 Change from Spin-Max-tower to Enclosed Stand N Spin ( -2,153.36) Change from 180 to 203 cubic yards of EWF w Blow-in ( +1,818.28) Change to drainage work due !low!.dscovery of catch basin (-2,634.00) Total Net changes -2,969.08 x . $3,265.99 deduction $181,719.79 less $3,265.99 = $178,453.80 Final contract amount Jeff Hansen, CPSI 425.766.7822 .Ittt-y�Systra�, LLC B 1 ju,m, t#. A 98382 Fax ,teya;;ba �yt, torn Allplay Systems, LLC PO Box 1886 Sequim, WA 98382 Phone: 425.766,7822 Fax: 888,655.6412 jeff allp 'Lsys ms.cor Qu ray www.atipitlysystems.40rn Teasdale Park change orders and adjustments Original Contract$152,282.69 Change order 1 0.00 Change order 2 $29,437.10 Total contract $181,719.79 Change from Spin-Max-tower to Enclosed Stand N Spin ( -2,153.36) Change from 180 to 203 cubic yards of EWF w Blow-in ( +1,818.28) Change to drainage work due to discovery of catch basin (-2,634.00) Total Net changes-2,969.08 x 1.10 = $3,265.99 deduction $181,719.79 less $3,265.99 = $178,453.80 Final contract amount ��g z� AllPlay Systems, LLC • P.O. Box 1886 Quotation '' E °' Sequim, WA 98382 • Toll Free: 888.531.4881 Jeff Hansen Fax: 888.655.6412 (425)766-7822 Our ;;�. aY Email: jeff®allplaysystems.com Project: City of Renton -Teasdale Park Date: 8/27/2018 City of Renton Teasdale Park 1055 S Grady Way j 601 S 23rd St Renton,WA, 98057 Renton,WA, 98055 I Contact: Alan Wyatt Contact: Shelly Haynie Phone: 425-430-6571 !Phone: 360-556-3552 'Email: awyatt®rentonwa.gov [Email: Josh®cascademiniexcavating.com _ a This quote and purchase will be administered in accordance with the terms of NASPO ValuePoint Master Agreement #6479,executed 12/1/2016. The customer is responsible for final quantity count and unloading of freight at site, Playcraft Custom 2 to 5 age structure PR#R5ODAA4BA 1 $32,561 85 $32,561.85 Playcraft Revolution Hybrid 5 to 12 age structure, R5H649D6A I 1 $37,106.821 $37,106.82 IPlaycraft PC2474 Enclosed Stand N Spin 1 $2,003.00' $2,003.00 Playcraft PC2181-8, 8'single post swing 1 $1,221.001 $1,221.001 Playcraft PC2192-1 Swing Arm Attachment with full bucket seat 1 $740.30 $740.301 NASPO NASPO Washington State Contract Discount(12%) 1 -$8,835.961 -$8,835.96 LPlaycraft Material Playcraft Freight to sitencrease Surcharge ^mm 1 $1,600 OO4 41 $1,600.001 Zeager Brc 180 cubic yards of EWF with Blow-in Service t 1 $16,048.28i $16,048.28' CME Demo and Disposal of existing EWF and play equipment I 1 $17,780.00` $17,780.00 CME Installation of Play equipment i 1 $24,640 00 $24,640 00 CME Unload freight, provide and spread fabric, dispose pkg 1 $4,580 001 $4,580 001 ICME 320'feet of construction fencing w delivery Et pick up 1 $935.001 $935.00 Callis Ins Performance Bond i 1 $4,290 00 $4,290.001 _ Playcraft 2 to 5 age appropriate sign HDPE A2-1302 I 1 $654.001 $654.00 Playcraft 5 to 12 age appropriate sign HDPE A2-1303 ----t 1 $654 00; $654.00 NASPO NASPO Washington State Contract Discount(12%) t -$156.96! -$156.96( Superior Extra Excavation and grading work $10,487.00; $10,487.00North Star Provide, lay drain pipe and drain rock, fabric $13,640.00 $13,640 00; , E______ , 1 --,- _.... __,.r_ Page 1 of 2 .___ ._� y.4 ................,w.....,1.,.......-._..,. - 1{ ....,_.....i_ i ,.. .........._ ........,.i Additional Info: Subtotal $162,230.73 Tax10.0% $16,223.07 Total $178,453.80 Sincerely, Jeff Hansen Accepted By: (425) 766-7822 jeff@allplaysystems.com Date: Page 2 of 2